Anda di halaman 1dari 1

ABSENSI PEKERJA HARIAN

Revitalisasi Toilet Sayap Kiri Setwapres Lantai 3


Jl. Veteran III Jakarta Pusat
Periode : 17 s/d 22 Juni2022
KASBON/
KEAHLIA 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun
JUMLAH SATUAN
NO NAMA TOTAL UPAH UANG SISA UPAH KETERANGAN
N JUMAT SABTU MGG SENIN SELASA RABU KAMIS HARI KERJA UPAH
MAKAN
1 M. Ilyas (Iyas) 1 1 1 1 1 1 x 6 160.000 960.000 950.000 10.000 2 x Swab (antigen)
2 Mohamad Murodi (Roni) 1 1 1 1 1 1 x 6 160.000 960.000 950.000 10.000 2 x Swab (antigen)

1.920.000 1.900.000 20.000


Periode : 27 Juni s/d 02 Juli 2022
27-Jun 28-Jun 29-Jun 30-Jun 01-Jul 02-Jul 03-Jul KASBON/
JUMLAH HARI SATUAN
NO NAMA KEAHLIAN TOTAL UPAH UANG SISA UPAH KETERANGAN
SENIN SELASA RABU KAMIS JUMAT SABTU MGG KERJA UPAH
MAKAN
1 M. Ilyas (Iyas) 1 1 1 1 1 1 x 6 160.000 960.000 950.000 10.000 2 x Swab (antigen)
2 Mohamad Murodi (Roni) 1 1 1 1 1 1 x 6 160.000 960.000 950.000 10.000 2 x Swab (antigen)
3 Ganda Sumitra (Anda) x x x 1 1 1 1 4 160.000 640.000 400.000 240.000 1 x Swab (antigen)
4 Bahruji (Uji) x x x 1 1 1 1 4 130.000 520.000 400.000 120.000 1 x Swab (antigen)

3.080.000 2.700.000 380.000

Mengetahui: Periode : 17 s/d 22 Juni2022 20.000 Jakarta, 02 Juli 2022


Periode : 27 Juni s/d 02 Juli 2022 380.000
TOTAL 400.000 catt; roni dan ilyas pada tgl; 02 terima uang
Terbilang; kas masing-masing @rp 700,000 termasuk
Rinno Darsono empat ratus ribu M. Ilyas uang makan ditanggal tersebut diatas
Team Pelaksana Mandor

Anda mungkin juga menyukai