Pekerjaan : Pengawasan Teknis Pemeliharaan Berkala Jalan Batas Pidie - Meulaboh (DAK)
Lokasi : Kab. Aceh Barat
Tahun : 2022
NO URAIAN JUMLAH
TOTAL Rp 377,402,000
PPN Rp 37,740,200
GRAND TOTAL Rp 415,142,200
DI BULATKAN Rp 415,140,000
Terbilang : Empat Ratus Lima Belas Juta Seratus empat Puluh Ribu Rupiah
JUMLAH HARGA
NO NAMA POSISI VOLUME SATUAN HARGA SATUAN (Rp)
SATUAN (Rp)
I BIAYA TENAGA AHLI
1 Imran, ST Supervision Engineer (1 Orang) 1.00 x 4.00 OB Rp 25,500,000 Rp 102,000,000
x
Sub Total I Rp 102,000,000
II BIAYA STAF PENDUKUNG
1 Inspector 1 (1 Orang) 1.00 x 4.00 OB Rp 8,300,000 Rp 33,200,000
2 Lab. Technician (1 Orang) 1.00 x 3.50 OB Rp 8,300,000 Rp 29,050,000
3 Surveyor (1 Orang) 1.00 x 3.50 OB Rp 8,300,000 Rp 29,050,000
4 Tenaga K3 (1 Orang) 1.00 x 4.00 OB Rp 8,300,000 Rp 33,200,000
5 Drafter/Operator Komputer (1 Orang) 1.00 x 4.00 OB Rp 5,000,000 Rp 20,000,000
6 Pelayan Kantor (1 Orang) 1.00 x 4.00 OB Rp 3,000,000 Rp 12,000,000
JUMLAH HARGA
NO URAIAN VOLUME SATUAN HARGA SATUAN (Rp)
SATUAN (Rp)
I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI
1 Bahan Operasional Kantor/ATK dan Fotocopy Field Team 4.00 Bln Rp 1,188,000 Rp 4,752,000
2 Bahan - bahan Gambar Field Team 4.00 Bln Rp 800,000 Rp 3,200,000
Sub Total I Rp 7,952,000
II BIAYA KOMUNIKASI
I Field Team 4.00 Bln Rp 800,000 Rp 3,200,000
Sub Total II Rp 3,200,000
III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)
1 Sewa Printer (1 Unit) 1.00 x 4.00 UB Rp 1,000,000 Rp 4,000,000
2 Sewa Camera Digital (1 Unit) 1.00 x 4.00 UB Rp 400,000 Rp 1,600,000
3 Sewa GPS (1 Unit) 1.00 x 4.00 UB Rp 400,000 Rp 1,600,000
Sub Total III Rp 7,200,000
IV ALAT PELINDUNG KERJA
1 Topi Pelindung (Safety Helmet) 5.00 Unit Rp 70,000 Rp 350,000
2 Sepatu Keselamatan (Safety Shoes) 5.00 Unit Rp 350,000 Rp 1,750,000
3 Rompi Keselamatan (Safety Vest) 5.00 Unit Rp 50,000 Rp 250,000
Sub Total IV Rp 2,350,000
V BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (Supervision Engineer) (1 Unit) 1.00 x 4.00 UB Rp 10,000,000 Rp 40,000,000
2 Sewa Sepeda Motor Sub Prof. Staff (Inspector 1) (1 Unit) 1.00 x 4.00 UB Rp 1,500,000 Rp 6,000,000
3 Sewa Sepeda Motor Sub Prof. Staff (Lab. Technician 1) (1 Unit) 1.00 x 3.50 UB Rp 1,500,000 Rp 5,250,000
4 Sewa Sepeda Motor Sub Prof. Staff (Surveyor 1) (1 Unit) 1.00 x 3.50 UB Rp 1,500,000 Rp 5,250,000
5 Sewa Sepeda Motor Sub Prof. Staff (Tenaga K3 1) (1 Unit) 1.00 x 4.00 UB Rp 1,500,000 Rp 6,000,000
2 Mobilisasi/Demobilisasi
Banda Aceh - Lapangan 2.00 x 5.00 Org/PP Rp 200,000 Rp 2,000,000
Sub Total VII Rp 16,000,000
VIII BIAYA LAPORAN - LAPORAN
1 Laporan RMK 5.00 Eks Rp 200,000 Rp 1,000,000
2 Laporan Bulanan 5.00 x 4.00 Eks Rp 100,000 Rp 2,000,000
2 Laporan Bulanan 5.00 x 1.00 Eks Rp 200,000 Rp 1,000,000
3 Laporan Khusus 5.00 Eks Rp 200,000 Rp 1,000,000
4 Laporan Akhir 5.00 Eks Rp 300,000 Rp 1,500,000
5 Laporan CD 5.00 Eks Rp 50,000 Rp 250,000
Sub Total VIII Rp 6,750,000