Latihan RAB HER
Latihan RAB HER
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGALAN :
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGARAN :
URAIAN
KODE ANALISA SATUAN
KOEFISIEN SATUAN NAMA ITEM
A0 M2 Pembersihan Lapangan
K.35 M2 Pengeteran/Residu
Rp 682.50
Rp 17,137.50
Rp 17,670.00
Rp 6,397.50
Rp 56,797.50
Rp 40,000.00 Rp 48,000.00
Rp 22,500.00 Rp 8,437.50
Rp 30,000.00 Rp 360.00
Rp 108,000.00
Rp 358,560.00
Rp 1,997,692.50
Rp 468,250.00
Rp 22,440.00
Rp 334,700.00
Rp 21,850.00
Rp 99,925.00
Rp 2,521,500.00
Rp 2,121,000.00
Rp 60,845.00
Rp 197,615.00
Rp 68,925.00
Rp 225,615.00
Rp 257,000.00
Rp 50,000.00
Rp 116,250.00
Rp 454,250.00
Rp 76,270.00
Rp 23,465.00
Rp 20,440.00
Rp 4,975.00
Rp 426,500.00
Rp 35,725.00
ANALISA SATUAN PEKERJAAN
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGARAN :
II PEKERJAAN TANAH
Galian Tanah M3 A.1 41.50
Urugan Kembali M3 1/2A.1 37.60
Urugan Pasir Bawah Lantai/Bawah Pondasi M3 A. 18 12.63
IV PEKERJAAN KAYU
Kap Kuda-Kuda Gording M3 F.22 1.50
Kusen Pintu/Jendela M3 F.27 0.67
Kap Kuda-Kuda Gording M3 F.22 3.78
Jendela Kaca Rangka Kayu (Kaca Mati) M2 F.36.c (1) 1.13
Plafond Tripleks M3 F.1.a+F.37 240.00
Pintu Doubel Tripleks M2 F.36.1 3.30
Pintu Doubel Tripleks Lapis Seng M2 F.36.b 3.40
Jendela Kaca Rangka Kayu M2 F.36c (2) 2.12
Kusen Pintu/Jendela M3 F.27 0.86
V PEKERJAAN ATAP
Atap Seng Gelombang M2 H.8.a 238.80
Bubungan Seng Plat 10M H.10.a 46.60
Pekerjaan Talang 10M H.17 47.00
List Plank M2 F.21 10.00
VI PEKERJAAN KUNCI/PENGGANTUNG
Kunci Tanam Lengkap Buah MT032 4.00
Engsel Pintu Buah MT033 8.00
Engsel Jendela Buah MT034 4.00
Grendel Pintu Buah MT035 4.00
Grendel Jendela Buah MT036 2.00
Angkur/Baut/Sengkang Buah MT037 48.00
Kait Angin Buah MT038 2.00
IX PEKERJAAN LISTRIK
Titik Lampu Buah MT044 12.00
Stop Kontak Buah MT045 3.00
Saklar Buah MT046 4.00
Sekring Kast Lokal Buah MT047 1.00
N PEKERJAAN
Rp 1,691,203.43
Rp 17,670.00 Rp 733,305.00
Rp 6,397.50 Rp 240,546.00
Rp 56,797.50 Rp 717,352.43
Rp 32,475,913.40
Rp 108,000.00 Rp 671,760.00
Rp 358,560.00 Rp 5,450,112.00
Rp 1,997,692.50 Rp 6,552,431.40
Rp 468,250.00 Rp 1,123,800.00
Rp 22,440.00 Rp 762,960.00
Rp 334,700.00 Rp 2,209,020.00
Rp 21,850.00 Rp 2,403,500.00
Rp 99,925.00 Rp 11,791,150.00
Rp 68,925.00 Rp 137,850.00
Rp 426,500.00 Rp 1,373,330.00
Rp 31,444,942.50
Rp 2,121,000.00 Rp 3,181,500.00
Rp 2,521,500.00 Rp 1,689,405.00
Rp 2,121,000.00 Rp 8,017,380.00
Rp 257,000.00 Rp 290,410.00
Rp 60,845.00 Rp 14,602,800.00
Rp 197,615.00 Rp 652,129.50
Rp 225,615.00 Rp 767,091.00
Rp 35,725.00 Rp 75,737.00
Rp 2,521,500.00 Rp 2,168,490.00
Rp 39,469,700.00
Rp 50,000.00 Rp 11,940,000.00
Rp 116,250.00 Rp 5,417,250.00
Rp 454,250.00 Rp 21,349,750.00
Rp 76,270.00 Rp 762,700.00
Rp 545,000.00
Rp 23,000.00 Rp 92,000.00
Rp 12,500.00 Rp 100,000.00
Rp 12,500.00 Rp 50,000.00
Rp 12,500.00 Rp 50,000.00
Rp 6,000.00 Rp 12,000.00
Rp 4,500.00 Rp 216,000.00
Rp 12,500.00 Rp 25,000.00
Rp 810,000.00
Rp 100,000.00 Rp 200,000.00
Rp 120,000.00 Rp 240,000.00
Rp 20,000.00 Rp 20,000.00
Rp 10,000.00 Rp 200,000.00
Rp 10,000.00 Rp 150,000.00
Rp 10,595,260.00
Rp 20,440.00 Rp 6,724,760.00
Rp 23,465.00 Rp 2,815,800.00
Rp 4,975.00 Rp 1,054,700.00
Rp 160,000.00
Rp 5,000.00 Rp 60,000.00
Rp 15,000.00 Rp 45,000.00
Rp 10,000.00 Rp 40,000.00
Rp 15,000.00 Rp 15,000.00
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp 2,585,130.00
II PEKERJAAN TANAH Rp 1,691,203.43
III PEKERJAAN BATU ATAU BETON Rp 32,475,913.40
IV PEKERJAAN KAYU Rp 31,444,942.50
V PEKERJAAN ATAP Rp 39,469,700.00
VI PEKERJAAN KUNCI/PENGGANTUNG Rp 545,000.00
VII PEKERJAAN SANITAIR Rp 810,000.00
VIII PEKERJAAN PENGECETAN Rp 10,595,260.00
IX PEKERJAAN LISTRIK Rp 160,000.00
JUMLAH (I+II+III+IV+V+VI+VII+VIII+IX) Rp 119,777,149.33
PPN 10% Rp 11,977,714.93
TOTAL (JUMLAH +PPN) Rp 131,754,864.26
DIBULATKAN Rp 131,755,000.00
DAFTAR LOGIKA KETERGANTUNGAN
RENCANA ANGGARAN BIAYA (RAB)
BANGUNAN FASILITAS UMUM DAN RUMAH PETUGAS
13 25 T
40 5
W
4
60
23 60
43 Z
18 53 2
Y 3
T 30 U 15 32 V 16 38 X 40
14 17
5 45 2 47 6 53 2 55
60
ANALISA SATUAN PEKERJAAN
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGARAN :
URAIAN
KODE ANALISA SATUAN
KOEFISIEN SATUAN NAMA ITEM
A0 M2 Pembersihan Lapangan
0.029 Oh Pekerja
0.001 Oh Mandor
Besi Beton:
110.000 Kg Besi Beton
2.300 Kg Kawat Ikat
3.645 Oh Tukang Besi
1.215 Oh Mandor
4.535 Oh Pekerja
Bekisting:
0.400 M3 Papan Kelas II
0.250 Kg Paku
0.375 Oh Tukang Kayu
0.038 Oh Kepala Tukang
0.400 Oh Pekerja
0.008 Oh Mandor
K.35 M2 Pengeteran/Residu
KEBUTUHAN TENAGA
HARGA SATUAN JUMLAH BIAYA VOLUME DURASI
SUNBER DAYA KERJA
Rp 1,127,850.00
Rp 7,750.00 Rp 852,500.00
Rp 8,000.00 Rp 18,400.00
Rp 32,500.00 Rp 118,462.50
Rp 30,000.00 Rp 36,450.00
Rp 22,500.00 Rp 102,037.50
Rp 504,822.50
Rp 1,200,000.00 Rp 480,000.00
Rp 7,500.00 Rp 1,875.00
Rp 32,500.00 Rp 12,187.50
Rp 40,000.00 Rp 1,520.00
Rp 22,500.00 Rp 9,000.00
Rp 30,000.00 Rp 240.00
Rp 468,250.00 2.40 3
Rp 22,440.00 6.60 2
Rp 334,700.00 6.60 7
Rp 21,850.00 110.00 2
Rp 99,925.00 118.00 6
Rp 2,521,500.00 0.86 5
Rp 2,121,000.00 1.50 4
Rp 60,845.00 240.00 2
Rp 197,615.00 3.30 1
Rp 68,925.00 2.00 6
Rp 225,615.00 3.40 1
Rp 257,000.00 1.13 1
Rp 50,000.00 238.80 5
Rp 116,250.00 46.60 5
Rp 454,250.00 47.00 5
Rp 76,270.00 10.00 5
Rp 23,465.00 120.00 2
Rp 20,440.00 329.00 2
Rp 4,975.00 212.00 2
Rp 426,500.00 3.22 3
Rp 35,725.00 1.13 1
BIAYA
Rp 159,705.00
Rp 152,685.00
Rp 7,020.00
Rp 925,425.00
Rp 162,000.00
Rp 324,000.00
Rp 15,795.00
Rp 351,000.00
Rp 8,640.00
Rp 60,750.00
Rp 3,240.00
Rp 733,305.00
Rp 702,180.00
Rp 31,125.00
Rp 240,546.00
Rp 212,346.00
Rp 28,200.00
Rp 717,352.43
Rp 606,240.00
Rp 106,565.63
Rp 4,546.80
Rp 671,760.00
Rp 447,840.00
Rp 209,925.00
Rp 13,995.00
Rp 5,450,112.00
Rp 1,094,400.00
Rp 396,720.00
Rp 1,485,192.00
Rp 741,000.00
Rp 91,200.00
Rp 1,539,000.00
Rp 102,600.00
Rp 1,167,745.60
Rp 164,393.60
Rp 106,272.00
Rp 629,760.00
Rp 106,600.00
Rp 13,120.00
Rp 147,600.00
Rp 29,520.00