PEKERJAAN PONDASI HYDRANT BEST 2

No Uraian Sat Vol Owner

I PEKERJAAN PERSIAPAM DAN PEKERJAAN TANAH


1 Pengukuran m2 30.00
2 Pembersihan lapangan m2 30.00
3 Bor strauss paol m' 36.00
4 Cor beton sitemix m3 2.54
5 Pembesian 5D13, dia 8 kg 231.60
Besi beton M12 = 18 btg
Besi beton M8 = 12 btg
6 Galian tanah m3 7.50
7 buang tanah bekas galian m3 7.50
8 Urugan pasir m3 3.00
9 Cor lantai kerja m2 30.00

II PEKERJAAN PONDASI
1 Pilecap 600x500x30cm
Bekisting m2 6.60
Pembesian kg 1,416.94
Besi beton M16 = 78 btg
Pengecoran Ready mix m3 9.00

2 Pedestal 20x20x50cm
Bekisting m2 1.60
Pembesian kg 90.06
Besi beton M16 = 4 btg
Besi beton M8 = 3 btg
Pengecoran stiemix m3 0.08

III PEKERJAAN BAJA


A Struktur Atap
1 Kolom doubling CNP 150x50x0.2 kg 120.20
2 Rafter doubling CNP 150x50x0.2 kg 220.62
3 Balok doubling CNP 150x50x.02 kg 131.13
4 Gording CNP 150x50x0.2 kg 210.35
5 Treakstang M12 ljr 12.00
6 Mur treakstang m3 48.00
7 Atap galvalum 0.3 kepuh biru bromo m2 56.00
8 Pengecatan rangka atap kg 682.31
B Pekerjaan Dinding
1 Gording CNP 125 kg 238.50
2 Treastang M12 ea 16.00
3 Galvalum 0.3 kepung biru bromo m2 53.50
4 Pengacatan rangka cladding kg 238.50
5 Baut gording + clading ea 120.00
6 Mur treakstang ea 64.00

III PEKERJAAN FINISHING


1 Plesteran dan acian m2 38.20
2 Skonengan sudut m' 28.40
3 Pembersihan lokasi ls 1.00