In VIKNAtech Engineering Sdn. Bhd., we have wide and in-depth know-how


and knowledge in design, engineering and project management of Palm Oil Mills,
Kernel Crushing Plants, Palm Oil Refinery and Bulking Installation. We have
combined together the experience of notable human resources on the
construction and design of mills throughout South East Asia inclusive of India.
Our Engineers have considerable experience operating in Indonesian
environment.

VIKNAtech will continue to upgrade its team with proven specialists.

VIKNAtech also has the design capabilities and experienced staff equipped with
advanced engineering software to undertake various type of argo-based
processing plant. The firm has established good working relationship with foreign
companies in sourcing technology and equipment for various argo-based
industries plus we have technology partners in India, Australia and China.

VIKNAtech is also well supported by experts in providing innovative and


optimum engineering solutions on industrial wastewater treatment plant and
environmental issues.
VIKNAtech

2. COMPANY DATA

1. Name of Company : VIKNAtech Engineering Sdn. Bhd.

2. Company Number : 571725-V

3. Office Address : No. 5-1A, Jalan Bandar 10,


Pusat Bandar Puchong,
47100 Puchong,
Selangor Darul Ehsan,
Malaysia

4. Telephone : +603-58827401

5. Fax : +603-58827419

6. Email Address : MKMAHEN@PD.JARING.MY

7. Year Incorporated : Mac 2002

8. Scope of works : Consultancy on Design, Engineering and Project


Management of Palm Oil Mills, Kernel Crushing
Plant, Palm Oil Refineries and Bulking Installations.

: Design, Engineering and Construction of Biomass


Power Plant using Palm Oil Mill Waste.

: Consultancy on Design, Engineering and Project


Management of other Agro based processing
factories such as Rice mill, Sugar mill, Coconut
crushing plant, etc.

: Design and Consultancy of Industrial Waste Water


Treatment Plant.

: Process and Engineering Auditing of Palm Oil Mills,


Assessment Upgrading and Extension of existing
factories and Re-engineering of process for higher
efficiencies and lower production costs.

9. Company Secretary : Back-Office Corporate Services Sdn. Bhd.

10. Banker : Affin Bank Berhad, Puchong Branch, Selangor, Malaysia.


: Citibank Berhad, Puchong Branch, Selangor, Malaysia
VIKNAtech

3. MANAGEMENT TEAM

NAME DESIGNATION
EXPERIENCE

Fauzy Abdullah Chairman 30 years

Ir. K. Mahenthiran Director 12 years

C. F. Chooi Technical Director 37 years

R. Sivanesan Business Development Director 25 years

Chiang Sin Kong Senior Project Manager 32 years

P. Krishnakumar Civil Engineer 10 years

Ir. Tan Kiat Poh Electrical Engineer 25 years

T. Thanaraj Project Manager 10 years

Tamil Selvan Site Engineer 20 years

Ab. Rahman B. Mohd Noor Executive, Technical/Design 20 years

Zainon Bt. Lani Senior Draughtswoman (civil) 16 years


VIKNAtech

4. COMPLETED CONTRACTS

4.1 P.T. Sungai Rangit Palm Oil Mill, Kalimantan, Indonesia.

a. Owner : P.T. Sumber Mitra Jaya Group


B. Scope of work : Design and Project Management.

4.2 Design of 10 TPH and 20 TPH Palm oil Mill at Ketapang, Kalimantan,
Indonesia for Golden Hope Plantation Sdn Bhd. (vertical sterilizer)

a. Turnkey Contractor: Mindo Palm Industrial Products Sdn Bhd / Felda Engineering
S/B.
b. Owner : Golden Hope Plantation Bhd.
c. Scope of works : Design and Drawings

4.3 Design of 30 TPH to 60 TPH (extension) Palm oil mill for Minanga
Ogan,
Palembang, Indonesia.

a. Turnkey Contractor: Mindo Palm Industrial Products Sdn. Bhd.


b. Owner : P.T. Perkebunan Minanga Ogan
C. Scope of work : Design and Drawings

4.4 45/90 TPH Palm Oil Mill for Korindo Group at Ashiki, Irian Jaya, Indonesia

a. Turnkey Contractor: Mindo-Trade Sdn. Bhd.


b. Owner : Korindo Group, Indonesia
c. Scope of work : Design and Project Management

4.5 10 TPH Palm Oil Mill for P.T. Surya Borneo Indah, Pontianak.
Turkey contractor - Mindo-Trade Sdn. Bhd.

A. Owner : P.T. Surya Borneo Indah


B. Scope of work : Design and Engineering

4.6 Upgrading of Acydesa Palm Oil Mill, Honduras, Latin America.

a. Main Contractor : Rajawali Seroja Sdn. Bhd.


b. Scope of work : Design and Drawings
VIKNAtech

4.7 Audit, assessment and improvement of OER at P.T. Kurnia Luwuk Sejati Palm Oil
Mill at Luwuk, Sulawesi, Indonesia.

a. Status : Achieved OER of 25% and KER of 5.5%

4.8 60/120/180 TPH Havys Palm Oil Mill at Daerah Bera, Pahang.

a. Owner : Havys Oil Mill Sdn Bhd


b. Scope of work : Design and Engineering.

4.9 Bulking Installation and Palm Oil Refinery at Johor Port, Pasir
Gudang, Johor.

a. Owner :Pacific oil and Fats Industries Sdn Bhd


(Pacific Inter-Link Sdn. Bhd.)
b. Scope of work : Design, Engineering and Project
Management

10. Upgrading of Syarikat Perusahaan Kelapa Sawit Sdn. Bhd.


(From 40 TPH to 80 TPH)

a. Owner : Bell Group Of Companies


b. Scope of work : Design and Engineering

4.11 Vegetable Oil Bulking Installation for PT. Sumatra Bulkers at Rengat,
Pekan Baru, Indonesia.

Owner : Felda-Johore Bulkers Sdn. Bhd.


a. Scope of work : Design and Drawings

4.12 Vegetable Oil Bulking Installation for PT. Kalimantan Bulkers at


Pontianak, Kalimantan, Indonesia.

Owner : Felda-Johore Bulkers Sdn. Bhd.


b. Scope of work : Design and Drawings

4.13 Extension of PT. Kurnia Luwuk Sejati Palm Oil Mill from 30TPH to 60
TPH at Luwuk, Sulawesi Tengah, Indonesia.

a. Owner : P.T. Kurnia Luwuk Sejati


b. Scope of work : Design and Drawings
VIKNAtech

4.14 50 – 100 TPH Palm Oil Mill At Chumpon, Thailand.

a. Owner : Vichitbhan Plantation Co. Ltd.


b. Scope of work : Design and Drawings

4.15 40 – 80 TPH Koong Shing Palm Oil Mill Sdn. Bhd. at Kunak, Tawau,
Sabah.

a. Owner : N. Y. Hiew (Holdings) Sdn. Bhd.


b. Scope of work : Design and Drawings

4.16 40 – 90 TPH Aumkar Palm Oil Mill at Ulu Tingkayu, Kunak, Tawau,
Sabah.

c. Owner : Manilal & Sons (Malaya) Sdn. Bhd.


d. Scope of work : Design and Drawings
VIKNAtech

5. CONTRACTS IN PROGRESS

5.1. 45 TPH ACE Palm Oil Mill at Keratong, Pahang.

a. Owner : ACE Agricultural Sdn. Berhad


b. Status : Commissioning

5.2. Extension of PT. Sungai Rangit Palm Oil Mill at Sukamara, Pengkalan
Bun, Kalimantan Tengah, Indonesia.

a. Owner : P.T. Sempoerna Agro


b. Status : Commissioning

5.3. 45-90 TPH Sook Oil Mill at Keningau, Sabah.

a. Owner : Sook Oil Mill Sdn. Bhd.


b. Status : Construction

5.4. 60-120 TPH Kwantas Oil Mill at Kinabatangan, Sabah.

a. Owner : Kwantas Berhad


b. Status : Tendering

5.5. 45–90 TPH Yuwang Palm Oil Mill at Ulu Tingkayu, Tawau, Sabah.

a. Owner : Yuwang Palm Oil Mill Sdn. Bhd.


b. Status : Approval

5.6. Constructing 30 Ton FFB/Hr Expandable To 60 Ton FFB/Hr Palm Oil Mill at
Pekan, Pahang.

a. Owner : Kurnia Setia Berhad


b. Status : Preliminaries

5.7. 45 Ton FFB/HR Palm Oil Mill with Capacity to be increased to 60 Ton
FFB/HR at Lahad Datu, Sabah.

a. Owner : SPC Biodiesel Sdn. Bhd.


b. Status : Preliminaries
VIKNAtech

5.8. Bulking Installation At Bagendang, Sampit, Indonesia

a. Owner : P.T. Agro Indomas


b. Status : Preliminaries
VIKNAtech

Name : Mohd Fauzy Abdullah

Position : Chairman

Academic Qualification - Masters in Agricultural Development Economics,


Australia National University, Canberra.

- Bachelor in Agricultural Science


(Honours 2 Upper), University of Malaya

Professional Experience

I. Government Sector

• MARDI : Head of Economic Research (1973-77)


• PORLA : Chief Economist (1978-82)

II. Banking Sector – BBMP Group (1982-1990)

• Bumiputra Merchant Bankers Berhad

Chief Economist & General Manager in charge of Corporate Finance and


Investment

• Bumiputra Lloyds Leasing Berhad

Executive Director – responsible for turnaround management of the Company

• BBM Securities Sdn. Bhd.

Executive Director – Set up the stock broking arm of the Group

• Bank Bumiputra Malaysia Berhad

Chief General Manager and a member of the Bank’s Executive Committee


(EXCO) in charge of the Bank’ Treasury, Investment Banking and
Commercial Banking Operations. The Bank’s Treasury operations, which
was in Excess of RM20 Billion covered both domestic and foreign branches in
London, New York, Tokyo, Hong Kong and Bahrain. In addition, he
VIKNAtech

supervised subsidiaries involved in Unit Trust, Trustee, Stockbroking and


Leasing.

III. Corporate Sector

• FIMA Group

Executive Director – participated in the management Buyout (MBO) of FIMA,


an agro-based conglomerate Involved in plantation, food processing, logistics
and capital market. Established Capital Corp. Securities, which after 3 years
of operation emerged as the Top Ten stockbroker in the country. Successfully
listed FIMA on the Main Board of KLSE with a market capitalization of RM1.0
Billion (1990-96).

• Capital Risk Management

Chief Straights – involved in corporate advisory and Research work for the
government and the private sector in Malaysia and Indonesia, particularly in
areas concerning Strategic planning, corporate finance, M&A, and industry
Studies (1997-present)

IV. Other Achievements

Fauzy had an illustrious career in the public service. He represented the


Government of Malaysia In the Food and Agriculture Organization (FAO) in Rome
and United Nation Center for Trade and Development (UNCTAD) in Geneva. He
was registered on the Panel of Experts of the International Trade Centre (ITC) of
UNCTAD and was a member on the technical committee of Rubber Producer
Council, Steering Committee for the setting up of a Malaysian Commodity
Exchange and Association Of Banks Malaysia. He was awarded a Research
Fellowship at the East-West Centre, Hawaii, USA.

In the corporate sector, Fauzy had held various directorship including in


Kumpulan FIMA Berhad, FIMA Metalbox Berhad (Chairman), Seng Hup Berhad
(Executive Chairman) and Mechmar Corporation Berhad (Director).
VIKNAtech

Name : Ir. Mahenthiran M. Kandasamy

Position : Director

Qualifications: -

♦ B. Eng. (Hons.) in Mechanical Engineering, University of Technology,


Malaysia (1991).

♦ Professional Engineer Registered with Board of Engineers (BEM), Malaysia.

Core Skills: -

Design and technical consultancy of palm oil mills, kernel crushing plant, palm oil
bulking installation and palm oil refinery. He also has vast experience of handling
projects in Indonesia.

Experience: -

♦ July 2001 – to date VIKNAtech Engineering Sdn. Bhd.

Position: Director / Consultant

Responsible to provide technical consultancy service for project undertaken by


the firm. List of projects handled as per in completed contract list.

♦ July 2000 – July 2001 Kai Peng Vessels Sdn. Bhd.

Position: Project Manager

Responsible for implementing two (2)


projects: -

 60/120 TPH Palm Oil Mill for Tabung


Haji Plantation Sdn. Bhd. in Riau,
Indonesia. (Partial contract)

 Implementation of 60 TPH, TRP Palm


Oil Mill at Taiping, Perak. (Kuala
Sidim Bhd)
VIKNAtech

♦ July 1998 – July 2000 Konsultan Proses Sdn. Bhd.

Position: Project Manager

Responsible for implementing following


Project: -

 Extension of 45 to 90 TPH for Tung


Hup Palm Oil Mill at Sandakan,
Sabah.

♦ March 1997 – June 1998 Konsultan Process Sdn. Bhd.

Position: Design Engineer

Project Involved: -

 Prolific Yield Oil Palm Mill (45mt


FFB/Hr) at Sandakan, Sabah

 Tung Hup Oil Palm Mill 45/90mt


FFB/Hr – 2nd line) at Sandakan, Sabah

 Oil Palm India Limited (20mt FFB/Hr)


at Kerala, India

 Sabah Land Development Board


(45/90mt FFB/Hr) Kunak Oil Palm Mill
at Kunak, Sabah

 Abedon Oil Palm Mill (30/60mt


FFB/Hr) at Sandakan, Sabah

 Abadi Mewah Oil Palm Mill (30/60mt


FFB/Hr) at Sandakan, Sabah

 Minat Teguh Oil Palm Mill


(45mtFFB/Hr) at Sandakan, Sabah
(IJM Plantation Sdn. Bhd.)

♦ Nov 1995 – Feb 1997 Mettube Sdn. Bhd.

Position: Production Engineer


VIKNAtech

 Totally responsible for my production


crew (150 personnel) in achieving
production targets based on 3
rotating shift.

 Planning and co-ordination of


manpower, machines and various
department activities to maximize
production output

 Provide technical support in


improving quality and productivity

 Provide technical support to tool


room operation

♦ June 1995 – Oct 1995 ALPS Electric (M) Sdn. Bhd.

Position: Production Engineer

 In-charge of tool room which


consisted of CNC and conventional
machines in making plastic mould
and press dies

 In-Charge of overall measuring


equipment control and calibration

 In-Charge of sectional ISO 9002


implementation committee

♦ June 1991 –
May 1995 Matsushita
Precision Industrial (M) Sdn. Bhd.

Position: Production Engineer

 In-Charge of tool room (machine


shop) which consisted of CNC and
conventional type machines in
making jigs and fixtures

 Directly involved in making of


Deflection Yoke winding mould
VIKNAtech

(CAD/CAM application). Attended 3


months training in Japan.

 In-Charge of jigs and fixtures design


group equipped with Micro Cadam
CAD system

 Involved in creating ideas, checking


and approving jigs and fixtures
design for new models

 In-charge of calibrating section,


which involved checking and follow-
up of all calibration activities (ISO
9002) requirements

 Managed all concerning activities


and report to Department Manager
(QCC, Technical Skill Competition,
etc.)
VIKNAtech

COURSES, SEMINARS & CONFERENCES ATTENDED: -

♦ Basic Management for Supervisor, Kuala Lumpur 1992

♦ QCC Leadership Workshop, NPC, Kuala Lumpur. 1992

♦ Seminar on CMM & CAD/CAM Applications in Reverse Engineering, UTM,


1993

♦ Sanno Manufacturing Management Course (Foundation), 1993

♦ Inspection and Measurement Task Rank B, Shah Alam, Selangor Darul


Ehsan. 1994

♦ Statistical Process Control, NPC, Kuala Lumpur, 1994

♦ Technical Seminar on Metrology and Calibration, Sisir, Singapore, 1994

♦ Effective Safety Management, Kuala Lumpur, 1995

♦ Introduction to PLC, Festo Sdn. Bhd., Kuala Lumpur, 1999

♦ Steam (Boiler) Engineer Course, Kuala Lumpur, 1999

PROFFESSIONAL MEMBERSHIP: -

♦ Registered as Professional Engineer with Board of Engineers, Malaysia.


(BEM)

♦ Corporate Member of Institution of Engineer, Malaysia. (IEM)


VIKNAtech

Name: C. F. CHOOI (F.I.C.E.)

Position: Technical Director

Working History: Director of Technical Services, 1998 – 2001 (Retired In


2001).
Group Engineer, 1974 – 1997.
Palm Oil Mill Manager/Engineer, 1964 – 1974.
Power Station Shift Charge Engineer, 1962–1964.

Last Position Held: Director of Technical Services, Boustead Holdings Bhd.

Responsibilities:

1. Responsible for the management control of the Boustead’s own palm oil
mills (7 Mills), And Client- Mills under the Management of Boustead Estate
Agency Sdn. Bhd.

Clients Amongst Others, Included Perbadanan Ladang-Ladang Tabung


Haji, Tradewinds, J.C. Chang, Kuala Sidim, Sarawak Land Consolidation And
Rehabilitation Authority, Melewar Properties, Tai Tak Plantations, Johore
Tenggara Oil Palms, Pacific Cocoa (Lam Soon), Highlands and Lowlands,
Pertubuhan Peladang Negeri Johore, and Sabah Rubber Fund Board.

2. Provides Specialist Design and Project Consultancy Services


on Palm Oil Mills, Rubber Factories and Oil Bulking Stations,
both for Own Company and Client Companies. Under His
Tenure Of Group Engineer And Director, Technical Services,
He Undertook The Consultancy On The Design, Planning And
Construction Of More Than 30 Oil Mills, 3 Rubber Factories
And 2 Palm Oil Bulking Installations, For Boustead Holdings
And Other Plantation Companies Which Included Major
Companies Like Felda (Federal Land Development Authority,
Hap Seng Sdn Bhd, Asiatic Development, Kisaran Mill P.T.P.
VI Sumatra, I.O.I. Plantations, And Selumpur Mill And
Segamat Mill

3. Management, Process and Engineering Audits and Advisory


Visits to Oil Mills, Rubber Factories and Palm Oil Bulking
Installations. Outside Clients Under This Service Included
Felda, Tabung Haji, Tradewinds, J.C. Chang, Pacific Cocoa,
VIKNAtech

I.O.I., Felcra. Salcra, Highlands and Lowlands, Sabah Rubber


Fund Board, Selumpur Mill and Segamat Mill.

4. Overseeing the Preparation and Securing the Boards’ Approval on the Mills
and Factories Annual Budgets and Capital Works. The Capital Works Would
Be Implemented Under The Design And Control Of The Department Of The
Director, Technical Services.

Other Activities:

Active Member in the Technical Committees at MPOB (Then PORIM), As Well As


Being A Lecturer In The MPOB Mill Engineer Training Courses.

He Served For Many Years In The MAPA Technical Committees.


VIKNAtech

C. F. Chooi Held The Position Of Director, Technical Services, Boustead


Estates Agency Sdn. Bhd, Subsidiary Of Boustead Holdings Bhd From 1997 Until
His Retirement In 2001.

He Was The Group Engineer From 1974 To 1996 Before Being Appointed To The
Newly Created Post Of Director Technical Services In 1997.

During His Tenure of Service as the Group Engineer and Director Technical
Services, He Was In Direct Control of the Design, Planning, Implementation,
Project Management and Consultancies Of:

1. Highlands and Lowlands Bhd:

• Extensive Mill Expansion And Upgrading Works For All The H& L Bhd’s
• Five (5) Oil Mills from 1974 to 1984.
• 30 TPH Jabor Valley Mill, Tenggannu, In 1976.
• Pale Crepe Rubber Factory In Nilai, In 1974.
• Cocoa Bean Fermentary At Chersonese Estate in 1980.
• Cocoa Bean Fermentary At Torkington Estate in 1976.
• Management of Its 5 Oil Mills Up To 1985.

2. Perbadanan Ladang-Ladang Tabung Haji

• 30 TPH Bukit Lawiang Mill, Kluang in 1989.


• 30/60 TPH Sungei Tenegang Mill, Lahad Datu, Sabah, In 1991.
• 120 TPH Pulau Mill, Riau, Indonesia, In 2000.

3. Felda (Federal Land Development Authority, Malaysia).

• 60 T.P.H. Ulu Belitong Mill, Johore, In 1985.


• 60 Tons per Day Pasak Rubber Factory, Johore, In 1983.
• Technical Audit Visits (2 Visits per Year) On 20 Of Its Mills,
• From 1987 to 1990.

4. Bousteads Holdings Bhd:

• 30 TPH Bukit Mertajam Mill, Kulim, In 1974


• Malakoff Smr Factory, Padang Serai, Kedah, 1976.
• Kedah Palm Oil Bulking Installation, Butterworth, Penang, 1977.
• 30 Tph Telok Sengat Mill, Kulai, Johore, 1985.
• 30 Tph Nak Oil Mill, Sandakan, Sabah, 1980.
VIKNAtech

• 45 Tph Segamaha Oil Mill,Lahad Datu, 1996.


• 60 Tph Trong Palm Oil Mill, Trong, Perak, 2000.
• 60 TPH Denymarker Indahlestari Oil Mill, Indonesia. Construction In
1999.
• Defered Due to Social Problems in Indonesia Following the 1997
Economic Downturn.
• 45 TPH Logan Bunut Oil Mill, Sarawak, Commenced In 2000.

5. Segamat Stores and Agency.

• 20 TPH Selumpur Oil Mill, 1977.


• 40 TPH Segamat Oil Mill, 1978.

6. Sabah Land Development Board. Sabah.

• 60 Tons Per Day Tuaran Smr Factory, Sabah, 1987.


• 30 Tons Per Day Tenom Smr Rubber Factory, Sabah, 1978
• Tuaran Latex Concentrate Factory, Tuaran, Sabah, 1990.
• Tebong Rss Factory, Sabah, 1992.
• Beaufort Specialty Rubber Factory, Beaufort, Sabah, 1997.

7. Tradewinds Sdn Bhd (In The Pernas Group).

• 30 T.P.H Permai Mill, Sabah, In 1990.

8. Pertubuhan Peladang Negri Johore.

• 30 Tph Bukit Bujang Mill, Johore, 1986.

9. Johore Tenggara.

• 30 T.P.H. Ulu Sebol Mill, Johore, 1978.

10. J. C. Chang Proprietary Co. Ltd., Johore.

• 30 Tph Pahang Oil Mill, Pahang Enterprise Sdn. Bhd. 1981.


• 30/60 Tph Melewar Mill, Melewar Sdn.Bhd.Sabah, 1988.

11. P.T.P. VI, Kisaran, Indonesia.


VIKNAtech

• 60 Tph. Teluk Dalam Mill, 1988.

12. Gradient Holdings Sdn Bhd.

• 30 TPH Nak Oil Mill, Sandakan, Sabah, 1986.

13. Lam Soon Sdn Bhd.

• 40 TPH Pacific Cocoa Palm Oil Mill, Lahad Datu, Sabah, 1997.

14. Hap Seng Sdn Bhd.

• 45 TPH Bukit Mas Palm Oil Mill, Lahad Datu, Sabah.


• Major Upgrading Works To Their Jerocco 2 and Tomanggong Mills,
Sabah,
• From 1997 to 2000.

15. I.O.I. Bhd.

• 45 TPH Lee Lau Oil Mill, Keratong, Pahang, 1992.

16. PT. Kalimantan Sanggar Pusakar, Lyman Agro Group, Indonesia.

• Wajok Bulking Installation, Pontianak, Kalimantan,1998


• Ksp Belitang Oil Mill, Kalimantan Barat, Indonesia, 1997.
• Sdk Oil Mill, Kalimantan Barat, Indonesia, 1999.

17. Asiatic Development Bhd.

• Sri Tanjong Oil Mill, Lahad Datu, 1995.

18. Lai Fook Kim Sdn Bhd.

• 30 TPH Ladang Mill, Sandakan, 1995.

19. Meridian Plantation (United Malacca)

• 40 TPH Oil Mill, Sabah, Commenced In 2000.


VIKNAtech

20. Gan Teng Siew Realty, K. Lumpur.

• Major Upgrading Of Ulu Kanchong Mill, Negri Sembilan, 1993-1996.

21. Tai Tak Plantations.

• Major Upgrading Works on a 4-Year Master Plan, Commenced 1999.


VIKNAtech

The Group Engineering Department, under the management of C. F. Chooi, also


undertook process cum engineering audits for outside plantation owners for a
number of years until their own staffs were competent enough to be
independent:

1. Federal Land Consolidation and Releabilitation Authority (FELCRA)

• Audit visits on Bukit Kepong Mill and Nasaruddin Mill

2. Rubber Industry Smallholders Development Authority (RISDA)

• Audit visits on Sungei Ambat Mill and Ulu Keratong Mill

3. Quek Seng & Sons Pte Ltd.

• Management of Pakloh Oil Mill

4. Ketengah

• Management of its Kilang Sawit Panji Alam Mill, Terengganu

5. Perbadalan Ladang-Ladang Tabung Haji

• Management on all its Mills

6. Tai Tak Plantations

• Management of Tai Tak Mill

7. J. C. Chang Pte Ltd.

• Management of its Pahang Mill and Melewar Mill

8. Johore Tenggara

• Management of its Ulu Sebol Mill


VIKNAtech

9. Pertubuhan Peladang Negeri Johore (PPNJ)

• Management of its Bukit Bujang Mill

10. Segamat Stores & Agency

Management of its Selumpur Mill and Segamat Mill

11. Sabah Rubber Fund Board (SRFB)

Management of its Tenom SMR factory and its Tuaran SMR factory

12. Sarawak Land Consolidation and Reclamation Authority (SALCRA)

• Management of its Lubok Antu Oil Mill, Sarawak

13. Dynamic Management Sdn. Bhd.

Audit visits on its Pukin Oil Mill and its Dinding SMR factory
VIKNAtech

Name: Sivanesan Ramasamy

Nationality: Malaysian

Qualifications: Diploma in Commerce, College Tunku Abdul Rahman (1977).

Associate Member of the Institute of Chartered Secretaries and


Administration UK (Majored in Financial Accounting) (1982).

Bachelor of Laws (2nd Class Hons.) UNIVERSITY OF


WOLVERHAMPTON U.K. (1993)

Certificate of Legal Practice (Malaysia) (1997)

Core Skills: Responsible for developing new business for the firm locally and
internationally. Also provide legal expertise in contract
management.

Job History:

a) Since 2001 to date: VIKNAtech Engineering Sdn. Bhd.

Position: Business Development Director

b) 27 years in Government service (1973 – 2001)

MARDI (Malaysian Agricultural Research and Development


Authority - 6 years (1/6/1973 – 28/2/1979)
Position: Research Assistant

c) PORLA (Palm Oil Research and Licensing Authority) under the Ministry of
Primary Industries, Malaysia.

d) MPOB (Malaysian Palm Oil Board)

Position held in PORLA / MPOB includes:-


VIKNAtech

a. Palm Oil Inspector (PORLA) (1/3/1979 – 6/3/1988)


b. Senior Palm Oil Inspector (PORLA) (7/3/1988 – 30/9/1990)
c. Enforcement Officer (PORLA) (1/10/1990 - 1992)
d. Head of the Licensing Division (PORLA) (1992 – 1996)
e. Senior Enforcement Officer (MPOB) (1996 - 2001)
f. Optional Retirement from 1/12/2001

RESPONSIBILITIES AS A PORLA / MPOB OFFICER INCLUDES:

Carrying out inspection regarding adherence to Licensing matters, inspection of


licensees’ premises, stock, documents and daily/monthly records.

Checking on any violations of conditions and regulations as stipulated in the


Palm Oil Registration And Licensing Authority (Incorporation) Act 1976.

Inspecting the documentation of palm oil business, transportation and storage


premises.

Liaising with the Customs Department regarding the transportation and


exportation of palm oil.

Submitting reports regarding enforcement activities and subsequently


undertaking follow-up measures.

Preparing and advising cases for cancellation of licenses and forwarding it to the
Authority/Licensing Committee.

Carrying out studies regarding the suitability of the regulations & conditions as
stipulated in PORLA Act 1976.

Giving advice and help to PORLA Licensees regarding licensing and enforcement
work.

Processing of application forms to obtain PORLA License.

Supervising registration & licensing of smallholders.

Preparing cases for prosecution in the Court as to offences committed within the
context of the PORLA Act.
VIKNAtech

Experience:

Job responsibility includes lIAISING WITH OTHER GOVERNMENT MINISTRIES SUCH


AS:

M.I.T.I. (Ministry of International Trade and Industry) for approval of permits from
the Custom’s Department

M.I.D.A. (Malaysian Industrial Development authority) for approval of setting up a


Palm Oil Manufacturing Refinery.

The Ministry of Domestic Trade and Consumer Affairs for the issuing of Trading
License for Cooking Oil.

The Ministry of Science, Technology & Environment for approval of license for
setting up a palm oil mill.

The Customs Department regarding the Transportation and Exportation of Palm


Oil.

The Factories and Machineries Department, Malaysia for issuing of Factory


License.

The Registrar of Company and The Registrar of Business for verification of status
of Directors of companies applying for license to trade.

SIRIM Malaysia for quality system verification.

With all State Governments in Malaysia for State’s approval of site to set up an
oil palm mill.

The Health Ministry for issuing a Health Certificate as requested by importing


companies overseas.

Liaising with the Police Department for theft or siphoning of palm oil from lorry
tankers transporting palm oil within Malaysia.
VIKNAtech

Name : Chiang Sin Kong

Position : Senior Project Manager

Tertiary : Diploma in Mechanical Engineering from Gordon Institute


Education of Technology

: First Grade Steam Certificate of Competency

Working Experience / Core Skills:

32 years of working experience, experience mill construction, commissioning and


day-to-day management of mill.

♦ Apr’03 to date VIKNAtech Engineering Sdn. Bhd.

Position: Senior Project Manager

♦ Oct’02 – Apr’03 Dindings Plam Oil Mill

Position: Mill Manager

♦ Mar’99 – Apr’02 PT PTS. Kal-Bar, Indonesia

Position: Project Manager

Supervision of mill construction and commissioning of 30


TPH mill

♦ Oct’96 – Oct’98 P.T. MISP. Kalimantan - Barat, Indonesia

Position: Project Manager

Supervision of mill construction and commissioning of 30


TPH mill
VIKNAtech

♦ May’93 – Sept‘96 Pantai Remis Palm Oil Mill Extension Milling capacity from
30 TPH to 60 TPH

Position: Mill Manager

♦ Mar – 1993 Changkat Chermin Plam Oil Mill (60 TPH)

Position: Study and review on the performance of mill

♦ 1992 – Dec‘02 Five PTP Mills (60 TPH) Spreading over Sumatra and
Kalimantan in Indonesia

Position: As a Processing Engineer advising mill’s staff on


efficient processing

♦ 1986 – Jan‘92 Pantai Remis Palm Oil Mill (30 TPH)

Position: Manager

♦ 1985 – 1986 Telok Sengat Palm Oil Mill (30 TPH)

Position: Manager

♦ 1984 – 1985 Kilang Sawit Panji Alam (30 TPH)

Position: Manager

♦ 1983 - 1984 Kampong Kuantan Palm Oil Mill (20 TPH)

Position: Manager

♦ 1981 - 1983 Tennamaram Palm Oil Mill (60 TPH)

Position: Manager
VIKNAtech

♦ 1979 – 1981 Chan Wing Palm Oil Mill (60 TPH)

Position: Manager

♦ 1978 – 1979 Kulai Palm Oil Mill (30 TPH)

Position: Manager

♦ 1975 – 1978 Tali Ayeh Palm Oil Mill (60 TPH)

Position: Manager

♦ 1974 – 1975 Bukit Rajah Palm Oil Mill (60 TPH)

Position: Engineer

♦ 1973 – 1974 Chan Wing Palm Oil Mill (30 TPH)

Position: Trainee Engineer

♦ 1972 – 1973 Kulai Palm Oil Mill (30 TPH)

Position: Trainee Engineer


VIKNAtech

Full Name : Tamil Selvan S/O Thangaveloo

Education

1963.1968 : Primary Tamil School, Banting

1969.1972 : Methodist English School, Banting

1973.1974 : Methodist English School, Seremban

1975.1978 : Technical Training Institute Kuala Lumpur


(Diploma In Mechanical Eng. Passed Leadership
Training)

Professional Experience

As A Mill Engineer Responsible For The Entire Mill Daily Production, Maintenance
Work.

Preparing Preventive Maintenance Schedules, Process Control and Day-to-day


Mill Operation.

Experienced On-site Control Of Palm Oil Mill Projects Involving Fabrication,


Installation And Commissioning And Operators Training.

Working Experience

• 2 Years Worked As Mechanical Foreman In Goh Ban Huat Sdn. Bhd., Kuala
Lumpur.

• 3 Years Worked As Technical Conductor In Selumpur Palm Oil Mill, Segamat.

• 4 Years Worked As Technical Assistant In Gaya Fats & Oil Sdn. Bhd.

• 4 Years Worked As Mill Assistant In Seri Langat Palm Oil Mill.

• 4 Years Worked As Mill Engineer In Gemas Palm Oil Mill Sdn. Bhd., Gemas.
VIKNAtech

• 3 Years Worked As Mill Manager/Engineer In Brooklands Palm Oil Mill,


Banting.

• 3 Years Worked As Project Engineer In Teknoemas Sdn. Bhd.

• 3 ½ Years Worked As Site/Project Engineer With Bell Group, Lahad Datu,


Sabah.

• Currently Working With Viknatech Engineering Sdn. Bhd. As Site/Project


Engineer.

Project Works Experience

• Trushidup Palm Oil Mill, Sandakan, Sabah.

Capacity : 45-90 TPH

Involved In Site Supervision Of The Construction Mechanical Works And


Commissioning/Training Of Mill Staff.

• W.T.K Palm Oil Mill, Sarawak.

Capacity : 30-60 TPH

Involved In The Construction Of Palm Oil Mill Worked For Turnkey Contractor
Including Commissioning And Training Of The Mill Staff.

• Involved In The Site Supervision Of All Mechanical Works Undertaken On A


Turnkey Basis.

a) Abadi Mewah Plam Oil Mill, Sabah.

Capacity : 45-90 TPH

b) Prolific Yield Plam Oil Mill, Sabah.

Capacity : 45-90 TPH

c) Tung Hup Plam Oil Mill, Sabah.

Capacity : 45-90 TPH Extension 2nd Line


VIKNAtech

Full Name : Thanaraj s/o Thavamani

Qualification:

B. Eng (Hons.) Mechanical / System (UPM)

Master Degree in Environmental Science (UPM)

Member of Professional Organization:

Graduate Member of Board of Engineers Malaysia.

Graduate Member of Institute of Engineers Malaysia.

Working Experience

March 2002 – to date : VIKNAtech Engineering Sdn. Bhd.

Position : Project Manager

: Technical team of the project undertaken by the firm.


List of projects handled as per in completed contract
list.

2000 – 2002 : Kai Peng Vessels Sdn. Bhd.

Position : Project Engineer

: Implementation of construction, completion and commis


-
- sioning of mechanical works of 120 tones FFB/Hr Pulai
Palm Oil Mill, Riau, Sumatra, Indonesia for Messrs. PT.
Multigambut Industri (TH Plantation Sdn. Bhd.).
VIKNAtech

Coordinate for installation of Autoclaves for Batu Kemas


Sdn. Bhd. at Slim River.

In charge of sterilizer and clutch door division: -

• Coordination of fabrication works.


• Coordination for installation works.
• Coordination of after sales service.

1997 – 2000 : Konsultant Process Sdn. Bhd.

Position : Project Engineer

: Assisted Project Manager in the designing and super -


- vision of construction for the execution and completion
of mechanical and electrical works for the proposed 20
tones FFB/Hr PORIM experimental mill for Messrs Pusat
Penyelidikan Kalapa Sawit Malaysia (PORIM) at Ladang
Labu, Nilai, Negeri Sembilan.

Assisted Project Manager in the designing and


supervision of construction for the execution and
completion of mechanical and electrical works for the
proposed 45 tones FFB/Hr palm oil mill for
Pembangunan Ladang Hassan Sdn. Bhd., Sg.
Memanjang, Beluar, Sabah.

Assisted Project Manager in the designing and


execution of Prolific Yield Oil Palm Oil Mill at Sandakan,
Sabah.

Designing of effluent treatment system for palm oil mill


project undertaken by Konsultant Process Sdn. Bhd.

Designing and supervision for the execution and


completion of proposed wastewater treatment plant for
Soya Sauce Factory at Jalan Chan Sow Lin for Messrs
Yuen Chan Industries.

Designing and supervision for the execution and


completion of air conditioning system for site and sales
office at Felda Bukit Cherakah Development Sdn. Bhd.

Designing of air conditioning system for Bangunan and


Makmal dua tingkat for Sirim Wilayah Selatan, Mukim
Senai, Johor.
VIKNAtech

Preparation of project report, financial appraisal and


project costing.

In charge of application and liaising with relevant


regulatory bodies, namely DOE, Machinery Department,
PORLA, JBA, TNB to secure licenses for the above on-
going projects.

Full Name : Ab. Rahman Bin Mohd Noor

Education

1975: Sijil Rendah Pelajaran (A)

1977: Malaysia Certificate of Education

1982: Sijil Institiut Kemahiran Mara (Kepujian) – Mechanical Draughtsmanship

1999: Certificate of Achievement of RxAuto Image Pro R14

2001: Certificate of Achievement of Managing Leadership Skill for Support Staff

Professional Experience

As designer respectable of preparation of all design and drawings for palm oil
mill and other related projects.

Working Experience

1986 – 1990 : Inter Mechanical Draughtsman – Guthrie Machineries

1990 – 2003 : Chief Draughtsman – Salcon Engineering Sdn. Bhd.

2003 – 2005 : Senior Draughtsman – Tricol Engineering Sdn. Bhd.


(associate of Salcon Engineering Sdn. Bhd.)

Project Involved
VIKNAtech

P.T. Astro Agro Niaga

• 30/60 FFB/hr P.T. Letawa Palm Oil Mill, Pasangkayu, South Sulawesi

P.T. Sari Aditya Loka

• 30/60 FFB/hr P.T. Sari Aditya Loka Province Jambi, Sumatera

Bakrie Sumatera Plantations

• 30/60 FFB/hr Pasaman Palm Oil Mill

Hup Cheong Engineering Works

• Supply & installation or 2 units 10 x 3.5 T


FFB caged sterilizers at Pontian, Johor

Unico Oil Mill Sdn. Bhd.

• Supply, deliver, install one (1) unit of 2,000


ton oil storage tank and one (1) HS 56 TP decanter c/w pipeworks

Unico Oil Mill Sdn. Bhd.

• To supply, deliver, install and twelve (12)


bays fruit loading ramp no. 2 c/w hydraulic system, one (1) set of P15 screw
press and digester, fruit elevator and pressing station extension works

Unico Oil Mill Sdn. Bhd.

• 40/80 tons turnkeys palm oil mill

Batu Putih Palm Oil Mill

• 45/90 T FFB/hr palm oil mill

P.T. Sari Lembah Subur no. 2 Oil Mill

• FFB/hr Oil Mill at Ukui, Sumatera, Indonesia

Unico Oil Mill Sdn. Bhd.

• 30/40 ton/hr extension work


VIKNAtech

Unico Oil Mill Sdn. Bhd.

• Second stage of 80 ton turnkey palm oil mill

P.T. Sari Aditya Loka

• 30/60 T FFB/hr oil mill at Seri Buatan


Sumatera, Indonesia

P.T. Kimai Trita Utama

• 20/40 T FFB/hr oil mill at Sei Buatan


Sumatera, Indonesia
Palmtech India Ltd.

• 15/30 T FFB/hr oil mill at Kakinada, India

Sei Lakitan Palm Oil Extension

• Extension of Sei Lakitan POM to 60 T FFB/hr

Sg. Lilin Oil Mill (Extension)

• Extension 60/120 T FFB/hr, Palembang,


Indonesia

Agromsa-Mexico

• 20/30 T FFB/hr Palm Oil Mill

Sg. Merah Oil Mill

• 60 T FFB/hr Sg. Merah Palm Oil Mill factory,


Lampung, Sumatera, Indonesia

Belaga Palm Oil Mill

• 15/40 FFB/hr Palm Oil Mill at Belaga Estate,


Kapit, Sarawak

Gunung Kambeng Palm Oil Mill

• 15 T FFB/hr at Samarinda, Indonesia

Agumil Philippines. Inc


VIKNAtech

• Design and supply one (1) unit of Spherical


sterilizer c/w conveyor

Bohol Palm Oil Mill

• 30/45/90 T FFB/hr palm oil mill at Martin Ao,


Carmen, Bohol Island, Philippines

Full Name : Zainon Binti Lani

Education : Diploma in Architechture, UTM Skudai, Johor.

Working Experience

1990 – 1991 : Brisksteel Product Sdn. Bhd. – Draughtswoman

1991 – 1994 : Toyota Assembly Services Sdn. Bhd. – Draughtswoman

1994 – 2005 : Cemas Konsultant Sdn. Bhd. – Senior Draughtswoman

Project Involved

a. 15 Tons Palm Oil Mill

• Gunung Kombeng Palm Oil Mill.

b. 15 – 45 TPH Palm Oil Mill

• Belaga Palm Oil Mill, Karif, Sarawak.

c. 20 – 40 TPH Palm Oil Mill


VIKNAtech

• PT. Surya Raya Lestari I, Indonesia.


• PT. Kimia Tirta Utama Palm Oil Mill, Sumatra, Indonesia.

d. 30 – 60 TPH Palm Oil Mill

• Sindora Palm Oil Mill, Johor.


• Balingan Palm Oil Mill.
• Tong Len Palm Oil Mill II, Lahad Datu, Sabah.
• PT. Bumi Permai Lestari, Indonesia.
• PT. Buana Wira Lestari, Indonesia.
• PT. Ramajaya Pramukti, Indonesia.
• PT. Sumber Indah Perkasa, Indonesia.
• PT. Sari Lembah Subur II, Riau, Indonesai.
• PT. Harapan Sawit Lestari.
• PT. Mutrada Malti Maju Palm Oil Mill.

e. 30 – 90 TPH Palm Oil Mill

• Jeroco II Palm Oil Mill, Sabah.

f. 40 – 80 TPH Palm Oil Mill

• Timora Palm Oil Mill, Lahad Datu, Sabah.


• Kim Loong Plam Oil Mill, Kota Tinggi, Johor.
• Unico Oil Mill II.

g. 40 – 90 TPH Palm Oil Mill

• Veetar Palm Oil Mill.


• Beaufort palm Oil Mill, Sabah.
• Monsok Palm Oil Mill, Sandakan, Sabah.

h. 60 – 120 TPH Palm Oil Mill

• Sungai Lilin Palm Oil Mill Extension to 120 MT FFB/Hr.


• PT. Kresna Duta Agroindo Palm Oil Mill, Indonesia.

Others Project Involved:

• Biltmore (M) Sdn. Bhd.


VIKNAtech

Proposed Industrial Development on part of PH. 2, Taman Industiral Jaya,


Johor Bahru.

• Enersave Engineering Sys. Sdn. Bhd.

Cadangan project kemudahan infrastruktur untuk basf integrated chemical


site (ICS) di Kuantan, Pahang.

• Enersave Water Sdn. Bhd.

Utilities Acid dosing project.

• Beacon Sdn. Bhd.

a. Syarikat Idris Razali


b. Lekir Bulk Terminal (modification works).