Material 2015
Material 2015
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
Page 1 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
25 Batu alam Batu Lempengan Merah M2 218,057.00
26 Glass Block Uk. 30 x 30 cm Bh 33,375.00
X.3.2. Pasir
1 Pasir Beton ex Palu M3 370623 *
2 Pasir Urug M3 100000 *
3
3 Pasir Putih/Pasangan M 310000 *
4 Pasir halus (HRS) M3 99,177.00 *
X.3.3. Tanah
1 Tanah Urug M3 90000 *
2 Tanah Urug Pilihan / Pasir urug M3 198486 *
Page 2 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
X.3.4. Semen
1 Semen Abu-abu 1 zak = 50 kg Zak 85000 Tonasa*
2 Semen Abu-abu 1 zak = 50 kg Zak 99,045.00 Tiga Roda
3 Semen Abu-abu 1 zak = 50 kg Zak 83,460.00 Bosowa
4 Semen Abu-abu 1 zak = 50 kg Zak 81,334.00 Holcim
5 Semen Abu-abu 1 zak = 50 kg Zak 101,878.00 Gresik
6 Semen Putih 1 zak = 20 kg Zak 74,900.00 Red Bull
7 Semen Putih 1 zak = 40 kg Zak 150000 *
8 Semen Putih 1 zak = 40 kg Zak 101,650.00 Tiga Roda
X.3.6. Besi
X.3.6.1. Besi Nako
1 Besi Nako Panjang 27 cm Btg 15,515.00
2 Besi Nako Panjang 66 cm Btg 19,795.00
3 Besi Nako Panjang 65 cm Btg 18,725.00
4 Besi Nako Panjang 53 cm Btg 16,585.00
5 Besi Nako Panjang 24 cm Btg 13,535.50
6 Besi Nako Panjang 60 cm Btg 17,655.00
X.3.6.2. Kawat
1 Kawat Wiremesh M6 Panjang 6 mm x 2.1 m x 54,0 m Roll 5,901,464.00 *
2 Kawat Wiremesh Panjang 8 mm x 2.1 m x 5.4 m lbr 750000 *
3 Kawat Wiremesh Panjang 10 mm x 2.1 m x 5.4 m lbr 1,456,405.00 *
4 Kawat Las Panjang 2.6 mm RB 26 @ 5 Kg Dos 171,302.00 Esab
5 Kawat Las Panjang 3.2 mm RB 26 @ 5 Kg Dos 209,485.00 Esab
6 Kawat Las Panjang 4 mm RB 26 @ 5 Kg Dos 257,487.00 Esab
7 Kawat Bendrat Bendrat 1 Kg 20000 *
8 Kawat Bendrat Bendrat 21,5 roll 428,454.00
9 Kawat Nyamuk Lebar 90 cm M' 27,141.00
10 Kawat Kasa Lebar 90 cm M' 38,830.00
Page 3 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
11 Kawat Duri Kg 124,547.00
12 Kawat Bronjong (M15) Kg 9,799.00 *
Page 4 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
11 Ring baut Baut 1/2 tebal bh 535.00
12 Ring baut Baut 1/2 tipis bh 535.00
13 Ring baut Baut 3/8 tebal bh 535.00
14 Ring baut Baut 3/8 tipis bh 535.00
X.3.6.6. Paku
1 Paku Triplek Kg 35000 *
2 Paku Payung Kg 33,871.00
3 Paku Beton Biasa semua ukuran Dos 33,871.00
4 Paku Beton Bagus semua ukuran Dos 33,871.00
5 Paku Ulir Bh 1,270.00
6 Paku Sumbat Bh 865.00
7 Paku Sekrup 1 1/4" Bh 222.00
8 Paku Sekrup 1 1/2" Bh 27,141.00
9 Paku Sekrup 2" Bh 37,271.00
10 Paku Sekrup 2 1/2" Bh 43,817.00
11 Paku Beton 1" Ktk 20,524.00
12 Paku Beton 1,5" Ktk 20,524.00
13 Paku Beton 2" Ktk 20,524.00
14 Paku Beton 3" Ktk 42,372.00
15 Paku Beton 4" Ktk 50,873.00
16 Paku Beton 4,2 x 100" Kg 41,324.00
17 Paku Beton 4,3 x 100" Kg 41,324.00
18 Paku Seng 2" besar Kg 41,324.00
19 Paku Seng 1 3/4" kecil Kg 41,324.00
20 Paku Ulin 1" Kg 35000 *
21 Paku Ulin 1 1/2" Kg 35000
22 Paku Ulin 2" Kg 35000 *
23 Paku Ulin 3" Kg 35000 *
24 Paku Ulin 3 1/2" Kg 35000
25 Paku Ulin 4" Kg 35000
26 Paku Biasa 1 1/2" Kg 20000 *
27 Paku Biasa 2" Kg 20000 *
28 Paku Biasa 3" Kg 20000 begisting*
29 Paku Biasa 3 1/2" Kg 20000 *
30 Paku Biasa 4" Kg 20000 *
31 Paku Anti Karat Kg 77,013.00 Untuk Gen
teng Metal
X.3.6.7. Baja
Page 5 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
1 Baja Profil WF 150 Kg 33,375.00
2 Pintu Besi M2 1,246,664.00
3 Rolling Door M2 1,496,023.00
4 Pipa Baja Glb M(46) Kg 23,040.00 *
5 Baja Pra tegang (M56) Kg 11,123.00 *
6 Baja Struktur (M48) Kg 33,376.00 *
7 Pipa baja Kg 30,985.00 *
8 Reducer Pipa 2" ke 3" bh 225,000.00
X.3.7. Cat
X.3.7.1. Peralatan Cat
1 Ampelas Lbr 4,826.00 *
2 Bak Cat Bh 28,204.00
3 Kuas Roll 4" Bh 15,453.00 Imundex
4 Kuas Roll 7" Bh 21,828.00 Imundex
5 Kuas 4" Bh 16,869.00 *
6 Kuas 3" Bh 14,036.00
7 Kuas 2,5 " Bh 9,785.00
8 Kuas 2" Bh 8,368.00
9 Kuas 1,5 " Bh 6,952.00
10 Kuas 1" Bh 4,118.00
Page 6 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
3 Cat Type 397 Klg 99,045.00 Paragon
4 Cat Type 393 Klg 99,045.00 Paragon
5 Cat Putih Klg 390,484.00 Paragon
6 Cat Putih Klg 99,045.00 Paragon
7 Elastomeric Wall Paint Premium Full Acrylic Emulsion ( Exterior) Klg 288,189.00 Jotun
8 Elastomeric Wall Paint Premium Full Acrylic Emulsion ( Exterior) Klg 298,319.00 Jotun
9 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 257,019.00 Jotun
10 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 267,150.00 Jotun
11 Wall Paint (Water Base) Modified Acrylic (matt Finish) ( Exterior) Klg 102,728.00 Jotun
12 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 108,183.00 Jotun
13 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 211,044.00 Jotun
14 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 160,393.00 Jotun
15 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 125,482.00 Jotun
16 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 125,482.00 Jotun
17 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 125,482.00 Jotun
18 Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Klg 561,861.00 Jotun
19 Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (ext) Klg 633,396.00 Jotun
20 Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (ext) Klg 729,243.00 Jotun
21 Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (ext) Klg 825,870.00 Jotun
22 Wall Paint (Water Base) Anti bacterial & Elastomeric (Interior) Klg 133,887.00 Jotun
23 Wall Paint (Water Base) Anti bacterial & Elastomeric (Interior) Klg 17,011.00 Jotun
24 Wall Paint (Water Base) Modified Acrylic (High Sheen Finish) ( Interior) Klg 186,887.00 Jotun
25 Wall Paint (Water Base) Modified Acrylic (High Sheen Finish) ( Interior) Klg 204,030.00 Jotun
26 Cat tembok Durable Elastomeric Exterior Klg 253,902.00 Propan
27 Cat tembok Durable Elastomeric Exterior Klg 274,163.00 Propan
28 Cat tembok Acrylic weather shield Klg 233,642.00 Propan
29 Cat tembok Acrylic weather shield Klg 255,461.00 Propan
30 Cat tembok Interior Klg 121,430.00 Propan
31 Cat tembok Décor alkali resisting primer Klg 108,968.00 Propan
32 Cat Eksterior Weatershield ( Exterior ) Klg 283,230.00 ICI Dulux
33 Cat tembok Interior Klg 212,390.00 ICI Dulux
34 Cat tembok Interior Klg 679,938.00 ICI Dulux
35 Cat tembok Interior Klg 113,213.00 Vinilex*
36 Cat tembok Interior Klg 63,624.00 Komilex
37 Cat tembok Interior Klg 261,978.00 Mowilex*
38 Cat tembok Interior Klg 113,213.00 Catylac
39 Coating Natural Kg 94720 Propan*
X.3.7.2.3. Waterproofing
1 Semen AM 50 Nat Standar Isi 1 Kg 18,286.00
2 Semen AM 53 Nat White Isi 1 Kg 11,202.00
3 Semen AM 86 Grey Isi 40 Kg 174,844.00
4 Semen AM 100 waterproofing Grey Isi 40 Kg 150,050.00 *
5 Waterproofing Ultraproof UPR - 960 Isi 1 Klg 64,701.00 Propan
6 Waterproofing Ultraproof UPR - 960 Isi 4 Klg 214,940.00 Propan
7 Waterproofing Ultraproof UPR - 960 Isi 20 Klg 1,000,972.00 Propan
8 Waterproofing Sikaset Accelerator Per Kg Kg 32,596.00 Sika
9 Waterproofing Sika 102 Kg 65,714.00 Sika
10 Waterproofing Sika Top 107 Seal Kg 29,479.00 Sika
11 Waterproofing Sika Rain Tite Compound (Red & Grey) Kg 65,714.00 Sika
Page 7 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
12 Waterproofing Sika Rain Tite Membrane Kg 42,726.00 Sika
13 Waterproofing Sikaproof 300 RM Kg 171,302.00 Sika
14 Waterproofing Sikaproof 400 SBS Kg 194,679.00 Sika
15 Waterproofing Sikaproof Primer Kg 82,078.00 Sika
16 Floor coating Alkyd Paint White Isi 5 Kg 786,908.00 Jotun
17 Floor coating Alkyd Paint Yellow 2 Isi 5 Kg 786,908.00 Jotun
18 Floor coating Alkyd Paint Grey Isi 5 Kg 786,908.00 Jotun
19 Floor coating Alkyd Paint Green Isi 5 Kg 786,908.00 Jotun
20 Floor coating Alkyd Paint Red Isi 5 Kg 786,908.00 Jotun
21 Floor coating Alkyd Paint Blue Isi 5 Kg 786,908.00 Jotun
22 Floor coating Alkyd Paint Black Isi 5 Kg 786,908.00 Jotun
Page 8 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
X.3.8. Multipleks
1 Triplek 3 mm Lbr 65000
2 Triplek 3.2 mm Lbr 65,041.00
3 Triplek 4 mm Lbr 75000
4 Triplek 6 mm Lbr 116,391.00
5 Triplek 9 mm Lbr 172004
6 Triplek 12 mm Lbr 248,273.00
7 Triplek 15 mm Lbr 247,810.00
8 Triplek 18 mm Lbr 297,398.00
9 Melaminto Lbr 171,302.00
10 Teakwood 3 mm Lbr 171,302.00
11 Teakwood 4 mm Lbr 376,244.00
12 Triplek lapis aluminium Lbr 165,847.00
13 Lumbercoll 16 mm Lbr 290,527.00
14 Lumbercoll 18 mm Lbr 250000
15 Multiplek Mega sungkai 3 mm Lbr 155,717.00
Page 9 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
10 Kaca Grafir 5 mm M2 1,036,267.00
11 Kaca Grafir 8 mm M2 1,296,536.00
2
12 Kaca Buram Polos 5 mm M 398,842.00
13 Kaca Buram Polos 8 mm M2 698,073.00
2
14 Kaca Buram Motif 5 mm M 698,073.00
15 Kaca Buram Motif 8 mm M2 698,073.00
2
16 Kaca Patri 13 mm M 219,615.00
17 Kaca Flash 5 mm M2 897,561.00
2
18 Kaca RD 5 mm M 698,073.00
19 Kaca Rayband 5 mm M2 231,722.00
X.3.9.2. Gypsum
1 Gypsum Standard Board Ukuran 9x 1200 x 2400 mm M2 79,448.00 Knauf
2 Gypsum Standard Board Ukuran 12 x 1200 x 2400 mm M2 55,973.00 Knauf
3 Gypsum Fireshield Ukuran 12 x 1200 x 2400 mm M2 121,430.00 Knauf
4 Gypsum Fireshield Ukuran 15 x 1200 x 2400 mm M2 132,340.00 Knauf
5 Gypsum Moistureshield Ukuran 9x 1200 x 2400 mm M2 108,962.00 Knauf
6 Gypsum Moistureshield Ukuran 12 x 1200 x 2400 mm M2 121,430.00 Knauf
7 Gypsum Moistureshield Ukuran 15 x 1200 x 2400 mm M2 133,898.00 Knauf
8 Gypsum Denseshield Ukuran 12 x 1200 x 2400 mm M2 121,430.00 Knauf
9 Gypsum Denseshield Ukuran 15 x 1200 x 2400 mm M2 133,898.00 Knauf
10 Gypsum List Polos Ukuran 3x 1100 x 2200 mm M2 27,145.00 Knauf
X.3.9.3. GRC
1 GRC (External) Ukuran 9x 300 x 2440 Lbr 134,677.00
2 GRC (External) Ukuran 9x 1220 x 2440 Lbr 428,454.00
3 GRC (External) Ukuran 12 x 1220 x 2440 Lbr 579,628.00
4 GRC (External) Ukuran 15 x 1220 x 2440 Lbr 765,089.00
5 GRC (External) Ukuran 4x 600 x 2440 Lbr 37,583.00
6 GRC (External) Ukuran 9x 100 x 2440 Lbr 53,168.00
7 GRC (External) Ukuran 9x 200 x 2440 Lbr 94,936.00
8 GRC (Internal) Ukuran 4x 1220 x 2440 Lbr 134,465.00
9 GRC (Internal) Ukuran 5x 1220 x 2440 Lbr 160,393.00
10 GRC (Internal) Ukuran 6x 1220 x 2440 Lbr 218,057.00
11 GRC (Internal) Ukuran 8x 1220 x 2440 Lbr 311,567.00
12 GRC (Internal) Ukuran 10 x 1220 x 2440 Lbr 354,071.00
Page 10 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
5 Kalsi Board Ukuran 1200 x 2400 x 12 mm Lbr 288,898.00
Page 11 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
41 Granito Tile Travertine Honed Grup B Box 570,277.00 Essenza
42 Granito Tile Travertine Polished Grup B Box 651,319.00 Essenza
43 Granito Tile Big Grain Unpolished Grup A Box 401,959.00 Essenza
44 Granito Tile Big Grain Polished Grup A Box 475,209.00 Essenza
45 Granito Tile Marble Honed Grup A Box 419,103.00 Essenza
46 Granito Tile Marble Polished Grup A Box 500,145.00 Essenza
47 Granito Tile Domus Unpolished Grup A Box 383,257.00 Essenza
48 Granito Tile Flame Rock Grup A Box 383,257.00 Essenza
49 Granito Tile Ructic Box 264,812.00 Essenza
50 Granito Tile Salsa Oasis ( unpolished ), Silver Box 286,631.00 Granito
51 Granito Tile Salsa Crystal ( polished ), Silver Box 353,646.00 Granito
52 Granito Tile Salsa Oasis ( unpolished ), Gold Box 324,035.00 Granito
53 Granito Tile Salsa Crystal ( polished ), Gold Box 380,140.00 Granito
54 Granito Tile Palazzo Mirror ( polished ), Silver Box 382,407.00 Granito
55 Granito Tile Palazzo Mirror ( polished ), Gold Box 448,714.00 Granito
56 Granito Tile Salt & Pepper Unpolished Grup A Box 288,189.00 Essenza
57 Granito Tile Salt & Pepper Polished Grup A Box 401,959.00 Essenza
58 Granito Tile Salt & Pepper Unpolished Grup B Box 328,710.00 Essenza
59 Granito Tile Salt & Pepper Polished Grup B Box 442,480.00 Essenza
60 Granito Tile Salt & Pepper Unpolished Grup C Box 373,906.00 Essenza
61 Granito Tile Salt & Pepper Polished Grup C Box 501,703.00 Essenza
62 Granito Tile Travertine Honed Grup A Box 497,028.00 Essenza
63 Granito Tile Travertine Polished Grup A Box 578,069.00 Essenza
64 Granito Tile Travertine Honed Grup B Box 570,277.00 Essenza
65 Granito Tile Travertine Polished Grup B Box 651,319.00 Essenza
66 Granito Tile Big Grain Polished Grup A Box 493,911.00 Essenza
67 Granito Tile Big Grain Unpolished Grup A Box 412,090.00 Essenza
68 Granito Tile Marble Honed Grup A Box 419,103.00 Essenza
69 Granito Tile Marble Polished Grup A Box 500,145.00 Essenza
70 Granito Tile Domus Unpolished Grup A Box 384,192.00 Essenza
71 Granito Tile Flame Rock Grup A Box 383,257.00 Essenza
72 Granito Tile Ructic Box 286,631.00 Essenza
73 Granito Tile Salsa Crystal ( polished ), Silver Box 419,103.00 Granito
74 Granito Tile Palazzo Mirror ( polished ), Silver Box 490,794.00 Granito
75 Granito Tile Palazzo Mirror ( polished ), Gold Box 518,846.00 Granito
76 Granito Tile Aurora Mirror ( polished ), Silver Box 492,494.00 Granito
77 Granito Tile Aurora Mirror ( polished ), Gold Box 571,835.00 Granito
78 Granito Tile Sejati Polished Box 304,086.00 Sejati
79 Granito Tile Sejati AL - Polished Box 368,919.00 Sejati
80 Granito Tile Sejati YS - Polished Box 428,765.00 Sejati
81 Granito Tile San Remo (Rustic) Box 560,926.00 Sejati
82 Granito Tile Nordic 1 - 4 Box 439,363.00 Sejati
83 Granito Tile Salsa & Pepper ( Grup A ) Black Box 405,572.00 Essenza
84 Granito Tile Salsa & Pepper ( Grup B ) Grey Box 329,022.00 Essenza
85 Granito Tile Travertine ( Grup A ) Box 478,326.00 Essenza
86 Granito Tile Travertine ( Grup B ) Box 531,938.00 Essenza
87 Granito Tile Marble Polished Box 601,447.00 Essenza
88 Granito Tile Marble Honed Box 531,626.00 Essenza
89 Granito Tile Domus ( Grup A ) unpolished Box 440,298.00 Essenza
90 Granito Tile Unicolor coper mocca Box 329,022.00 Essenza
Page 12 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
91 Granito Tile Unicolor ivory Box 329,022.00 Essenza
92 Granito Tile Unicolor crem Box 329,022.00 Essenza
93 Granito Tile Cove Box 963,797.00 Granito
94 Granito Tile Utility Tile Box 274,163.00 Granito
95 Granito Tile Mosaics Jasmine Bh 1,963,571.00 Granito
96 Granito Tile Mosaics Sonar Bh 1,535,765.00 Granito
97 Granito Tile Mosaics Venus Bh 2,632,166.00 Granito
98 Granito Tile Faye m2 196,805.00 Niro
99 Granito Tile Karyla m2 181,220.00 Niro
100 Granito Tile Estee m2 181,220.00 Niro
101 Granito Tile White Latte m2 202,472.00 Niro
102 Granito Tile White Crystal m2 202,472.00 Niro
103 Granito Tile Topaz Polish 1 Dus = 0.96 m2 = 6 Pcs m2 261,978.00 Indogress
104 Granito Tile Topaz Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 233,642.00 Indogress
105 Granito Tile Galena Polish 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
106 Granito Tile Pink Oval Polish 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
107 Granito Tile Citrine Polish 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
108 Granito Tile Ruby Polish 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
109 Granito Tile Galena Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 261,978.00 Indogress
110 Granito Tile Pink Oval Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 261,978.00 Indogress
111 Granito Tile Citrine Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 261,978.00 Indogress
112 Granito Tile Ruby Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 261,978.00 Indogress
113 Granito Tile Zirconium Polish 1 Dus = 0.96 m2 = 6 Pcs m2 311,567.00 Indogress
114 Granito Tile Moonstone Polish 1 Dus = 0.96 m2 = 6 Pcs m2 311,567.00 Indogress
115 Granito Tile Selenium Polish 1 Dus = 0.96 m2 = 6 Pcs m2 311,567.00 Indogress
116 Granito Tile Zirconium Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
117 Granito Tile Moonstone Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
118 Granito Tile Selenium Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
119 Granito Tile Olivine Polish 1 Dus = 0.96 m2 = 6 Pcs m2 354,071.00 Indogress
120 Granito Tile Olivine Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 325,735.00 Indogress
121 Granito Tile Cobalt Blue Polish 1 Dus = 0.96 m2 = 6 Pcs m2 410,744.00 Indogress
122 Granito Tile Titanium Polish 1 Dus = 0.96 m2 = 6 Pcs m2 410,744.00 Indogress
123 Granito Tile Black Onyx Polish 1 Dus = 0.96 m2 = 6 Pcs m2 410,744.00 Indogress
124 Granito Tile Cobalt Blue Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 375,323.00 Indogress
125 Granito Tile Titanium Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 375,323.00 Indogress
126 Granito Tile Black Onyx Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 375,323.00 Indogress
127 Granito Tile Saphire Polish 1 Dus = 0.96 m2 = 6 Pcs m2 439,080.00 Indogress
128 Granito Tile Saphire Unpolished 1 Dus = 0.96 m2 = 6 Pcs m2 403,660.00 Indogress
129 Montagne Alpen Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 269,062.00 Indogress
130 Montagne Everest Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 283,230.00 Indogress
131 Montagne Majestic Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 325,735.00 Indogress
132 Montagne Perla Mitika Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 325,735.00 Indogress
133 Montagne Girgio Mitika Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 325,735.00 Indogress
134 Montagne Noce Mitika Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 346,987.00 Indogress
135 Montagne Gris Mitika Rocktile 1 Dus = 0.96 m2 = 6 Pcs m2 346,987.00 Indogress
X.3.10.2. Keramik
1 Keramik Dinding Polos Ukura 20 x 20 cm Box 76,234.00 Kia
2 Keramik Dinding Special ( Warna MudUkura 20 x 20 cm Box 81,377.00 Kia
3 Keramik Roxy Ukura 20 x 20 cm Box 746,387.00 Asia
Page 13 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
4 Keramik Ukura 20 x 20 cm Box 76,234.00 Asia
5 Keramik Ukura 20 x 20 cm Box 87,143.00 Ikad
6 Keramik Ukura 20 x 20 cm Box 71,558.00 Mulia
7 Keramik Dinding Polos Ukura 20 x 25 cm Box 84,876.00 Kia
8 Keramik Dinding Special ( Warna MudUkura 20 x 25 cm Box 86,364.00 Kia
9 Keramik Dinding Medium ( Warna TuaUkura 20 x 25 cm Box 91,040.00 Kia
10 Keramik Ukura 20 x 25 cm Box 93,377.00 Ikad
11 Keramik Dinding List Ukura 7.5 x 20 cm Bh 11,202.00 Kia
12 Keramik Dinding Special Ukura 25 x 40 cm Box 162,730.00 Kia
13 Keramik Dinding Medium Ukura 25 x 40 cm Box 172,861.00 Kia
14 Keramik Ukura 25 x 40 cm Box 151,042.00 Kia
15 Keramik Dinding List Ukura 7.5 x 20 cm Bh 23,953.00 Kia
16 Keramik Dinding Premium Ukura 25 x 40 cm Box 205,589.00 Lacasa
17 Keramik Dinding Exclusive A Ukura 25 x 40 cm Box 219,615.00 Lacasa
18 Keramik Dinding List Ukura 7.5 x 20 cm Bh 45,064.00 Lacasa
19 Keramik Dinding Premium Ukura 30 x 50 cm Box 230,525.00 Lacasa
20 Keramik Dinding Exclusive A Ukura 30 x 50 cm Box 242,993.00 Lacasa
21 Keramik Murano Ukura 30 x 30 cm Box 64,545.00 Asia
22 Keramik Jungle/Etna Ukura 30 x 30 cm Box 66,259.00 Asia
23 Keramik Orient/Marmol/Capri/Milo Ukura 30 x 30 cm Box 67,974.00 Asia
24 Keramik Newton/Nori/Marble Ukura 30 x 30 cm Box 69,221.00 Asia
25 Keramik Corsica Ukura 30 x 30 cm Box 74,675.00 Asia
26 Keramik Oscar Ukura 30 x 30 cm Box 92,556.00 Asia
27 Keramik Petra Ukura 30 x 30 cm Box 79,351.00 Asia
28 Keramik Dinding List Ukura 7.5 x 20 cm Bh 54,415.00 Lacasa
29 Keramik Lantai Rustic Ukura 30 x 30 cm Box 92,556.00 Kia
30 Keramik Ukura 30 x 30 cm Box 70,000.00 Mulia
31 Keramik Ukura 30 x 30 cm Box 79,351.00 Ikad
32 Keramik Lantai Special Ukura 40 x 40 cm Box 101,170.00 Kia
33 Keramik Lantai Medium Ukura 40 x 40 cm Box 104,287.00 Kia
34 Keramik Murano Ukura 40 x 40 cm Box 73,117.00 Platinum
35 Keramik Torino/Galleria Ukura 40 x 40 cm Box 77,792.00 Platinum
36 Keramik Tahiti Ukura 40 x 40 cm Box 79,351.00 Platinum
37 Keramik Genesis Ukura 40 x 40 cm Box 84,026.00 Platinum
38 Keramik Caracas Ukura 40 x 40 cm Box 84,026.00 Platinum
39 Keramik Cordon Ukura 40 x 40 cm Box 91,819.00 Platinum
40 Keramik Albatros Ukura 40 x 40 cm Box 93,377.00 Platinum
41 Keramik Ozone Ukura 40 x 40 cm Box 101,170.00 Platinum
42 Keramik Ukura 40 x 40 cm Box 94,344.00 Mulia
43 Keramik Ukura 40 x 40 cm Box 80,909.00 Asia
44 Keramik Normay (Dasar terang) Ukura 40 x 40 cm Box 90,260.00 Milan
45 Keramik Normay (Dasar gelap) Ukura 40 x 40 cm Box 93,377.00 Milan
46 Keramik Liceo ( dasar gelap) Ukura 40 x 40 cm Box 119,872.00 Supermilan
47 Keramik Liceo ( dasar terang) Ukura 40 x 40 cm Box 112,079.00 Supermilan
48 Keramik Putih polos Ukura 40 x 40 cm Box 79,351.00 Hercules
49 Keramik Dasar terang Ukura 40 x 40 cm Box 82,468.00 Hercules
50 Keramik Dasar gelap Ukura 40 x 40 cm Box 85,585.00 Hercules
51 Keramik Lantai Special Ukura 45 x 45 cm Box 108,962.00 Kia
52 Keramik Lantai Medium Ukura 45 x 45 cm Box 113,638.00 Kia
53 Keramik Ukura 40 x 40 cm Box 82,096.00 Arwana
Page 14 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
Page 15 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
4 Staircase nosing profile L 68 mm x T 22 mm M 43,870.00 Kendo
5 Skirting profile T 60 mm P 2400 mm M 39,055.00 Kendo
6 Skirting profile T 100 mm P 2400 mm M 45,475.00 Kendo
7 Lem Perekat Khusus Berat 400 gram Botol 58850 Gracewood
8 Lem Perekat Khusus Berat 800 gram Botol 110,638.00 Hornitex
9 PE Foam Tebal 3 mm M2 15,301.00
2
10 PE Foam Warna Abu-abu M 29,425.00 Hornitex
(Ex Jerman)
2
11 PE Foam Warna Putih M 14,124.00 Hornitex
(Ex Jerman)
12 Step Nosing Kayu Tongue Panjang 1,2 m Btg 42,372.00 Gracewood
13 Step Nosing Kayu Tongue Panjang 2,4 m Btg 77,575.00 Gracewood
14 Step Nosing Kayu Groove Panjang 1,2 m Btg 38,520.00 Gracewood
15 Step Nosing Kayu Groove Panjang 2,4 m Btg 77,575.00 Gracewood
16 Plin Lantai MDF Ukuran 4 cm x Panj Btg 242,890.00 Hornitex
17 Plin Lantai MDF Ukuran 6 cm x Panj Btg 270,710.00 Hornitex
18 Plin Lantai MDF Ukuran 6 cm x Panj Btg 297,460.00 Hornitex
19 Lis Jepit Bawah Pintu Aluminium Panjang 2,7 m Btg 460,100.00 Hornitex
20 Lis Jepit Bawah Pintu MDF Panjang 2,4 m Btg 513,600.00 Hornitex
21 Lis Jepit Bawah Pintu MDF Panjang 2,7 m Btg 582,080.00 Hornitex
22 Lis Jepit Antar Parket Aluminium Panjang 2,7 m Btg 500,760.00 Hornitex
23 Lis Jepit Antar Parket MDF Panjang 2,4 m Btg 513,600.00 Hornitex
24 Lis Jepit Antar Parket MDF Panjang 2,7 m Btg 582,080.00 Hornitex
25 Step Noosing Tangga Aluminium Panjang 2,7 m Btg 734,020.00 Hornitex
26 Step Noosing Tangga MDF Motif Kayu Panjang 2,4 m Btg 513,600.00 Hornitex
Page 16 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
24 Paving Block Benteng Abu-Abu (8 cm) isi Bh 3,636.00 Malang Indah
25 Paving Block Benteng Merah (8 cm) isi Bh 5,166.00 Malang Indah
26 Paving Block K 225 Serasi Abu-Abu (6 cm) isi 44 /m2
Bh 3551 Malang Indah
27 Paving Block K 225 Serasi Merah (6 cm) isi 44 /m2 Bh 4968 Malang Indah
28 Paving Block K 225 Serasi Abu-Abu (8 cm) isi 44 /m2
Bh 4118 Malang Indah
29 Paving Block K 225 Serasi Merah (8 cm) isi 44 /m2 Bh 5535 Malang Indah
30 Paving Block K 225 Tiga Berlian Abu (6 cm) isi 35 /m2
Bh 4,118.00 Malang Indah
31 Paving Block K 225 Tiga Berlian Mera(6 cm) isi 35 /m2 Bh 5,535.00 Malang Indah
32 Paving Block K 225 Tiga Berlian Abu (8 cm) isi 35 /m2
Bh 4,401.00 Malang Indah
33 Paving Block K 225 Tiga Berlian Mera(8 cm) isi 35 /m2 Bh 6,243.00 Malang Indah
34 Paving Block K 225 Diagonal Abu-Abu(6 cm) isi 40 /m2
Bh 4,118.00 Malang Indah
35 Paving Block K 225 Diagonal Merah (6 cm) isi 40 /m2 Bh 5,535.00 Malang Indah
36 Paving Block K 225 Diagonal Abu-Abu(8 cm) isi 40 /m2
Bh 5,818.00 Malang Indah
37 Paving Block K 225 Diagonal Merah (8 cm) isi 40 /m2 Bh 5,960.00 Malang Indah
38 Paving Block K 225 Bata Abu-Abu (6 cm) isi 48 /m2
Bh 3,410.00 Malang Indah
39 Paving Block K 225 Bata Merah (6 cm) isi 48 /m2 Bh 4,826.00 Malang Indah
40 Paving Block K 225 Bata Abu-Abu (8 cm) isi 48 /m2
Bh 4,118.00 Malang Indah
41 Paving Block K 225 Bata Merah (8 cm) isi 48 /m2 Bh 5,535.00 Malang Indah
42 Paving Block K 225 Gras Block Abu-A(6 cm) isi 9 /m2
Bh 16,303.00 Malang Indah
43 Paving Block K 225 Diagonal Jumbo (6 cm) isi 30 /m2 Bh 4,543.00 Malang Indah
44 Paving Block K 225 Diagonal Jumbo (6 cm) isi 30 /m2
Bh 4,968.00 Malang Indah
45 Paving Block K 225 Diagonal Jumbo (8 cm) isi 30 /m2 Bh 4,968.00 Malang Indah
46 Paving Block K 225 Diagonal Jumbo (8 cm) isi 30 /m2
Bh 5,251.00 Malang Indah
47 Paving Block K 225 Benteng Abu-Abu(6 cm) isi 35 /m2 Bh 4,118.00 Malang Indah
48 Paving Block K 225 Benteng Merah (6 cm) isi 35 /m2
Bh 5,535.00 Malang Indah
49 Paving Block K 225 Benteng Abu-Abu(8 cm) isi 35 /m2 Bh 4,543.00 Malang Indah
50 Paving Block K 225 Benteng Merah (8 cm) isi 35 /m2
Bh 6,243.00 Malang Indah
51 Paving Block 300 Serasi Abu-Abu (6 cm) isi 44 /m2 Bh 4331 Malang Indah
52 Paving Block 300 Serasi Merah (6 cm) isi 44 /m2
Bh 6201 Malang Indah
53 Paving Block 300 Serasi Abu-Abu (8 cm) isi 44 /m2 Bh 4926 Malang Indah
54 Paving Block 300 Serasi Merah (8 cm) isi 44 /m2
Bh 7221 Malang Indah
55 Paving Block 300 Tiga Berlian Abu-Abu (6 cm) isi Bh 4,926.00 Malang Indah
56 Paving Block 300 Tiga Berlian Merah (6 cm) isi Bh 6,739.00 Malang Indah
57 Paving Block 300 Tiga Berlian Abu-Abu (8 cm) isi Bh 5,521.00 Malang Indah
58 Paving Block 300 Tiga Berlian Merah (8 cm) isi Bh 7,816.00 Malang Indah
59 Paving Block 300 Diagonal Abu-Abu (6 cm) isi Bh 4,628.00 Malang Indah
60 Paving Block 300 Diagonal Merah (6 cm) isi Bh 7,191.00 Malang Indah
61 Paving Block 300 Diagonal Abu-Abu (8 cm) isi Bh 5,223.00 Malang Indah
62 Paving Block 300 Diagonal Merah (8 cm) isi Bh 7,518.00 Malang Indah
63 Paving Block 300 Bata Abu-Abu (6 cm) isi Bh 5,450.00 Malang Indah
64 Paving Block 300 Bata Merah (6 cm) isi Bh 5,903.00 Malang Indah
65 Paving Block 300 Bata Abu-Abu (8 cm) isi Bh 4,628.00 Malang Indah
66 Paving Block 300 Bata Merah (8 cm) isi Bh 6,923.00 Malang Indah
67 Paving Block 300 Gras Block Abu-Abu (6 cm) isi Bh 16,444.00 Malang Indah
68 Paving Block 300 Diagonal Jumbo Abu-Abu (6 cm) isi Bh 4,826.00 Malang Indah
69 Paving Block 300 Diagonal Jumbo Merah (6 cm) isi Bh 5,110.00 Malang Indah
70 Paving Block 300 Diagonal Jumbo Abu-Abu (8 cm) isi Bh 5,110.00 Malang Indah
71 Paving Block 300 Diagonal Jumbo Merah (8 cm) isi Bh 5,535.00 Malang Indah
72 Paving Block 300 Benteng Abu-Abu (6 cm) isi Bh 4,926.00 Malang Indah
73 Paving Block 300 Benteng Merah (6 cm) isi Bh 6,796.00 Malang Indah
Page 17 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
74 Paving Block 300 Benteng Abu-Abu (8 cm) isi Bh 5,521.00 Malang Indah
75 Paving Block 300 Benteng Merah (8 cm) isi Bh 7,816.00 Malang Indah
X.3.10.6. Kansteen
1 Kansteen Type K.225 Ukuran 15/20 x 30 x 50 cm Bh 58922 Malang Indah
2 Kansteen Type K.300 Ukuran 15/20 x 30 x 50 cm Bh 70543 Malang Indah
3 Kansteen Type K.225 Ukuran 15/20 x 20 x 50 cm Bh 47685 Malang Indah
4 Kansteen Type K.300 Ukuran 15/20 x 20 x 50 cm Bh 55910 Malang Indah
5 Kansteen Type K.225 Ukuran 20/20 x 40 x 50 cm Bh 70160 Malang Indah
6 Kansteen Type K.300 Ukuran 20/20 x 40 x 50 cm Bh 82496 Malang Indah
7 Kansteen Type K.225 Ukuran 15/20 x 30 x 50 cm Bh 64613 Malang Indah
8 Kansteen Type K.300 Ukuran 15/20 x 40 x 50 cm Bh 70637 Malang Indah
9 Kansteen Type K.225 Ukuran 12/15 x 20 x 50 cm Bh 45000 Malang Indah
10 Kansteen Type K.300 Ukuran 12/15 x 20 x 50 cm Bh 50000 Malang Indah
X.3.10.7. Tegel/Ubin
1 Tegel/Ubin Grys Warna Ukuran 30 x Bh 4,815.00 Malang Indah
2 Tegel/Ubin Grys Warna Ukuran 20 x Bh 2,354.00 Malang Indah
3 Tegel/Ubin Grys Abu-abu Ukuran 30 x Bh 4,280.00 Malang Indah
4 Tegel/Ubin Grys Abu-abu Ukuran 20 x Bh 2,140.00 Malang Indah
Page 18 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
19 Genteng Beton Bubungan Piramid Natural Isi 3,5 Bh/m2 Bh 7,660.00 Malang Indah
20 Genteng Beton Bubungan Piramid Cat Air 1x Isi 3,5 Bh/m Bh
2
9,608.00 Malang Indah
21 Genteng Beton Bubungan Piramid Cat Air 2x Isi 3,5 Bh/m Bh
2
8,407.00 Malang Indah
22 Genteng Beton Nok Bubungan Bulat Natural Bh 11,114.00 Malang Indah
23 Genteng Beton Nok Bubungan Bulat Cat Air 1x Bh 9,282.00 Malang Indah
24 Genteng Beton Nok Bubungan Bulat Cat Air 2x Bh 9,785.00 Malang Indah
25 Genteng Beton Nok Bubungan Piramid Natural Bh 11,114.00 Malang Indah
26 Genteng Beton Nok Bubungan Piramid Cat Air 1x Bh 9,282.00 Malang Indah
27 Genteng Beton Nok Bubungan Piramid Cat Air 2x Bh 9,785.00 Malang Indah
28 Genteng Beton Kyoto Natural Isi 12 Bh/m Bh
2
8,475.00 Malang Indah
29 Genteng Beton Kyoto Cat Air 1x Isi 12 Bh/m2 Bh 6,102.00 Malang Indah
30 Genteng Beton Kyoto Cat Air 2x Isi 12 Bh/m2 Bh 7,022.00 Malang Indah
Page 19 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
18 Atap Metal Genteng 3 x 4 Ukuran 115.5 x Lbr 188,304.00 Surya Color
19 Atap Metal Genteng 2 x 4 Ukuran 77 x Lbr 145,799.00 Surya Roof
20 Atap Metal Genteng 2 x 4 Ukuran 77 x Lbr 127,381.00 Surya Color
21 Atap Metal Genteng 1 x 4 Ukuran 38.5 x Lbr 74,959.00 Surya Roof
22 Atap Metal Genteng 1 x 4 Ukuran 38.5 x Lbr 65,041.00 Surya Color
23 Atap Metal Nok model U Ukuran 110 x Bh 65,041.00 Surya Roof
24 Atap Metal Nok model U Ukuran 110 x Bh 56,540.00 Surya Color
25 Atap Metal Nok Model C Ukuran R. 9 - 9,5 c Bh 40,955.00 Surya Roof
26 Atap Metal Nok Model C Ukuran R. 9 - 9,5 c Bh 32,454.00 Surya Color
27 Atap Metal Nok samping Ukuran 110 x Bh 65,041.00 Surya Roof
28 Atap Metal Nok samping Ukuran 110 x Bh 56,540.00 Surya Color
29 Atap Metal Wall Flashing Ukuran 110 x Bh 65,041.00 Surya Roof
30 Atap Metal Wall Flashing Ukuran 110 x Bh 56,540.00 Surya Color
31 Atap Metal Tutup Nok Bh 42,372.00 Surya Roof
32 Atap Metal Tutup Nok Bh 36,705.00 Surya Color
33 Atap Metal Genteng 2 x 4 ( Merpati ) Ukuran 77 x Lbr 86,293.00 Sakura Roof
34 Atap Metal Genteng 2 x 4 ( Elang ) Ukuran 77 x Lbr 114,630.00 Sakura Roof
35 Atap Metal Genteng 2 x 4 ( Garuda ) Ukuran 77 x Lbr 127,381.00 Sakura Roof
36 Atap Metal Genteng 1 x 4 ( Merpati ) Ukuran 38.5 x Lbr 43,789.00 Sakura Roof
37 Atap Metal Genteng 1 x 4 ( Elang ) Ukuran 38.5 x Lbr 59,374.00 Sakura Roof
38 Atap Metal Genteng 1 x 4 ( Garuda ) Ukuran 38.5 x Lbr 65,041.00 Sakura Roof
39 Atap Metal Nok model U Ukuran 110 x Bh 38,122.00 Sakura Roof
40 Atap Metal Nok Model C Ukuran R. 9 - 9,5 c Bh 29,621.00 Sakura Roof
41 Atap Metal Nok samping Ukuran 110 x Bh 46,622.00 Surya Roof
42 Atap Metal Wall Flashing Ukuran 110 x Bh 46,622.00 Surya Color
43 Atap Metal Tutup Nok Bh 36,705.00 Surya Roof
Page 20 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
25 Atap Aluminium Klip Lok (Bima) Tebal 0,45 mm TCT, M2 151,940.00 Persada
26 Atap Aluminium Spandek (Satria) Tebal 0,45 mm TCT, M2 177,620.00 Persada
2
27 Atap Aluminium Spandek (Satria) Tebal 0,45 mm TCT, M 135,890.00 Persada
28 Atap Aluminium Spandek (Satria) Tebal 0,40 mm TCT, M2 158,360.00 Persada
2
29 Atap Aluminium Spandek (Satria) Tebal 0,40 mm TCT, M 121,980.00 Persada
30 Atap Aluminium Spandek (Satria) Tebal 0,35 mm TCT, M2 144,450.00 Persada
2
31 Atap Aluminium Spandek (Satria) Tebal 0,35 mm TCT, M 109,140.00 Persada
32 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,45 mm TCT, M2 162,640.00 Persada
2
33 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,45 mm TCT, M 127,330.00 Persada
34 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,40 mm TCT, M2 146,590.00 Persada
2
35 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,40 mm TCT, M 113,420.00 Persada
36 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,35 mm TCT, M2 133,750.00 Persada
2
37 Atap Aluminium Trimdek ( Arjuna ) Tebal 0,35 mm TCT, M 99,510.00 Persada
Page 21 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
17 Rockwoll Slab D. 80 Kg/M 3
Teba 50 mm x Roll 47,080.00
18 Rockwoll Slab D. 100 Kg/M3 Teba 25 mm x Roll 31,030.00
19 Rockwoll Slab D. 100 Kg/M 3
Teba 50 mm x Roll 59,385.00
20 Rockwoll Blanket D. 40 Kg/M3 Teba 25 mm x Roll 50,290.00
21 Rockwoll Blanket D. 40 Kg/M 3
Teba 50 mm x Roll 100,580.00
22 Rockwoll Blanket D. 60 Kg/M3 Teba 25 mm x Roll 71,155.00
23 Rockwoll Blanket D. 60 Kg/M 3
Teba 50 mm x Roll 156,220.00
24 Rockwoll Blanket D. 80 Kg/M3 Teba 25 mm x Roll 94,160.00
25 Rockwoll Blanket D. 80 Kg/M 3
Teba 50 mm x Roll 190,995.00
26 Rockwoll Blanket D. 100 Kg/M3 Teba 25 mm x Roll 118,770.00
27 Rockwoll Blanket D. 100 Kg/M 3
Teba 50 mm x Roll 244,495.00
28 Aluminium Foil Lebar 1,25 m Panjang 60 m (Single Side) Lbr 310,300.00 AB Foil
29 Aluminium Foil Lebar 1,25 m Panjang 60 m (Double Side) Lbr 548,910.00 AB Foil
Page 22 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
36 Casement Stay CMT75-030" US32D Psg 437,663.00 Kend
37 Casement Stay CMT45-008" US32D Psg 108,962.00 Kend
38 Grendel Tanam 306 6" BRS Bh 260,561.00 Kend
39 Grendel Tanam 306 12" BRS Bh 386,658.00 Kend
40 Grendel 440 3" US 3 Bh 114,630.00 Kend
41 Grendel 440 4" US 3 Bh 133,048.00 Kend
42 Grendel WC SKT 741 (Indicator) US 32D Bh 181,220.00 Kend
43 Security Bolt 5071 + Key BRS Bh 120,297.00 Kend
44 Door Viewer 36 - 60 mm US 3 Bh 130,214.00 Kend
45 Door Selector RC 75-002 US 32D Bh 191,137.00 Kend
46 Ramskar 321 US 3 Bh 184,053.00 Kend
47 Rambuncis 330 US 3 Bh 529,756.00 Kend
48 Spring Knip 75 - 378 US 3 Bh 215,223.00 Kend
49 Door Stop 75 - 011 US 3 Bh 210,973.00 Kend
50 Door Stop 75 - 011 US 15 Bh 210,973.00 Kend
51 Door Stop 75 - 012 US 4 Bh 226,558.00 Kend
X.3.13.2. Closet
1 Closet Jongkok CE 9 Bh 297,928.00 Toto
2 Closet Jongkok CE 7 Bh 849,956.00 Toto
3 Closet Jongkok Bh 212,390.00 Duty
4 Closet Jongkok Rapi C Squat Bh 57,107.00 Amstad
5 Closet Jongkok Rapi EX Squat Bh 304,483.00 Amstad
6 Closet Jongkok Rapi DX Top Spud Squat + Flush Valve Squat TS Bh 3,296,793.00 Amstad
7 Closet Duduk CW 668 J/SW 668 J Set 5,667,123.00 Toto
8 Closet Duduk One Piece Toilet Champion One Piece Toi Set 9,067,476.00 Amstad
9 Closet Duduk One Piece Toilet Lexington One Piece Toi Set 9,355,089.00 Amstad
10 Closet Duduk One Piece Toilet Hamilton One Piece Toil Set 7,110,856.00 Amstad
11 Closet Duduk One Piece Toilet Sanremo Classic One Pie Set 6,053,913.00 Amstad
12 Closet Duduk Close Coupled Toilet Granada 3000 CCST Set 3,813,930.00 Amstad
13 Closet Duduk Close Coupled Toilet Projecta CCST Set 3,561,737.00 Amstad
Page 23 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
4 Kran air Bh 332,819.00 San Ei
5 Kran air Bh 48500
6 Kran tembok Bh 304,483.00 Toto
7 Kran air Wall Tap IN 301C Wall Tap Chrome 1/2" Bh 184,053.00 Amstad
8 Kran air Wall Tap IN 301A Wall Tap Acrylic 1/2" Bh 184,053.00 Amstad
9 Kran air Wall Tap IN 26 Garden Wall Tap Chrome 1/2" Bh 212,390.00 Amstad
10 Kran air Wall Tap IN 24 Double Faucet 2 in 1 W/M Chrome 1/ Bh 184,053.00 Amstad
11 Kran air Wall Tap IN 301C Wall Tap Chrome 1/2" Bh 396,575.00 Amstad
X.3.13.4. Wastafel
1 Wastafel Type LW 650 J/LW 650 FJ Bh 8,843,619.00 Toto
2 Wastafel Type LW 501 J Bh 4,739,110.00 Toto
3 Wastafel Type L 34 Bh 1,902,648.00 Toto
4 Wastafel Type L 529 V1 Bh 2,618,139.00 Toto
5 Wastafel Lavatory and Pedestal San Remo 55 Bh 2,880,250.00 Amstad
6 Wastafel Lavatory and Pedestal Nevada Bh 2,728,651.00 Amstad
7 Wastafel Vanitory Monaco Bh 1,097,898.00 Amstad
8 Wastafel Vanitory Rondalyn Bh 791,866.00 Amstad
9 Wastafel Vanitory Aqualyn Bh 726,693.00 Amstad
10 Wastafel Wall Hung Lavatory Studio 50 Bh 2,147,757.00 Amstad
11 Wastafel Wall Hung Lavatory Studio 45 Bh 2,081,167.00 Amstad
12 Wastafel Wall Hung Lavatory Studio 35 Bh 1,969,239.00 Amstad
X.3.13.5. Urinal
1 Urinal Top Spud Urinal Washbrook Bh 5,702,543.00 Amstad
2 Urinal Top Spud Urinal Mini Washbrook Bh 4,288,563.00 Amstad
3 Urinal Top Spud Urinal Maybrook II Bh 3,641,079.00 Amstad
4 Urinal Divider Bh 753,613.00 Amstad
X.3.14. Pipa
X.3.14.1. Pipa Besi
1 Pipa Besi ø 1/2" Panjang 4 m Btg 378,157.00
2 Pipa Besi ø 3/4" Panjang 4 m Btg 495,752.00
3 Pipa Besi ø 2" Panjang 4 m Btg 1,398,263.00
Page 24 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
3 Pipa PVC ø 1" Btg 42372
4 Pipa PVC ø 1 1/2" Btg 91,960.00
5 Pipa PVC ø 2" Putih Btg 56540 Maspion
6 Pipa PVC ø 3" Btg 200000
7 Pipa PVC ø 4" Btg 250000
8 Pipa PVC ø 4" Btg 12,425,324.00 Butterfly KV
9 Pipa PVC ø 16" (400 mm) Btg 64,571,154.00 Butterfly KV
10 Pipa PVC ø 24" (600 mm) Btg 84,320,121.00 Butterfly KV
Page 25 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
8 Pipa PVC ø 2 1/2" Pjg 4m Btg 130,540.00 Supralon
9 Pipa PVC ø 3" Pjg 4m Btg 200000 Supralon
10 Pipa PVC ø 4" Pjg 4m Btg 250000 Supralon
11 Pipa PVC ø 5" Pjg 4m Btg 428,000.00 Supralon
12 Pipa PVC ø 6" Pjg 4m Btg 650000 Supralon
13 Pipa PVC ø 8" Pjg 4m Btg 1,027,200.00 Supralon
14 Pipa PVC ø 10" Pjg 4m Btg 1,655,290.00 Supralon
15 Pipa PVC ø 12" Pjg 4m Btg 2,265,725.00 Supralon
16 Pipa PVC ø 14" Pjg 4m Btg 2,795,910.00 Supralon
17 Pipa PVC ø 16" Pjg 4m Btg 3,161,315.00 Supralon
18 Pipa PVC ø 3/4" Pjg 6m Btg 43,870.00 Supralon
19 Pipa PVC ø 1" Pjg 6m Btg 54,035.00 Supralon
20 Pipa PVC ø 1 1/4" Pjg 6m Btg 76,505.00 Supralon
21 Pipa PVC ø 1 1/2" Pjg 6m Btg 100,580.00 Supralon
22 Pipa PVC ø 2" Pjg 6m Btg 150,870.00 Supralon
23 Pipa PVC ø 2 1/2" Pjg 6m Btg 194,205.00 Supralon
24 Pipa PVC ø 3" Pjg 6m Btg 276,060.00 Supralon
25 Pipa PVC ø 4" Pjg 6m Btg 403,925.00 Supralon
26 Pipa PVC ø 5" Pjg 6m Btg 639,325.00 Supralon
27 Pipa PVC ø 6" Pjg 6m Btg 843,695.00 Supralon
28 Pipa PVC ø 8" Pjg 6m Btg 1,310,215.00 Supralon
29 Pipa PVC ø 10" Pjg 6m Btg 1,867,150.00 Supralon
30 Pipa PVC ø 12" Pjg 6m Btg 2,687,840.00 Supralon
31 Pipa PVC ø 14" Pjg 6m Btg 3,748,745.00 Supralon
32 Pipa PVC ø 16" Pjg 6m Btg 4,698,370.00 Supralon
Page 26 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
24 Pipa PVC ø 12" Pjg 6m Btg 1,830,770.00 Supralon
25 Pipa PVC ø 14" Pjg 6m Btg 2,403,755.00 Supralon
26 Pipa PVC ø 16" Pjg 6m Btg 3,113,165.00 Supralon
Page 27 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
12 Pipa Air ø 1/2" Air Btg 81,320.00 Spindo
13 Pipa Air ø 3/4" Air Btg 102,720.00 Spindo
14 Pipa Air ø 1" Air Btg 141,240.00 Spindo
15 Pipa Air ø 1 1/4" Air Btg 181,900.00 Spindo
16 Pipa Air ø 1 1/2" Air Btg 240,750.00 Spindo
17 Pipa Air ø 2" Air Btg 339,190.00 Spindo
18 Pipa Air ø 2 1/2" Air Btg 466,520.00 Spindo
19 Pipa Air ø 3" Air Btg 573,520.00 Spindo
20 Pipa Air ø 4" Air Btg 759,700.00 Spindo
21 Pipa Air ø 5" Air Btg 1,074,280.00 Spindo
22 Pipa Air ø 6" Air Btg 1,302,190.00 Spindo
Page 28 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
14 Pipa Air ø 3/4" Air Btg 527,510.00 Spindo
15 Pipa Air ø 1" Air Btg 664,470.00 Spindo
16 Pipa Air ø 1 1/4" Air Btg 753,280.00 Spindo
17 Pipa Air ø 1 1/2" Air Btg 1,027,200.00 Spindo
18 Pipa Air ø 2" Air Btg 1,335,360.00 Spindo
19 Pipa Air ø 2 1/2" Air Btg 1,890,690.00 Spindo
20 Pipa Air ø 3" Air Btg 2,670,720.00 Spindo
21 Pipa Air ø 4" Air Btg 3,766,400.00 Spindo
22 Pipa Air ø 5" Air Btg 4,108,800.00 Spindo
23 Pipa Air ø 6" Air Btg 5,409,920.00 Spindo
24 Pipa Air ø 8" Air Btg 8,901,330.00 Spindo
Page 29 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
12 Pipa Air ø 8" Hitam Btg 5,134,930.00 Spindo
13 Pipa Air ø 1/2" Air Btg 205,440.00 Spindo
14 Pipa Air ø 3/4" Air Btg 267,500.00 Spindo
15 Pipa Air ø 1" Air Btg 404,460.00 Spindo
16 Pipa Air ø 1 1/4" Air Btg 513,600.00 Spindo
17 Pipa Air ø 1 1/2" Air Btg 595,990.00 Spindo
18 Pipa Air ø 2" Air Btg 853,860.00 Spindo
19 Pipa Air ø 2 1/2" Air Btg 1,232,640.00 Spindo
20 Pipa Air ø 3" Air Btg 1,506,560.00 Spindo
21 Pipa Air ø 4" Air Btg 2,054,400.00 Spindo
22 Pipa Air ø 5" Air Btg 2,602,240.00 Spindo
23 Pipa Air ø 6" Air Btg 3,218,560.00 Spindo
24 Pipa Air ø 8" Air Btg 6,436,050.00 Spindo
X.3.14.5.2. Bushing
1 Bushing ø 3/4" Bh 6,313.00
Page 30 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
2 Bushing ø 1" Bh 9,202.00
3 Bushing ø 1 1/4" Bh 1,498.00
4 Bushing ø 1 1/2" Bh 18,725.00
5 Bushing ø 2" Bh 24,610.00
6 Bushing ø 2 1/2" Bh 42,800.00
7 Bushing ø 3" Bh 59,920.00
8 Bushing ø 4" Bh 111,280.00
9 Bushing ø 5" Bh 256,800.00
10 Bushing ø 6" Bh 314,580.00
X.3.14.5.3. Cap
1 Cap ø 1/2" Bh 5,136.00
2 Cap ø 3/4" Bh 6,206.00
3 Cap ø 1" Bh 8,560.00
4 Cap ø 1 1/4" Bh 12,519.00
5 Cap ø 1 1/2" Bh 17,120.00
6 Cap ø 2" Bh 23,968.00
7 Cap ø 2 1/2" Bh 485,780.00
8 Cap ø 3" Bh 68,480.00
9 Cap ø 4" Bh 111,280.00
10 Cap ø 5" Bh 285,690.00
11 Cap ø 6" Bh 371,290.00
X.3.14.5.4. Cross
1 Cross ø 1/2" Bh 25,680.00
2 Cross ø 3/4" Bh 32,100.00
3 Cross ø 1" Bh 40,660.00
4 Cross ø 1 1/4" Bh 57,780.00
5 Cross ø 1 1/2" Bh 74,900.00
6 Cross ø 2" Bh 97,370.00
7 Cross ø 2 1/2" Bh 188,320.00
8 Cross ø 3" Bh 256,800.00
X.3.14.5.5. Elbow 45
1 Elbow 45 ø 1/2" Bh 10,700.00
2 Elbow 45 ø 3/4" Bh 12,840.00
3 Elbow 45 ø 1" Bh 18,190.00
4 Elbow 45 ø 1 1/4" Bh 26,750.00
5 Elbow 45 ø 1 1/2" Bh 36,380.00
6 Elbow 45 ø 2" Bh 48,150.00
7 Elbow 45 ø 2 1/2" Bh 99,510.00
8 Elbow 45 ø 3" Bh 144,450.00
9 Elbow 45 ø 4" Bh 272,850.00
10 Elbow 45 ø 5" Bh 642,000.00
11 Elbow 45 ø 6" Bh 856,000.00
X.3.14.5.6. Elbow 90
1 Elbow 90 ø 1/2" Bh 3,424.00
2 Elbow 90 ø 3/4" Bh 6,848.00
3 Elbow 90 ø 1" Bh 6,848.00
Page 31 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
4 Elbow 90 ø 1 1/4" Bh 10,272.00
5 Elbow 90 ø 1 1/2" Bh 13,696.00
6 Elbow 90 ø 2" Bh 22,470.00
7 Elbow 90 ø 2 1/2" Bh 44,940.00
8 Elbow 90 ø 3" Bh 67,410.00
9 Elbow 90 ø 4" Bh 119,840.00
10 Elbow 90 ø 5" Bh 41,516.00
11 Elbow 90 ø 6" Bh 481,500.00
X.3.14.5.8. Nipple
1 Nipple ø 1/2" Bh 5,778.00
2 Nipple ø 3/4" Bh 6,848.00
3 Nipple ø 1" Bh 11,235.00
4 Nipple ø 1 1/4" Bh 15,515.00
5 Nipple ø 1 1/2" Bh 21,400.00
6 Nipple ø 2" Bh 32,100.00
7 Nipple ø 2 1/2" Bh 51,360.00
8 Nipple ø 3" Bh 85,600.00
9 Nipple ø 4" Bh 143,380.00
10 Nipple ø 5" Bh 314,580.00
11 Nipple ø 6" Bh 513,600.00
Page 32 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
Page 33 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
1 DOP PVC ø 2" Bh 31,030.00 Rubbering
2 DOP PVC ø 3" Bh 58,850.00 Rubbering
3 DOP PVC ø 4" Bh 113,420.00 Rubbering
4 DOP PVC ø 6" Bh 173,340.00 Rubbering
X.3.14.5.18. Plug
1 Plug ø 1/2" Bh 3,210.00
2 Plug ø 3/4" Bh 3,745.00
Page 34 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
3 Plug ø 1" Bh 6,420.00
4 Plug ø 1 1/4" Bh 7,490.00
5 Plug ø 1 1/2" Bh 8,025.00
6 Plug ø 2" Bh 10,272.00
7 Plug ø 2 1/2" Bh 22,470.00
8 Plug ø 3" Bh 29,960.00
9 Plug ø 4" Bh 53,500.00
10 Plug ø 5" Bh 143,380.00
11 Plug ø 6" Bh 188,320.00
Page 35 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
2 Round Flens ø 3/4" Bh 10,272.00
3 Round Flens ø 1" Bh 12,626.00
4 Round Flens ø 1 1/4" Bh 17,120.00
5 Round Flens ø 1 1/2" Bh 20,544.00
6 Round Flens ø 2" Bh 25,145.00
7 Round Flens ø 2 1/2" Bh 42,158.00
8 Round Flens ø 3" Bh 53,714.00
9 Round Flens ø 4" Bh 82,176.00
10 Round Flens ø 5" Bh 134,820.00
11 Round Flens ø 6" Bh 150,870.00
X.3.14.5.24. Sock
1 Sock ø 1/2" Bh 2,354.00
2 Sock ø 3/4" Bh 3,424.00
3 Sock ø 1" Bh 5,778.00
4 Sock ø 1 1/4" Bh 4,815.00
5 Sock ø 1 1/2" Bh 10,272.00
6 Sock ø 2" Bh 14,873.00
7 Sock ø 2 1/2" Bh 29,746.00
8 Sock ø 3" Bh 52,965.00
9 Sock ø 4" Bh 75,328.00
10 Sock ø 5" Bh 188,320.00
11 Sock ø 6" Bh 293,715.00
X.3.14.5.25. Tee
1 Tee ø 1/2" Bh 4,601.00
2 Tee ø 3/4" Bh 5,778.00
3 Tee ø 1" Bh 10,272.00
4 Tee ø 1 1/4" Bh 13,696.00
5 Tee ø 1 1/2" Bh 18,297.00
6 Tee ø 2" Bh 41,088.00
7 Tee ø 2 1/2" Bh 70,834.00
8 Tee ø 3" Bh 90,201.00
9 Tee ø 4" Bh 150,656.00
10 Tee ø 5" Bh 414,304.00
11 Tee ø 6" Bh 564,960.00
X.3.14.5.26. Union
1 Union ø 1/2" Bh 13,696.00
2 Union ø 3/4" Bh 18,297.00
3 Union ø 1" Bh 21,721.00
4 Union ø 1 1/4" Bh 29,746.00
5 Union ø 1 1/2" Bh 38,734.00
6 Union ø 2" Bh 59,385.00
7 Union ø 2 1/2" Bh 90,201.00
8 Union ø 3" Bh 150,656.00
9 Union ø 6" Bh 715,509.00
X.3.14.6. Lem
1 Lem PVC Kecil 1/2 Kg Klg 37,450.00
Page 36 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
2 Lem PVC Kecil 1/4 Kg (2 ons) Klg 8,560.00
3 Lem PVC Klg 64,200.00
4 Seltif TBA Bh 5,350.00
Page 37 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
5 Seltif Bh 5,350.00
X.3.16. Aspal
1 Aspal Kg 17000
2 Alat Bantu Ls 13,109.00
3 Filler (M05) Kg 1,192.00
4 Bahan Pengisi (filler tambahan) Pakai Harga Semen Kg 1700
5 Asbuton Halus (M55) Ton 430,208.00
6 Bunker Oil (M54) ltr 6,488.00
7 Aspal Emulsi (M31) Kg 15,757.00
Page 38 of 677
No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk
###
3 Filter, Strippe, dll ls 26,350.00
4 Plastik Polithelene Uk L= 1.00 P= 1.50 t=0.04 - 0.07 m2 Super
5 Bahan Modifikasi (M67) Kg 102,156.00
6 Bahan Anti Pengelupasan (anti stripping agent) Kg 74,019.00
7 Anchorge (M65) bh 675,171.00
8 Ducting (Strand prestress) (M71) m1 68,060.00
9 Bahan Pengawet kresot (M63) ltr 9,799.00
10 Tiang Pancang Beton Pratekan (M50) M3 561,241.00
11 Expansion Joint tipe Asphaltic Plug Kg 15,757.00
12 Gebalan rumput m2 72,694.00
13 Pohon bh 119,039.00
14 Tanah humus M3 370,622.00
15 Pupuk kg 42000
16 Rel Pengaman m1 412,500.00
17 Paku Jalan bh 21400
Page 39 of 677
REKAP ANALISA SNI
RJ YG DIPAKAI
1 PEKERJAAN TANAH
2 PEKERJAAN PONDASI
Page 40 of 677
N0 KODE PEKERJAAN SAT HARGA SATUAN KET
3.1 Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 + 2) cm m3 1,170,310
w/c = 0,87
3.2 Membuat beton mutu f'c = 9,8 MPa (K 125), slump (12 + 2) cm m3 1,212,849
w/c = 0,78
3.3 Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12 + 2) cm m3 1,245,846
w/c = 0,72
3.4 Membuat lantai kerja beton mutu f'c = 7,4 MPa (K 100), m3 1,102,522
3.5 Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm m3 1,285,199
w/c = 0,66
3.6 Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12 + 2)cm m3 1,322,351
w/c = 0,61
3.7 Membuat beton mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm m3 1,350,952
w/c = 0,58
3.8 Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 + 2) cm m3 1,368,945
w/c = 0,56
3.9 Membuat beton mutu f'c = 24,0MPa (K 275), slump (12 + 2) cm m3 1,400,135
w/c = 0,53
3.1 Membuat beton mutu f'c = 26,4 MPa (K 300), slump (12 + 2) cm m3 1,409,667
w/c = 0,52
3.11 Membuat beton mutu f'c = 28,8 MPa (K 325), slump (12 + 2) cm m3 1,499,278
w/c = 0,49
3.12 Membuat beton mutu f'c =31,2 MPa (K 350), slump (12 + 2) cm m3 1,511,895
w/c = 0,48
3.17 Memasang 10 kg jaring kawat baja/wire mesh dengan besi polos kg 118,513
3.18 Memasang 10 kg jaring kawat baja/wire mesh dengan besi ulir kg 129,013
Page 41 of 677
N0 KODE PEKERJAAN SAT HARGA SATUAN KET
4 PEKERJAAN DINDING
campuran 1 PC : 2 PP
campuran 1 PC : 3 PP
4.11 Memasang 1 m2 dinding bata merah tebal 1/2 bata, m2 185,973
campuran 1 PC : 4 PP
campuran 1 PC : 6 PP
campuran 1 PC : 8 PP
camp spesi 1 PC : 3 PP
camp spesi 1 PC : 4 PP
camp spesi 1 PC : 3 PP
5. PEKERJAAN PLESTERAN
Page 42 of 677
N0 KODE PEKERJAAN SAT HARGA SATUAN KET
5.17 Memasang finishing siar pasangan dinding bata merah (=20 m') m2 29,057
5.18 Memasang finishing siar pas. dinding conblock ekspose (=8 m') m2 14,674
5.19 Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 61,917
6. PEKERJAAN KAYU
kayu kelas I
kayu kelas II
kelas I atau II
kelas I atau II
kelas I
6.25 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II atau III m2 183,420
Page 43 of 677
N0 KODE PEKERJAAN SAT HARGA SATUAN KET
6.26 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III m2 194,497
6.27 Memasang rangka langit-langit (100 x 100) cm, kayu kelas III m2 99,532
6.28 Memasang rangka langit-langit (30 x 60) cm, kayu kelas III m2 141,276
6.29 Memasang rangka langit-langit (30 x 30) cm, kayu kelas III m2 166,824
6.50 Pekerjaan Lantai Jembatan Papan Ulin Yang Dipaku diatas gelagar m2 304,847
8. PEKERJAAN LANGIT-LANGIT
Page 44 of 677
N0 KODE PEKERJAAN SAT HARGA SATUAN KET
9 PEKERJAAN PENGECATAN
9.6 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Cat Penutup M2 27,421
9.7 Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lapis Cat Pebutup) M2 24,442
9.8 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Vinilex M2 18,942
9.9 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mowilex M2 29,653
10 PEKERJAAN SANITASI
Page 45 of 677
ANALISA SNI
KOTA BALIKPAPAN
1.19a Sandbag m3
0.300 Oh Pekerja Tidak terampil 89,653.85 26,896.16 26896.16
0.010 Oh Mandor 127,009.61 1,270.10 1270.1
1.100 M3 Pasir Urug 100,000.00 110,000.00 110000
218.000 Kg Semen 1,700.00 370,600.00 370600
21.000 Oh Karung 2,500.00 52,500.00 52500
28,166.26 561266.26
2 PEKERJAAN PONDASI
3.1 Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 + 2) cm m3
w/c = 0,87
247.000 kg Portland Cement 1,700.00 419,900.00 419900
0.621 m3 Pasir ex Palu 370,623.00 230,050.99 230050.99
0.740 m3 Kerikil (max 30mm) 425,000.00 314,500.00 314500
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 975,200.99 1170310.18
3.2 Membuat beton mutu f'c = 9,8 MPa (K 125), slump (12 + 2) cm m3
w/c = 0,78
276.000 kg Portland Cement 1,700.00 469,200.00 469200
0.591 m3 Pasir ex Palu 370,623.00 219,197.03 219197.03
0.750 m3 Kerikil (max 30mm) 425,000.00 318,592.59 318592.59
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,017,739.62 1212848.81
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan Rp. Upah Bahan Jumlah
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan Rp. Upah Bahan Jumlah
3.3 Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12 + 2) cm m3
w/c = 0,72
299.000 kg Portland Cement 1,700.00 508,300.00 508300
0.571 m3 Pasir ex Palu 370,623.00 211,519.84 211519.84
0.753 m3 Kerikil (max 30mm) 425,000.00 320,166.67 320166.67
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,050,736.51 1245845.7
3.4 Membuat lantai kerja beton mutu f' c = 7,4 MPa (K 100), m3
slump (3-6)cm, w/c = 0,87
230.000 kg Portland Cement 1,700.00 391,000.00 391000
0.638 m3 Pasir ex Palu 370,623.00 236,404.53 236404.53
0.761 m3 Kerikil (max 30mm) 425,000.00 323,314.81 323314.81
200.000 ltr Air 50.00 10,000.00 10000
1.200 OH Pekerja Tidak terampil 89,653.85 107,584.62 107584.62
0.200 OH Tukang batu 119,538.46 23,907.69 23907.69
0.020 OH Kepala tukang 134,480.76 2,689.62 2689.62
0.060 OH Mandor 127,009.61 7,620.58 7620.58
141,802.51 960,719.34 1102521.85
3.5 Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm m3
w/c = 0,66
326.000 kg Portland Cement 1,700.00 554,200.00 554200
0.543 m3 Pasir ex Palu 370,623.00 201,195.34 201195.34
0.762 m3 Kerikil (max 30mm) 425,000.00 323,944.44 323944.44
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,090,089.78 1285198.97
3.6 Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12 + 2)cm m3
w/c = 0,61
352.000 kg Portland Cement 1,700.00 598,400.00 598400
0.522 m3 Pasir ex Palu 370,623.00 193,518.15 193518.15
0.764 m3 Kerikil (max 30mm) 425,000.00 324,574.07 324574.07
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,127,242.22 1322351.41
3.7 Membuat beton mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm m3
w/c = 0,58
371.000 kg Portland Cement 1,700.00 630,700.00 630700
0.499 m3 Pasir ex Palu 370,623.00 184,782.04 184782.04
0.776 m3 Kerikil (max 30mm) 425,000.00 329,611.11 329611.11
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,155,843.15 1350952.34
3.8 Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 + 2) cm m3
w/c = 0,56
384.000 kg Portland Cement 1,700.00 652,800.00 652800
0.494 m3 Pasir ex Palu 370,623.00 183,193.65 183193.65
0.770 m3 Kerikil (max 30mm) 425,000.00 327,092.59 327092.59
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan Rp. Upah Bahan Jumlah
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,173,836.24 1368945.43
3.10 Membuat beton mutu f'c = 26,4 MPa (K 300), slump (12 + 2) cm m3
w/c = 0,52
413.000 kg Portland Cement 1,700.00 702,100.00 702100
0.486 m3 Pasir ex Palu 370,623.00 180,281.62 180281.62
0.756 m3 Kerikil (max 30mm) 425,000.00 321,425.93 321425.93
215.000 ltr Air 50.00 10,750.00 10750
1.650 OH Pekerja Tidak terampil 89,653.85 147,928.85 147928.85
0.275 OH Tukang batu 119,538.46 32,873.08 32873.08
0.028 OH Kepala tukang 134,480.76 3,765.46 3765.46
0.083 OH Mandor 127,009.61 10,541.80 10541.8
195,109.19 1,214,557.55 1409666.74
3.11 Membuat beton mutu f'c = 28,8 MPa (K 325), slump (12 + 2) cm m3
w/c = 0,49
439.000 kg Portland Cement 1,700.00 746,300.00 746300
0.479 m3 Pasir ex Palu 370,623.00 177,369.58 177369.58
0.745 m3 Kerikil (max 30mm) 425,000.00 316,703.70 316703.7
215.000 ltr Air 50.00 10,750.00 10750
2.100 OH Pekerja Tidak terampil 89,653.85 188,273.09 188273.09
0.350 OH Tukang batu 119,538.46 41,838.46 41838.46
0.035 OH Kepala tukang 134,480.76 4,706.83 4706.83
0.105 OH Mandor 127,009.61 13,336.01 13336.01
248,154.39 1,251,123.28 1499277.67
3.12 Membuat beton mutu f'c =31,2 MPa (K 350), slump (12 + 2) cm m3
w/c = 0,48
448.000 kg Portland Cement 1,700.00 761,600.00 761600
0.476 m3 Pasir ex Palu 370,623.00 176,575.39 176575.39
0.741 m3 Kerikil (max 30mm) 425,000.00 314,814.81 314814.81
215.000 ltr Air 50.00 10,750.00 10750
2.100 OH Pekerja Tidak terampil 89,653.85 188,273.09 188273.09
0.350 OH Tukang batu 119,538.46 41,838.46 41838.46
0.035 OH Kepala tukang 134,480.76 4,706.83 4706.83
0.105 OH Mandor 127,009.61 13,336.01 13336.01
248,154.39 1,263,740.20 1511894.59
4 PEKERJAAN DINDING
5. PEKERJAAN PLESTERAN
5.17 Memasang finishing siar pasangan dinding bata merah (=20 m') m2
3.108 kg Portland Cement 1,700.00 5,283.60 5283.6
0.150 OH Pekerja Tidak terampil 89,653.85 13,448.08 13448.08
0.070 OH Tukang batu 119,538.46 8,367.69 8367.69
0.007 OH Kepala tukang 134,480.76 941.37 941.37
0.008 OH Mandor 127,009.61 1,016.08 1016.08
23,773.22 5,283.60 29056.82
5.18 Memasang finishing siar pas. dinding conblock ekspose (=8 m') m2
1.600 kg Portland Cement 1,700.00 2,720.00 2720
0.075 OH Pekerja Tidak terampil 89,653.85 6,724.04 6724.04
0.035 OH Tukang batu 119,538.46 4,183.85 4183.85
0.004 OH Kepala tukang 134,480.76 537.92 537.92
0.004 OH Mandor 127,009.61 508.04 508.04
11,953.85 2,720.00 14673.85
6. PEKERJAAN KAYU
6.25 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II atau III m2
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan Rp. Upah Bahan Jumlah
0.015 m3 Kaso-kaso (5 x 7) cm 8,000,000.00 123,200.00 123200
0.200 kg Paku 7 cm - 10 cm 20,000.00 4,000.00 4000
0.150 OH Pekerja Tidak terampil 89,653.85 13,448.08 13448.08
0.250 OH Tukang kayu 119,538.46 29,884.62 29884.62
0.025 OH Kepala tukang 134,480.76 3,362.02 3362.02
0.075 OH Mandor 127,009.61 9,525.72 9525.72
56,220.44 127,200.00 183420.44
6.26 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III m2
0.016 m3 Kaso-kaso (5 x 7) cm 8,000,000.00 130,400.00 130400
0.250 kg Paku 7 cm - 10 cm 20,000.00 5,000.00 5000
0.200 OH Pekerja Tidak terampil 89,653.85 17,930.77 17930.77
0.300 OH Tukang kayu 119,538.46 35,861.54 35861.54
0.030 OH Kepala tukang 134,480.76 4,034.42 4034.42
0.010 OH Mandor 127,009.61 1,270.10 1270.1
59,096.83 135,400.00 194496.83
6.27 Memasang rangka langit-langit (100 x 100) cm, kayu kelas III m2
0.012 m3 Balok kayu 3,442,593.00 41,311.12 41311.12
0.100 kg Paku 2" - 5" 20,000.00 2,000.00 2000
0.150 OH Pekerja Tidak terampil 89,653.85 13,448.08 13448.08
0.250 OH Tukang kayu 119,538.46 29,884.62 29884.62
0.025 OH Kepala tukang 134,480.76 3,362.02 3362.02
0.075 OH Mandor 127,009.61 9,525.72 9525.72
56,220.44 43,311.12 99531.56
6.28 Memasang rangka langit-langit (30 x 60) cm, kayu kelas III m2
0.023 m3 Balok kayu 3,442,593.00 79,179.64 79179.64
0.150 kg Paku 2" - 5" 20,000.00 3,000.00 3000
0.200 OH Pekerja Tidak terampil 89,653.85 17,930.77 17930.77
0.300 OH Tukang kayu 119,538.46 35,861.54 35861.54
0.030 OH Kepala tukang 134,480.76 4,034.42 4034.42
0.010 OH Mandor 127,009.61 1,270.10 1270.1
59,096.83 82,179.64 141276.47
6.29 Memasang rangka langit-langit (30 x 30) cm, kayu kelas III m2
0.027 m3 Balok kayu 3,442,593.00 92,950.01 92950.01
0.200 kg Paku 2" - 5" 20,000.00 4,000.00 4000
0.250 OH Pekerja Tidak terampil 89,653.85 22,413.46 22413.46
0.350 OH Tukang kayu 119,538.46 41,838.46 41838.46
0.030 OH Kepala tukang 134,480.76 4,034.42 4034.42
0.013 OH Mandor 127,009.61 1,587.62 1587.62
69,873.96 96,950.01 166823.97
6.31 Memasang lisplank (2.5 x 20) cm, kayu kelas II atau III m2
0.011 m3 Papan Kayu (Meranti) 3,442,593.00 37,180.00 37180
0.050 kg Paku 2" - 5" 20,000.00 1,000.00 1000
0.100 OH Pekerja Tidak terampil 89,653.85 8,965.39 8965.39
0.200 OH Tukang kayu 119,538.46 23,907.69 23907.69
0.020 OH Kepala tukang 134,480.76 2,689.62 2689.62
0.005 OH Mandor 127,009.61 635.05 635.05
36,197.75 38,180.00 74377.75
6.50 Pekerjaan Lantai Jembatan Papan Ulin Yang Dipaku diatas gelagar m2
0.100 Oh Pekerja 89,653.85 8,965.39 8965.39
0.250 Oh Tukang Kayu 119,538.46 29,884.62 29884.62
0.025 Oh Kepala Tukang 134,480.76 3,362.02 3362.02
0.005 Oh Mandor 127,009.61 635.05 635.05
0.031 M3 Papan Ulin 8,000,000.00 248,000.00 248000
0.400 Kg Paku Biasa 35,000.00 14,000.00 14000
262,635.05 42,212.03 304847.08
8. PEKERJAAN LANGIT-LANGIT
8.1 Memasang 1 m2 langit-langit plywood, uk (60 x 120) cm, tebal 4 mm m2
0.375 lbr Plywood 4' x 8' x 4 mm 75,000.00 28,125.00 28125
0.030 kg Paku 35,000.00 1,050.00 1050
0.070 OH Pekerja Tidak terampil 89,653.85 6,275.77 6275.77
0.100 OH Tukang kayu 119,538.46 11,953.85 11953.85
0.010 OH Kepala tukang 134,480.76 1,344.81 1344.81
0.004 OH Mandor 127,009.61 444.53 444.53
20,018.96 29,175.00 49193.96
9 PEKERJAAN PENGECATAN
.
9.1 Mencuci Bidang Permukaan Tembok yang pernah dicat M2
0.150 Oh Pekerja Tidak terampil 89,653.85 13,448.08 13448.08
0.003 Oh Mandor 127,009.61 317.52 317.52
0.050 Kg Sabun 15,000.00 750.00 750
Jumlah 13,765.60 750.00 14515.6
9.2 Mengerok Karat Cat Lama Permukaan Baja Dengan cara manual M2
0.150 Oh Pekerja Tidak terampil 89,653.85 13,448.08 13448.08
0.003 Oh Mandor 127,009.61 317.52 317.52
0.050 Kg Sabun 15,000.00 750.00 750
Jumlah 13,765.60 750.00 14515.6
9.6 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Ca M2
0.020 Oh Pekerja Tidak terampil 89,653.85 1,793.08 1793.08
0.063 Oh Tukang Cat 119,538.46 7,530.92 7530.92
0.006 Oh Kepala tukang 134,480.76 847.23 847.23
0.003 Oh Mandor 127,009.61 317.52 317.52
0.100 Kg Plamir 29,791.00 2,979.10 2979.1
0.110 Ltr Cat Dasar 19,809.00 2,178.99 2178.99
0.260 Klg Cat Penutup 2 x 45,285.20 11,774.15 11774.15
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan Rp. Upah Bahan Jumlah
Jumlah 10,488.75 16,932.24 27420.99
9.7 Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lapis Cat Pebutup) M2
0.020 Oh Pekerja Tidak terampil 89,653.85 1,793.08 1793.08
0.063 Oh Tukang Cat 119,538.46 7,530.92 7530.92
0.006 Oh Kepala tukang 134,480.76 847.23 847.23
0.003 Oh Mandor 127,009.61 317.52 317.52
0.110 Ltr Cat Dasar 19,809.00 2,178.99 2178.99
0.260 Klg Cat Penutup 2 x 45,285.20 11,774.15 11774.15
Jumlah 10,488.75 13,953.14 24441.89
9.8 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Vini M2
0.028 Oh Pekerja Tidak terampil 89,653.85 2,510.31 2510.31
0.042 Oh Tukang Cat 119,538.46 5,020.62 5020.62
0.004 Oh Kepala tukang 134,480.76 564.82 564.82
0.003 Oh Mandor 127,009.61 317.52 317.52
0.120 Ltr Cat Dasar 19,809.00 2,377.08 2377.08
0.180 Kg Cat Penutup 2 x 45,285.20 8,151.34 8151.34
Jumlah 8,413.27 10,528.42 18941.69
9.9 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mo M2
0.028 Oh Pekerja Tidak terampil 89,653.85 2,510.31 2510.31
0.042 Oh Tukang Cat 119,538.46 5,020.62 5020.62
0.004 Oh Kepala tukang 134,480.76 564.82 564.82
0.003 Oh Mandor 127,009.61 317.52 317.52
0.120 Ltr Cat Dasar 19,809.00 2,377.08 2377.08
0.180 Kg Cat Penutup 2 x 104,791.20 18,862.42 18862.42
Jumlah 8,413.27 21,239.50 29652.77
9.10 Pengecatan Permukaan Baja Dengan Meni Besi M2
0.020 Oh Pekerja Tidak terampil 89,653.85 1,793.08 1793.08
0.200 Oh Tukang Cat 119,538.46 23,907.69 23907.69
0.020 Oh Kepala tukang 134,480.76 2,689.62 2689.62
0.010 Oh Mandor 127,009.61 1,270.10 1270.1
0.100 Kg Meni besi 60,649.00 6,064.90 6064.9
0.010 Bh Kuas 4" 16,869.00 168.69 168.69
Jumlah 29,660.49 6,233.59 35894.08
10 PEKERJAAN SANITASI
DIVISI 1. UMUM
: 2.3.4 : Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 - 130 cm : M1 3337343.61
: 2.3.5 : Gorong2 Pipa Baja Bergelombang : Ton 32393750.63
: 2.4.3 : Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan : M1 72043.21
: 3.4. : Pengupasan permukaan aspal lama dan pencampuran kembali t=15cm : M3 256509.36
: 3.1 (6) : Coferdam, Penyokong, Pengaku dan Pekerjaan yang berkaitan : Ls 19759788.61
: 4.2 (2) : Lps. Pond. Ag. Kls. B, CBR Min 60% : M3 955583.89
Page 78 of 677
MATA PEMB. PEKERJAAN SAT HARGA SATUAN KET.
: 6.2 (3)(a) : Bahan Aspal untuk Pekerjaan Pelaburan yang diencerkan : Liter 19979.66
: 6.3(3a) : Lataston Lapis Aus (HRS-WC) 3.0 cm (gradasi senjang/semi senjang) : Ton 758770.67
: 6.3.4a : Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) : Ton 671373.18
: 6.3.4b : Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) : Ton 671318.18
: 6.3(5b) : Laston Lapis Aus Modifikasi (AC-WC Mod) (gradasi halus/kasar) : Ton 792314.77
: 6.3(5c) : Laston Lapis Aus Perata (AC-WC(L)) (gradasi halus/kasar) : Ton 755172.78
: 6.3(5d) : Laston Lapis Aus Perata (AC-WC(L)Mod) (gradasi halus/kasar) : Ton 792314.77
: 6.3(6b) : Laston Lapis Antara Modifikasi (AC-BC Mod)(gradasi halus/kasar) : Ton 798900.75
: 6.3(6c) : Laston Lapis Antara Perata (AC-BC(L)) (gradasi halus/kasar) : Ton 709969.59
: 6.3(6d) : Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) (gradasi halus/kasar) : Ton 1246174.39
: 6.3(7c) : Laston Lapis Antara Perata (AC-Base(L)) (gradasi halus/kasar) : Ton 763406.72
: 6.3(7d) : Laston Lapis Antara Modifikasi Perata (AC-Base(L)Mod) (gradasi halus/kasar) : Ton 769728.48
: 6.3 (8)a : Aspal minyak : Ton 18700000
Page 79 of 677
MATA PEMB. PEKERJAAN SAT HARGA SATUAN KET.
:7.1 (2) :Beton mutu tinggi dengan fc’=45 MPa (K-500) :M3 3814399.6
:7.1 (4) :Beton mutu tinggi dengan fc’=35 MPa (K-400) :M3 3649889.47
:7.1 (5) :Beton mutu sedang dengan fc’=30 MPa (K-350) :M3 3576743.04
:7.1 (6) :Beton mutu sedang dengan fc’= 25 MPa (K-300) :M3 2769066.34
:7.1 (7) :Beton mutu sedang dengan fc’= 20 MPa (K-250) :M3 2693252.83
:7.1 (8) :Beton mutu rendah dengan fc’= 15 MPa (K-175) :M3 1782804.13
:7.1 (10) :Beton mutu rendah dengan fc’= 10 MPa (K-125) :M3 1557499.05
: 7.2.(4) : Baja Prategang : Kg 649006.62
: 7.3 (6) :Anyaman Kawat Yang Dilas (Welded Wire Mesh) : Kg 19478.2
: 7.4 (3) :Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan dan pemasangan. : Kg 38341.12
: 7.4 (4) :Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaan dan pemasangan. : Kg 38374.12
: 7.4 (5) :Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan dan pemasangan. : Kg 38335.62
: 7.6 (7) : Pemancangan Tiang Pancang Kayu. ukuran .... : btg 38943.08
: 8.1 (3) : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor : M3 738377.26
: 8.2 (2) : Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm) : M2 206376.38
Page 80 of 677
MATA PEMB. PEKERJAAN SAT HARGA SATUAN KET.
Page 81 of 677
ITEM PEMBAYARAN NO. : 2.1 Analisa EI-21
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi
Waktu siklus = T1 + T2 Ts1 0.60 menit masuk dalam
- Menggali, memuat dan berputar T1 0.50 menit waktu siklus
- Lain lain T2 0.10 menit disesuaikan dgn
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 34.58 M3 lapangan
Ts1 x Fk
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 34.58 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 242.08 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.12 Jam
- Mandor = (Tk x M) : Qt (L03) 0.03 Jam
Rp. 80,506.59 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20.00 % Kuat Tekan min.
: - Volume Pasir Ps 80.00 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60.00 %
- Mortar (campuran semen & pasir) Mr 40.00 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.08 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.11
x {D5 x (1000)} (M12) 161.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.48 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 7.00 menit
- Mengaduk T2 5.00 menit
- Menuang T3 4.00 menit
- Menunggu, dll. T4 4.00 menit
Ts1 20.00 menit
3. TENAGA
Produksi Pas. Batu yang menentukan( Prod. C. Mixer ) Q1 1.25 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 8.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.80 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.41 jam
- Pekerja = (Tk x P) : Qt (L01) 8.03 jam
Rp. 1,226,221.57 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.50 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 15.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
Pekerja = (Tk x P) : Qt (L01) 2.33 Jam
Tukang = (Tk x T) : Qt (L02) 0.93 Jam
Mandor = (Tk x M) : Qt (L03) 0.47 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.70 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 7.00 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 10.00 M'
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 8.50 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 10.00 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter dalam gorong-gorong baja d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 0.25 Cm
7 BJ Pipa Baja Bergelombang BJp 7.90 T/m3
BJp1 0.12 T/m'
II. URUTAN KERJA
1 Gorong-gorong baja diterima dari pemasok
di lokasi pekerjaan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong baja tp 0.15 M
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
2. ALAT
2.a. TAMPER (untuk pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10.00 lintasan
Tebal lapis hamparan tp 0.15 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 1.30 Ton 10
M' per hari
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10.00 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T - orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.75 Jam
- Tukang = (Tk x T) : Qt (L02) - Jam
- Mandor = (Tk x M) : Qt (L03) 0.35 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.25 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10.00 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T - orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.75 Jam
- Tukang = (Tk x T) : Qt (L02) - Jam
- Mandor = (Tk x M) : Qt (L03) 0.35 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.30 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam Diperhitungkan
Efisiensi alat Fa 0.83 - hanya tamper
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10.00 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T - orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.75 Jam
- Tukang = (Tk x T) : Qt (L02) - Jam
- Mandor = (Tk x M) : Qt (L03) 0.35 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Material Porous terdiri dari batu pecah dan pasir
2. ALAT
2.a. TAMPER (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan b 0.50 M
Banyak lintasan n 6.00 lintasan
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 50.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.28 Jam
- Mandor = (Tk x M) : Qt (L03) 0.14 Jam
Rp. 460,052.92 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.b. ALAT BANTU
Diperlukan alat-alat bantu kecil : alat pemotong, dll. Lump Sump
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 150.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.09 Jam
- Tukang = (Tk x T) : Qt (L02) 0.05 Jam
- Mandor = (Tk x M) : Qt (L03) 0.05 Jam
Rp. 34,545.92 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Diameter dalam pipa d 0.10 M
6 Material penyaring terdiri dari material porus
7 Penyangga sambungan pipa dengan mortar
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu dengan Mortar TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diamet TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.4 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.5 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong2 Pipa Baja Bergelombang TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.6 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan di TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.7 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan di TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.3.8 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tulangan di TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 2.4.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bahan Porous untuk Bahan Penyaring (Filter) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
A. TENAGA
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls 1.0000 600.00 600.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 0.32 menit dalam waktu siklus
- Lain lain T2 0.1 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 0.42 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 49.40 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 345.83 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.06 Jam
- Mandor = (Tk x M) : Qt (L03) 0.02 Jam
Rp. 95,475.68 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 8.00 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.00 Jam
- Mandor = (Tk x M) : Qt (L03) 0.13 Jam
Rp. 374,826.98 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50 M3
M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.90 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.00 menit
- Waktu kembali = (L x 60) : Vr T2 1.20 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 72.05 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 504.34 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.06 Jam
- Mandor = (Tk x M) : Qt (L03) 0.01 Jam
Rp. 131,188.06 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 1.00 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman 40 - 75%) Fv 1.00 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 60.00 menit
- Waktu kembali = (L x 60) : Vr T2 36.00 menit
- Waktu lain-lain T3 0.05 menit
Ts 96.05 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 64.84 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 453.91 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.15 Jam
- Mandor = (Tk x M) : Qt (L03) 0.02 Jam
Rp. 1,179,255.53 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 30.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 0.60 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1 2.00 menit
- Waktu kembali = (L x 60) : Vr T2 1.20 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 43.23 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 302.60 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.28 Jam
- Mandor = (Tk x M) : Qt (L03) 0.02 Jam
Rp. 1,223,952.36 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Berat volume bahan (lepas) D 2.20 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COLD MILLING (E36)
3. TENAGA
Produksi menentukan : COLD MILLING Q1 27.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 189.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.07 Jam
- Mandor = (Tk x M) : Qt (L03) 0.04 Jam
Rp. 169,548.14 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Tebal perkerasan aspal t 0.10 M
7 Berat volume perkerasan aspal (lepas) D 2.30 Ton/M3
8 Memakai Motor Grader ( yes = 1 , No = 0 ) -
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 1.20 m3/jam
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 4.15 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 0.24 Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 1.20 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 8.40 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.67 Jam
- Mandor = (Tk x M) : Qt (L03) 0.83 Jam
Rp. 189971.43 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 m
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 18.68 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 130.73 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt 0.5355 Jam
- Mandor = (Tk x M) : Qt 0.0535 Jam
Rp. 56,800.84 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.30 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.40 menit
- Lain lain T2 0.3 menit
Waktu Siklus = T1 x Fv Ts1 0.70 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 29.64 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 207.50 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.13 Jam
- Mandor = (Tk x M) : Qt (L02) 0.03 Jam
Rp. 217,381.53 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.30 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 4.37 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 30.61 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.91 Jam
- Mandor = (Tk x M) : Qt (L03) 0.23 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan (lepas) D 1.69 Ton/M3
2. ALAT
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 987.70 M3
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.04 Jam
- Mandor = (Tk x M) : Qt (L02) 0.01 Jam
Rp. 245168.704 / M3
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50 M
Lebar Efektif kerja Blade b 1.5 M
Lebae overlap bo 0.30
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Jumlah lajur lintasan N 2.00 lajur
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 2.00 menit
Ts1 2.75 menit
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 611.18 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 4,278.27 M2
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.01 Jam
- Mandor = (Tk x M) : Qt (L02) 0.00 Jam
Rp. 18926.787 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L - KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 8.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 - menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 - menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2 menit
Ts2 2.00 menit
Kap. Prod. / jam = V x Fa x 60 Q2 398.40 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.00 jam
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2 asumsi
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.07 jam
- Mandor = (Tk x M) : Qt (L03) 0.01 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 15-30 cm setara dengan volume Vp 2.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.00 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.00 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10 menit
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.50 jam
- Mandor = (Tk x M) : Qt (L03) 0.35 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 15 menit
Ts 60.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.67 jam
- Mandor = (Tk x M) : Qt (L03) 0.47 jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Tebal perkerasan aspal t 0.15 M
7 Berat volume perkerasan aspal (lepas) D 2.20 Ton/M3
8 Memakai Motor Grader ( yes = 1 , No = 0 ) 1.00
1. BAHAN
Aggregat Klas B (M27) 0.30 M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.85 M3 lihat panduan
Faktor Bucket Fb 0.90 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Penggaruan T1 0.50 menit
Waktu Siklus = T1 x Fv Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Excavator Q1 12.09 M3/Jam
Produksi Garu / hari = Tk x Q1 Qt 84.66 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.33 Jam
- Mandor = (Tk x M) : Qt (L03) 0.08 Jam
Rp. 256509.363 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Penggalian untuk cofferdam Uk 3.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Pasir dimasukkan dalam karung dengan asumsi (EI-322) 2.00 M3
- Bahan pengaman tebing 0.4 - 0,6 M3 (kayu) 0.50 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Perkiraan Volume galian V 10.00 M3
Volume Bucket Fb 0.90 M3
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.50 menit
3. TENAGA
Tenaga yang diperlukan harus stanby selama pekerjaan
pondasi pilar yang diasumsikan selama Qt 15.00 Hari
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 0.50 orang
Koefisien tenaga / M3 :
- Pekerja = P x Qt x 7 (L01) 210.00 Jam
- Mandor = M x Qt x 7 (L03) 52.50 Jam
19759788.609 / M3
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.00 M
Lebae overlap bo 0.30
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1 menit
Ts1 1.75 menit
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 2,525.57 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 17,679.00 M2
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.00 Jam
- Mandor = (Tk x M) : Qt (L02) 0.00 Jam
Rp. 18268.118 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Tebal hamparan t 0.25 m
Berat Isi Bahan : - Batu D1 1.20 Ton/M3 Padat
- Pasir D2 1.40 Ton/M3 Padat
- Batu Pecah D3 1.35 Ton/M3 Padat
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
3. TENAGA
Produksi menentukan : COLD RECYCLE Q1 18.84 M2/Jam
Produksi Galian / hari = Tk x Q1 Qt 131.86 M2
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.53 Jam
- Mandor = (Tk x M) : Qt (L03) 0.05 Jam
279747.336 / M2
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor (E05) Jam 0.1250 312,181.32 39,022.66
2. Jack Hammer (E26) Jam 0.1250 55,165.56 6,895.69
3. Wheel Loader (E15) Jam 0.1250 741,285.90 92,660.74
4. Excavator (E10) Jam 0.1250 508,375.27 63,546.91
5 Dump Truck (E08) Jam 0.3217 373,416.55 120,123.16
Alat bantu Ls 1.0000 225.00 225.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0139 508,375.27 7,056.00
2. Bulldozer (E04) Jam 0.014502 808,292.34 11,722.22
3. Alat bantu Ls 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.4 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 2 - 4 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN awal
1. Excavator (E10) Jam 0.0154 508,375.27 7,840.00
2. Bulldozer (E04) Jam 0.428603 808,292.34 346,436.77
3. Alat bantu Ls 1.0000 150.00 150.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.5 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Struktur dengan kedalaman 4 - 6 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0231 508,375.27 11,760.01
2. Bulldozer (E04) Jam 0.014502 808,292.34 11,722.22
3. Alat bantu Ls 1.0000 200.00 200.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.6 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan Cold Milling Machine TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Cold Milling (E37) Jam 0.0370 906,238.42 33,564.39
2 Dump Truck (E08) Jam 0.2911 373,416.55 108,712.37
3. Alat bantu Ls 1.0000 10,000.00 10,000.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1.7 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Jack Hammer E26 Jam 0.2410 55,165.56 13,292.91
2. Compresor E05 Jam 0.2410 312,181.32 75,224.41
3. Dump Truck E08 Jam 0.1122 373,416.55 41,881.10
4 Motor Greder E13 Jam - 793,812.73 0.00
5 Alat Bantu Ls 1.0000 500.00 500.00
KEGIATAN :
NAMA PEKERJAAN : NORMALISASI SUNGAI AMPAL HULU
: NORMALISASI SUNGAI AMPAL HULU
LOKASI ………………………………………………………………….
ITEM PEMBAYARAN NO. : KOTA BALIKPAPAN PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Tanah dan Pembuangan (Cut & Fill) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.2.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Timbunan Biasa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0337 741,285.90 25007.24
2. Dump Truck (E08) Jam 0.1499 373,416.55 55968.22
3. Motor Grader (E13) Jam 0.0019 793,812.73 1484.16
4 Vibro Roller (E19) Jam 0.0021 487,349.49 1019.39
5. Water tank truck (E23) Jam 0.0070 443,666.55 3118.14
6 Alat Bantu Ls 1.0000 250.00 250
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.2.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Timbunan Pilihan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 741,285.90 6304.34
2. Dump Truck (E08) Jam 0.2287 373,416.55 85407.99
3. Motor Grader (E13) Jam 0.0031 793,812.73 2475.04
3. Tandem (E17) Jam 0.0081 581,147.40 4679.55
4. Water Tanker (E23) Jam 0.0070 443,666.55 3118.14
5. Alat Bantu Ls 1.0000 250.00 250
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.2.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Timbunan Pilihan berbutir diatas tanah rawa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Dump Truck (E08) Jam 0.0493 373,416.55 18395.12
2. Whell Loader (E15) Jam 0.0071 741,285.90 5253.62
3. Alat Bantu Ls 1.0000 50.00 50
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.00163617432693738 793,812.73 1298.82
2. Vibro Roller (E19) jam 0.000627510040160643 487,349.49 305.82
3 Water tank truck (E23) jam 0.0337349397590361 443,666.55 14967.06
4 Alat Bantu Ls 1 500.00 500
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
MATA PEMBAYARAN NO. : 3.4.1 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pembersihan dan Pengupasan Lahan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 15 – 30 cm TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Pohon % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 30 – 50 cm TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Pohon % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4.4 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 50 – 75 cm TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Pohon % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4.5 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter > 75 cm TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Pohon % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4. PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengupasan permukaan aspal lama dan pencampuran kemTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1 Agregat Klas B (M27) M3 0.3000 542,550.00 162765
C. PERALATAN
1. Excavator E10 Jam 0.0827 508,375.27 42034.34
2. Vibrator Roller E19 Jam 0.0006 487,349.49 305.82
3. Motor Grader E13 Jam 0.0268 793,812.73 21290
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.1 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Coferdam, Penyokong, Pengaku dan Pekerjaan yang berka TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ls % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 10.3750 508,375.27 5274393.48
2. Pompa Air (E22) Jam 105.0000 59,535.15 6251191.13
3. Alat bantu Ls 1.0000 5,000.00 5000
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.3.a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0004 793,812.73 314.31
2. Vibro Roller (E19) jam 0.0016 487,349.49 793.47
3. Water tank truck (E23) jam 0.0337 443,666.55 14967.06
4. Alat Bantu Ls 1.0000 500.00 500
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 3.4 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN TOTAL HARGA (Rp.) :
: Pengupasan dan Pencampuran Kembali Perkerasan Lama
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Cold Recyclers (E38) Jam 0.0531 3,646,579.80 193583.87
2 Dump Truck (E08) Jam 0.0664 373,416.55 24789.4
3 Wheel Loader (E15) Jam 0.0163 741,285.90 12112.51
4 Water Tanker (E23) Jam 0.0141 443,666.55 6236.28
5 Vibro Roller (E19) Jam 0.0064 487,349.49 3131.56
6 Alat bantu Ls 1.0000 5,000.00 5000
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.25861 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0496 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari 0 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - Pemuatan lepas
Faktor Efisiensi alat Fa 0.83 - sedang
Waktu siklus Ts1
- Memuat dan lain-lain T1 1.00 menit panduan
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 63.50 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 444.47 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1102 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0157 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor kehilangan bahan Fh 1.05 -
9 Tebal hamparan t 0.15 M
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 6.00 Ton
Faktor efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 45.00 Km / Jam
Kecepatan rata-rata kosong v2 60.00 Km / Jam
Waktu Siklus : Ts1
- Waktu tempuh isi = (L : v1) x 60 menit T1 33.33 menit
- Waktu bongkar T3 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 25.00 menit
- Lain-lain T4 15.00 menit
Ts1 103.33 menit
3. TENAGA
Lebar Hamparan Soil Cement b 6.00 M
Kadar semen (3 - 12) % s 7.50 %
Berat jenis tanah Bj 1.60 ton / M3
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 43.20 Ton
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
2164284.98 / Ton
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor kembang material (padat - lepas) Fk 1.20 -
9 Tebal hamparan padat t 0.15 M
10 Berat volme Aggregat (Lepas) D 1.60 ton/M3
1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08) 1.20 M3
2. ALAT
2.a. WHEL LOADER (E15)
Kapasitas bucket V 1.50 M3 lepas
Faktor bucket Fb 0.90 - Pemuatan sedang
Faktor efisiensi alat Fa 0.83 -
Waktu siklus : Ts1
- Muat T1 1.00 menit panduan
Ts1 1.00 menit
3. TENAGA
Produksi menetukan : WHEEL LOADER Q1 67.23 M3/Jam
Produksi Soil Cement / hari = Tk x Q1 Qt 470.61 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1041 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0149 Jam
Rp. 383785.842 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal SBST t 1.50 Cm
9 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 2.00 menit lihat tabel
V - Loading
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 1,948.70 M2
Produksi / hari = Tk x Q1 Qt 13,640.87 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0103 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0005 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 95.24 % 100 bagian
- Minyak Tanah / Pencair K 4.76 % 5 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.05 Kg / Ltr
- Minyak Tanah / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter Campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 800.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 332.00 Ltr/Jam
Produksi / hari = Tk x Q1 Qt 2,324.00 Liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC-10 atau AC-20 As 56 % 100 bagian
- Minyak Flux / Pencair K 44 % 80 bagian
7 Berat jenis bahan :
- Aspal AC-10 atau AC-20 D1 1.03 Kg / liter
- Minyak Flux / Pencair D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.10 liter Campuran
2. ALAT
2.a. ASPHALT SPRAYER (E03)
Kapasitas alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 332.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A , CBR Min TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semen utk. Pond. Semen Tanah TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : TON % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Semen (M12) Kg 1,050.0000 1,700.00 1,785,000.00
C. PERALATAN
1. Dump Truck (E08) Jam 0.3767 373,416.55 140,679.50
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Tanah Timbunan (M08) M3 1.2000 90,000.00 108,000.00
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0149 741,285.90 11,026.12
2. Dump Truck (E08) Jam 0.4486 373,416.55 167,512.01
3. Motor Grader (E13) Jam 0.0281 793,812.73 22,316.02
4. Vibratory Roller (E19) Jam 0.0268 487,349.49 13,048.18
5. P. Tyre Roller (E18) Jam 0.0065 550,663.08 3,556.18
6. Water Tanker (E23) Jam 0.0141 443,666.55 6,236.28
7. Cold Milling (E37) Jam 0.0167 906,238.42 15,164.63
8. Alat Bantu Ls 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN
NAMA PEKERJAAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 4.2 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Resap Pengikat TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.05 jam
- Mandor = (Tk x M) : Qt (L03) 0.01 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal lapis agregat padat t 0.30 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 1.00 menit panduan
Ts1 1.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 63.50 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 444.47 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.11 jam
- Mandor = (Tk x M) : Qt - 0.02 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.05 jam
- Mandor = (Tk x M) : Qt - 0.01 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat isi agregat (lepas) Bil 1.51 ton/M3
Faktor kehilangan - Agregat C Fh 1.05
1. BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M28) 1.26 M3 Agregat lepas
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - Pemuatan sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.05 Jam
- Mandor = (Tk x M) : Qt (L03) 0.01 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor kembang material (padat - lepas) Fk 1.20 -
9 Tebal hamparan padat t 0.15 M
10 Berat volume tanah (lepas) Bj 1.30 ton/m3
11 Berat volume chip = Agg Kasar Bjc 1.40 ton/m3
1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08) 1.20 M3
Curing membran = (1/t) x 0,2 1.33 liter
Chipping = ((1/t) x 1,2)/1000)/bjc 0.01 m3
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas bucket V 1.50 M3 lepas
Faktor bucket Fb 0.85 - Pemuatan sedang
Faktor efisiensi alat Fa 0.83 -
Waktu siklus : Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menetukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Soil Cement / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 21.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.15 Jam
- Mandor = (Tk x M) : Qt (L03) 0.01 Jam
Rp. 469,339.42 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor hilang Material Fh 1.05 -
9 Tebal hamparan t 0.15 M
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 6.00 Ton
Faktor efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktu siklus Ts1
- Waktu mengisi T1 30.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 75.00 menit
- Waktu bongkar T3 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T4 50.00 menit
- Lain-lain T5 5.00 menit
Ts1 190.00 menit
3. TENAGA
Lebar Soil Cement b 6.00 M
Kadar semen : Spesifikasi 5.4.3 (1) = ( 3 - 12 ) % s 7.50 %
Berat jenis tanah Bj 1.60 ton / M3
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 43.20 Ton
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Perkerasan Lama
sepanjang Ls 250.00 M
8 Faktor hilang Material Fh 1.55 -
9 Tebal hamparan t 0.25 M
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 6.00 Ton
Faktor efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktu siklus Ts1
- Waktu mengisi T1 30.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 75.00 menit
- Waktu bongkar T3 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T4 50.00 menit
- Lain-lain T5 5.00 menit
Ts1 190.00 menit
3. TENAGA
Lebar Penanganan b 7.00 M
Kadar semen 4-6% s 5.00 %
Berat jenis tanah Bj 1.60 ton / M3
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 35.00 Ton
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0071 741,285.90 5,253.62
2. Dump Truck (E08) jam 0.5463 373,416.55 204,008.51
3. Motor Grader (E13) jam 0.0211 793,812.73 16,737.02
4. Tandem Roller (E17) jam 0.0100 581,147.40 5,834.81
5. Water Tanker (E23) jam 0.0141 443,666.55 6,236.28
6. Alat Bantu Ls 1.0000 5,000.00 5,000.00
7.
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. B TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0157 741,285.90 11,674.71
2. Dump Truck (E08) jam 0.5588 373,416.55 208,679.84
3. Motor Grader (E13) jam 0.0141 793,812.73 11,158.01
4. Tandem Roller (E17) jam 0.0054 581,147.40 3,111.90
5. Water Tanker (E23) jam 0.0141 443,666.55 6,236.28
6. Alat Bantu Ls 1.0000 5,000.00 5,000.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.1.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0071 741,285.90 5,253.62
2. Dump Truck (E08) jam 0.7795 373,416.55 291,095.30
3. Motor Grader (E13) jam 0.0043 793,812.73 3,381.22
4. Tandem Roller (E17) jam 0.0054 581,147.40 3,111.90
5. Water Tanker (E23) jam 0.0141 443,666.55 6,236.28
6. Alat Bantu Ls 1.0000 5,000.00 5,000.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas C TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.4 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Tanah Semen TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0071 741,285.90 5,253.62
2. Dump Truck (E08) Jam 0.6968 373,416.55 260,187.55
3. Motor Grader (E13) Jam 0.0043 793,812.73 3,381.22
4. Vibrator Roller (E19) Jam 0.0107 487,349.49 5,219.27
5. P. Tyre Roller (E18) Jam 0.0036 550,663.08 1,976.76
6. Water Tanker (E23) Jam 0.0141 443,666.55 6,236.28
7. Pulvi Mixer (E27) Jam 0.0067 1,029,755.00 6,892.60
8. Alat Bantu Ls 1.0000 500.00 500.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.4(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semen Untuk Pondasi Semen Tanah. TOTAL HARGA :
SATUAN PEMBAYARAN : TON % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Semen (M12) Kg 1,050.0000 1,700.00 1,785,000.00
C. PERALATAN
1. Dump Truck (E08) Jam 0.6927 373,416.55 258,668.76
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 5.4.1a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semen Untuk Stabilisasi Perkerasan Lama TOTAL HARGA :
A. TENAGA
B. BAHAN
1. Semen (M12) Kg 1,550.0000 1,700.00 2,635,000.00
C. PERALATAN
1. Dump Truck (E08) Jam 1.0226 373,416.55 381,844.36
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 64.00 % terhadap volume
- Kerosene K 36.00 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT SPRAYER (E41)
Lebar penyemprotan b 4.00 M
Kecepatan penyemprotan V 10.00 m/menit Asumsi
Kapasitas pompa aspal pas 4.00 liter/menit Panduan
Faktor effisiensi kerja Fa 0.83 Sedang
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 199.20 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 1,394.40 liter
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As 80.00 % terhadap volume
- Kerosene K 20.00 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.10 liter
2. ALAT
2.a. ASPHALT SPRAYER (E41)
Kapasitas Alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 Asumsi
Waktu siklus (termasuk proses pemanasan) Ts 2.00 Jam Panduan
Sedang
Kap. Prod. / jam = V x Fa Q1 332.00 liter
Ts
3. TENAGA
Kapasitas Produksi / jam = Asphalt Distributor Q4 332.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 liter
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Berat Isi Agregat Chipping : padat Bip 1.47 -
lepas Bil 1.27
8 Faktor Kehilangan Fh 1.05
9 Tebal SBST t 1.50 Cm
10 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 0.45 menit lihat tabel
V - Loading
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 94.07 M2
Produksi / hari = Tk x Q1 Qt 658.47 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.21 Jam
- Mandor = (Tk x M) / Qt (L02) 0.01 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat Isi Agregat Chipping : padat Bip 1.47 -
lepas Bil 1.27
8 Faktor Kehilangan Fh 1.05
9 Tebal DBST t 2.50 Cm
10 Lapisan DBST terdiri dari (spesifikasi) :
- Lapisan pertama ukuran normal = 13 mm
- Lapis kedua ukuran normal Ld 6.00 mm
1.c. Total Chipping per M2 = (B1 + B2) * Bip * 1000 Bt 34.70 Kg.
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus V - Loading Ts1 0.45 menit
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Wheel Loader Q1 56.44 M2
Produksi / hari = Tk x Q1 Qt 395.08 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.35 Jam
- Mandor = (Tk x M) / Qt (L03) 0.02 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 96.00 % terhadap volume
- Kerosene K 4.00 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / Ltr
- Kerosene D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.03 liter
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Faktor efisiensi kerja Fa 0.80 -
Kapasitas pompa aspal pas 100.00 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR Q1 4,800.00 liter
Produksi / hari = Tk x Q1 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis Latasir padat t 0.02 M Tabel 6.3.1 (2)
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
Berat isi Agregat (padat) Bip 1.81 ton/m3
Berat Isi Agregat (lepas) Bil 1.51 ton/m3
9 Komposisi campuran SS Kelas A
- Pasir Kasar PK 29.00 %
- Pasir Halus PH 58.00 % Gradasi harus -
- Semen FF 3.00 % memenuhi -
- Asphalt As 10.00 % Spesifikasi
10 Berat Isi bahan :
- Latasir (SS) Kelas A D1 2.20 ton / M3
- Pasir Kasar D2 1.46 ton / M3
- Pasir Halus D3 1.46 ton / M3
11 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Pasir Kasar = (PK x (D1 x tM3) x Fh1) : D2 (M01d) 0.01 M3
1.b. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D3 (M01c) 0.01 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.04 Kg
1.d. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10) 3.40 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
3. TENAGA
Produksi menentukan : Mixing Plant Q2 1,257.58 M2
Produksi Latasir / hari = Tk x Q2 Qt 8,803.03 M2
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.01 Jam
- Mandor = (Tk x M) / Qt (L03) 0.00 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis Latasir padat t 0.02 M Tabel 6.3.1 (2)
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran SS Kelas B
- Pasir Kasar M01a PK 44.00 % Gradasi harus -
- Pasir Halus M01c PH 44.00 % memenuhi -
- Semen FF 3.00 % Spesifikasi
- Asphalt As 9.00 %
11 Berat Isi bahan :
- Latasir (SS) Kelas B D1 2.20 ton / M3
- Pasir Kasar D2 1.46 ton / M3
- Pasir Halus D3 1.46 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Pasir Kasar = (PK x (D1 x tM3) x Fh1) : D2 (M01d) 0.01 M3
1.b. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D3 (M01c) 0.01 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.39 Kg
1.d. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10) 4.08 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 943.18 M2
Produksi Latasir / hari = Tk x Q5 Qt 6,602.27 M2
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.01 Jam
- Mandor = (Tk x M) / Qt (L03) 0.00 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (HRS) padat t 0.03 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran HRS
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 33.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 23.00 % memenuhi -
- Pasir Halus PH 34.50 % Spesifikasi
- Semen FF 2.20 %
- Asphalt As 7.30 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- HRS-WC D1 2.23 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
- Pasir Halus D4 1.46 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agregat Kasar = ("5-10&10-15" x Fh1) : D2 (M92) 0.24 M3
1.b. Agregat Halus = ("0-5" x Fh1) : D3 (M91) 0.15 M3
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c) 0.25 M3
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 5.03 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 52.47 ton
Produksi HRS / hari = Tk x Q5 Qt 367.31 ton
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (ATB) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran ATB :
- Coarse Agregat CA 51.00 % Gradasi harus -
- Fine Agregat FA 37.50 % memenuhi -
- Fraksi Filler FF 5.00 % Spesifikasi
- Asphalt minimum 6 % As 6.50 %
9 Berat jenis bahan :
- ATB D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 0.72 M3
1.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 0.53 M3
1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 126.50 Kg
1.d. Aspal = (AS x (D1 x 1M3) x Fh2) x 1000 156.98 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts1 2.00 menit
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant (AMP) Q2 18.04 M3/Jam
Produksi ATB / hari = Tk x Q2 Qt 126.30 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt 0.39 Jam
- Mandor = (Tk x M) / Qt 0.06 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (HRS BASE) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran HRS BASE :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 40.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 21.00 % memenuhi -
- Pasir Halus PH 31.50 % Spesifikasi
- Semen FF 1.50 %
- Asphalt As 6.00 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- HRS BASE D1 2.23 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
- Pasir Halus D4 1.46 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.30 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.14 M3
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c) 0.23 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 244.87 ton
Produksi HRS BASE / hari = Tk x Q5 Qt 1,714.12 ton
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (HRS BASE) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran HRS BASE :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 40.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 21.00 % memenuhi -
- Pasir Halus PH 31.50 % Spesifikasi
- Semen FF 1.50 %
- Asphalt As 6.00 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- HRS BASE D1 2.23 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
- Pasir Halus D4 1.46 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.30 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.14 M3
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c) 0.23 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 244.87 ton
Produksi HRS BASE / hari = Tk x Q5 Qt 1,714.12 ton
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC-WC L) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.10 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 6.00 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.33 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.32 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
Kap. Prod. / jam = V x Fb x Fa x 60 x Bip Q1 104.48 ton
Ts1
Koefisien Alat/ton = 1 : Q1 (E15) 0.01 Jam
3. TENAGA
Produksi menentukan : A M P Q2 41.50 M2 / Jam
Produksi AC-WC / hari = Tk x Q2 Qt 290.50 M2
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC-WC) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.50 %
- Bahan Modifikasi (% terhadap asphalt) Bm 8.00 %As Jika "aspal alam"
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.33 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.32 M3
1.c. Bahan Modifikasi = (Bm x As x Fh2) x 1000 (M67) - Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-WC / hari = Tk x Q2 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC-WC L) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.33 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.32 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : A M P Q2 41.50 M2 / Jam
Produksi AC-WC / hari = Tk x Q2 Qt 290.50 M2
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC-WC) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.57 % Spesifikasi
- Asphalt As 5.00 %
- Bahan Modifikasi (% terhadap asphalt) Bm 8.00 %As Jika "aspal alam"
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 0.33 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.32 M3
1.c. Bahan Modifikasi = (Bm x As x Fh2) x 1000 (M67) - Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-WC / hari = Tk x Q2 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 51.50 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.80 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat Isi bahan :
- AC-BC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.41 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock file ke cold bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 0.38 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.27 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 0.93 menit
- Kecepatan maju rata rata Vf 30.00 km/jam panduan
- Kecepatan kembali rata rata Vr 40.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.10 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.08 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 0.93 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 52.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.30 %
- Bahan Modifikasi Bm 8.00 %As
11 Berat Isi bahan :
- AC-BC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.41 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 0.39 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.27 M3
1.c. Bahan Modifikasi = (Bm x As x Fh2) x 1000 (M67) 4.37 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 52.20 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.10 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat Isi bahan :
- AC-BC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.41 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock file ke cold bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 0.39 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.27 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 0.93 menit
- Kecepatan maju rata rata Vf 30.00 km/jam panduan
- Kecepatan kembali rata rata Vr 40.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.10 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.08 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 0.93 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 52.00 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.30 %
- Bahan Modifikasi Bm 8.00 %As
11 Berat Isi bahan :
- AC-BC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.41 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin L 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 0.39 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 0.27 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30 18.00 %
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 50.30 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 26.30 % memenuhi -
- Semen FF 0.90 % Spesifikasi
- Asphalt As 4.50 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat Isi bahan :
- AC-Base D1 2.32 ton / M3
- Agr Pch Mesin 20 - 30 mm D2 1.42 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D4 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93) 0.13 M3
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92) 0.37 M3
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91) 0.18 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30 18.00 %
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 50.30 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 26.30 % memenuhi -
- Semen FF 0.90 % Spesifikasi
- Asphalt As 4.10 %
- Bahan Modifikasi Bm 8.00 %As
11 Berat Isi bahan :
- AC-Base D1 2.32 ton / M3
- Agr Pch Mesin 20 - 30 mm D2 1.42 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D4 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93) 0.13 M3
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92) 0.37 M3
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91) 0.18 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93) 0.13 M3
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92) 0.37 M3
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91) 0.18 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30 18.00 %
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 50.30 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 26.30 % memenuhi -
- Semen FF 0.90 % Spesifikasi
- Asphalt As 4.10 %
- Bahan Modifikasi Bm 8.00 %As
11 Berat Isi bahan :
- AC-Base D1 2.32 ton / M3
- Agr Pch Mesin 20 - 30 mm D2 1.42 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D4 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93) 0.13 M3
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92) 0.37 M3
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91) 0.18 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 41.50 ton
Produksi AC-BC / hari = Tk x Q5 Qt 290.50 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
3. TENAGA
Tidak diperlukan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.b. ALAT BANTU Lump Sump
Diperlukan alat-alat bantu kecil
3. TENAGA
Tidak diperlukan
Rp. 81,420.90 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.b. ALAT BANTU Lump Sump
Diperlukan alat-alat bantu kecil
3. TENAGA
Tidak diperlukan
Rp. 1,925.00 / Kg
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 7.00 %
- Tebal nominal padat t 0.04 M
6 Berat isi bahan :
- Campuran Aspal Dingin (diambil) D1 2.19 Ton/M3
- Aspal (diambil) D2 1.03 Ton/M3
- Agregat lepas (diambil) D3 1.51 Ton/M3
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.35 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 153.30 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.80 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit referensi
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 12.00 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 84.00 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.08 jam
- Pekerja = (Tk x P) : Qt (L01) 1.00 jam
Rp. 4,011,186.86 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal rata2 Lapen t 0.07 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan - Agregat Fh1 1.05 -
Fator kehilangan - Aspal Fh2 1.03 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.3.
- Agregat Pengunci Ap1 25.00 Kg/M2 Tabel 6.6.3.
- Agregat Penutup Ap2 14.00 Kg/M2 Tabel 6.6.3.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.3.
- Paska Agregat Pengunci As2 1.50 Kg/M2 Tabel 6.6.3.
As 95.71 Kg/M3
9 Berat isi bahan :
- Agregat D1 1.42 ton / M3
- Aspal D2 1.03 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.40 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04) 0.26 M3
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M04) 0.15 M3
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10) 98.59 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1 0.45 lihat tabel
V - Loading
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 141.10 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.14 Jam
- Mandor = (Tk x M) / Qt (L03) 0.01 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal rata2 Lapen t 0.08 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan - Agregat Fh1 1.05 -
Faktor kehilangan - Aspal Fh2 1.03 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 180.00 Kg/M2 Tabel 6.6.4.
- Agregat Pengunci Ap1 25.00 Kg/M2 Tabel 6.6.4.
- Aspal : - Paska Agregat Pokok As1 7.50 Kg/M2 Tabel 6.6.4.
As 100.00 Kg/M3
9 Berat isi bahan :
- Agregat D1 1.42 ton / M3
- Aspal D2 1.03 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.77 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04) 0.25 M3
1.c. Aspal = {((As1) : t M3) x Fh2} (M10) 103.00 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1 0.45 lihat tabel
V - Loading
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 141.10 M3
Ts1
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 141.10 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.14 Jam
- Mandor = (Tk x M) / Qt (L03) 0.01 Jam
PROYEK
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.1 (1)(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Aspal Kg 0.6790 17,000.00 11,543.00
2. Kerosene liter 0.3708 15,575.00 5,775.21
C. PERALATAN
PROYEK
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURDA TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.2 (3)(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bahan Aspal untuk Pekerjaan Pelaburan yan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Latasir Kelas A (SS-A) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
-
1. Pekerja (L01) Jam 0.0056 16,009.61 89.11
2. Mandor (L03) Jam 0.0008 18,144.23 14.43
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0003 741,285.90 192.63
2. AMP E01 Jam 0.0008 7,187,076.78 5,715.02
3. Genset E12 Jam 0.0008 775,054.30 616.31
4. Dump Truck E08 Jam 0.0116 373,416.55 4,321.52
5. Asphalt Finisher E02 Jam 0.0013 434,792.12 554.33
6. Tandem Roller E17 Jam 0.0013 581,147.40 729.35
7 P. Tyre Roller E18 Jam 0.0004 550,663.08 197.56
8 Alat Bantu Ls 1.0000 50.00 50.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0003 741,285.90 256.84
2. AMP E01 Jam 0.0011 7,187,076.78 7,620.03
3. Genset E12 Jam 0.0011 775,054.30 821.74
4. Dump Truck E08 Jam 0.0223 373,416.55 8,329.26
5. Asphalt Finisher E02 Jam 0.0013 434,792.12 554.33
6. Tandem Roller E17 Jam 0.0013 581,147.40 729.35
7 P. Tyre Roller E18 Jam 0.0004 550,663.08 197.68
8 Alat Bantu Ls 1.0000 - -
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(3a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC) 3.0 cm (grada TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0191 434,792.12 8,286.01
6. Tandem Roller E17 Jam 0.0157 581,147.40 9,095.14
7 P. Tyre Roller E18 Jam 0.0043 550,663.08 2,372.50
8 Alat Bantu Ls 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3.4 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Asphalt Treated Base (ATB) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1 Wheel Loader (E15) Jam 0.0380 741,285.90 28,168.86
2 AMP (E01) Jam 0.0554 7,187,076.78 398,396.72
3 Genset (E12) Jam 0.0554 775,054.30 42,963.10
4 Dump Truck (E09) Jam 0.5682 490,252.85 278,552.75
5 Asphalt Finisher (E02) Jam 0.0767 434,792.12 33,342.95
6 Tandem Roller (E17) Jam 0.0459 581,147.40 26,670.37
7 P. Tyre Roller (E18) Jam 0.0257 550,663.08 14,152.23
8 Alat Bantu Ls 1.0000 100.00 100.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0041 434,792.12 1,775.57
6. Tandem Roller E17 Jam 0.0158 581,147.40 9,153.96
7 P. Tyre Roller E18 Jam 0.0049 550,663.08 2,711.42
8 Alat Bantu Ls 1.0000 50.00 50.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0041 434,792.12 1,775.57
6. Tandem Roller E17 Jam 0.0158 581,147.40 9,153.96
7 P. Tyre Roller E18 Jam 0.0049 550,663.08 2,711.42
8 Alat Bantu Ls 1.0000 - -
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(5a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) (gradasi halus/ka TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.3832 373,416.55 143,093.02
5. Asp. Finisher E02 Jam 0.0144 434,792.12 6,272.10
6. Tandem Roller E17 Jam 0.0135 581,147.40 7,859.39
7 P. Tyre Roller E18 Jam 0.0058 550,663.08 3,195.19
8 Alat Bantu Ls 1.0000 50.00 50.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(5b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Aus Modifikasi (AC-WC Mod) (g TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asp. Finisher E02 Jam 0.0137 434,792.12 5,973.43
6. Tandem Roller E17 Jam 0.0135 581,147.40 7,859.39
7 P. Tyre Roller E18 Jam 0.0058 550,663.08 3,195.19
8 Alat Bantu Ls 1.0000 35.00 35.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(5c) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Aus Perata (AC-WC(L)) (gradas TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asp. Finisher E02 Jam 0.0137 434,792.12 5,973.43
6. Tandem Roller E17 Jam 0.0135 581,147.40 7,859.39
7 P. Tyre Roller E18 Jam 0.0058 550,663.08 3,195.19
8 Alat Bantu Ls 1.0000 35.00 35.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(5d) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Aus Perata (AC-WC(L)Mod) (gr TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asp. Finisher E02 Jam 0.0137 434,792.12 5,973.43
6. Tandem Roller E17 Jam 0.0135 581,147.40 7,859.39
7 P. Tyre Roller E18 Jam 0.0058 550,663.08 3,195.19
8 Alat Bantu Ls 1.0000 35.00 35.00
-
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(6a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) (gradasi halus/ TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0080 741,285.90 5,966.36
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.3832 373,416.55 143,093.02
5. Asphalt Finisher E02 Jam 0.0096 434,792.12 4,181.40
6. Tandem Roller E17 Jam 0.0090 581,147.40 5,239.60
7 P. Tyre Roller E18 Jam 0.0039 550,663.08 2,130.13
8 Alat Bantu Ls 1.0000 50.00 50.00
-
JUMLAH HARGA PERALATAN 352,519.09
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(6b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara Modifikasi (AC-BC Mod) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN -
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0110 434,792.12 4,778.74
6. Tandem Roller E17 Jam 0.0108 581,147.40 6,287.51
7 P. Tyre Roller E18 Jam 0.0046 550,663.08 2,556.15
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(6c) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara Perata (AC-BC(L)) (grad TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0080 741,285.90 5,966.36
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.3976 373,416.55 148,459.01
5. Asphalt Finisher E02 Jam 0.0110 434,792.12 4,778.74
6. Tandem Roller E17 Jam 0.0108 581,147.40 6,287.51
7 P. Tyre Roller E18 Jam 0.0046 550,663.08 2,556.15
8 Alat Bantu Ls 1.0000 50.00 50.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(6d) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara Modifikasi Perata (AC-B TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0110 434,792.12 4,778.74
6. Tandem Roller E17 Jam 0.0108 581,147.40 6,287.51
7 P. Tyre Roller E18 Jam 0.0046 550,663.08 2,556.15
8 Alat Bantu Ls 1.0000 35.00 35.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(7a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Pondasi (AC-Base) (gradasi hal TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0092 434,792.12 3,982.29
6. Tandem Roller E17 Jam 0.0090 581,147.40 5,239.60
7 P. Tyre Roller E18 Jam 0.0052 550,663.08 2,840.17
8 Alat Bantu Ls 1.0000 35.00 35.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(7b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Pondasi Modifikasi (AC-Base M TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0173 741,285.90 12,842.18
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0092 434,792.12 3,982.29
6. Tandem Roller E17 Jam 0.0090 581,147.40 5,239.60
7 P. Tyre Roller E18 Jam 0.0052 550,663.08 2,840.17
-
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(7c) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara Perata (AC-Base(L)) (gr TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 741,285.90 7,095.13
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0092 434,792.12 3,982.29
6. Tandem Roller E17 Jam 0.0090 581,147.40 5,239.60
7 P. Tyre Roller E18 Jam 0.0052 550,663.08 2,840.17
8 Alat Bantu Ls 1.0000 - -
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3(7d) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Laston Lapis Antara Modifikasi Perata (AC-B TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0173 741,285.90 12,842.18
2. AMP E01 Jam 0.0241 7,187,076.78 173,182.57
3. Genset E12 Jam 0.0241 775,054.30 18,676.01
4. Dump Truck E08 Jam 0.5069 373,416.55 189,301.45
5. Asphalt Finisher E02 Jam 0.0092 434,792.12 3,982.29
6. Tandem Roller E17 Jam 0.0090 581,147.40 5,239.60
7 P. Tyre Roller E18 Jam 0.0052 550,663.08 2,840.17
-
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3 (8)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Aspal Minyak TOTAL HARGA :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Aditif anti pengelupasan TOTAL HARGA :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.3 (10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bahan Pengisi (Filler) Tambahan TOTAL HARGA :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1 Alat bantu Ls 1.0000 50.00 50.00
-
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.5 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Campuran Beraspal Dingin Untuk Pelapisan TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.6 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam (t=…. TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.6 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Fondasi/Perata Penetrasi Macadam TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 % Total Campuran
- Pasir Ps 49.50 % Total Campuran
- Asbuton Asb 16.00 % Total Campuran
- Peremaja, terdiri atas : Md 4.50 % Total Campuran
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (jarang digunakan) As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 % Total Campuran
- Pasir Ps 73.00 % Total Campuran
- Asbuton Asb 21.00 % Total Campuran
- Peremaja, terdiri atas : Md 6.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 % Total Campuran
- Pasir Ps 63.00 % Total Campuran
- Asbuton Asb 18.00 % Total Campuran
- Peremaja, terdiri atas : Md 5.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
2425297.6 / M2.
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 % Total Modifier
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1. BAHAN
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
18679378.355 / Ton
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.4 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lasbutag TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.4 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Latasbusir Kelas A TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.4 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Latasbusir Kelas B TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.4 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bitumen Asbuton TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 6.4 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bitumen Bahan Peremaja TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 450 Kg/M3
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 3,814,399.60 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 400 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 478.0 Kg/M3 Berdasarkan
: Pasir Ps 622.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 3,649,889.47 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 365 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3 Berdasarkan
: Pasir Ps 637.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5145 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000 M3
1.e. Paku (M18) 3.2000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 3,576,743.04 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 350 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3 Berdasarkan
: Pasir Ps 631.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5097 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 2,769,066.34 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.50 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 670.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 2,693,252.83 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 300 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 1,782,804.1 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 300 Kg/M3 K-175
1. BAHAN
1.a. Semen (PC) = Sm x 0.7 x 1.03 (M12) 229.278 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 0.7 x 1.05 (M01) 0.3517 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 0.7 x 1.05 (M03) 0.6337 M3
1.d. Batu Belah = {(Kr/1000 x D1) : D4} x 0.30 * 1.05 (M06) 0.6518 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6827 jam
- Pekerja = (Tk x P) : Qt (L01) 8.1928 jam
Rp. 1,449,786.5 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 250 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5113 M3
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3 Agregat Kasar
1.e. Kayu Perancah (M19) 0.0500 M3
1.f Paku (M18) 0.4000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 1,557,499.1 / M3
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 0.90 M
4 Bentang PC I Girder L 15.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (1)a Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 16 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
40544612.702 / Buah
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 1.25 M
4 Bentang PC I Girder L 24.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (1)b Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 25 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 1.60 M
4 Bentang PC I Girder L 34.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (1)c Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 35 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
100766265.556 / Buah
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 0.90 M
4 Bentang PC I Girder L 15.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (2)a Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 16 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
40544706.202 / Buah
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 1.25 M
4 Bentang PC I Girder L 24.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (2)b Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 25 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC I Girder H 1.60 M
4 Bentang PC I Girder L 34.60 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 30.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 45.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
ITEM PEMBAYARAN NO. : 7.2 (2)c Analisa EI-721a
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 35 meter
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
100766265.556 / Buah
I. ASUMSI
1 PC voided slab dicetak di lokasi pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Ukuran voided slab tinggi 57 cm dan lebar 97 cm H 0.45 M2
4 Bentang PC voided slab L 10.00 M
5 Menggunakan beton K350
6 Komponen baja tulangan 150.00 kg/m3
1. BAHAN
- Beton K350 = luas penampang x pjg girder 4.3740 M3
- Strand 292.18 kg
- Tulangan baja 582.62 kg
- Anchorage 6.00 buah
- Ducting (casing strand)= Jlh x pjg girder 126.00 M
ALAT BANTU
2.c. - Alat bantu Lumpsum
TENAGA
3. Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00 jam
- Tukang = (Tk x Tb) : Qt (L02) 5.00 jam
- Pekerja = (Tk x P) : Qt (L01) 18.00 jam
58629022.881 / Buah
I. ASUMSI
1 PC Diafragma dicetak di lokasi proyek K 350
2 Lokasi pekerjaan : di setiap jembatan
3 Bahan diterima di lokasi jembatan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan 1.1 1.10
6 Ukuran 0.9 x 1.17 x 0.15 0.1580 M3
7 tulangan 200 kg/m3
1. BAHAN
- Pracetak PC Diafragma bentang K 350 0.1580 m3
- tulangan 31.5900 kg
2.
ALAT
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 7.75 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.9036 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.9036 jam
- Pekerja = (Tk x P) : Qt (L01) 9.0361 jam
I. ASUMSI
1 Kabel Prategang dan diterima di lokasi pek.
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
Kabel Prategang 1.0 Kg
2. ALAT
2.a DUMP TRUCK (E08)
Kapasitas bak sekali muat V 10.00 Buah
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 75.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 50.00 menit
- Lain-lain (bongkar dan muat) T3 45.00 menit
Ts1 170.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 23.24 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.3012 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3012 jam
- Pekerja = (Tk x P) : Qt (L01) 3.0120 jam
Rp. 649,007 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 15,382.13 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U32 (M57a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 15,767.13 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D32 (M39b) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 16,971.63 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D39 (M57b) 1.0500 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 16,366.63 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D48 (M57c) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 16,971.63 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi Jembatan
3 Bahan dasar (besi) dan kawat las diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (M57c) 1.1000 Kg
1.b. Kawat Las (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0700 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2100 jam
Rp. 19,478.20 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00 KM
6 Berat Rangka Baja per komponen Bg 1,200.00 Kg
A. PENGADAAN
1. BAHAN
Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan 1.0000 kg
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000.00 Kg
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 180.00 menit
Ts1 330.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00 kg
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.0001 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0001 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0010 jam
A. PEMASANGAN
1. BAHAN
Tidak diperlukan bahan
2. ALAT
2.b. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00 buah
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20.00 menit
- Waktu Erection T2 30.00 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10.00 menit
Ts1 60.00 menit
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) Qt 6,972.0 kg
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang T 5.00 orang
- Pekerja P 20.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0010 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0050 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.0201 jam
Rp. 38,341.1 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00 KM
6 Berat Rangka Baja per komponen Bg 1,200.00 Kg
1. BAHAN
Baja Struktur Titik leleh 2800 kg/cm2 1.0000 kg
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000.00 Kg
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 180.00 menit
Ts1 330.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.0001 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0001 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0010 jam
A. PEMASANGAN
1. BAHAN
Kayu Perancah 20.00 M3/rangka baja M19 0.0167 M3 per kg rangka
2. ALAT
2.a. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00 buah
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20.00 menit
- Waktu Erection T2 30.00 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10.00 menit
Ts1 60.00 menit
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) Qt 6,972.0 kg/jam
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang T 5.00 orang
- Pekerja P 20.00 orang
Koefisien Tenaga / Kg :
- Mandor = (Tk x M) : Qt (L03) 0.0010 jam
- Tukang = (Tk x T) : Qt (L02) 0.0050 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0201 jam
Rp. 38,374.12 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00 KM
6 Berat Rangka Baja per komponen Bg 1,200.00 Kg
1. BAHAN
Baja Struktur Titik leleh 3500 kg/cm2 1.0000 kg
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000 Kg
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 180.00 menit
Ts1 330.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00 kg
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0001 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0001 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0010 jam
A. PEMASANGAN
1. BAHAN
Kayu Perancah 20 M3/rangka baja M19 0.0167 M3 per kg rangka
2. ALAT
2.b. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00 buah
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20.00 menit
- Waktu Erection T2 30.00 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10.00 menit
Ts1 60.00 menit
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) = Q3 x Tk Qt 6,972.0 kg
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1 orang
- Tukang T 5 orang
- Pekerja P 20 orang
Koefisien Tenaga / Kg :
- Mandor = (Tk x M) : Qt (L03) 0.0010 jam
- Tukang = (Tk x T ): Qt (L02) 0.0050 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0201 jam
Rp. 38,335.62 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Material rangka baja di lokasi
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Berat Rangka Baja Span 60 M (Class B) Br 130,000 Kg
6 Untuk perletakan sementara : perancah kayu
7 Berat rangka baja per komponen Bg 1,500 Kg rata-rata
1. BAHAN
Kayu Perancah 20.00 M3/rangka baja M19 0.0002 M3 per kg rangka
2. ALAT
2.a. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00 batang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20 menit
- Waktu Erection T2 30 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10 menit
Ts1 60.00 menit
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) = Tk x Q1 Qt 8,715.0 kg/jam
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1 orang
- Tukang T 5 orang
- Pekerja P 20 orang
Koefisien Tenaga / Kg :
- Mandor = (Tk x M) : Qt (L03) 0.0008 jam
- Tukang = (Tk x T ) : Qt (L02) 0.0040 jam
- Pekerja = (Tk x P ) : Qt (L01) 0.0161 jam
I. ASUMSI
1 Pengangkutan Material dari Pabrik ke Pelabuhan (1)
dengan Trailer
2 Pengangkutan dari Pelabuhan (1) ke Pelabuhan (2)
dengan Kapal Laut
3 Jarak Pabrik ke Pelabuhan (1) Ld1 25.0 KM
4 Jarak dari Pelabuhan (1) ke Pelabuhan (2) Lp 100.0 Millaut
5 Jarak dari Pelabuhan (2) ke Lokasi Pekerjaan Ld2 25.0 KM
1. BAHAN
Tidak ada pemakaian bahan
2. ALAT
Pengangkutan dari pabrik ke Pelabuhan 1
TENAGA
Diperlukan untuk menurunkan material di pelabuhan/hari Qt1 17,144 Kg
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 10.00 orang
ALAT BANTU
Diperlukan alat-alat bantu kecil Lump Sump
- Tambang
- Tackle
3 TENAGA
Diperlukan untuk memuat di pelabuhan ke truk Qt2 96,833 Kg Crane 2
dan penurunan dari truk di lokasi pekerjaan Qt3 96,833 Kg Crane 3
Kebutuhan tenaga : - Mandor M 2.00 orang 2 regu
- Pekerja P 20.00 orang 2 regu
Koefisien Tenaga / Kg :
- Mandor = ( M ) : (Qt2 + Qt3) (L03) 0.0000 jam
- Pekerja = ( P ) : (Qt2 + Qt3) (L01) 0.0001 jam
Rp. 1,645.90 / Kg
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu tinggi dengan fc’=45 MPa (K-500) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu tinggi dengan fc’=35 MPa (K-400) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu sedang dengan fc’=30 MPa (K-350) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu sedang dengan fc’= 25 MPa (K-300) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu sedang dengan fc’= 20 MPa (K-250) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu rendah dengan fc’= 15 MPa (K-175) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton Siklop fc’=15 MPa (K-175) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. :7.1 (10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Beton mutu rendah dengan fc’= 10 MPa (K-125) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (1)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 15.00 15.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (1)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 25 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (1)c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar I Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (2)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 16 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 16 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (2)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 25 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 25 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2 (2)c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit Pracetak Gelagar U Bentang 35 meter TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah L (m) = 35 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 (E31) 0.9036 974,215.69 880,315.38
2 Crane 2 (E31) 0.9036 974,215.69 880,315.38
3 Alat Bantu LS 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2.(5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pelat Berongga (Hollow Slab) Pracetak bentang 21 met TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah 21 (m) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : Beton Diafragma K350 (fc’ 30 MPa) termasuk pekerjaa PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : 7.2.(6) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : m3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.2.(4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Baja Prategang TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 24 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 32 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 32 Ulir TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 39 Ulir TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan BJ 48 Ulir TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
-
1. Baja Tulangan (Ulir) D48 (M57c) Kg 1.1000 11,000.00 12,100.00
2. Kawat Beton (M14) Kg 0.0200 20,000.00 400.00
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.3 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Anyaman Kawat Yang Dilas (Welded Wire Mesh) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.4 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Baja Struktur Titik leleh 2500 kg/cm2 Buah 1.0000 33,376.00 33,376.00
-
-
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.4 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Baja Struktur Titik leleh 2800 kg/cm2 Buah 1.0000 33,376.00 33,376.00
-
-
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.4 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Baja Struktur Titik leleh 3500 kg/cm2 Buah 1.0000 33,376.00 33,376.00
-
-
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.4 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Pemasangan jembatan baja fabrikasi TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.4 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Pengangkutan Bahan Jembatan Rangka Baja TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi Jembatan
3 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Bahan pondasi cerucuk (M52) 1.00 m1
2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk Lumpsum
- 1 set palu tripot
- Alat pertukangan
3. TENAGA
Produksi Tiang dalam 1 hari Qt 28.00 M1
Rp. 147,783.42 / M1
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Diameter tiang pancang kayu sesuai keperluan 200.00 MM
1. BAHAN
1.a. Bahan tiang pancang kayu tanpa pengawetan (M52) 1.00 M1
2. ALAT
2.e. ALAT BANTU
- Alat bantu Lumpsum
-
-
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00 M1
160487.888 / Kg
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Diameter tiang pancang kayu sesuai keperluan 200.00 MM
1. BAHAN
1.a. - Bahan tiang pancang kayu (M52) 1.00 M1
- Bahan pengawet: kreosot 1 liter/M1 0.25 liter
2. ALAT
2.e. ALAT BANTU
- Alat bantu Lumpsum
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00 M1
Rp. 180,313.00 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 Km
4 Jam kerja efektif per-hari Tk 7.00 jam
4 Ukuran diameter tiang pancang (sesuai keperluan) Uk 200.00 mm
5 Tebal tiang t 8.18 mm
6 Berat per-meter tiang b 42.50 kg
7 Panjang Tiang (sesuai keperluan) p 12.00 M
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05 Kg
Plat Baja (untuk penyambungan) (M48) 0.31 Kg
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 25.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 40.00 Km/Jam
Kecepatan rata-rata kosong v2 60.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 37.50 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 25.00 menit
- Lain-lain (bongkar dan muat) T3 10.00 menit
Ts1 72.50 menit
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.01 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.01 jam
- Pekerja = (Tk x P) : Qt (L01) 0.03 jam
Rp. 48,720.51 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 Km
4 Jam kerja efektif per-hari Tk 7.00 jam
4 Ukuran diameter tiang pancang (sesuai keperluan) Uk 600.00 mm
5 Tebal tiang t 12.00 mm
6 Berat per-meter tiang b 187.00 kg
7 Panjang Tiang (sesuai keperluan) p 12.00 M
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05 Kg
Plat Baja (untuk penyambungan) (M48) 0.21 Kg
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 10.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 75.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 50.00 menit
- Lain-lain (bongkar dan muat) T3 80.00 menit
Ts1 205.00 menit
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.70 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.80 jam
- Pekerja = (Tk x P) : Qt (L01) 8.40 jam
Rp. 258,369.61 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 Km
4 Jam kerja efektif per-hari Tk 7.00 jam
4 Ukuran diameter tiang pancang (sesuai keperluan) Uk 1,000.00 mm
5 Tebal tiang t 16.00 mm
6 Berat per-meter tiang b 395.00 kg
7 Panjang Tiang (sesuai keperluan) p 12.00 M
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05 Kg
Plat Baja (untuk penyambungan) (M48) 0.17 Kg
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 6.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 75.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 50.00 menit
- Lain-lain (bongkar dan muat) T3 80.00 menit
Ts1 205.00 menit
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 1.17 jam
- Tukang = (Tk x Tb) : Qt (L02) 4.67 jam
- Pekerja = (Tk x P) : Qt (L01) 14.00 jam
Rp. 399,619.50 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton & tulangan sesuai analisa item pekerjaan ybs.
3 Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 14.10 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Panjang Tiang (sesuai kebutuhan) Lt 10.39 M
7 Ukuran tiang pancang (sesuai kebutuhan) Uk 0.35 M
8 Kebutuhan baja tulangan : 250 Kg/m3 Mb 250.00 Kg/M3
1. BAHAN
1.a. Beton K 400 (EI-712) 1.00 M3
1.b. Baja Tulangan = Mb (EI-732) 250.00 Kg
1.c. Plat Baja utk Sepatu tiang/sambungan (t=16mm) (M48) 2.64 Kg
1.d. Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02} (M19) 0.03 M3
1.e. Paku (M18) 0.28 Kg
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 42.30 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 28.20 menit
- Lain-Lain (tunggu, bongkar dan muat) T3 140.00 menit
Ts1 210.50 menit
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.80 jam
- Pekerja = (Tk x P) : Qt (L01) 5.60 jam
Rp. 7,906,203.68 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton & tulangan sesuai analisa item pekerjaan ybs.
3 Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 14.10 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Panjang Tiang (sesuai kebutuhan) Lt 7.96 M
7 Ukuran tiang pancang (sesuai kebutuhan) Uk 0.40 M
8 Kebutuhan baja tulangan : 250 Kg/m3 Mb 250.00 Kg/M3
1. BAHAN
1.a. Beton K 400 (EI-712) 1.00 M3
1.b. Baja Tulangan = Mb (EI-732) 250.00 Kg
1.c. Plat Baja utk Sepatu tiang/sambungan (t=16mm) (M48) 4.50 Kg
1.d. Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02} (M19) 0.03 M3
1.e. Paku (M18) 0.32 Kg
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 42.30 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 28.20 menit
- Lain-Lain (tunggu, bongkar dan muat) T3 140.00 menit
Ts1 210.50 menit
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.80 jam
- Pekerja = (Tk x P) : Qt (L01) 5.60 jam
Rp. 7,990,656.06 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton & tulangan sesuai analisa item pekerjaan ybs.
3 Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 14.10 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Panjang Tiang (sesuai kebutuhan) Lt 6.29 M
7 Ukuran tiang pancang (sesuai kebutuhan) Uk 0.45 M
8 Kebutuhan baja tulangan : 250 Kg/m3 Mb 250.00 Kg/M3
1. BAHAN
1.a. Beton K 400 (EI-712) 1.00 M3
1.b. Baja Tulangan = Mb (EI-732) 250.00 Kg
1.c. Plat Baja utk Sepatu tiang/sambungan (t=16mm) (M48) 7.21 Kg
1.d. Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02} (M19) 0.04 M3
1.e. Paku (M18) 0.36 Kg
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 42.30 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 28.20 menit
- Lain-Lain (tunggu, bongkar dan muat) T3 140.00 menit
Ts1 210.50 menit
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.80 jam
- Pekerja = (Tk x P) : Qt (L01) 5.60 jam
Rp. 8,106,192.35 / M3
I. ASUMSI
1 Membeli Tiang Pancang jadi dari Pabrik dan diterima di
lokasi jembatan
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Ukuran tiang pancang sesuai kebutuhan (diameter) Uk 350.00 mm
6 Panjang Tiang Pancang p 10.39 M
7 Jarak pabrik ke lokasi jembatan Ld2 2.00 KM
1. BAHAN
Tiang Pancang Beton Prategang Pracetak Lengkap (M50) 1.00 M1
Volume per batang is 1.00 M3
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 140.00 menit
Ts1 290.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 17.43 M3
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.80 jam
- Pekerja = (Tk x P) : Qt (L01) 4.02 jam
Rp. 1,972,800.74 / M3
I. ASUMSI
1 Membeli Tiang Pancang jadi dari Pabrik dan diterima di
lokasi jembatan
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Ukuran tiang pancang sesuai kebutuhan (diameter) Uk 400.00 mm
6 Panjang Tiang Pancang p 7.96 M
7 Jarak pabrik ke lokasi jembatan Ld2 2.00 KM
1. BAHAN
Tiang Pancang Beton Prategang Pracetak Lengkap (M50) 1.00 M1
Volume per batang is 1.00 M3
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 140.00 menit
Ts1 290.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 17.43 M3
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.80 jam
- Pekerja = (Tk x P) : Qt (L01) 4.02 jam
Rp. 1,972,800.74 / M3
I. ASUMSI
1 Membeli Tiang Pancang jadi dari Pabrik dan diterima di
lokasi jembatan
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Ukuran tiang pancang sesuai kebutuhan (diameter) Uk 400.00 mm
6 Panjang Tiang Pancang p 7.96 M
7 Jarak pabrik ke lokasi jembatan Ld2 2.00 KM
1. BAHAN
Tiang Pancang Beton Prategang Pracetak Lengkap (M50) 1.00 M1
Volume per batang is 1.00 M3
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00 menit
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00 menit
- Lain-lain (bongkar dan muat) T3 140.00 menit
Ts1 290.00 menit
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 17.43 M3
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.80 jam
- Pekerja = (Tk x P) : Qt (L01) 4.02 jam
Rp. 1,972,800.74 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Tiang pancang kayu diterima di lokasi jembatan
3 Lokasi pekerjaan : di lokasi jembatan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Panjang Tiang p 4.00 M
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 174.30 M'
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.04 jam
- Tukang = ( Tk x Tb ) : Qt (L02) 0.08 jam
- Pekerja = ( Tk x P ) : Qt (L01) 0.24 jam
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00 jam
4 Panjang Tiang p 20.00 M
5 Ukuran Tiang sesuai keperluan
6 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dlm item Penyediaan Tiang Pancang Beton
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 46.48 M'
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M3 :
- Mandor = ( Tk x M ) : Qt (L03) 0.15 jam
- Tukang = ( Tk x Tb ) : Qt (L02) 0.30 jam
- Pekerja = ( Tk x P ) : Qt (L01) 1.51 jam
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00 jam
4 Panjang Tiang p 6.00 M
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 32.18 M'
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.22 jam
- Tukang = ( Tk x Tb ) : Qt (L02) 0.87 jam
- Pekerja = ( Tk x P ) : Qt (L01) 2.18 jam
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25.00 % Spec.
: - Volume Pasir Ps 75.00 % Spec.
7 Perbandingan Batu & Mortar :
- Batu Bt 65.00 %
- Mortar (campuran semen & pasir) Mr 35.00 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.17 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.12 M3
x {D5 x (1000)} (M12) 176.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.51 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 17.00 menit
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.46 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 10.25 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.68 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.37 jam
- Pekerja = (Tk x P) : Qt (L01) 5.46 jam
1217785.404 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Adukan encer sebagai pengisi adalah beton K-175 - - - Spec.
7 Kadar Semen Adukan (Spec.K-175) : - Minimum Ks1 220.00 Kg/M3 Spec.
: - Maksimum Ks2 300.00 Kg/M3 Spec.
8 Perbandingan Air/Semen Maksimum (Spec.K-175) Wcr 0.57 - Spec.
9 Perbandingan Adukan (K-175) : Semen Sm 12.50 %
: Pasir Ps 37.50 %
: Kerikil Kr 50.00 %
10 Berat Jenis Material :
- Beton / Pasangan Batu Kosong Diisi Adukan D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Kerikil / Batu D4 1.40 T/M3
11 Perbandingan Batu & Adukan : - Batu Bt 70.00 %
- Adukan encer Ae 30.00 %
1. BAHAN
1.a. Semen (PC) = {Sm x D1 x Ae x 1000} : 40 (M12) 2.25 Zak
1.b. Pasir = {(Ps x D1) : D3} x Ae x 1.05 (M01) 0.22 M3
1.c. Agregat Kasar = {(Kr x D1) : D4} x Ae x 1.1 (M03) 0.28 M3 Agregat Kasar
1.d. Batu Belah = {(Bt x D1) : D4 x 1.1 (M06) 1.32 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.68 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.05 jam
- Pekerja = (Tk x P) : Qt (L01) 6.83 jam
Rp. 1,234,885.22 / M3
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan material Fh 1.10 -
1. BAHAN
1.a. Batu Belah (M06) 1.10 M3
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong = 4 buah
- Palu Batu = 2 buah
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 8.00 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.88 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.75 jam
- Pekerja = (Tk x P) : Qt (L01) 5.25 jam
Rp. 626,902.43 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi, anyaman kawat dan batu) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.10 -
1. BAHAN
1.a. Kawat Bronjong (M15) 15.00 Kg
1.b. Batu (M02) 1.10 M3
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang = 2 buah
- Pemotong kawat = 2 buah
- Palu pemecah batu = 2 buah
3. TENAGA
Produksi pekerjaan per hari Qt 8.00 M3
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.88 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 2.63 jam
- Pekerja = ( P x Tk ) : Qt (L01) 5.25 jam
Rp. 805,022.46 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00 jam
4 Panjang Tiang p 6.00 M
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 32.18 M'
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.22 jam
- Tukang = ( Tk x Tb ) : Qt (L02) 0.87 jam
- Pekerja = ( Tk x P ) : Qt (L01) 2.18 jam
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00 jam
4 Panjang Tiang p 8.00 M
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 50.71 M'
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 10.00 orang
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.22 jam
- Tukang = ( Tk x Tb ) : Qt (L02) 0.87 jam
- Pekerja = ( Tk x P ) : Qt (L01) 2.18 jam
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pondasi Cerucuk, Pengadaan dan Pemancang TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Kayu Tanpa PengawTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Kayu Dengan Peng TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Baja ukuran: 200 M TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (4)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Baja ukuran: Diame TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (4)c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Baja ukuran: Diame TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (5)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Bertulang Pra TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (5)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Bertulang Pra TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (5)c PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Bertulang Pra TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN m3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (6)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Prategang Pr TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (6)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Prategang Pr TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (6)c PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Prategang Pr TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemancangan Tiang Pancang Kayu. ukuran .... TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : btg - % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemancangan Tiang Pancang Beton . Ukuran30 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 - % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemancangan Tiang Pancang Pipa Baja ukuran TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 (Dia 200 mm) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.9 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.10 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu Kosong Yang Diisi Adukan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.10 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu Kosong TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.10 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bronjong TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (10)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemancangan Tiang Pancang Pipa Baja ukuran TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 (Dia 304.8 mm) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
………………………………………………………………….
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 7.6 (10)b PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pemancangan CCSP W-350 A 1000 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 (W-350 A 1000) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan
TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 25.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1772 jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1063 jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Faktor kehilangan material Agregat Fh 1.10 -
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00 %
- Agregat Halus Ah 15.00 %
8 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 98.09 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 686.66 M3
Kebutuhan tenaga :
- Pekerja P 16.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0102 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal Lapis Hotmix padat untuk patching t 0.04 M Rata-rata
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00 % Gradasi harus -
- Fine Agregat FA 37.50 % memenuhi -
- Fraksi Filler FF 1.00 % Spesifikasi
- Asphalt minimum 6 % As 6.50 %
9 Berat jenis bahan :
- ATB D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
10 Jarak stock pile ke cold bin l 100.00 m
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju (ke bin) Vf 15.00 km/jam
Kecepatan kembali (ke stock pile) Vr 20.00 km/jam
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70 menit
- Lain lain 1000 x Vf 1000 x Vr T2 0.75 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : AMP Q6 15.04 M3 / Jam
Produksi ATB / hari = Tk x Q6 Qt 105.25 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.3301 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1330 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 7.00 %
- Tebal nominal padat untuk patching t 0.04 M Rata-rata
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20 diambil
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63 M3
Kebutuhan tenaga : - Mandor M 2.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1566 jam
Rp. 3,546,745.26 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 800.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Kapasitas pompa aspal pas 55.00 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90 liter
Produksi / hari = Tk x Q1 Qt 21,090.30 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat jenis bahan (lepas) D 1.60 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 2.00 menit
Ts2 47.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 jam
- Mandor = (Tk x M) : Qt (L03) 0.1000 jam
Rp. 141,866.18 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 8.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 75.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 50.00 menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00 menit
Ts2 127.00 menit
Kap. Prod. / jam = V x Fa x 60 Q2 6.27 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.1594 jam
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2 asumsi
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700 jam
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 8.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000 jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 30.00 Km/Jam
Kecepatan rata-rata kosong v2 60.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 25.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 2.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 1.00 menit
- Lain-lain T4 1.00 menit
Ts 29.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.3333 jam
- Mandor = (Tk x M) : Qt (L03) 0.4667 jam
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000 M2
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1400 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam
Rp. 98,017.66 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10 M2
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.25 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 97,853.29 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00 bh
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.50 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 252,801.98 / bh
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Tebal plat jembatan 0.20 cm
1. BAHAN
- Beton K300 0.22 m3
- Baja tulangan (bila diperlukan) kg
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 7.50 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 52.50 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1333 Jam
Rp. 194,537.55 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Tebal Lantai Jembatan Kayu 0.10 cm
1. BAHAN
- Kayu Klas I untuk 1 m2. 0.10 m3
- Paku dan material lainnya 0.20 kg
2. ALAT
3. TENAGA
Produksi menentukan : Q1 1.00 M2/Jam
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt 7.00 M2/Hari
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 1.0000 Jam
Rp. 920,900.96 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Pelapisan permukaan dengan cat anti karat 0.10 cm
1. BAHAN
- Cat anti karat per meter persegi 0.60 kg
- Ampelas dan material lainnya 2.00 Lb
2. ALAT
3. TENAGA
Produksi menentukan : Q1 0.75 M2/Jam
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt 5.25 M2/Hari
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 0.50 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.6667 Jam
- Mandor = (Tk x M) : Qt (L03) 0.6667 Jam
Rp. 103,087.00 / M3
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk -Pek Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspa TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 741,285.90 22,345.40
2. AMP E01 Jam 0.0665 7,187,076.78 477,983.90
3. Genset E12 Jam 0.0665 775,054.30 51,545.78
4. Dump Truck E09 Jam 1.0946 490,252.85 536,620.13
5. Pedestrian Roller E24 Jam 0.1975 105,698.48 20,876.65
6. Alat Bantu Ls 1.0000 10,000.00 10,000.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor (Perata) TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
0.00
1. Pekerja Biasa (L01) Jam 1.0000 16,009.61 16,009.61
2. Mandor (L03) Jam 0.1000 18,144.23 1,814.42
B. BAHAN
C. PERALATAN
0.00
1 Dump Truck E09 Jam 0.2265 490,252.85 111,045.22
2 Alat Bantu Ls 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK :
A. TENAGA
0.00
1. Pekerja (L01) jam 0.0700 16,009.61 1,120.67
2. Mandor (L03) jam 0.0140 18,144.23 254.02
B. BAHAN
C. PERALATAN
0.00
1 Dump Truck E09 jam 0.1594 490,252.85 78,140.20
2 Alat Bantu Ls 1.0000 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
0.00
1. Pekerja Biasa (L01) Jam 2.3333 16,009.61 37,355.77
2. Mandor (L03) Jam 0.4667 18,144.23 8,467.31
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.3.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semak/perdu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.3.(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pohon TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.5.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan beton TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 312,181.32 41,624.18
2. Jack Hammer E26 Jam 0.1333 55,165.56 7,355.41
3. Wheel Loader E15 Jam 0.1333 741,285.90 98,838.12
4. Alat bantu Ls 1.0000 1,000.00 1,000.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.5.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan kayu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
0.00
1. Pekerja (L01) Jam 4.0000 16,009.61 64,038.46
2. Mandor (L03) Jam 1.0000 18,144.23 18,144.23
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.5.(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi pelapisan permukaan baja strukTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
0.00
1. Pekerja (L01) Jam 2.6667 16,009.61 42,692.30
2. Mandor (L03) Jam 0.6667 18,144.23 12,096.15
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.1500 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.3750 jam
Rp. 211,701.83 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 217,144.55 / M2
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 100.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 10.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 120.0 menit
- Menurunkan = Rata-rata 1 menit / buah T3 100.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 5.0 menit
Ts 235.0 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 148.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0472 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0472 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2359 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 120.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 172.5 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 36.52 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1917 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3833 jam
- Pekerja = (Tk x P) : Qt (L01) 0.9583 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai
6 Faktor kehilangan bahan Fh 1.00 - drawing
7 Tulangan praktis Rc 50.00 Kg/Cu.m
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 120.00 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 260.0 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 24.23 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2889 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5778 jam
- Pekerja = (Tk x P) : Qt (L01) 2.3111 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
2.a. TAMPER (E25)
Kecepatan V 0.60 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.40 M
Banyak lintasan n 4 lintasan
Tebal lapis hamparan rata-rata tp 0.05 M
###
3. TENAGA ###
Produksi paving block / hari = Tk x Q1 Qt 17.43 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.4016 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.6064 jam
- Pekerja = (Tk x P) : Qt (L01) 2.4096 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 120.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 165.0 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 25.45 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2750 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5500 jam
- Pekerja = (Tk x P) : Qt (L01) 2.2000 jam
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(1) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(2) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(6) .(a) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Patok Kilometer TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(7) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Rel Pengaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK:
A. PEKERJA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(8) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Paku Jalan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.4.(12) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
1. Tamper E25 Jam 0.24 65,379.07 15,753.99
2. Alat Bantu Ls 1.00 100.00 100.00
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.6(1) PERKIRAAN VOL. PEK.:
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (ConcreteTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK:
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KON: : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / K : : KOTA BALIKPAPAN
ITEM PEMBAYARAN NO. : 8.6.2 PERKIRAAN VOL. P:
JENIS PEKERJAAN : MEMASANG KANSTEEN K-300 TOTAL HARGA (Rp.:
SATUAN PEMBAYARAN : M' % THD. BIAYA PRO :
TENAGA
BAHAN
PERALATAN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
35 Km = a C 45 Km = b
A B
3 Km = c
Base Camp --------->
D
Kalkulasi Jarak Rata-Rata =
20 ....................................
21 ....................................
22 ....................................
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 28,000,000.00
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150.00 50,000.00 7,500,000.00
2 Kantor M2 60.00 75,000.00 4,500,000.00
3 Barak M2 60.00 45,000.00 2,700,000.00
4 Bengkel M2 100.00 25,000.00 2,500,000.00
5 Gudang, dan lain-lain M2 100.00 25,000.00 2,500,000.00
6 Sewa Direksi keet (Rp. 500.000,- / bulan) Ls 1.00 500,000.00 500,000.00
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108.00 55,000.00 5,940,000.00
3 Bituminous Testing
Marshall Asphalt Test Set 1.00 20,000,000.00 20,000,000.00
Extraction Test, Centrifuge/Refflux Method Set 1.00 9,000,000.00 9,000,000.00
Specific Gravity for Coarse Aggregate Set 1.00 9,000,000.00 9,000,000.00
Specific Gravity for Fine Aggregate Set 1.00 9,000,000.00 9,000,000.00
Mix Air Viod Content (Accurate Method) Set 1.00 15,000,000.00 15,000,000.00
Core Drill Set 1.00 15,000,000.00 15,000,000.00
Metal Thermometer Set 1.00 1,000,000.00 1,000,000.00
Accessories and Tolls Set 1.00 5,000,000.00 5,000,000.00
Penetration Test Bln 6.00 1,000,000.00 6,000,000.00
Softening Point Set 1.00 6,000,000.00 6,000,000.00
Refusal Density Compactor Set 1.00 15,000,000.00 15,000,000.00
4 Concrete Testing
Slump Cone Set 1.00 500,000.00 500,000.00
Cylinder/Cube Mould for Compressive Strength Set 1.00 10,000,000.00 10,000,000.00
Beam Mould for Flexural Strength (RIGID) Set 1.00 10,000,000.00 10,000,000.00
Crushing Machine Set 1.00 50,000,000.00 50,000,000.00
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS 1.00 100,000,000.00 100,000,000.00
2 Pemeliharaan Jalan Kerja / Samping LS 1.00 100,000,000.00 100,000,000.00
3 ...................... .... -
4 ...................... .... -
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1.00 5,000,000.00 5,000,000.00
2 ...................... ....
3 ...................... ....
4 ...................... ....
B. PERALATAN
KETERANGAN
Di Luar PPN
per 1 M3
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
ALAT
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
68.
Biaya Operasi per Jam = (H+I+J+K+L+M) P 298566.313883929 Rupiah KETER
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 434792.121252015 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
Kondis
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
E17
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 1500000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.615116279069768 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 4152.03488372093 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 15 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 4167.03488372093 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA Kondis
Nilai B
1. Bahan Bakar = (12%-15%) x Pw x Ms H 23400 Rupiah Depres
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
###
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 16009.6142857143 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 13875 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 16009.6142857143 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 13875 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 16009.6142857143 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 13875 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 16009.6142857143 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 13875 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
STONE CRUSH
Tabel-t
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15 % / Tahun ###
2. Upah Operator / Sopir U1 22413.4614285714 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 14942.3071428571 Rp./Jam ###
4. Bahan Bakar Bensin Mb 8474 Liter ###
5. Bahan Bakar Solar Ms 13000 Liter ###
6. Minyak Pelumas Mp 50000 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
X.2. HARGA PERALATAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 2,000,000.00
1.8 Manajemen dan Keselamatan Lalu Lintas LS 5,500,000.00
1.18.(1) Relokasi Utilitas dan Pelayanan Telkom yang Ada LS 35,000,000.00
1.18.(2) Relokasi Utilitas dan Pelayanan PDAM yang Ada LS 25,000,000.00
1.18.(3) Relokasi Utilitas dan Pelayanan PLN yang Ada LS 50,000,000.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 80,506.59
2.2 Pasangan Batu dengan Mortar M3 1,226,221.56
2.3.1 Gorong-gorong Pipa Beton Bertulang, diameter dalam 50 cm M1 987,629.83
2.3.2 Gorong-gorong Pipa Beton Bertulang, diameter 50 - 70 cm M1 1,422,685.80
2.3.3 Gorong-gorong Pipa Beton Bertulang, diameter dalam 70 - 100 cm M1 2,693,177.33
2.3.4 Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 - 130 cm M1 3,337,343.61
2.3.5 Gorong2 Pipa Baja Bergelombang Ton 32,393,750.63
2.3.6 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 337,498.88
2.3.7 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M 1
367,817.96
2.3.8 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 398,487.39
2.4.1 Bahan Porous untuk Bahan Penyaring (Filter) M3 460,052.92
2.4.2 Anyaman Filter Plastik M2 34,545.91
2.4.3 Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1 72,043.21
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (2) Beton mutu tinggi dengan fc’=45 MPa (K-500) M3 3,814,399.60
7.1 (4) Beton mutu tinggi dengan fc’=35 MPa (K-400) M3 3,649,889.47
7.1 (5) Beton mutu sedang dengan fc’=30 MPa (K-350) M3 3,576,743.03
7.1 (6) Beton mutu sedang dengan fc’= 25 MPa (K-300) M3 2,769,066.34
7.1 (7) Beton mutu sedang dengan fc’= 20 MPa (K-250) M3 2,693,252.82
7.1 (7)a Beton mutu sedang dengan fc’= 20 MPa (K-225) M3
7.1 (8) Beton mutu rendah dengan fc’= 15 MPa (K-175) M3 1,782,804.13
7.1 (9) Beton Siklop fc’=15 MPa (K-175) M3 1,449,786.50
7.1 (10) Beton mutu rendah dengan fc’= 10 MPa (K-125) M3 1,557,499.05
7.2 (1)a Bentang 16 meter Buah 40,544,612.70
7.2 (1)b Bentang 25 meter Buah 67,355,727.70
7.2 (1)c Bentang 35 meter Buah 100,766,265.55
7.2 (2)a Bentang 16 meter Buah 40,544,706.20
7.2 (2)b Bentang 25 meter Buah 67,355,727.70
7.2 (2)c Bentang 35 meter Buah 100,766,265.55
7.2.(4) Baja Prategang Kg 649,006.62
7.2.(5) Pelat Berongga (Hollow Slab) Pracetak bentang 21 meter Buah 58,629,022.88
7.2.(6) Beton Diafragma K350 (fc’ 30 MPa) termasuk pekerjaan penegangan setelah pengecoran m3 3,214,167.17
(post-tension)
7.3 (1) Baja Tulangan BJ 24 Polos Kg 15,382.12
7.3 (2) Baja Tulangan BJ 32 Polos Kg 15,767.12
7.3 (3) Baja Tulangan BJ 32 Ulir Kg 16,971.62
7.3 (4) Baja Tulangan BJ 39 Ulir Kg 16,366.62
7.3 (5) Baja Tulangan BJ 48 Ulir Kg 16,971.62
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 19,478.19
7.4 (3) Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan dan pemasangan. Kg 38,341.11
7.4 (4) Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaan dan pemasangan. Kg 38,374.11
7.4 (5) Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan dan pemasangan. Kg 38,335.61
7.4 (7) Pemasangan jembatan baja fabrikasi Kg 1,834.20
7.4 (8) Pengangkutan Bahan Jembatan Rangka Baja Kg 1,645.89
7.6 (1) Fondasi Cerucuk ulin 10x10, Pengadaan dan Pemancangan m1 147,783.41
7.6 (2) Pengadaan Tiang Pancang Kayu Tanpa Pengawetan.(Kayu Ulin) m1 160,487.88
7.6 (3) Pengadaan Tiang Pancang Kayu Dengan Pengawetan. ukuran .... M3 7,843,181.15
7.6 (4) Pengadaan Tiang Pancang Baja ukuran: 200 MM Kg 48,720.50
7.6 (4)a DindingTurap Baja Kg 40,805.60
7.6 (4)b Pengadaan Tiang Pancang Baja ukuran: Diameter 600 mm tebal 12 mm Kg 258,369.60
7.6 (4)c Pengadaan Tiang Pancang Baja ukuran: Diameter 1000 mm tebal 16 mm Kg 399,619.49
7.6 (5)a Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 350 x 350mm Kg 7,906,203.67
7.6 (5)b Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 400 x 400mm Kg 7,990,656.05
7.6 (5)c Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 450 x 450mm Kg 8,106,192.34
7.6 (6)a Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 350 mm Kg 1,972,800.74
7.6 (6)b Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 400 mm Kg 1,972,800.74
No. Mata Uraian Satuan Harga satuan
Pembayaran (Rupiah)
7.6 (6)c Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 450 mm Kg 1,972,800.74
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan (Kayu Ulin) M3 160,487.88
7.6 (7) Pemancangan Tiang Pancang Kayu. Ukuran Ulin 10 X 10- 4m btg 38,943.08
No. Mata Uraian Satuan Harga satuan
Pembayaran (Rupiah)
7.6 (8) Pemancangan Tiang Pancang Beton bertulang pracetak. Ukuran: Meter Panjang 156,604.09
7.6 (9)b 400 mm x 400 mm Meter Panjang 225,462.82
7.6 (9)c 500 mm x 500 mm Meter Panjang 225,462.82
7.6 (10) Pemancangan Tiang Pancang Pipa Baja ukuran 200 MM M' 235,478.62
7.6 (10)a Diameter 500 mm Meter Panjang 233,439.06
7.6 (10)b Diameter 600 mm Meter Panjang 233,439.06
7.6 (10)c Diameter 1000 mm tebal 16 mm Meter Panjang 1,250,000.22
7.6 (12) Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tiang pancang Meter Panjang -
dikerjakan di air 28,819.81
7.6 (17) Pengujian Keutuhan Tiang dengan Pile Integrated Test Buah 8,242,758.85
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter …………….. Meter Panjang 554,263.89
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter ………… Meter Panjang 1,217,785.40
7.9 Pasangan Batu M3 1,217,785.40
7.10 (1) Pasangan Batu Kosong yang Diisi Adukan M3 1,234,885.22
7.10 (2) Pasangan Batu Kosong M3 626,902.43
7.10 (3) Bronjong M3 805,022.46
7.11 (1) Expansion Joint Tipe Asphaltic Plug Buah 143,346.15
7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21 mm - 41 mm) m1 126,312.36
7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32 mm - 62 mm) m1 187,553.55
7.11 (5) Join Filler untuk sambungan konstruksi Buah 75,718.07
7.11 (6) Expansion Joint Tipe baja bersudut Buah 191,074.74
7.13. Sandaran (Railing) m1 386,258.63
7.15 (1) Pembongkaran Pasangan Batu Buah 392,787.21
7.15 (2) Pembongkaran Beton M3 232,214.41
7.15 (3) Pembongkaran Beton Pratekan Meter Kubik 444,300.65
7.15 (4) Pembongkaran Bangunan Gedung Meter Persegi 172,108.81
7.15 (5) Pembongkaran Rangka Baja Meter Persegi 580,647.59
7.15 (6) Pembongkaran Balok Baja (Steel Stringers) Meter Panjang 489,063.44
7.15 (7) Pembongkaran Lantai Jembatan Kayu Meter Persegi 164,539.28
7.15 (8) Pembongkaran Jembatan Kayu Meter Persegi 495,162.08
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Uraian Satuan Harga satuan
Pembayaran (Rupiah)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
ITEM PEMBAYARAN NO. : 7.7 (1) Analisa EI-771
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.04 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 104.58 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 % Berdasarkan
: Pasir Ps 791.0 % JMF & sesuai
: Agregat Kasar Kr 1,077.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam
Rp. 1.00 / M2
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA ………………………………………………………………….
ITEM PEMBAYARAN NO. : KOTA BALIKPAPAN PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : NORMALISASI SUNGAI AMPAL HULU
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA ………………………………………………………………….
ITEM PEMBAYARAN NO. : KOTA BALIKPAPAN PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
NAMA PAKET : NORMALISASI SUNGAI AMPAL HULU
PROP / KAB / KODYA : NORMALISASI SUNGAI AMPAL HULU
ITEM PEMBAYARAN NO. …………………………………………… PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : KOTA BALIKPAPAN TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
1. Pekerja (L01) jam 1.4056 16,009.61 22,503.47
2. Tukang (L02) jam 0.7028 17,076.92 12,001.85
3. Mandor (L03) jam 0.1506 18,144.23 2,732.56
B. BAHAN
1. Semen (M12) Kg 410.0000 1,647.80 675,598.00
2 Pasir (M01a) M3 0.6237 334,375.00 208,540.69
3 Agregat Kasar (M03) M3 0.7885 364,870.00 287,706.51
4 Baja Tulangan Polos (M39a) Kg 15.8750 9,630.00 152,876.25
5 Joint Sealent (M94) Kg 0.9900 35,123.00 34,771.77
6 Cat Anti Karat (M95) Kg 0.0200 36,822.50 736.45
7 Expansion Cap (M96) M2 0.1700 6,231.50 1,059.36
8 Polytene 125 mikron (M97) Kg 0.4375 19,827.50 8,674.53
9 Curing Compound (M98) Ltr 0.8700 39,655.00 34,499.85
10 Multiplex 12 mm (M73) Lbr 0.1600 144,450.00 23,112.00
11 Kayu Acuan (M99) M3 0.0960 2,675,000.00 256,800.00
12 Paku (M18) Kg 1.0240 21,400.00 21,913.60
13 Additive (M67a) Ltr 0.9139 39,655.00 36,241.50
JUMLAH HARGA BAHAN 1,742,530.50
C. PERALATAN
1 Wheel Loader E15 jam 0.0244 741,285.90 18,095.81
2 Batching Plant E43 jam 0.0502 804,416.88 40,382.37
3 Truck Mixer E49 jam 0.5705 834,637.18 476,179.76
4 Con. Vibrator E20 jam 0.0502 54,887.97 2,755.42
5 Water Tank Truck E23 jam 0.0422 443,666.55 18,708.83
6 Conc. Paver E42 jam 0.0074 673,766.19 5,010.90
7 Alat Bantu Ls 1.0000 100.00 100.00
8
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.A Analisa EI-10A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.B Analisa EI-10B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.77 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 5.40 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 12.9694 Jam
- Mandor = (Tk x M) / Qt (L03) 2.5939 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.4.
- Agregat Pengunci Ap 25.00 Kg/M2 Tabel 6.6.4.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.4.
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit Lihat panduan
Ts1 0.45 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.C Analisa EI-10C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM Spec. 6.5.2 (2)
- Kadar Aspal terhadap berat total campuran As 4.50 % Tabel 6.5.3 (1)
- Tebal nominal padat t 0.04 M Tabel 6.5.3 (1)
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.D Analisa EI-10D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 2,895,717.59 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 25.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 800.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 332.00 liter
Produksi / hari = Tk x Q1 Qt 2,324.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang