Anda di halaman 1dari 9

Timing Average Filling & blending Dispatch QC & R&D Tanker Unloading areas - Inward log Plant open

areas Factory toilets - sweepers Office block Canteen Colony Housekeeping check list Office Toilet Floor Moping Basin cleaning Basin Platform cleaning & keeping dry Urinal pot cleaning Toilet 1 cleaning Toilet 2 cleaning Office Block Floor mat Floor moping Dusting of furnitures & computers Wall hangings to be cleaned Artificial flowers cleaning Glass window cleaning Cabin 1 - moping & dusting Cabin 2 - moping & dusting Meeting Room moping & dusting Conference Room - moping & dusting Conference Room - moping & dusting Conference Room - Arrange chairs Conference Room - Glassa window cleaning Filling & Blending Floor brooming Cleaning floor Collection of waste and disposal 9 2 7 to 3 1 7 to 3 1 7 to 3 1 7 to 3 2 7 to 3 2 7 to 3 1 7 to 5 2 7 to 3 1 8 to 4

Activity

Outside

Section 1 ETP to Scrap yard Section 2 Scrap yard to barrel yard Section 3 Barrel yard to tanker unloading including passage Section 4 ETP to MCC room Section 5 MCC to entire BMP Inside

Section 6 Office block - ground floor Section 7 Office block - QC & R&D and Control Room Section 8 Filling & Blending area - Ground floor Section 9 Filling & Blending area - Top floor with packaging area Section 10 Canteen area Section 11 TO plant to utility

Section 12 Dispatch to Change room Section 13 BMP

Section 14 All toilets

Key areas ETP, frontage, weighbridge, parking shed, truck parking, driver's cabin, forklift shed,mandir, frontage of scrap yard POP cage, containers, chemney, cooling tower, barrel yard passage, additive yard, well, storage tank, unloading points maintenance yard, mcc, passage passage, BMP front-sides-back, leaky rework

receptions, toilets, cabins, cubicals, conference room, floor, doors & windows doors & windows, toilets, passage, ups room, control room, QC and R&D passages, filling machines, BKs, TO palnt, BK 16 Stair cases, BKs, FTs, Packaging area Passages, Canteen, Pail empty storage TO plant, pouch filling, rakes, stores, VI blending area, FM6 Loading bays, Baboo's sitting palce, dispatch room, rakes, change room, passage btw change toom to pail line BMP, leakey rework room Office toilets, QC/R&D/Control room toilets, plant toilets, driver's toilets, BMP toilets

1 Outside

Section 1: ETP to Scrap yard ETP, Frontage, Weighbridge, parking shed, truck parking, driver's cabin, forklift shed, mandir, scrap yar Monday Tuesday Wednesday Activity 7.30 1.30 7.30 1.30 7.30 Brooming Disposal of waste Cobweb removal

Section 2: Scrap yard to Barrel yard POP cage, conttainers, chemney, cooling tower, barrel yard Monday Activity 7.30 1.30 Brooming Disposal of waste Cobweb removal

Tuesday 7.30

1.30

Wednesday 7.30

Section 3: Barrel yard to tanker unloading including passage Passage, additive yard, well, storage tank, unloading points Monday Activity 7.30 1.30 Brooming Disposal of waste Floor cleaning Cobweb removal

Tuesday 7.30

1.30

Wednesday 7.30

Section 4: ETP to MCC room Maintenance yard, MCC room, passage Activity Brooming Disposal of waste Floor cleaning Cobweb removal Monday 7.30 1.30 Tuesday 7.30 1.30 Wednesday 7.30

Section 5: MCC to BMP BMP-fornt & back and leaky rework Activity Brooming Disposal of waste Floor cleaning Cobweb removal Monday 7.30 1.30 Tuesday 7.30 1.30 Wednesday 7.30

2 Inside Section 6 (Office Block - ground floor) Toilets Activity Basin cleaning Urinal pot cleaning Toilet seat cleaning Basin Platform cleaning & keeping dry Moping Monday 8.30 1.30 Tuesday 8.30 1.30 Wednesday 8.30

Reception, Cabins, Cubicles, conference room, floors & windows Monday 7.30 Tuesday 7.30 Wednesday 7.30

Activity Brooming Moping Dusting Conference room - arrangements Cleaning of class woindow

1.30

1.30

Section 7: Office block - QC and R&D Doors & windows, passage, UPS room, QC, R&D, Control room Monday Tuesday Activity 7.30 1.30 7.30 Brooming Moping Dusting Disposal of waste Floor cleaning Cleaning of class woindow

1.30

Wednesday 7.30

Section 8: Filling and Blending - Ground floor Passages, filling machines, TO plant, BKs, BK16 Monday Activity 7.30 Brooming Dusting Disposal of waste Floor cleaning Cleaning of class woindow Cobweb removal

1.30

Tuesday 7.30

1.30

Wednesday 7.30

Section 9: Filling & Blending - Top floor including packaging storage & Filter storage Stair cases, BKs, FTs, Packaging area Monday Tuesday Wednesday Activity 7.30 1.30 7.30 1.30 7.30

Brooming Dusting Disposal of waste Floor cleaning Cobweb removal Stair case cleaning

Section 10: Canteen area Passages, pail empty storage, canteen Activity Brooming Disposal of waste Floor cleaning Cleaning of class woindow Monday 7.30 1.30 Tuesday 7.30 1.30 Wednesday 7.30

Section 11: TO plant to utility TO plant, pouch filling, stores, utility, rakes, BK16, FM6 Monday Activity 7.30 1.30 Brooming Dusting Disposal of waste Floor cleaning Cleaning of class woindow Cobweb removal

Tuesday 7.30

1.30

Wednesday 7.30

Section 12: Dispatch to change room Loading bays, dispatch room, rakes, passage, change room Monday Activity 7.30 1.30 Brooming Dusting Disposal of waste Floor cleaning Cleaning of class woindow Cobweb removal

Tuesday 7.30

1.30

Wednesday 7.30

Section 13: BMP BMP & leaky rework Activity Brooming Dusting Disposal of waste Floor cleaning Cobweb removal Monday 7.30 1.30 Tuesday 7.30 1.30 Wednesday 7.30

t shed, mandir, scrap yard frontage Wednesday Thursday 1.30 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 8.30 1.30

Friday 8.30

1.30

Saturday 8.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Wednesday 1.30

Thursday 7.30 1.30

Friday 7.30

1.30

Saturday 7.30 1.30

Anda mungkin juga menyukai