PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
GAMBAR RENCANA
PENGESAHAN
PEKERJAAN :
PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
DISETUJUI DIBUAT
PEJABAT PELAKSAN TEKNIS KEGIATAN KONSULTAN PERENCANA
(PPTK) CV. SAHARA ENGINEERING
BIDANG BINA MARGA
PEKERJAAN :
LOKASI :
DESA POLO PANGALE
PENINGKATAN JALAN
S
Team Asistensi :
JULFRI PALULLUNGAN, ST
NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG, ST
NIP : 19940324 201903 1 014
PERENCANA :
KAMARUDDIN
DRAFTER : PARAF :
KETERANGAN :
01 11
PEMERINTAH KABUPATEN MAMUJU TENGAH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Alamat : Jalan Poros Topoyo-Palu
PEKERJAAN :
PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
LOKASI :
KECAMATAN PANGALE
AKHIR PEKERJAAN KABUPATEN MAMUJU
STA.0+1+300 TENGAH
2°17'9.76''S
119°10'27.22''E
DISETUJUI :
STA 0+0450
STA 0+0400
STA 0+0350
STA 0+0300
STA 0+0250
STA 0+0200
IRFAN SYUAIB, ST
Nip. 1977 0802 200901 1 006
STA 0+0150
Team Asistensi :
AWAL PEKERJAAN
STA.TITIK AWAL
STA 0+050
PERENCANA :
KAMARUDDIN
DRAFTER : PARAF :
KETERANGAN :
02 11
PEMERINTAH KABUPATEN MAMUJU TENGAH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Alamat : Jalan Poros Topoyo-Palu
PEKERJAAN :
AKHIR PEKERJAAN
STA.0+1+300
2°17'9.76''S
119°10'27.22''E
PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
STA 1+300
STA 1+250
STA 1+200
STA 1+150 LOKASI :
STA 1+100 STA 1+050 STA 1+000 STA 0+0950 STA 0+0900 STA 0+0850
STA 0+800 STA 0+0750 STA 0+0700 STA 0+0650 STA 0+0600 STA 0+0550 STA 0+0500
STA 0+0450
KECAMATAN PANGALE
STA 0+0400
KABUPATEN MAMUJU
TENGAH
STA 0+0350
STA 0+0200
STA 0+0150
IRFAN SYUAIB, ST
STA 0+0100 Nip. 1977 0802 200901 1 006
Team Asistensi :
STA.TITIK AWAL
STA.TITIK AWAL JULFRI PALULLUNGAN, ST
AWAL PEKERJAAN STA 0+000 NIP : 19890716 201903 1 006
STA.0+000
MARSEM TALLUKARAENG, ST
2°17'6.34''S NIP : 19940324 201903 1 014
119°11'0.38''E
CINDY PATRESIA ADO, ST
NIP : 19960728 201903 2 028
PERENCANA :
KAMARUDDIN
DRAFTER : PARAF :
KETERANGAN :
03 11
W
S
N
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
E
STA 0+0700
Alamat : Jalan Poros Topoyo-Palu
PEKERJAAN :
STA 0+0650
PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
STA 0+0600
LOKASI :
KECAMATAN PANGALE
STA 0+0550
KABUPATEN MAMUJU
TENGAH
STA 0+0500
DISETUJUI :
STA 0+0450
PEJABAT PELAKSANA TEKNIS KEGIATAN
STA 0+0400
(PPTK)
STA 0+0350
BIDANG BINA MARGA
STA 0+0300
STA 0+0250
STA 0+0200
STA 0+0150
STA 0+000
STA.TITIK AWAL
STA 0+050
STA 0+0100
IRFAN SYUAIB, ST
Nip. 1977 0802 200901 1 006
20 JULFRI PALULLUNGAN, ST
NIP : 19890716 201903 1 006
19 MARSEM TALLUKARAENG, ST
18 NIP : 19940324 201903 1 014
1:3000
17 CINDY PATRESIA ADO, ST
NIP : 19960728 201903 2 028
16
TANAH ASLI PERENCANA :
15
RENCANA CV. SAHARA ENGINEERING
14
13
12
11
FARHAM FAHRI ABIDIN, ST.
10 DIREKTUR
9 TEAM LEADER : PARAF :
8
7 KAMARUDDIN
6
DRAFTER : PARAF :
5
4 AGUS HARDI WIBOWO. D
3
JUDUL GAMBAR SKALA
2
1 LONG SECTION V = 1 : 250
STA 0+000 - STA 0+700 H = 1 : 3000
0
KETERANGAN :
Nomor Patok P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15
Jarak Patok 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
Jumlah Jarak 0+000 0+050 0+100 0+150 0+200 0+250 0+300 0+350 0+400 0+450 0+500 0+550 0+600 0+650 0+700
22,35 22,2
11,15 11,0
19,35 19,2
15,85 15,7
15,05 14,9
13,95 13,8
10,95 10,8
15,55 15,4
11,55 11,4
9,4
9,2
7,3
8,0
6,6
7,5
Tinggi Tanah Asli TANGGAL KODE NO. LBR JML. LBR
9,55
9,35
7,45
8,15
7,65
6,75
Tinggi Rencana 04 11
N
W
E
PEMERINTAH KABUPATEN MAMUJU TENGAH
S
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Alamat : Jalan Poros Topoyo-Palu
PEKERJAAN :
PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
LOKASI :
STA 1+300
STA 1+250
STA 1+200
STA 1+150
STA 1+100
STA 1+050
STA 1+000
STA 0+0950 STA 0+0900 STA 0+0850
KECAMATAN PANGALE
STA 0+800
STA 0+0750
KABUPATEN MAMUJU
TENGAH
DISETUJUI :
IRFAN SYUAIB, ST
Nip. 1977 0802 200901 1 006
20 JULFRI PALULLUNGAN, ST
NIP : 19890716 201903 1 006
19 MARSEM TALLUKARAENG, ST
18 NIP : 19940324 201903 1 014
1:3000
17 CINDY PATRESIA ADO, ST
NIP : 19960728 201903 2 028
16
TANAH ASLI PERENCANA :
15
RENCANA CV. SAHARA ENGINEERING
14
13
12
11
FARHAM FAHRI ABIDIN, ST.
10 DIREKTUR
9 TEAM LEADER : PARAF :
8
7 KAMARUDDIN
6
DRAFTER : PARAF :
5
4 AGUS HARDI WIBOWO. D
3
JUDUL GAMBAR SKALA
2
1 LONG SECTION V = 1 : 250
STA 0+750 - STA 1+300 H = 1 : 3000
0
KETERANGAN :
Nomor Patok P16 P17 P18 P19 P20 P21 P22 P23 P24 P25 P26 P27
Jarak Patok 50 50 50 50 50 50 50 50 50 50 50
Jumlah Jarak 0+750 0+800 0+850 0+900 0+950 1+000 1+050 1+100 1+150 1+200 1+250 1+300
2,7
3,7
3,5
4,7
4,0
2,7
5,2
3,0
3,5
0,3
1,5
1,4
3,85
3,65
4,85
4,15
2,85
1,65
5,35
3,15
3,65
0,45
1,55
Tinggi Rencana 05 11
25 18
Lapisan Existing
24 17 Lapisan Existing
Timbunan Pilihan
t= 15
Timbunan Pilihan
t= 15
23 16 PEMERINTAH KABUPATEN
Saluran Existing MAMUJU TENGAH
2% 2% Saluran Existing DINAS PEKERJAAN UMUM
22 15 2% 2%
DAN PENATAAN RUANG
JALAN POROS TOPOYO - PALU
21 14
PEKERJAAN :
20 13 PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
19 12
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA LOKASI :
22,2
14,9
ELEV. ELEV.
KECAMATAN PANGALE
EXISTING EXISTING
0 + 000 0 + 150 KABUPATEN MAMUJU TENGAH
22,35
15,05
ELEV. ELEV.
RENCANA RENCANA DISETUJUI :
22 18
PEJABAT PELAKSANA TEKNIS KEGIATAN
Lapisan Existing (PPTK)
Lapisan Existing BIDANG BINA MARGA
21 17 Timbunan Pilihan
Timbunan Pilihan t= 15
t= 15
20 16 Saluran Existing
Saluran Existing 2% 2%
2% 2%
IRFAN SYUAIB, ST
19 15 Nip. 1977 0802 200901 1 006
DIPERIKSA :
18 14 TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
17 13 NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG,ST
16 12 NIP : 19940324 201903 1 014
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA -5 -4 -3 -2 -1 0 1 2 3 4 5 STA
CINDY PATRESIA ADO, ST
19,2
15,4
ELEV. ELEV. NIP : 19960728 201903 2 028
EXISTING EXISTING
0 + 050 0 + 200 PERENCANA :
19,35
15,55
ELEV. ELEV.
CV. SAHARA ENGINEERING
RENCANA RENCANA
18 18
Lapisan Existing Lapisan Existing
KAMARUDDIN
15 13
DRAFTER : PARAF :
14 12
AGUS HARDI WIBOWO. D
13,8
ELEV.
EXISTING
0 + 100 0 + 250
TANGGAL KODE NO. LBR JML. LBR
15,85
13,95
ELEV. ELEV.
RENCANA RENCANA
06 11
14 14
Lapisan Existing
Lapisan Existing
13 Timbunan Pilihan 13
t= 15
Timbunan Pilihan
t= 15
12 Saluran Existing 12 PEMERINTAH KABUPATEN
2% 2%
Saluran Existing
MAMUJU TENGAH
2% 2% DINAS PEKERJAAN UMUM
11 11 DAN PENATAAN RUANG
JALAN POROS TOPOYO - PALU
10 10
PEKERJAAN :
9 9 PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
8 8
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA LOKASI :
11,4
11,0
ELEV. ELEV.
KECAMATAN PANGALE
EXISTING EXISTING
0 + 300 0 + 450 KABUPATEN MAMUJU TENGAH
11,55
11,15
ELEV. ELEV.
RENCANA RENCANA DISETUJUI :
14 12
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
Lapisan Existing BIDANG BINA MARGA
13 11
Lapisan Existing
Timbunan Pilihan
t= 15
Timbunan Pilihan
12 t= 15
10
Saluran Existing
2% 2%
IRFAN SYUAIB, ST
11 Saluran Existing 9 Nip. 1977 0802 200901 1 006
2% 2%
DIPERIKSA :
10 8 TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
9 7 NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG,ST
8 6 NIP : 19940324 201903 1 014
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA
CINDY PATRESIA ADO, ST
10,8
ELEV. ELEV.
9,2
NIP : 19960728 201903 2 028
EXISTING EXISTING
0 + 350 0 + 500 PERENCANA :
10,95
ELEV. ELEV.
9,35
CV. SAHARA ENGINEERING
RENCANA RENCANA
12 10
11 9 Timbunan Pilihan
Timbunan Pilihan
t= 15 FARHAM FAHRI ABIDIN, ST
t= 15
DIREKTUR
Saluran Existing
TEAM LEADER : PARAF :
10 8
Saluran Existing
2% 2% 2% 2%
KAMARUDDIN
9 7
DRAFTER : PARAF :
8 6
AGUS HARDI WIBOWO. D
ELEV. ELEV.
9,4
7,3
EXISTING EXISTING
0 + 400 0 + 550
TANGGAL KODE NO. LBR JML. LBR
ELEV. ELEV.
9,55
7,45
RENCANA RENCANA
07 11
10 8
Lapisan Existing
Timbunan Pilihan
Lapisan Existing
t= 15
9 7
Saluran Existing Timbunan Pilihan
t= 15
2% 2%
8 6 Saluran Existing PEMERINTAH KABUPATEN
2% 2% MAMUJU TENGAH
DINAS PEKERJAAN UMUM
7 5
DAN PENATAAN RUANG
JALAN POROS TOPOYO - PALU
6 4
PEKERJAAN :
5 3 PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
4 2
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA LOKASI :
ELEV. ELEV.
8,0
5,2
KECAMATAN PANGALE
EXISTING EXISTING
0 + 600 0 + 750 KABUPATEN MAMUJU TENGAH
ELEV. 8,15 ELEV.
5,35
RENCANA RENCANA DISETUJUI :
10 6
Lapisan Existing PEJABAT PELAKSANA TEKNIS KEGIATAN
Lapisan Existing (PPTK)
Saluran Existing Timbunan Pilihan BIDANG BINA MARGA
t= 15
9 Timbunan Pilihan 5
t= 15
2% 2%
Saluran Existing
8 4
2% 2%
IRFAN SYUAIB, ST
7 3 Nip. 1977 0802 200901 1 006
DIPERIKSA :
6 2 TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
5 1 NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG,ST
4 0 NIP : 19940324 201903 1 014
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA
CINDY PATRESIA ADO, ST
ELEV. ELEV.
4,7
7,5
4,85
7,65
6 Lapisan Existing
9
FARHAM FAHRI ABIDIN, ST
Lapisan Existing
Timbunan Pilihan DIREKTUR
t= 15
TEAM LEADER : PARAF :
8 Timbunan Pilihan 5
t= 15
Saluran Existing
KAMARUDDIN
Saluran Existing 2% 2%
7 4
2% 2%
DRAFTER : PARAF :
6 3
AGUS HARDI WIBOWO. D
ELEV. ELEV.
4,0
6,6
EXISTING EXISTING
0 + 700 0 + 850
TANGGAL KODE NO. LBR JML. LBR
ELEV. ELEV.
4,15
6,75
RENCANA RENCANA
08 11
7 6
6 5
5 Lapisan Existing
4 PEMERINTAH KABUPATEN
Timbunan Pilihan
Lapisan Existing MAMUJU TENGAH
t= 15 DINAS PEKERJAAN UMUM
4 3 Timbunan Pilihan DAN PENATAAN RUANG
Saluran Existing t= 15
JALAN POROS TOPOYO - PALU
Saluran Existing
2% 2%
3 2
PEKERJAAN :
2% 2%
2 1 PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
1 0
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA LOKASI :
ELEV. ELEV.
3,0
KECAMATAN PANGALE
1,4
EXISTING EXISTING
0 + 900 1 + 050 KABUPATEN MAMUJU TENGAH
ELEV. 3,15 ELEV.
1,55
RENCANA RENCANA DISETUJUI :
6 3
PEJABAT PELAKSANA TEKNIS KEGIATAN
Lapisan Existing (PPTK)
Lapisan Existing BIDANG BINA MARGA
5 Timbunan Pilihan 2
t= 15 Timbunan Pilihan
t= 15
Saluran Existing
Saluran Existing
4 1
2% 2%
2% 2%
IRFAN SYUAIB, ST
3 0 Nip. 1977 0802 200901 1 006
DIPERIKSA :
2 -1 TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
1 -2 NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG,ST
0 -3 NIP : 19940324 201903 1 014
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA
CINDY PATRESIA ADO, ST
ELEV. ELEV.
3,5
0,3
NIP : 19960728 201903 2 028
EXISTING EXISTING
0 + 950 1 + 100 PERENCANA :
ELEV. ELEV.
3,65
0,45
CV. SAHARA ENGINEERING
RENCANA RENCANA
6 6
5 5
Lapisan Existing FARHAM FAHRI ABIDIN, ST
DIREKTUR
3 3 Timbunan Pilihan
2% 2% t= 15
DRAFTER : PARAF :
Saluran Existing
2 2
2% 2% AGUS HARDI WIBOWO. D
ELEV. ELEV.
2,7
1,5
EXISTING EXISTING
1 + 000 1 + 150
TANGGAL KODE NO. LBR JML. LBR
ELEV. ELEV.
2,85
1,65
RENCANA RENCANA
09 11
6
5
Lapisan Existing
4 Timbunan Pilihan
t= 15 PEMERINTAH KABUPATEN
MAMUJU TENGAH
Saluran Existing
DINAS PEKERJAAN UMUM
3 DAN PENATAAN RUANG
2% 2%
JALAN POROS TOPOYO - PALU
2
PEKERJAAN :
1 PENINGKATAN JALAN
DESA POLO PANGALE
KECAMATAN PANGALE
0
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA LOKASI :
ELEV.
2,7
KECAMATAN PANGALE
EXISTING
1 + 200 KABUPATEN MAMUJU TENGAH
ELEV. 2,85
RENCANA DISETUJUI :
6
PEJABAT PELAKSANA TEKNIS KEGIATAN
Lapisan Existing (PPTK)
BIDANG BINA MARGA
5 Timbunan Pilihan
t= 15
Saluran Existing
4
2% 2%
IRFAN SYUAIB, ST
3 Nip. 1977 0802 200901 1 006
DIPERIKSA :
2 TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
1 NIP : 19890716 201903 1 006
MARSEM TALLUKARAENG,ST
0 NIP : 19940324 201903 1 014
JARAK -5 -4 -3 -2 -1 0 1 2 3 4 5 STA
CINDY PATRESIA ADO, ST
ELEV.
3,7
5 Timbunan Pilihan
t= 15 FARHAM FAHRI ABIDIN, ST
DIREKTUR
Saluran Existing
TEAM LEADER : PARAF :
4
2% 2%
KAMARUDDIN
3
DRAFTER : PARAF :
2
AGUS HARDI WIBOWO. D
ELEV.
3,5
EXISTING
1 + 300
TANGGAL KODE NO. LBR JML. LBR
ELEV.
3,65
RENCANA
10 11
Timbunan Pilihan Tebal 15 cm
Lapisan Existing
500
PEMERINTAH KABUPATEN
MAMUJU TENGAH
Tanah Asli 2% 2% DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
JALAN POROS TOPOYO - PALU
PEKERJAAN :
PENINGKATAN JALAN
DESA POLO PANGALE
Drainase Existing KECAMATAN PANGALE
LOKASI :
KECAMATAN PANGALE
KABUPATEN MAMUJU TENGAH
DISETUJUI :
500
Tanah Asli
Tanah Asli 2% 2% IRFAN SYUAIB, ST
Nip. 1977 0802 200901 1 006
DIPERIKSA :
TIM ASISTENSI : PARAF
JULFRI PALULLUNGAN, ST
NIP : 19890716 201903 1 006
Drainase Existing
MARSEM TALLUKARAENG,ST
NIP : 19940324 201903 1 014
PERENCANA :
CV. SAHARA ENGINEERING
TIPIKAL 1 : 50
KETERANGAN :
Drainase Existing
11 11