Anda di halaman 1dari 3

QUESTION ANSWER MARK

1. i) process element
ii) input element
iii) feedback and effect element
iv) output element
2. A a) Make a mark using a center punch before drilling.
B b) i) Wear goggles
ii) Make sure the workpiece is clamped tightly beore drilling.
3. a) 43.62
b) 10.14 mm
4. - Marking
- Drilling
- Chiselling
5 i) A
ii) C – tooth size
D – blade width
6 TDS = major dia – pitch
= 10.00 – 1.5
= 8.5 mm
7 - Mild steel
- Stainless steel
- High speed steel
8 - Combination of more than one metal. (Bronze,brass, etc)
- Metal that contains iron (Steel,cast iron, etc.)
- Metal that does not contain iron. (Gold, copper, etc.)
9 NAMA KOMPONEN SIMBOL
NAME OF COMPONENT SYMBOL

Peraruh boleh laras


Variable inductor

Perintang
Resistor

Transistor NPN
NPN transistor

Pemuat
Capacitor

10 E - Green
F - Blue
G - Orange
H - Silver
11 - Human to machine
- Between Human
- Machine to human
12

13 B, A, E, D
14 Basikal/kereta/motor, belon panas/jet/helikopter, sampan/bot
15 - hidro
- thermal
- solar
- nuclear
16 i) series motor
ii) used to work that need high torque such as a car starter
iii) a) number of coil
b) current flow
17 i) memerluka tenag elektrik untuk berputar
ii) menukarkan tenaga elektrik kepada tenaga mekanikal
iii) menghasilkan tenaga elektrik
iv) menukarkan tenaga mekanikal kepada tenaga elektrik
18 - penjana pirau
- penjana siri
19 - Storing
- Shilter
- Recreation
20 - 3,1,4
21
Light construction engineering Heavy construction engineering
Kejuruteraan pembinaan ringan Kejuruteraan pembinaan berat
LUMUT PORT KLCC
MRR2 BUKIT JALIL STADIUM
KLIA LUMUT INDUSTRIAL PARK
22

JOB SCOPE OF WORK


PEKERJAAN BIDANG KERJA
Quantity surveyor Manages and oversees the whole proceeding of
Juru Ukur Bahan organizations
Mengurus keseluruhan prisedur organisasi.
Construction worker Prepares project designs
Pekerja binaan Menyediakan rekabentuk projek
Engineer Prepares assessment or cost estimation for a project
Jurutera Menyediakan pentaksiran harga untuk projek
Manager Carries out work at the construction site.
Pengurus Melakukan kerja-kerja di tapak pembinaan.
Technician Solves problems regarding construction technology
Juruteknik Menyelesaikan masalah berkaitan teknologi
pembinaan.
Architect Supervising and monitoring work
Arkitek Memantau dan menyelia kerja
23 - Table Survey
- Electronic Distance Measurement(EDM)
- Aerial survey
- Compass Survey

24 a) 2.35 m
b) 56.070 m
25 i) Clay
ii) Silt
iii) Sand
iv) Gravel
26 - Plumb bob
- Tilting level
- Leveling staff
27 X, /, X, /
28 D,B,C,A
29 - function
- human
- strenght
30 i) to ensure functionality of the product
ii) to create an object almost resembly real object and can be view from all angles
iii) to monitor ans access measurement ratio, stability, durability and strength
iv) to ensure that all problems are attended to at the stage of implimentation