Circuit Diagram:
Apparatus Required:
3. Voltmeter (0-300V) MC 1
(0-50V) MC 1
4. Rectifier 230/0-270V 1-Ph 1
5. Rheostat 300/2A T.W.W 2
PROCEDURE:
1. OC test:
(i) Connections are made as shown in the circuit diagram for OC & SC test.
(ii) With the rectifier in the zero voltage position, TPST switch open and the
rheostats in their proper positions, the d.c. supply to the motor is switched ON.
(iii) The dc motor is brought to rated speed of the alternator by properly varying the
field rheostat of motor.
(iv) Now, the alternator field is excited by applying the dc voltage through the
rectifier in steps. At each step, note down the field current and the
corresponding generated voltage. This procedure is repeated till the voltage
generated is much beyond rated value.
(v) Reduce the alternator field excitation to zero level.
MODEL GRAPHS
Tabulation:
a) OC & SC Test:
O. C. Test S. C. Test
(If) (A)
2. SC test
(i) with the rectifier in the minimum voltage position, the TPST switch is closed.
(ii) Increase field excitation gradually till the S.C. current of the alternator reaches
the rated current of alternator.
(iii) Note down all the meter readings.
b) Armature Resistance:
Ra = (1.6) RdC =
XS = Z S2 − Ra2 =
E0 = ( v cos φ + I a Ra ) 2
+ ( v sin φ ± I a X S )
2
=
E 0 −V
% Re g = x 100 =
V
where
E0 – Generated emf of alternator per phase voltage
V – Full load, rated terminal voltage per phase.