perwatan perakitan a b c
bop dianggran 60,000 100,000 800,000 500,000 330,000
produksi 180,000 220,000
jamkerja 110,000 57,000 36,000
jam perawatan 1,000 100 1,500 5,500 2,000
jam mesin 800 4,000 5,600 4,800 5,200
bop
a 7
b 3
c 2