Workmanship
F = CLPN
F is a leak rate per unit of duct surface area (typically CFM/100SF) CL is a constant P is static pressure (typically in in. W.G. ) N is an exponent (most typically 0.65)
Definitions
Seam: Joining two longitudinally (in the direction of airflow) oriented edges of duct surface between two joints. Helical (spiral) lock seams are exempt from sealing requirements.
Definitions
Joints: All other duct surface connections made on the perimeter are deemed to be joints including:
Girth Joints Branch & Sub-Branch Intersections Duct Collar Tap-ins Fitting Subsections
Definitions
Joints: (Continued)
Louver and Air Terminal Connections to Ducts Access Door and Access Panel Frames and Jambs Duct, Plenum and Casing Abutments to Building Structures
Definitions
Duct Wall Penetrations
Control Rods/Levers Pressure Taps Fastener Penetrations
Duct Sealing
Leakage is a Function of Static Pressure and System Size Designer Must Specify the Duct Pressure Class or Classes Required for Duct Construction Duct Construction at 1" & " Pressure Class Meet Seal Class C Recommended
Duct Sealing
Unsealed Ducts may leak at the following Rates:
Duct Pressure in Inches w.g. CFM/100 S.F.
11 20 31 48
Sealants
Liquids
Consistency of Heavy syrup Can be Applied by Brush, Cartridge Gun or Powered Pump Contain 30-60 percent Volatile Solvents Shrinkage when Drying
Sealants
Liquids
Recommended for Slip Type Joints where the Sealant Fills a Small Space Between Overlapping Pieces of Metal Where Clearances Exceed 1/16" Several Applications may be Necessary
Sealants
Mastics
More Suitable for Application as Fillet, in Groves or Between Flanges Have Excellent Adhesion and Elasticity
Gaskets
Durable, Soft Elastomer Butyl or Extruded Forms Used in Flange Joints Should Have Adhesive Backing for Ease of Application
Sealants
Tapes
Such Closures are Listed as Components of Systems Complying with UL 181 No Recognized Industry Performance Standards that set forth:
Peel Adhesion, Shear Adhesion Tensile Strength Temperature Limits Accelerated Aging
Sealants
Tapes
Some test results are published in the product directories of the Pressure Sensitive Tape Council located in Glenview, Illinois. Shelf Life Difficult to Identify (6 mos.-1 yr.) Aging Characteristics Questionable Compatibility of the Adhesive with the Duct Material (Flexible, Non-metallic Ducts)
Sealants
Heat-Applied Materials
Hot Melts normally Shop Applied Thermally Activated Uses Heat to either Shrink Fit Closures or to Expand Compounds within Joint Systems
Sealants
Shelf Life may be one year or less often only 6 months. Installer should verify that shelf life has not been exceeded. Safety Considerations
Sealants may be flammable in wet or partially cured state Use liquids & mastics in well-ventilated areas Observe printed precautions of manufacturers
Leakage Tests
Need to verify leakage control by field testing is not present when adequate methods of assembly and sealing are used. Leakage tests for duct systems constructed to 3" w.g. or lower not recommended not cost effective.
Leakage Tests
For Systems of 4" w.g. Class and higher:
The designer must determine if any justification for testing exists. If so, he must clearly designate in the contract documents the portions of the system(s) to be tested and must specify the appropriate test methods.
Leakage Tests
ASHRAE Energy Conservation Standards Series 90 text on Leakage Control generally requires tests only for pressures in excess of 3" w.g. Adequate airtightness can normally be ensured by
Selecting static pressure construction class suitable for operating condition AND Sealing ductwork properly
SEALING APPLICABLE
Test Procedures
1. 2.
Select a section of duct to be tested. Select a test pressure not in excess of the pressure class rating of the duct. (Usually the actual operating pressure.) Calculate the allowable leakage using leakage factors for the duct surface area.
3.
Test Procedures
4.
Select the blower and orifice suitable for the test airflow requirements. Connect the blower and flowmeter to the duct section. Provide temporary seals at all ends of the ductwork.
5.
6.
Test Procedures
7.
Start the blower at a low airflow capacity, increasing the airflow until the test pressure is reached. Adjust blower capacity until steadystate conditions at the test pressure are achieved.
8.
Test Procedures
9.
Record the airflow (across the orifice) at the steady state condition. This airflow is the CFM leakage of the tested section of the duct.
10.
P in. w.g. 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34 0.36 0.38 0.40 0.42 0.44 0.46 0.48 0.50 0.52 0.54 0.56 0.58 0.60
Orifice Size 1.4" 2.625" 18.7 22.8 26.2 29.3 32.1 34.6 37.0 39.2 41.3 43.3 45.2 47.0 48.8 50.5 52.1 53.7 55.3 56.8 58.3 59.7 61.1 62.4 63.8 65.1 66.4 67.6 68.9 70.1 71.3 4.90" 57.1 78.8 95.3 109.2 121.5 132.6 142.8 152.3 161.2 169.6 177.6 185.2 192.6 199.6 206.5 213.0 219.4 225.6 231.6 237.5 243.2 248.8 254.3 259.6 264.9 270.0 275.0 280.0 284.8 289.6
P in. w.g. 1.22 1.24 1.26 1.28 1.30 1.32 1.34 1.36 1.38 1.40 1.42 1.44 1.46 1.48 1.50 1.52 1.54 1.56 1.58 1.60 1.62 1.64 1.66 1.68 1.70 1.72 1.74 1.76 1.78 1.80
Orifice Size 1.4" 28.7 28.9 29.2 29.4 29.6 29.8 30.1 30.3 30.5 30.7 30.9 31.2 31.4 31.6 31.8 32.0 32.2 32.4 32.6 32.8 33.0 33.2 33.4 33.6 33.8 34.0 34.2 34.4 34.6 34.8 2.625" 101.4 102.3 103.1 103.9 104.7 105.5 106.3 107.1 107.9 108.6 109.4 110.2 110.9 111.7 112.4 113.2 113.9 114.6 115.4 116.1 116.8 117.5 118.2 118.9 119.6 120.3 121.0 121.7 122.4 123.1 4.90" 410.3 413.6 416.9 420.1 423.4 426.5 429.7 432.9 436.0 439.1 442.2 445.2 448.3 451.3 454.3 457.2 460.2 463.1 466.0 468.9 471.8 474.7 477.5 480.3 483.1 485.9 488.7 491.5 494.2 496.9
P in. w.g. 4.10 4.20 4.30 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00
Orifice Size 1.4" 52.3 52.9 53.5 54.1 54.7 55.3 55.9 56.5 57.1 57.6 58.2 58.8 59.3 59.9 60.4 61.0 61.5 62.0 62.6 63.1 63.6 64.1 64.6 65.1 65.6 66.1 66.6 67.1 67.6 68.1 2.625" 185.3 187.5 189.7 191.9 194.0 196.2 198.3 200.4 202.4 204.4 206.5 208.5 210.4 212.4 214.3 216.3 218.2 220.0 221.9 223.8 225.6 227.4 229.2 231.0 232.8 234.6 236.3 238.1 239.8 241.4 4.90" 746 755 763 772 781 789 797 806 814 822 830 838 846 854 862 869 877 884 892 899 907 914 921 928 935 942 949 956 963 970
TABLE 5-2 ORIFICE FLOW RATE (SCFM) VS. PRESSURE DIFFERENTIAL (in. of Water)
13.6
3.4
GIVEN: From Fig. 4-1 Leakage Class = CL6 Operating Pressure = 3.5 w.g. Leakage Factor = 13.6 CFM/100 sf. CALCULATION: % of flow = Leakage Factor
Fan CFM Duct Area
ASSUME: Fan CFM = 16000 Duct Area = 4000 sf. Fan CFM = 16000 = 4 Duct Area 4000 = 13.6 4 = 3.40
Through-Penetration Firestopping
Eli P. Howard, III Group Director Technical Resources SMACNA
Today's Program
Definition & Purpose Background & Terminology Codes & Regulations Specification Responsibilities Firestopping Selection Factors Typical Details/Drawings
Definition
A through-penetration firestop system is a specific field erected construction of an assemblage of materials designed to prevent the spread of fire and its by-products for a prescribed period of time through openings which are made in floors and walls to accommodate through penetrating items such as ducts, metal and plastic pipes, electrical conduit, cables, cable trays, etc.
Definition
A firestop system consists of three components:
1. A fire resistive assembly or fire barrier (wall, floor, etc.); 2. The penetrating items (ducts, pipes, conduits, etc.); and 3. The sealant material.
Purpose
Outline Considerations in Specifying and Installing Through-Penetration Firestop Systems
Terminology
Annular Space The distance from the inside edge of the opening to the outside of the penetrating item.
Terminology
Area Separation A wall of fire-resistance-rated construction (expressed in hours), which serves to divide the floor area of a building into acceptable area limits as set forth in the code having jurisdiction.
Terminology
Fire-Rated Partition A partition having an assembly of materials that will afford a given fireresistance rating (expressed in hours) to impede the spread of fire from one area to another.
Terminology
Fire Wall A continuous (basement-to-roof) wall having adequate fire-resistance rating (expressed in hours) with adequate structural stability under fire conditions to completely subdivide a building or separate adjoining buildings to restrict spread of fire.
Terminology
F Rating A rating, usually expressed in hours, indicating a specific length of time that a fire-resistive barrier can withstand fire before being consumed or permitting the passage of flame through an opening in the assembly.
Terminology
Intumescence A characteristic of certain fire barrier products that when exposed to heat, expand, self-sealing and filling any void in the penetration. When exposed to flame, intumescent materials will form a hard char.
Terminology
L Rating A rating, usually expressed in cubic feet per minute per square foot of opening, determined by the air leakage test. It is a measure of the ability of a fire-resistive assembly to resist air or smoke infiltration resulting from pressure differences. L ratings may be given for ambient and elevated temperatures.
Terminology
T Rating A rating, usually expressed in hours, indicating the length of time that the temperature on the non-fire side of a fireresistance-rated assembly exceeds 325 above its ambient temperature.
Specification Responsibilities
Architects
It is Important that the Architect Clearly Identify All Fire Resistant Assemblies and their Hourly Ratings on the Drawings
Engineers/Systems Designers
It is Important that the System Designers Clearly Identify on the Project Drawings All Penetrations of Fire Resistive Assemblies and the Details of the Required Materials and Methods to be Installed to Maintain the Fire Resistive Integrity of those Assemblies.
Building/Code Officials
It is Mandatory that the Plans and Specifications Completely Identify All Fire Resistant Construction, Penetrations of those Designated Fire Resistant Assemblies, and the Details of How those Penetrations are to be Protected. It is the Responsibility of the Code Official to Determine that the Required Information is Contained in the Construction Documents.
HVAC/Electrical Contractors
The HVAC and Electrical Contractors Are Not Responsible for the Quantity, Location and the Details of Producing or Maintaining the Required Fire Resistance Ratings of Assemblies which are Penetrated by the Materials and Systems Installed by their Trades Except as those Quantities and Details are Shown on the Drawings and in the Specifications.
A.
The Material and Construction Type (Wall, Floor, etc.) of the Fire Resistant Assembly being Penetrated:
Concrete Brick/Block Gypsum Metal Wood
B.
C.
D.
The Required Rating of the Firestop System Determined by the Rating of the Penetrated Assembly:
F Rating (Hours) T Rating (Hours) L Rating (CFM/SQ. FT)