Anda di halaman 1dari 19

November

2014
Edition

KURIKULUM STANDARD KOLEJ VOKASIONAL


KEMENTERIAN PENDIDIKAN MALAYSIA
PROGRAM DIPLOMA VOKASIONAL MALAYSIA
( TEKNOLOGI CADD SENIBINA )

NAMA KURSUS:
SUBMISSION DRAWING 3

KOD KURSUS :
WCS 5044

KURIKULUM STANDARD KOLEJ VOKASIONAL


KEMENTERIAN PENDIDIKAN MALAYSIA
Last Edited 4-7 Nov 2014
Module Page 1/11 Document Page 1
November
2014
Edition

KURIKULUM STANDARD KOLEJ VOKASIONAL


KEMENTERIAN PENDIDIKAN MALAYSIA
PROGRAM TEKNOLOGI CADD SENIBINA

VISI
KolejVokasionalKementerianPendidikan Malaysia
sebagaiinstitusipendidikanvokasionalberhasratmenyediakansumbermanusiabersahsiahungguldanberkemahiran
tinggi yang memenuhikeperluanindustriuntukpembangunanekonomi, sosialdanteknologi.

MISI
Menyediakantenagamanusiabersahsiahdanberkemahirantinggi yang memenuhikeperluanpasaran.
Membangunkansistempendidikanvokasionalsecaraberkesan.
Mengintegrasikanteknologidalampendidikanvokasional.
Menggalakkanhubunganantaraindustridanmasyarakat.
Mengembangkankemahiranvokasionalsecarakreatifdaninovatif.

MATLAMAT PROGRAM

Matlamatpendidikanvokasionalialahuntukmembentuklepasanpendidikanvokasional yang:
1. Bersediamenyertaipasarankerja
2. Menjadiusahawan yang berdayasaing
3. Mampumelanjutkanpengajiankeperingkat yang lebihtinggi.

Last Edited 4-7 Nov 2014


Module Page 2/11 Document Page 2
November
2014
Edition

OBJEKTIF PROGRAM

1. Melahirkanpelajarberkompetensipekerjaanarastinggidanmenepatikehendakindustri.
2. Memupukwatak professional.
3. Melahirkanpelajarberkompetensiusahawanberdayasaingdalambidangvokasionalpilihannya.
4. Membekalkanilmuuntukmelanjutkanpengajiankeperingkat yang lebihtinggi.
5. Memupukkecintaankepadapembelajaransepanjanghayat.

PROGRAM EDUCATIONAL OBJECTIVE (PEO)

1.

Kebolehanmengaplikasipengetahuanakademikdanvokasionalsertamengembangkannyamelaluikreativitida
ninovasidalamProgram TeknologiCaddSenibina
2. Berkebolehanmengamalkannilai-
nilaimurnimelaluipengaplikasianpengetahuandankemahiranvokasionaldalamProgram
TeknologiCaddSenibina
3. BerkebolehanberkomunikasidanbekerjasamasecaraberkesandalamProgram TeknologiCaddSenibina
4. BerkebolehanmemberisumbangandalampelbagaibidangtugasdalamProgram TeknologiCaddSenibina
5.

Berkebolehanmengamalkankemahirankeusahawanandanpembelajaransepanjanghayatselaridenganperu
bahanpersekitaranbagiProgram TeknologiCaddSenibina

Last Edited 4-7 Nov 2014


Module Page 3/11 Document Page 3
November
2014
Edition

Last Edited 4-7 Nov 2014


Module Page 4/11 Document Page 4
November
2014
Edition

PROGRAM OUTCOME (PO)

1. Berkeupayaanmengaplikasikanpengetahuanmatematik, sains, ICT danvokasional di


tempatkerjadalamProgram TeknologiCaddSenibina
2. BerkeupayaanberkomunikasisecaraberkesandalamProgram TeknologiCaddSenibina
3. BerkeupayaanmengembangkanpengetahuansecarakreatifdaninovatifdalamProgram
TeknologiCaddSenibina
4. BerkeupayaanmemberisumbangansecaraberkesandalamkumpulandalamProgram
TeknologiCaddSenibina
5. BerkeupayaanmemahamitanggungjawabterhadapprofesiondalamProgram TeknologiCaddSenibina
6.

Berkeupayaanmeningkatkankesedarankeperluanpembelajaransepanjanghayatbagiperkembangankerjaya
dalambidangProgram TeknologiCaddSenibina
7.

BerkeupayaanmengaplikasikankemahirankeusahawananmelaluikonsepPendidikanBerasaskanProdukda
nSekolahNiaga (School Enterprise) dalamProgram TeknologiCaddSenibina
8.

BerkeupayaanmemberisumbangandanbekerjasamadalammelaksanakanpelbagaibidangtugasdalamProgr
am TeknologiCaddSenibina
9. Berkemahiranmengenalpastidanmenyelesaikanmasalah yang berkaitandenganbidangtugasProgram
TeknologiCaddSenibina

Last Edited 4-7 Nov 2014


Module Page 5/11 Document Page 5
November
2014
Edition

MINISTRY OF EDUCATION, MALAYSIA

VOCATIONAL COLLEGE STANDARD CURRICULUM

MODULE INFORMATION

PROGRAMME : CADD ARCHITECTURE TECHNOLOGY

COURSE NAME : SUBMISSION DRAWING 3

COURSE CODE : WCS 5044

YEAR/SEMESTER : 1SEMESTER 1

CREDIT UNIT : 4.0

CONTACT HOUR : FACE TO FACE : 7.0 HOURS / WEEK

NON FACE TO FACE :

COURSE TYPE : VOCATIONAL

PREREQUISITE : -

CORE REQUISITE : -

Last Edited 4-7 Nov 2014


Module Page 6/11 Document Page 6
November
2014
Edition

COURSE LEARNING OUTCOMES

At the end of the module,students should be able to:-

1.0 Produce exceptional character & complexity building plan (C3, PLO1)
2.0 Follow submission drawing requirement & procedure (P3, PLO2)
3.0 Comply with submission drawing (A2, PLO6)

COURSE DESCRIPTION

This course is designed for preparing students with knowledge and skill in drawing exceptional character and complexity building site plan, floor and
roof plan , elevation and sections. They also will learn how to prepare submission drawing and verify the preparation in order to fulfill local authorities
requirements.

Last Edited 4-7 Nov 2014


Module Page 7/11 Document Page 7
November
2014
Edition

PROGRAMME : CADD ARCHITECTURE TECHNOLOGY

COURSE NAME : SUBMISSION DRAWING 3

COURSE CODE : WCS 5044

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS
1.1 Obtain site information 1.1.1 Identify types of information such as features
21 HOUR 1. PRODUCE stated below according to specification;
(3 WEEK) EXCEPTIONAL  Site analysis report
CHARACTER &  Key plan
1JAM TEORI COMPLEXITY  Location plan
X 3 MINGGU = BUILDING SITE PLAN  Certified plan
3JAM  Land title
 Topography survey plan
6JAM AMALI X 3 1.1.2 Determine types of information such as features
MINGGU = 18 stated above according to specification;
JAM 1.1.3 Collect site information storage location based
on standard requirement.
1.1.4 Comply with organization’s procedure in
obtaining site information such as clearance from
person in charge according to standard
procedure

Last Edited 4-7 Nov 2014


Module Page 8/11 Document Page 8
November
2014
Edition

1.2 Select drawing tools 1.2.1 Determine suitable types of drawing technique
according to standard method.
1.2.2 Determine types of drawing tools and software
(CAD) available as well as their function and
suitability according to specification

1.3 Prepare exceptional character & 1.2.3 Describe exceptional character & complexity
complexity building site plan building site plan drawing element such as
drawing stated below according to specification

 Building plan
 Site layout
 Road
 Building plan
 Drainage
 Related drawing symbols
 Car park
 Related schedule (ventilation & lighting
car park)
 North orientation & bearing
 Unit scale (metric & imperial)
1.2.4 Determine exceptional character & complexity
building site plan drawing elementstated above.

1.3 Create exceptional character 1.3.1 Draw exceptional character complexity building
complexity building site plan site plan using computer aided design (CADD)
drawing/ manual technique in accordance with
drawing specification.

1.4 Inspect exceptional character & 1.4.1 Confirm exceptional character & complexity
complexity building site plan building site plan drawing element such as
Last Edited 4-7 Nov 2014
Module Page 9/11 Document Page 9
November
2014
Edition

drawing accuracy & quality features stated belowaccording to specification


 Building plan
 Site layout
 Road
 Building plan
 Drainage
 Related drawing symbols
 Car park
 Related schedule (ventilation & lighting car
park)
 North orientation & bearing
Unit scale (metric & imperial)

1.4.2 Check exceptional character & complexity


building site plan drawing quality and accuracy
such as features stated below according to
specification
 Drawing cleanliness
 Drawing dimension
 Drawing scale
 Drawing legend
 Drawing title block

1.5 Update exceptional character & 1.5.1 Identify Method of recording character &
complexity building site plan complexity building site plan drawings such as
drawing record features stated below according to specification;
 Upload latest version of drawing to server
 Drawing log book
1.5.2 Apply method of recording character &
complexity building site plandrawings such as as
features stated above according to specification
Last Edited 4-7 Nov 2014
Module Page 10/11 Document Page 10
November
2014
Edition

1.5.3 Comply Drawing naming convention as listed


according specification

PROGRAMME : CADD ARCHITECTURE TECHNOLOGY

COURSE NAME : SUBMISSION DRAWING 3

COURSE CODE : WCS 5044

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS
2.1 Obtain finalised schematic 2.1.1 Recognise finalised schematic drawings and floor
21 HOUR 2. PRODUCE EXCEPTIONAL drawings & roof plan as required for job
(3 WEEK) CHARACTER & 2.1.2 Comply with organization’s procedure in
COMPLEXITY BUILDING obtaining floor and roof plan information such as
1JAM TEORI FLOOR & ROOF PLAN clearance from person in charge according to
X 3 MINGGU = standard procedure
3JAM 2.1.3 Collect building floor and roof plan information
storage location based on standard requirement.
6JAM AMALI X 3
MINGGU = 18 2.2 Select drawing tools 2.2.1 Interpret finalized schematic drawingsand floor &
JAM roof planto suit job requirement and
industryprocedure.
2.2.2 Determine suitable types of drawing technique
according to standard method.
2.2.3 Determine types of drawing tools and software
(CAD) available as well as their function and
suitability according to specification

Last Edited 4-7 Nov 2014


Module Page 11/11 Document Page 11
November
2014
Edition

2.3 Prepare exceptional character & 2.3.1 Describe exceptional character & complexity
complexity building floor & roof building floor & roof plan drawing element such
plan drawing as stated below according to specification
 Floor plan / roof plan
 Dimension
 Symbol and legend
 Related notes involved
 Specifications
 Grid line
 Layer
 Line thickness

2.3.2 Determine exceptional character & complexity


building building floor & roof plan drawing
element such as stated above.

2.4 Create exceptional character 2.4.1 Draw exceptional character complexity floor and
complexity building floor and roof roof using computer aided design (CADD)
drawing/ manual technique in accordance with
drawing specification.

2.5 Inspect exceptional character & 2.5.1 Confirm exceptional character & complexity
complexity building floor & roof building floor & roof plan drawing element such
plan drawing accuracy & quality as features stated belowaccording to
specification;
 Floor plan / roof plan
 Dimension
 Symbol and legend
 Related notes involved
 Specifications
 Grid line
 Layer
Last Edited 4-7 Nov 2014
Module Page 12/11 Document Page 12
November
2014
Edition

 Line thickness
2.5.2 Check exceptional character & complexity
building floor & roof plan drawing quality and
accuracy such as features stated below
according to specification:
 Drawing cleanliness
 Drawing dimension
 Drawing scale
 Drawing legend
 Drawing title block
2.6 Update exceptional character & 2.6.1 Identify Method of recording character &
complexity building floor & roof complexity building floor & roof plan drawings
plan drawing record such as features stated below according to
specification;
 Upload latest version of drawing to server
 Drawing log book
2.6.2 Apply method of recording character &
complexity building floor & roof plandrawings
such as as features stated above according to
specification
2.6.3 Comply Drawing naming convention as listed
according specification

Last Edited 4-7 Nov 2014


Module Page 13/11 Document Page 13
November
2014
Edition

PROGRAMME : CADD ARCHITECRE TECHNOLOGY

COURSE NAME : SUBMISSION DRAWING 3

COURSE CODE : WCS 5044

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS
3.1 Obtainfinalisebuilding elevation & 3.1.1 Recognise finalised building elevation &
28 HOUR 3. PRODUCE EXCEPTIONAL sectionsplan sections drawing as required for job
(4 WEEK) CHARACTER & 2.1.4 Comply with organization’s procedure in
COMPLEXITY BUILDING obtaining building elevation & sections plan
1JAM TEORI X 4 ELEVATION & SECTIONS such as clearance from person in charge
MINGGU = 4JAM according to standard procedure
2.1.5 Collect building building elevation & sections
6JAM AMALI X 4 plan based on standard requirement.
MINGGU =
24JAM 3.2 Select drawing tools 3.2.1 Interpret finalized building elevation & sections
drawing to suit job requirement and
industryprocedure.
Last Edited 4-7 Nov 2014
Module Page 14/11 Document Page 14
November
2014
Edition

3.2.2 Determine suitable types of drawing technique


according to standard method.
3.2.3 Determine types of drawing tools and software
(CAD) available as well as their function and
suitability according to specification

3.3 Prepare exceptional character & 3.3.1 Describe exceptional character & complexity
complexity building elevations & building elevations & sections drawing
sections drawing element such as stated below according to
specification
 Floor plan / roof plan
 Dimension
 Symbol and legend
 Related notes involved
 Specifications
 Grid line
 Layer
 Line thickness
3.3.2 Determine exceptional character & complexity
building building floor & roof plan drawing
element such as stated above.

3.4 Create exceptional character 3.4.1 Draw exceptional character complexity


complexity building elevation and elevation and section using computer aided
sections Plan design (CADD) drawing/manual in accordance
with drawing specification.

3.5 Inspect exceptional character & 3.5.1 Confirm exceptional character & complexity
complexity building elevations & building elevations & sections drawing
sections accuracy & quality element such as features stated
belowaccording to specification:
 Plan
Last Edited 4-7 Nov 2014
Module Page 15/11 Document Page 15
November
2014
Edition

 Elevation
 Section
 Grid line
 Layer
 Line thickness
 Dimension
 Specifications
 Symbol & legend

3.5.2 Check exceptional character & complexity


building elevations & sections quality and
accuracy such as features stated below
according to specification
 Drawing cleanliness
 Drawing dimension
 Drawing scale
 Drawing legend
 Drawing title block

3.6 Update exceptional character & 3.6.1 Identify Method of recording character &
complexity building elevations & complexity building elevations & sections
sections record drawings such as features stated below
according to specification;
 Upload latest version of drawing to server
 Drawing log book
3.6.2 Apply method of recording character &
complexity building elevations & sections
drawings such as features stated above
according to specification
3.6.3 Comply Drawing naming convention as listed
according specification

Last Edited 4-7 Nov 2014


Module Page 16/11 Document Page 16
November
2014
Edition

PROGRAMME : CADD ARCHITECRE TECHNOLOGY

COURSE NAME : SUBMISSION DRAWING 3

COURSE CODE : WCS 5044

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS

Last Edited 4-7 Nov 2014


Module Page 17/11 Document Page 17
November
2014
Edition

4.1.1 RecogniseDraft submission drawing components


28 HOUR 4. VERIFY SUBMISSION 4.1 Obtain final draft submission as required for job
(4 WEEK) DRAWING PREPARATION drawing  Site plan
 Floor & roof plan
1JAM TEORI X 4  Elevation & Section
MINGGU =4JAM  Temporary building drawing
4.1.2 Comply with organization’s procedure in
6JAM AMALI X 4 obtaining final draft submission drawing such as
MINGGU =24JAM clearance from person in charge according to
standard procedure
4.1.3 Collect Draft submission drawing storage
location based on standard requirement.

4.2 Assess final draft submission 4.2.1 Prepare final draft submission drawing in
drawing quality & accuracy accordance with drawing specification.
4.2.2 Interpret final draft submission drawing such as
features stated below according to specification
 Site plan
 Floor & roof plan
 Elevation & Section
 Temporary building drawing
4.2.3 Determine final draft submission drawingquality
and accuracy standard as required for job

` 4.2.4 Check final draft submission drawing quality and


accuracy such as features stated below
according to specification
 Drawing cleanliness
 Drawing dimension
 Drawing scale
 Drawing legend
 Drawing title block

Last Edited 4-7 Nov 2014


Module Page 18/11 Document Page 18
November
2014
Edition

4.3 Submit finalised submission 4.3.1 Identify Organisation structure according


drawing organization requirement
4.3.2 Determine person in charge according to structure
organization as specified for job
4.3.3 Ensure all submission drawing are completed and
ready for verification according to requirement.
4.3.4 Follow company documentation submission
procedure such as features stated below
according to specification
 Submission cover letter
 Submission date line

Last Edited 4-7 Nov 2014


Module Page 19/11 Document Page 19

Anda mungkin juga menyukai