0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
14 tayangan2 halaman
Power layouts: 1-disconntion time schedule not submitted as mension in drawing notes. 2-short circuit calculations to be submitted for review with SLD. 3-setting out plan to be sumbitted,SU2 power cabling layouts to be submitted. 4-consider the irrigation electrical load in SLD,and second sump pump for bigger swell tank to be added with aproper KW load estimation. 5-same reting for spare CB's to be provided as per 7.8.
Power layouts: 1-disconntion time schedule not submitted as mension in drawing notes. 2-short circuit calculations to be submitted for review with SLD. 3-setting out plan to be sumbitted,SU2 power cabling layouts to be submitted. 4-consider the irrigation electrical load in SLD,and second sump pump for bigger swell tank to be added with aproper KW load estimation. 5-same reting for spare CB's to be provided as per 7.8.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai TXT, PDF, TXT atau baca online dari Scribd
Power layouts: 1-disconntion time schedule not submitted as mension in drawing notes. 2-short circuit calculations to be submitted for review with SLD. 3-setting out plan to be sumbitted,SU2 power cabling layouts to be submitted. 4-consider the irrigation electrical load in SLD,and second sump pump for bigger swell tank to be added with aproper KW load estimation. 5-same reting for spare CB's to be provided as per 7.8.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai TXT, PDF, TXT atau baca online dari Scribd
-------------------------------------------- power layouts: 1-disconntion time schedule not submitted as mension in drawing notes. 2-short circuit calculations to be submitted for review with SLD. 3-setting out plan to be sumbitted,SU2 power cabling layouts to be submitted,Ele ctrical rooms no's to be the same for nearest LV room. 4-consider the irrigation electrical load in SLD,and second sump pump for bigger swell tank to be added with aproper KW load estimation. 5-same reting for spare CB's to be provided as per 7.8.17 -electricity wiring re gulation. 6-very important missing affected current carring factor to be consider for cabl e size and voltage drop calculations as per appendixes A7(a)-A7(h) -electricity wiring regulation & as per c.1.4.18 -volume 1-MEP RPS spec's and resubmit it by details in tables. 7-DB spare to be added ,u have 14ways. 8-location of LV panels to be mentioned in SLD's. 9-power factor to be corrected to 0.93 not 0.85 as mention in notes. 10-follow the ADDC & project spec's. 11-lux calculation to be submitted then the no's of ex.light to be decided. 12-follow C.1.4.13-volume 1-RPS. 13-space of electrical room is subject to ADDC approval. 14-SU2,3 power layouts not submitted. 15-seperate the telephone submittal than power layouts submittals. 16-PDF files for load schedual not clear enough to review,submitted properly. 17-units feeded from SMDB12 to be fed from LV panels in LV room 1 to reduce the no of ducts in conjusted areas like section B-B it will be 3 layers instead of 4 layers & 3 main cables will cancelled from section C-C. 18-merging proposa 19-another duty water pump to be consider. 20-all mechnical equipments to be protected as per the ...... 21-TN-s to provided as per RPS .... 22-load scheduals to be as per the approved mechanical materials. 23-variation is rejected for DUCTS as per RSB regulation clause no:7.5.8. 24-manholes details to be submitted for all differant cases . 25-cables routing under ground in ducts to be at least 600mm not 300mm as shown in section B-B beside the footing and coordinate . 26-submit the coordination drawings after involoved the previous comments. 27-cables to be submitted as LSF material. 28-provide the approved supported document from authorities for the selected div ersity factors. 29-consider the heavy truck as per page 15-item 4.1 in outline RPS spec's to con firm the duct class by supported calculations. 30-all outgoing SMDB cables to be LSF type as per RPS spec's no C.1.4.15/16/18 - vol 1. 31-variation is rejected for bus coupler as per RSB regulation clause no:7.9.5 32-DB comments: b-spare ways to be added for power section. c-power section to be protected as per table no A5(m). d-all final circuits cables to be LSF type. 33-voltage surge protection to be provided as per RPS regulation no C.1.4.25/14. 34-requested sections to be submitted as per located in drawing no.. 35-coordinate with other services. 36-irrigation system not included in electrical shop drawing,to be considered. 37-coordinate with infrastructre contractor/drawings . 38-all materials to be submitted. 39-diversity factor to be clarify C.1.4.16/13. 40-submit repeation for typical factory unit DB to be removed. 41-load schedual for each LV panel's to be submitted sepertaly. 42-table no A5(m) to be applied for landlord SMDB's and factory unit typical DB. 43-LV panels dimenstion is subject to the shopdrawings & panels approval. 44-submit capbank. 45-20% spare to be added for factory unit DB as per RPS spec's C.1.4.16 46-unify the symbol of duct for all whole length. 47-Pf to be improved to 0.93 but not 0.85 as stated in SLD notes. 48-disconntion time data not submitted. 49-supply of emergency light to be indicated in drawing and load scheduals. 50-follow the metering 51-routing of type B is rejected,follow the same concept for other types. 52-cap banks to be beside it's LV Panel,and rearrange. 53-cables entris details to be submitted for the electrical rooms in trenches. 54-coordinate with etisalat authority for approval. 55-previous drawings comments are valid where applicable . 56-complaince statments for bms 57-complaince statments for telephone a-pull boxes to be installled,its apart from the containment system. b-provide concrete duct for crossing road as per etislate where appliaca ble. c-earthing for MDF is a part from earthing system as per C30.4 Rps spec' s d-coordinate with infrastructure contractor/drawings. 58-spacing between cables not mentioned in drawing. 59-SLD for SU2 not typical of SU1 to be modified according to diffrenct location of pumps rooms. 60-all whole length for cables to be ducted by class 10. 61-incoming supply intake from infrastructure drawing is differant than used in distribution voltage used in calculation,previously commented ,contractor has ap ply it. 62-at least 300mm spacing to be in section B-B between main cables and distribut ed cables to allow handling the cables by decreasing the spacing between cables. 63-section (c-c) & (b-b)are wrong to be corrected . 64-manholes to be installed to allow 8D bending radius for all cables. 65-manholes to be installed next to Electrical room 1,2 to entering the main cab les easily,cable ladder by layers to be installed at electrical rooms trenshs. 66-maholes location to be avoid the entrance of industrial units. 67-additional manhole required to be installed at (B-01). 68-based on letter no:.....Diversity factor approved subject to ADDC. 69-details to be provided for entries of cables for both electrical rooms provid ing cable ladders by layers.