BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12
NO URAIAN WAKTU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
1 TENAGA AHLI
Team Leader INDAH NURWIYANI 12.00 MM
2 TENAGA PENDUKUNG
Administrator Proyek DWI SARI AMBARNINGSIH 12.00 MM
Operator Komputer ROSSA CHANDRA DINI P. 12.00 MM
Drafter (CAD/ CAM Operator) EIX CHASSANAL K. P. 12.00 MM
Office Boy JOKO SANTOSO 12.00 MM
TIM 2
Surveyor 1. AHMAD FAUZI 3.40 MM
Asisten Surveyor 2. DANI SAEFUL ISLAM 3.40 MM
Asisten Surveyor 3. AFIF IRFAN FADHULLAH 3.40 MM
Drafter CAD 4. ERSYANDI R. PRIBADI 3.40 MM
TIM 2
Tenaga Sosial Kemasyarakatan 1. SITTI MUTHIA HANUM 3.40 MM
Surveyor 2. RAHMAT HIDAYAT 3.40 MM
Keterangan :
Manning Schedule Berdasarkan BQ pada RKS No. 0042.RKS/DAN.01.02/C44000000/2021 tanggal 29 November 2021