1. i) process element
ii) input element
iii) feedback and effect element
iv) output element
2. A a) Make a mark using a center punch before drilling.
B b) i) Wear goggles
ii) Make sure the workpiece is clamped tightly beore drilling.
3. a) 43.62
b) 10.14 mm
4. - Marking
- Drilling
- Chiselling
5 i) A
ii) C – tooth size
D – blade width
6 TDS = major dia – pitch
= 10.00 – 1.5
= 8.5 mm
7 - Mild steel
- Stainless steel
- High speed steel
8 - Combination of more than one metal. (Bronze,brass, etc)
- Metal that contains iron (Steel,cast iron, etc.)
- Metal that does not contain iron. (Gold, copper, etc.)
9 NAMA KOMPONEN SIMBOL
NAME OF COMPONENT SYMBOL
Perintang
Resistor
Transistor NPN
NPN transistor
Pemuat
Capacitor
10 E - Green
F - Blue
G - Orange
H - Silver
11 - Human to machine
- Between Human
- Machine to human
12
13 B, A, E, D
14 Basikal/kereta/motor, belon panas/jet/helikopter, sampan/bot
15 - hidro
- thermal
- solar
- nuclear
16 i) series motor
ii) used to work that need high torque such as a car starter
iii) a) number of coil
b) current flow
17 i) memerluka tenag elektrik untuk berputar
ii) menukarkan tenaga elektrik kepada tenaga mekanikal
iii) menghasilkan tenaga elektrik
iv) menukarkan tenaga mekanikal kepada tenaga elektrik
18 - penjana pirau
- penjana siri
19 - Storing
- Shilter
- Recreation
20 - 3,1,4
21
Light construction engineering Heavy construction engineering
Kejuruteraan pembinaan ringan Kejuruteraan pembinaan berat
LUMUT PORT KLCC
MRR2 BUKIT JALIL STADIUM
KLIA LUMUT INDUSTRIAL PARK
22
24 a) 2.35 m
b) 56.070 m
25 i) Clay
ii) Silt
iii) Sand
iv) Gravel
26 - Plumb bob
- Tilting level
- Leveling staff
27 X, /, X, /
28 D,B,C,A
29 - function
- human
- strenght
30 i) to ensure functionality of the product
ii) to create an object almost resembly real object and can be view from all angles
iii) to monitor ans access measurement ratio, stability, durability and strength
iv) to ensure that all problems are attended to at the stage of implimentation