B DRAINASE 117,221,000.00
B.1 Drainase Perumahan Staff
1 Parit Uk. 200/400 268 m' 241,000.00 64,588,000.00
2 Titi Plat Beton Uk. 1 x 3,5 meter 10 Unit 990,000.00 9,900,000.00
B.2 Drainase Perumahan Bachelor Manager
1 Parit Uk. 300/400 136 m' 241,000.00 32,776,000.00
2 Titi Plat Beton Uk. 1 x 1,5 meter 6 Unit 425,000.00 2,550,000.00
3 Titi Plat Beton Uk. 1 x 2,0 meter 1 Unit 552,000.00 552,000.00
4 Titi Plat Beton Uk. 1 x 3,5 meter 1 Unit 990,000.00 990,000.00
5 Titi Plat Beton Uk. 1 x 6 meter 3 Unit 1,955,000.00 5,865,000.00