DIVERGING ROW
ESCAPE LANE LANE (SAAT INI)
1m 6m 2.041m
FINAL
C
STAGE 50.596m 5.848m
3.6m LAJUR LAJUR
LAJUR BAHU ROW
LALULINTAS DALAM LALULINTAS PENDAKIAN ROUNDING
3m 3.6m 3.6m 1.5m 2.5m 1.5m 3.6m 3.6m 3.6m 3m 1.5m (RENCANA PELEBARAN)
BAHU LAJUR BAHU LAJUR BAHU 1.63m
LUAR LALULINTAS DALAM LALULINTAS LUAR
AC-WC, T = 5 CM
AC-BC = 10 CM
AGGREGATE BASE
CLASS A, T = 25 CM
BASE A, T = 15 CM
CAPPING LAYER GRANULAR CBR 15%
MERENCANAKAN MEMERIKSA / MENYETUJUI MENGETAHUI MENGETAHUI JUDUL GAMBAR :
PEKERJAAN JASA KONSULTANSI RENCANA TEKNIK AKHIR NO. GAMBAR :
PT. DIANTAMA REKANUSA PT. GUTEG HARINDO PT. YODYA KARYA PT. CKJT
PROYEK PEMBANGUNAN JALAN TOL TIPIKAL POTONGAN MELINTANG
RUAS SUMEDANG - DAWUAN REVIEW ROW PLAN STA 36+575 - STA 36+825
PT. CKJT STA. 26+800 ~ STA. 60+015 SKALA :
(PT. CITRA KARYA JABAR TOL) Ir. Imam Ashari Ir. Usman Sipayung Herman Tani K Ir. Bagus Medi Suarso, MM TANGGAL :
PADA JALAN TOL CILEUNYI - SUMEDANG - DAWUAN NO REV. NTS
RESIDENT ENGINEER TEAM LEADER TEAM LEADER PIMPINAN PROYEK TANGGAL :
36+750
C
ESCAPE LANE 32.843m
ROW ROW (SAAT INI)
1m 6m 1m C ROW
ROW 1
(PELEBARAN) FINAL BAHU LAJUR LAJUR BAHU FINAL
1 STAGE
PASIR = T = 1.0 M LUAR LALULINTAS LALULINTAS LUAR STAGE
IJUK = T = 5 CM 3.6m 1.5m 3m 3.6m 3.6m 1.5m 2.5m 1.5m 3.6m 3.6m 3m 3.6m
KERIKIL = T = 15 CM ROUNDING LAJUR BAHU BAHU LAJUR 1.5m
LALULINTAS DALAM DALAM LALULINTAS ROUNDING
1
DS-8 1 -4% 2.0 % -2.0 % -4%
-4% -4%
2
DS-3 1
DS-3
12.799m 4.098m
ROW ROW ROW
(RENCANA) (SAAT INI) (RENCANA)
ROW
(SAAT INI)
DS-3
LAJUR
LALULINTAS BAHU
0.8m1m 2.25m 2.25m 1m
BAHU LAJUR 0.8m DS-3
LALULINTAS
1 1
1 1
DS-3 DS-3
TANAH
BASE A, T = 15 CM PELAT BETON SEMEN Fs = 45 kg/cm2, T = 27 CM
PLASTIK, T = 125 MICRON
LEAN CONCRETE, T = 10 CM
BASE A, T = 15 CM
19.86 31.17
3156
600
ROUNDING
FINAL STAGE 300 360
ESCAPE LANE
LAJUR
150 BAHU LUAR
FINAL STAGE LALU LINTAS ROW
FINAL STAGE
EKSISTING
360 ROUNDING 300 360 360 150 250 150 360 360 300 ROUNDING 360
FINAL STAGE 150 BAHU LUAR LAJUR LAJUR BAHU BAHU LAJUR LAJUR BAHU LUAR 150 FINAL STAGE
760
LALU LINTAS LALU LINTAS DALAM DALAM LALU LINTAS LALU LINTAS
50 CL
FG FG 50 GUARDRAIL
300 50 50 4% 4%
4% 4%
4%
BATAS 300 40
200 Geogrig 80Kn Pelat Beton Semen FS 45 t = 30 cm 2
ROW 4%
DS-8 50 150 Plastic t = 125 micron
AC BC t = 5 cm
296
AC Base t = 10 cm 1
SOLID SODDING Lean Concrete t = 10 cm Aggregate Base Class A t= 40 cm
DS-8 Capping Layer t=20cm
Aggregate Base Class A t=15cm
2 Capping Layer t=20cm (granularcbr>15%)
ROW 1 (grangranular cbr >15%) Tanah
REVIEW
4%
SOLID SODDING DS-8
2
1
MERENCANAKAN MEMERIKSA / MENYETUJUI MENGETAHUI MENGETAHUI JUDUL GAMBAR :
PEKERJAAN JASA KONSULTANSI RENCANA TEKNIK AKHIR NO. GAMBAR:
PT. MULTI PHI BETA KSO PT. MATRA REKAYASA INTERNASIONAL PT. YODYA KARYA PT. CKJT
PROYEK PEMBANGUNAN JALAN TOL
RUAS SUMEDANG - DAWUAN
PT. CKJT STA. 26+800 ~ STA. 60+015 SKALA :
(PT. CITRA KARYA JABAR TOL)
PADA JALAN TOL CILEUNYI - SUMEDANG - DAWUAN Ir. Agus Budi S, MT. Ir. Agus M. Mahsun Herman Tani K Ir. Bagus Medi Suarso, MM TANGGAL :
NO REV.
RESIDENT ENGINEER TEAM LEADER TEAM LEADER PIMPINAN PROYEK TANGGAL :
60.53
24.87 35.66 42.45
600
100 ESCAPE LANE 100 284
360 ROUNDING 300 360 360 150 250 150 360 360 360 300 150
FINAL STAGE 150 BAHU LUAR LAJUR LAJUR BAHU BAHU LAJUR LAJUR LAJUR BAHU LUAR
LALU LINTAS LALU LINTAS DALAM DALAM LALU LINTAS LALU LINTAS PENDAKIAN ROUNDING
GUARDRAIL 50 CL
50 GUARDRAIL
4% 4% GUARDRAIL
ROW ESCAPE LANE 4% ROW
4% 4%
EXISTING EXISTING
Pelat Beton Semen FS = 45 kg/cm2, t = 30 cm AC-WC t = 5 cm
Plastic t = 125 micron AC-BC t = 10 cm Solid sodding
2 Lean Concrete t = 10 cm Aggregate Base Class A t = 40 cm 2
600
550
1 Capping Layer t = 20cm 1
Aggregate Base Class A t=15cm
300 Capping Layer t=20cm (granularcbr >15%)
100
(granular cbr >15%) Tanah
4%
ROW DS-8
REVIEW
2
493
100
MERENCANAKAN MEMERIKSA / MENYETUJUI MENGETAHUI MENGETAHUI JUDUL GAMBAR :
PEKERJAAN JASA KONSULTANSI RENCANA TEKNIK AKHIR NO. GAMBAR:
PT. MULTI PHI BETA KSO PT. MATRA REKAYASA INTERNASIONAL PT. YODYA KARYA PT. CKJT
PROYEK PEMBANGUNAN JALAN TOL TIPIKAL POTONGAN MELINTANG JALAN KABUPATEN
RUAS SUMEDANG - DAWUAN REVIEW ROW PLAN STA. 0+934.74 & 0+950 (MR STA 50+050)
PT. CKJT STA. 26+800 ~ STA. 60+015 SKALA :
(PT. CITRA KARYA JABAR TOL) Ir. Agus Budi S, MT. Ir. Agus M. Mahsun Herman Tani K Ir. Bagus Medi Suarso, MM TANGGAL :
PADA JALAN TOL CILEUNYI - SUMEDANG - DAWUAN
RESIDENT ENGINEER TEAM LEADER TEAM LEADER PIMPINAN PROYEK
NO REV.
TANGGAL :
NTS
MERENCANAKAN MEMERIKSA / MENYETUJUI MENGETAHUI MENGETAHUI JUDUL GAMBAR :
PEKERJAAN JASA KONSULTANSI RENCANA TEKNIK AKHIR NO. GAMBAR :
PT. MULTI PHI BETA KSO PT. MATRA REKAYASA INTERNASIONAL PT. YODYA KARYA PT. CKJT
PROYEK PEMBANGUNAN JALAN TOL
RUAS SUMEDANG - DAWUAN
PT. CKJT STA. 26+800 ~ STA. 60+015 SKALA :
(PT. CITRA KARYA JABAR TOL) Ir. Agus Budi S, MT. Ir. Agus M. Mahsun Herman Tani K Ir. Bagus Medi Suarso, MM TANGGAL :
PADA JALAN TOL CILEUNYI - SUMEDANG - DAWUAN NO REV.
RESIDENT ENGINEER TEAM LEADER TEAM LEADER PIMPINAN PROYEK TANGGAL :
ESCAPE LANE
ROW ROW MAIN ROAD ROW
(Pelebaran) CL (RTA) (RTA)
JALUR
ESCAPE LANE