Bobot Bulan I
No Uraian Dalam Ket.
% 1 2 3 4
E R NAWAT I
Direktris
REKAPITULASI PEKERJAAN
SATUAN KERJA : UNIVERSITAS HASANUDDIN - TA 2008
PEKERJAAN : RENOVASI ATAP POS SATPAM UNHAS
LOKASI : KAMPUS UNHAS TAMALANREA - MAKASSAR
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PEMBONGKARAN
IV PEKERJAAN PENGECATAN
V PEKERJAAN PENYELESAIAN
REAL COST
PPN 10 %
J U M LA H
DIBULATKAN
Terbilang =
Mengetahui,
5,635,749.38
72,219,301.94
2,521,284.99
2,500,000.00
84,126,336.31
8,412,633.63
92,538,969.94
92,538,000.00
#REF!
NO HARGA
No. JENIS PEKERJAAN VOLU
ANALI SAT SATUAN
ME
SA SNI (Rp.)
I PEKERJAAN PENDAHULUAN
1 Pengukuran 1.00 Ls 750,000.00
2 Dokumentasi & P3K 1.00 Ls 500,000.00
Jumlah I
II PEKERJAAN PEMBONGKARAN
1 Membongkar atap genteng beton, balok reng dan lisplank 137.97 m2 8,000.00
2 Membongkar kayu rangka kuda-kuda/kaso/gording 32.59 m3 120,000.00
3 Membongkar total plafon 91.99 m2 6,750.00
Jumlah II
III PEKERJAAN RENOVASI ATAP
1 Pemasangan rangka atap baja ringan 120.25 m2 195,000.00
2 Pemasangan atap genteng Metalroof (polos) 120.25 6.32.2 m2 113,850.00
3 Pemasangan nok genteng Metalroof (polos) 25.00 6.36.2 m' 73,300.00
4 Pemasangan lisplank woodplank 300x8 mm 47.40 6.6.52 m' 51,250.00
5 Pemasangan jalusi atap segitiga dari aluminium 2.00 bh 7,500,000.00
7 Pemasangan plafond Gypsum Board 91.99 9.6.24 m2 51,600.00
8 Pemasangan list plafond kayu profil 99.58 6.6.60 m' 7,820.00
8 Pemasangan Rangka Plafond Hollow 91.99 9.6.18 m' 111,887.50
Jumlah III
V PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan lisplank 14.22 14.6.9 m2 20,121.13
2 Pekerjaan pengecatan plafon 91.99 14.6.14 m2 24,190.50
3 Pekerjaan pengecatan list-plafon 6.97 14.6.9 m2
1,408.48
Jumlah V
VI PEKERJAAN PENYELESAIAN
1 Pengangkutan & Penyimpanan/pembuangan bahan bongkaran 1.00 Ls 1,500,000.00
2 Pembersihan akhir 1.00 Ls 1,000,000.00
Jumlah VI
)
JUMLAH
HARGA
(Rp.)
750,000.00
500,000.00
1,250,000.00
1,103,760.00
3,911,040.00
620,949.38
5,635,749.38
23,448,750.00
13,690,462.50
1,832,500.00
2,429,250.00
15,000,000.00
4,746,813.00
778,715.60
10,292,810.84
72,219,301.94
286,122.47
2,225,344.57
9,817.95
2,521,284.99
1,500,000.00
1,000,000.00
2,500,000.00
RAB MATERIALIST TRUSS POS SATPAM UNHAS
Roof Pitch : 30 Degrees ; Jarak Truss : 1,2 M
Material Banyaknya Panjang Total Harga Satuan Total Harga
C.7575 88 btg 6 m 528 m Rp 29,000 Rp 15,312,000
Reng (40 ; 0.6) 80 btg 6 m 480 Rp 17,400 Rp 8,352,000
Screw 12-14x20 1000 bj Rp 600 Rp 600,000
Screw 10-16x16 300 bj Rp 450 Rp 135,000
Dynabold 10-80 70 bj Rp 1,500 Rp 105,000
Talang (Valley Gutter) 3 lbr 4 m 12 Rp 75,000 Rp 900,000
DU Listplank
Jumlah Harga Rp 25,404,000
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PEMBONGKARAN
IV PEKERJAAN PENGECATAN
V PEKERJAAN PENYELESAIAN
REAL COST
PPN 10 %
J U M LA H
DIBULATKAN
Terbilang =
Mengetahui,
1,250,000.00
5,635,749.38
72,219,301.94
2,521,284.99
2,500,000.00
84,126,336.31
8,412,633.63
92,538,969.94
92,538,000.00
Konsultan Perencana ,
CV. ASA DESAIN
0
1 Satu
2 Dua
3 Tiga
4 Empat
5 Lima
6 Enam
7 Tujuh
8 Delapan
9 Sembilan
8 4
29198000 29198000
Milyaran
Delapan Ribu 29 Jutaan
Sembilan Puluh 198 Ribuan
Seratus 000 Ratusan
Sembilan Juta
Dua Puluh
DAFTAR HARGA BAHAN
4,000,000.00
4,500,000.00
75,000.00
17,000.00
20,000.00
HARGA
( Rp. )
50,000.00
70,000.00
100,000.00
100,000.00
DAFTAR ANALISA PEKERJAAN
48,000.00
2,550.00
Rp. 50,550.00
5,000.00
5,000.00
1,000.00
500.00
Rp. 11,500.00
Rp. 62,050.00
32,400.00
850.00
Rp. 33,250.00
5,000.00
10,000.00
2,500.00
500.00
Rp. 18,000.00
Rp. 51,250.00
93,750.00
4,000.00
Rp. 97,750.00
10,000.00
5,000.00
1,000.00
100.00
Rp. 16,100.00
Rp. 113,850.00
RENCANA ANGGARAN BIAYA
SATUAN KERJA : UNIVERSITAS HASANUDDIN - TA 2010
PEKERJAAN : RENOVASI ATAP KONSOL LT. 1,2 FKG UNHAS
LOKASI : KAMPUS UNHAS TAMALANREA - MAKASSAR
HARGA
No. JENIS PEKERJAAN VOLUME SAT SATUAN
(Rp.)
I PEKERJAAN PENDAHULUAN
1 Pengukuran 1.00 Ls 250,000.00
2 Administrasi 1.00 Ls 300,000.00
Jumlah I
III PEKERJAAN RENOVASI ATAP
1 Pemasangan Kaso+Reng dengan kayu kelas II 122.40 m2 51,000.00
2 Pemasangan Atap Genteng Metalroof (polos) 130.56 m2 113,850.00
3 Pemasangan lisplank 85.60 m' 51,250.00
Jumlah III
VI PEKERJAAN PENYELESAIAN
1 Pengangkutan bahan bongkaran 1.00 Ls 250,000.00
2 Pembersihan akhir 1.00 Ls 250,000.00
Jumlah VI
IAYA
JUMLAH
HARGA
(Rp.)
250,000.00
300,000.00
550,000.00
6,242,400.00
14,864,256.00
4,387,000.00
25,493,656.00
250,000.00
250,000.00
500,000.00
REKAPITULASI PEKERJAAN
SATUAN KERJA : UNIVERSITAS HASANUDDIN - TA 2011
PEKERJAAN : RENOVASI ATAP KONSOL LT. 1,2 FKG UNHAS
LOKASI : KAMPUS UNHAS TAMALANREA - MAKASSAR
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
REAL COST
PPN 10 %
J U M LA H
DIBULATKAN
Terbilang = Dua Puluh Sembilan Juta Seratus Sembilan Puluh Delapan Ribu Rupiah
E R NAWAT I
Direktris
KERJAAN
550,000.00
25,493,656.00
500,000.00
26,543,656.00
2,654,365.60
29,198,021.60
29,198,000.00
E R NAWAT I
Direktris
REKAPITULASI PEKERJAAN
SATUAN KERJA : UNIVERSITAS HASANUDDIN - TA 2010
PEKERJAAN : RENOVASI ATAP KONSOL LT. 1,2,3 PASCASARJANA UNHAS
LOKASI : KAMPUS UNHAS TAMALANREA - MAKASSAR
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PEMBONGKARAN
IV PEKERJAAN PENYELESAIAN
REAL COST
PPN 10 %
J U M LA H
DIBULATKAN
Terbilang = Dua Puluh Sembilan Juta Seratus Sembilan Puluh Delapan Ribu Rupiah
PASCASARJANA UNHAS
550,000.00
Err:509
25,493,656.00
500,000.00
Err:509
Err:509
Err:509
Err:509