REKAPITULASI

RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : Rehabilitasi R. Kelas SD N SANGKURIANG


LOKASI : KECAMATAN
TAHUN : 2022

NO URAIAN PEKERJAAN JUMLAH BIAYA ( Rp )


1 2 3

Rehabilitasi R. KELAS 3 lokal (Atap Genteng)


A PEKERJAAN PERSIAPAN Rp. 7,350,000.00
B PEKERJAAN STRUKTUR BETON BERTULANG Rp. 12,271,011.91
C PEKERJAAN DINDING Rp. 12,534,387.58
D PEKERJAAN KUSEN PINTU DAN JENDELA Rp. 42,656,064.81
E PEKERJAAN PLAFOND Rp. 34,793,673.31
F PEKERJAAN ATAP Rp. 106,358,293.80
G PEKERJAAN LANTAI Rp. 45,964,134.04
H PEKERJAAN INSTALASI LISTRIK Rp. 5,881,214.00
I PEKERJAAN FINISHING Rp. 32,943,796.53
J PENGADAAN MOBILER Rp. 1,800,000.00

Rehabilitasi R. KELAS 3 lokal (Atap Multiroof)


A PEKERJAAN PERSIAPAN Rp. 1,250,000.00
B PEKERJAAN DINDING Rp. 3,151,534.61
C PEKERJAAN KUSEN PINTU DAN JENDELA Rp. 35,651,014.71
D PEKERJAAN PLAFOND Rp. 15,213,120.30
E PEKERJAAN FINISHING Rp. 20,608,296.22
Jumlah Rp. 378,426,541.81
PPN 11% Rp. 41,626,919.60
Total (Jumlah + PPN 11%) Rp. 420,053,461.41
Dibulatkan Rp. 420,000,000.00

Terbilang: Empat Ratus Dua Puluh Juta Rupiah

Martapura, 2022

Diperiksa oleh : Dihitung oleh :


PPTK Pembangunan Tenaga Teknis

EDI SUBANDI, SE , MM HERDI SAPUTRA,.S.ST


NIP. 198004082001031001 NIP.-
RENCANA ANGGARAN BIAYA (RAB)
DANA ALOKASI KHUSUS OKU TIMUR ANGGARAN 2022
Rehabilitasi Ruang Kelas

Kegiatan : Rehabilitasi Ruang Kelas


Kabupaten : OKU Timur
Provinsi : Sumatera Selatan

HARGA JUMLAH PER SUB


NO ITEM PEKERJAAN SAT VOLUME SATUAN HARGA PEKERJAAN
(Rp) (Rp) (Rp)
Ruang Kelas 3 lokal (ATAP GENTENG)

A PEKERJAAN PERSIAPAN

1 Pekerjaan bongkaran atap lama ls 1.00 2,000,000.00 2,000,000.00


2 Papan proyek ls 1.00 300,000.00 300,000.00
3 Prasasti bh 3.00 350,000.00 1,050,000.00
4 Rencana Keselamatan Kerja ls 1.00 2,500,000.00 2,500,000.00
5 Biaya Adminitrasi & Pelaporan + Dokumentasi Proyek ls 1.00 1,500,000.00 1,500,000.00
7,350,000.00

B PEKERJAAN STRUKTUR BETON BERTULANG

1 Ring balok 12/20, ad. 1:2:3 m3 1.78 6,591,929.12 11,729,415.00


2 Kolom praktis 11/11, ad. 1:2:3 m' 4.40 123,090.21 541,596.92
8 Balok folding gate 15/20 ad. 1:2:3 m3 - 6,601,002.67 -
12,271,011.91

C PEKERJAAN DINDING

1 Pasangan bata tebal 1/2 bata. ad. 1Pc : 4Psr m2 45.74 142,980.25 6,539,344.71
2 Plesteran, ad. 1Pc : 4Psr m2 91.47 65,539.65 5,995,042.86
12,534,387.58

D PEKERJAAN KUSEN PINTU DAN JENDELA

1 Kusen pintu. kayu kelas II m3 0.11 7,920,739.75 855,439.89


2 Pintu panil kayu. kayu kls II m2 5.67 685,835.50 3,888,687.29
3 Jalusi pintu, kayu kelas II m2 0.96 621,977.50 597,098.40
4 Engsel kupu-kupu 4"kuningan untuk pintu bh 9.00 62,905.32 566,147.88
5 Kunci 2 slaag bh 3.00 241,213.75 723,641.25
6 Kunci gerendel pintu utama bh 3.00 30,917.00 92,751.00
7 Kusen jendela,kayu kelas II m3 1.11 7,920,739.75 8,811,030.90
8 Jendela panel kaca Depan (12 unit), kayu kelas II m2 5.88 763,472.40 4,489,217.71
9 Jendela panel kaca Belakang (18 unit), kayu kelas II m2 10.71 763,472.40 8,176,789.40
10 Jalusi jendela, kayu kelas II m2 10.08 621,977.50 6,269,533.20
11 Handle jendela bh 30.00 39,870.00 1,196,100.00
12 Engsel jendela bh 60.00 62,905.32 3,774,319.20
13 Kaitan jendela / hak angin bh 30.00 33,532.00 1,005,960.00
14 Kunci gerendel jendela bh 30.00 73,644.96 2,209,348.69
16 Pemasangangan folding gate 0,8 ukuran (705 x 250) cm m2 - 1,400,000.00 -
42,656,064.81

E PEKERJAAN PLAFOND
HARGA JUMLAH PER SUB
NO ITEM PEKERJAAN SAT VOLUME SATUAN HARGA PEKERJAAN
(Rp) (Rp) (Rp)
Ruang Kelas 3 lokal (ATAP GENTENG)

1 Pasangan Rangka langit-langit (60 x 120) cm kayu kelas III m2 226.96 76,895.25 17,452,453.52
2 Pasangan Langit-langit triplek 4 mm ukuran (120 x 240) cm m2 226.96 65,950.95 14,968,491.42
3 Pasangan list langit-langit Kayu Profil m' 74.14 32,003.35 2,372,728.37
34,793,673.31

F PEKERJAAN ATAP

1 Pasangan Rangka Atap ( Baja Ringan ) m2 309.58 189,521.50 58,672,103.87


2 Pekerjaan Atap Metal m2 309.58 128,013.21 39,630,355.93
3 Pekerjaan Nok atas m' 25.67 85,104.87 2,184,641.89
4 Pekerjaan Nok samping m' 24.12 85,104.87 2,052,729.35
5 Pasangan Lisplank GRC m' 75.46 50,602.48 3,818,462.76
106,358,293.80

G PEKERJAAN LANTAI

1 Pasangan lantai keramik (40 x 40) cm m2 189.23 242,903.45 45,964,134.04


45,964,134.04

H PEKERJAAN INSTALASI LISTRIK

1 MCB 6 Ampare bh 1.00 124,574.00 124,574.00


2 Saklar tunggal bh 3.00 61,705.00 185,115.00
3 Stop kontak bh 3.00 78,263.00 234,789.00
4 Pekerjaan Instalasi Titik lampu titik 16.00 253,546.00 4,056,736.00
5 Lampu Bergaransi bh 16.00 80,000.00 1,280,000.00
5,881,214.00

I PEKERJAAN FINISHING

1 Pengecatan dinding m2 355.87 44,202.98 15,730,601.12


2 Pengecatan kusen + pintu + jendela m2 140.17 50,576.36 7,089,287.68
3 Pengecatan Plafond m2 226.96 42,094.38 9,553,907.73
4 Biaya Pembersihan Akhir Proyek ls 1.00 570,000.00 570,000.00
32,943,796.53

J PENGADAAN MOBILER

1 Papan tulis whiteboard bh 3.00 600,000.00 1,800,000.00


1,800,000.00

JUMLAH 302,552,575.98
RENCANA ANGGARAN BIAYA (RAB)
DANA ALOKASI KHUSUS OKU TIMUR ANGGARAN 2022
Rehabilitasi Ruang Kelas

Kegiatan : Rehabilitasi Ruang Kelas


Kabupaten : OKU Timur
Provinsi : Sumatera Selatan

HARGA JUMLAH PER SUB


NO ITEM PEKERJAAN SAT VOLUME SATUAN HARGA PEKERJAAN
(Rp) (Rp) (Rp)
Ruang Kelas 3 lokal (ATAP MULTIROOF)

A PEKERJAAN PERSIAPAN

1 Pekerjaan kusen lama ls 1.00 1,250,000.00 1,250,000.00


1,250,000.00

B PEKERJAAN DINDING
Penutupan bekas pintu
1 Pasangan bata tebal 1/2 bata. ad. 1Pc : 4Psr m2 5.76 142,980.25 823,566.24
2 Plesteran, ad. 1Pc : 4Psr m2 35.52 65,539.65 2,327,968.37
3,151,534.61

C PEKERJAAN KUSEN PINTU DAN JENDELA

1 Kusen pintu. kayu kelas II m3 0.11 7,920,739.75 855,439.89


2 Pintu panil kayu. kayu kls II m2 5.67 685,835.50 3,888,687.29
3 Jalusi pintu, kayu kelas II m2 0.96 621,977.50 597,098.40
4 Engsel kupu-kupu 4"kuningan untuk pintu bh 9.00 62,905.32 566,147.88
5 Kunci 2 slaag bh 3.00 241,213.75 723,641.25
6 Kunci gerendel pintu utama bh - 30,917.00 -
7 Kusen jendela,kayu kelas II m3 - 7,920,739.75 -
8 Jendela panel kaca Depan (12 unit), kayu kelas II m2 - 763,472.40 -
9 Jendela panel kaca Belakang (18 unit), kayu kelas II m2 - 763,472.40 -
10 Kaca mati, m2 - 295,976.00 -
10 Jalusi jendela, kayu kelas II m2 - 621,977.50 -
11 Handle jendela bh - 39,870.00 -
12 Engsel jendela bh - 62,905.32 -
13 Kaitan jendela / hak angin bh - 33,532.00 -
14 Kunci gerendel jendela bh - 73,644.96 -
16 Pemasangangan folding gate 0,8 ukuran (500 x 250) cm m2 12.50 1,400,000.00 17,500,000.00
17 teralis jalusi m2 14.40 800,000.00 11,520,000.00
35,651,014.71

D PEKERJAAN PLAFOND LUAR

1 Pasangan Rangka langit-langit (60 x 120) cm kayu kelas III m2 106.50 76,895.25 8,189,344.13
2 Pasangan Langit-langit triplek 4 mm ukuran (120 x 240) cm m2 106.50 65,950.95 7,023,776.18
15,213,120.30

E PEKERJAAN FINISHING

1 Pengecatan dinding m2 364.80 44,202.98 16,125,245.28


2 Pengecatan Plafond m2 106.50 42,094.38 4,483,050.94
20,608,296.22

JUMLAH 75,873,965.83