PROGRAMME
PROGRAMME
The 2007 HVDC Users conference is organized by - SGCC: State Grid Corporation of China hosted by SGOC: State Grid Operation Company Limited supported by - CEPRI: China Electric Power Research Institute
OVERVIEW
The 2007 HVDC Users conference receives extensive response and support from world-wide HVDC users. There are 93 papers received in total, 90 of them are finally accepted after experts review. Around 160 delegates will attend the conference from more than 12 countries. The three-day conference organizes 13 technical sessions. Each session is about 1.5-2 hours long. Tea breaks are arranged in morning and afternoon intervals. Each individual presenter is allocated 15 minutes for presentation and 5 minutes for questions and answers under coordination by the chair or co-chair.
SESSION LIST
1-1 1-2 2-1 3-1 4-1 5-1 5-2 AC DC Breakers AC DC Filter and Harmonic Noise Control Transformer and Smoothing Reactor Water Cooling System Valve 5-2-1 Control 5-2-2 Measurement 5-2-3 Operational Experience 5-2-4 Protection SCADA and Communication DC Line Electrode and Insulation Charter and Company Introduction
Chair: Yuan Qingyun, Chief Engineer, SGOC, China Co-chair: Zeng Nanchao, Chief Engineer, Power System Research Dept, CEPRI, China
Shu Yinbiao, Vice President, SGCC 2-1-01 Three Gorges Shanghai 500kv DC Transmission Converter Stations Noise Treatment Li Wenyi, SGDC, China 2-1-03 The Noise Controlling Projection in Longquan Converter Station WANG Yusheng, SGOC, China 5-2-3-08 Transpower NZ Ltd Pole 2 Performance Thompson, Peter, Transpower NZ Ltd, New Zealand
2. 3. 10:15 -10:30
TEA BREAK
10:30 -12:15
4. 5. 6. 7.
2-1-02 Feasibility to Cancel PLC Noise Filter at HVDC Converter Station XIAO Yao, SPSC, China 6-2-16 Ground Electrode Problems CU HVDC Khanh Thai, Great River Energy, USA 5-1-02 Study on Type Test Technology of UHVDC Valves Wen J.L., CEPRI 7-1-02 ABB the World Leader in HVDC Control Upgrades Hans Bjrklund, ABB AB
LUNCH
14:00-15:40 8. 9. 3-1-06 Oil Leakage in HVDC Transformers, Fenno-Skan Harri Nurminen Fingrid Oyj, Finland 6-1-03 The Effect to DC Protection of Tian-Guang HVDC Arisen from Telecommunication System Failure WANG Xufeng, SPSC, China 10. 11. 15:40 -15:55 15:55 -17:25 3-1-07 Performance Analysis Wittmeier, Wayne Manitoba Hydro, Canada 5-1-04 Kii Channel HVDC Link Pole 2 Thyristor Valve Fault Yoriko Shinki(Ms) Kansai Electric Power Co., Japan
TEA BREAK
12. 5-1-03 Studying on the Valve Arrestor Explosion During the Commissioning Test of Three Gorges to Guangdong HVDC Transmission Project ZHU Yiying(Ms) CEPRI, China 1-1-04 Highgate Converter HPL Breakers Joshua Burroughs Vermont Electric Power Company, USA 7-1-05 Introduction of Xian Electric Manufacturing Corp. Someone, Xian Electric Manufacturing Corp. China 7-1-06 Introduction of Nanjin NARI-RELAYS Electric CO.,LTD Someone, Nanjin NARI-RELAYS Electric CO .,LTD. China
13.
14 . 15 .
08:30 -10:10 1.
2.
TEA BREAK
5. 6. 5-2-2-02 Startup Test after Maintenance in 2007 for 3GG HVDC Link, YANG Wankai, CEPRI, China 5-2-3-09 Life Extension of CU HVDC System
7.
8.
Goerss, Jud Great River Energy, USA 5-2-4-02 Improvements of 100HZ Protection in China Southern Grid ZHOU Hongyang SPSC, China 7-1-03 Upgradation of an HVDC System Dr. Asok Mukherjee SIEMENS LTD., CHINA
LUNCH
14:00 -15:40 9. 10. 11. 12 . 15:40 -15:55 15:55 -17:25 5-2-3-01 The Reliability Analysis of the HVDC Converter Stations ZHANG Ping SGOC, China 6-2-12 History of DC Line Fault Locators within Manitoba Hydro Tom, Radford Manitoba Hydro, Canada 5-2-3-06 The Reliability Analysis of Redundancy Scheming HVDC Protector LIU Yao, CEPRI, China 5-2-3-11 The Moyle Interconnector Smith, Maurice ESBI Engineering Ltd, Northern Ireland
TEA BREAK
13. 14. 15. 5-2-3-03 Maintenance for HVDC Control & Protection System SHEN Zhigang SGOC, China 5-2-3-12 HVDC Operational Experience in Brazil Jairo Junqueira Kalife Brazil Furnas, Brazil 6-2-15 Analysis of Field and Corona Effects of High Voltage Transmission Lines Wujun Quan Manitoba HVDC Research Centre Inc. Canada 16 17 7-1-07 Introduction of Baoding Tianwei Baobian Electric Co.,Ltd Someone, Baoding Tianwei Baobian Electric Co.,Ltd.China 7-1-08 Introduction of TBEA Shengyang Transformer Group Co. Someone, TBEA Shengyang Transformer Group Co.,Ltd.China
TEA BREAK
5. 6. 7. 8. 6-2-08 Cross Channel Link Wall Bushing Failures on the French Station Graldine Real (Ms) , RTE, France 6-2-14 Oteranga Bay Cable Station Roof Bushing Recoating 2005 Darren Horton, New Zealand 6-2-11 Silicone RUBBER, RTV and Booster Shed Performance Recksiedler, Les Manitoba Hydro, Canada 7-1-04 2007 HVDC Users Conference AREVA T&D Presentation Andre Canelhas, AREVA T&D
LUNCH 14:00 -15:15 9. 6-2-04 Development and Application of Field Testing Apparatus for Staged Line to Ground Fault MENG Qingdong, CEPRI, China 4-1-05 Cross Channel Link Evaporative Coolers Emilie,Thiollet (Mrs), RTE, France 4-1-04 Operation & Maintenance of the External Cooling System in Zhengping Converter Station LI Hui SGOC, China 15:15 -15:30 15:30 -16:20
10. 11.
TEA BREAK
12. 6-2-10 Application of Traveling Wave Fault Location in Tianguang HVDC System LIN Zhibo SPSC, China 7-1-01 HVDC Users Group Protocol Thompson, Peter , Transpower NZ Ltd Vote for next host of 2009 HVDC Users Conference 7-1-09 Introduction of XJ Group Corporation Someone, XJ Group Corporation. China
GENENAL INFORMATION
DURATION & VENUE
The conference will be held on Oct. 21-26, 2007 in Nayun Building in the Three Gorges Project Hotel, Yichang, China, a four-star hotel where all attendees will stay from October 21-23, at the following address: Bahekou, Three Gorges Dam Area, Yichang 443133 Hubei Prov., China Tel: +86 717-6613666 Fax: +86 717-6762353/ 6613071 Web: http://www.sxdaba.com/hotel The hotel offers five hundred guest rooms with different grades, all are well-equipped. One has only to gaze out the window to enjoy the view of the gorges and the Yangtze River. The western and Chinese restaurants offer Chinese and French style cuisine. For entertainment, there is a gymnasium, a beauty salon, dancing hall, karaoke, bowling alley and so on.
THEME
Enhance international cooperation and communication, promote the operation and management level of HVDC transmission.
ARRANGEMENT AT A GLANCE
MORNING SUN, OCT 21 MON, OCT 22 TUE, OCT 23 WED, OCT 24 THUR, OCT 25 FRI, OCT 26 Registration Opening +Sessions Sessions Sessions Three Gorges Cruise Technical Visit to Three Gorges Dam Technical Visit to Yidu Converter Station AFTERNOON Registration Sessions Sessions Sessions EVENING Welcome Reception Bonfire Party Banquet + Performance stay overnight on the yacht stay overnight on the yacht
AGENDA
21 Oct., Sunday
09:00-17:00 18:30-20:00 Registration Welcome Reception lobby, Nayun Bldg.,1/F Juhe Hall, 2/F
22 Oct., Monday
07:30-08:20 08:30-09:00 09:00-10:15 10:15-10:30 10:30-12:15 12:15-14:00 14:00-15:40 15:40-15:55 15:55-17:25 18:00-19:00 19:00-20:00 BREAKFAST Opening Address Technical Session TEA BREAK Technical Session LUNCH Technical Session TEA BREAK Technical Session SUPPER BONFIRE PARTY Juhe Hall, 2/F No.1 Conference Room, 3/F No.1 Conference Room, 3/F Open Tea-Bar, 3/F No.1 Conference Room, 3/F Juhe Hall, 2/F No.1 Conference Room, 3/F Open Tea-Bar, 3/F No.1 Conference Room, 3/F Backyard, Nayun Bldg. Backyard, Nayun Bldg.
23 Oct., Tuesday
07:30-08:20 08:30-10:10 10:10-10:25 10:25-12:10 12:10-14:00 14:00-15:40 15:40-15:55 15:55-17:25 18:00-19:30 20:00-21:10 BREAKFAST Technical Session TEA BREAK Technical Session LUNCH Technical Session TEA BREAK Technical Session BANQUET PERFORMANCE Juhe Hall, 2/F No.1 Conference Room, 3/F Open Tea-Bar, 3/F No.1 Conference Room, 3/F Juhe Hall, 2/F No.1 Conference Room, 3/F Open Tea-Bar, 3/F No.1 Conference Room, 3/F Juhe Hall, 2/F River Closure Memorial Garden
24 Oct., Wednesday
07:30-08:20 08:30-10:10 10:10-10:25 10:25-12:10 12:10-14:00 14:00-15:15 BREAKFAST Technical Session TEA BREAK Technical Session LUNCH Technical Session Juhe Hall, 2/F No.1 Conference Room, 3/F Open Tea-Bar, 3/F No.1 Conference Room, 3/F Juhe Hall, 2/F No.1 Conference Room, 3/F
TEA BREAK Technical Session Host Country Election Technical Session SUPPER Embarking Victoria 7
Open Tea-Bar, 3/F No.1 Conference Room, 3/F No.1 Conference Room, 3/F No.1 Conference Room, 3/F Juhe Hall, 2/F stay overnight on the yacht
25 Oct., Thursday
The whole day TA -Three Gorges Cruise stay overnight on the yacht
26 Oct., Friday
08:30-11:00 11:30-12:30 13:30-14:30 LUNCH
Technical Visit
Three Gorges Dam site Back to Nayun Bldg, Juhe Hall, 2/F Yidu Converter Station
WORKING LANGUAGE
The working language of the 2007 HVDC Users conference is English. All documents associated with the conference should be in English.
NAME BADGE
All participants for the 2007 HVDC Users conference are requested to wear name badges in order to join all technical sessions and social programs. Please wear name badges at all times during the conference period.
REGISTRATION
The Registration Desk is placed inside Nayun Building in Three Gorges Project Hotel. All participants are invited to come to the registration desk for the 2007 HVDC Users conference upon their arrival in Yichang. The registration desk will be open: Date Oct. 21 Oct. 22 Oct. 23 Oct. 24 copy with you. Time 09:00 ~ 17:00 08:30 ~ 18:00 Location lobby, 1/F, Nayun Bldg. No. 3 Conference Room, 3/F, Nayun Bldg.
Note: Staff will be allocated there for collecting final versions of presentation documents. Please keep a file
SECRETARIAT OFFICE
Duration & Location Duration Oct. 21 Oct. 22 Oct. 23 Oct. 24 Period 09:00 ~ 17:00 08:30 ~ 18:00 Location No. 3 Conference Room, 3/F, Nayun Bldg.
Service For any questions or information about conference programme, please contact: Mr. Guo Jianyong Mobile: 13810679280 or Mr. Ling Yun Mobile: 13997705237
TRANSPORT SERVICE
The Organizing Committee arranges airport pick-up service on Oct. 21st, and airport drop-off service on Oct. 26th for the participants who stay in Three Gorges Project Hotel during the conference period. It will take around one hour from Three Gorges Airport to Nayun Building in Three Gorges Project Hotel, the only airport in Yichang city, by a taxi. Detailed arrangement: Date Gathering Time Oct. 21 whole day Oct. 23 19:30-20:00 21:10-21:30 Oct. 24 20:00 Oct. 25 Whole day Oct. 26 morning 11:00-11:30 12:30-13:30 afternoon (after 14:30)
Transport pick-up from airport to hotel Hotel to Performance place back to hotel Hotel to Wharf on the yacht Wharf to Three Gorges Dam Back to hotel Hotel to Yidu Converter Station drop- off at the airport
Note: The Three Gorges Project Hotel is located at Three Gorges Dam Site within a closed administrative area. You cannot enter the special highway to Three Gorges without a permit. You are advised not to leave the Dam Site by taxi on your own. Otherwise you may not be able to get back to the hotel by yourself.
TEA BREAKS
Drinks, fruits and desserts are served for all participants from Oct. 22-24 during tea breaks. Time: twice a day, served in morning and afternoon interval Site: Open Tea-Bar, 3/F, Nayun Bldg.
in Three Gorges Project Hotel, including fax service, laptop rental, photocopy, printing, internet connecting, telephone service, express delivery, scanning, goods related with office and business for sale, etc.
Bonfire Party
Time: Oct. 22, Monday evening 19:00 ~ 20:00 Place: backyard, Nayun Bldg,Three Gorges Project Hotel Traditional local dances and music will be put on show. Audience will be cordially invited to join it.
Banquet
Time: October 23 Tuesday evening 18:00 ~ 19:30 Place: Juhe hall, Nayun Bldg., Three Gorges Project Hotel The invitation is delivered to all delegates and registered companions at the registration desk on arrival. Please make sure to bring the banquet invitation.
Performance
Show Time: October 23 Tuesday evening 20:00-21:10 Show Site: River Closure Memorial Garden, about 10 minutes drive from Three Gorges Project Hotel Topic: Three Gorges and the Yangtze River in Flourishing Age Gathering time: 19:30 Gathering Point: lobby, Nayun Bldg., Three Gorges Project Hotel There are seven parts in this grand situational performance which expresses the mankind praising to the nature, the floods striking to the people, the ancestors fighting with the floods, the contributions of Three Gorges Project, the hardship of the constructors and peoples looking forward to glorious future. Prelude. First PartWorshipping to the Yangtze Floods Second Part-- Boat Tracker Souls Dreams Third Part-- Lofty Sentiments and Aspirations Fourth PartThe Wonder Created by Heaven Fifth PartThree Gorges and the Yangtze River in Flourishing Age Epilogue
ACCOMMODATION
The Three Gorges Project Hotel was authorized by the Organizing Committee of the 2007 HVDC Users Conference to take care of the accommodation, tour registration, flight ticket booking, and so on. The 11
participants should reserve the hotel (Nayun Bldg. in Three Gorges Project Hotel) and plan your travel route in advance. Contact Person: Miss Wang Weiying Address: Bahekou Three Gorges Dam Area in Yichang City, China Tel.: 0717-6613666 Fax: 0717-67623536613071 E-mail: wwy_33@126.com
Post: 443133
SPONSORS
Domestic sponsors: Xian Electric Manufacturing Corp. Nanjin NARI-RELAYS Electric CO.,LTD Baoding Tianwei Baobian Electric Co.,Ltd. TBEA Shengyang Transformer Group Co.,Ltd XJ Group Corporation Foreign sponsors: ABB AB SIEMENS LTD., CHINA AREVA T&D
12
Serial
1-1-01 1-1-02
First Author
CHANG Kaizhong LIAO Wenfeng
Company
SPSC SGOC
Title
Analyses of XingRen DC Station 500kV AC Yard 5031 Circuit Breaker for Arc Interruption Fail The Analysis of Reasons for Temperature Rising of DC Disconnectors In Jiangling and Echeng Converter Station The Analysis and Teatments of GIS Faults in Yidu Converter Station Highgate Converter HPL Breakers
3. 4.
1-1-03 1-1-04
SGOC Vermont Electric Power Company, USA SGOC SGOC National Grid, USA EPDC, Japan Great River Energy, USA SGDC SPSC SGOC SGOC SPSC
1-2-01 1-2-02 1-2-03 1-2-04 1-2-05 2-1-01 2-1-02 2-1-03 3-1-01 3-1-02
ZHOU Guang BAI Qin Adamson, Keith Takehisa Sakai Goerss, Jud LI Wenyi XIAO Yao WANG Yusheng TANG Xiaozheng YANG Zeming
The Faults Analysis and Solutions of AC Filter in Jingzhou Converter Station Treatment Methods of the Malfunction of the Capacitors Sandy Pond HVDC Harmonic Distortion Testing Burning out of the AC Filter Reactor Used in Sakuma FC Resolving a Fifth Harmonic Problem on the AC System at the Inverter End Three Gorges Shanghai 500kv DC Transmission Converter Stations Noise Treatment Feasibility to Cancel PLC Noise Filter at HVDC Converter Station The Noise Controlling Projection in Longquan Converter Station Operation and Maintenance of The SIMENS Converter Transformer On-site Repair of Converter Transformers in Tianshengqiao-Guangzhou HVDC Transmission Project Influence of Converter Transformer Energization on HVDC Transmission System The Faults and Solutions of Converter Transformer in Jiangling Converter Station The Application of Infrared Diagnosis in Valve Reactor Overheat Analysis of HVDC Transmission Poject Oil Leakage in HVDC Transformers, Fenno-Skan Performance Analysis HVDC Users Nelson River ConverterTransformer Failures Function Improvement Summary Based on the First Set of Domestic Valve Cooling System in Operation The Problems and Solutions of Spraying Water System Existing Problems in Operation of the Valve Cooling System for Three Gorges-Guangdong DC Transmission Project and Problem-solving Methods 13
Fingrid Oyj Finland Manitoba Hydro, Canada Manitoba Hydro, Canada SGOC
22.
4-1-02
RAO Honglin
SGOC
23.
4-1-03
WEI Huabing
SGOC
No.
24. 25. 26. 27. 28.
Serial
4-1-04 4-1-05 5-1-01 5-1-02 5-1-03
First Author
DAI Chenrong Graldine Real Xu Lixin Wen J.L. ZHU Yiying
Company
SGOC TSO French SGOC CEPRI CEPRI RTE,
Title
Operation & Maintenance of the External Cooling System in Zhengping Converter Station Cross channel link wall bushing failures on the French Station Operation Characteristic Analysis of the LTT Valve and the ETT Valve Study on Type Test Technology of UHVDC Valves Studying on the Valve Arrestor Explosion during the Commissioning Test of Three Gorges to Guangdong HVDC Transmission Project Kii Channel HVDC Link Pole 2 Thyristor Valve Fault Analysis on Reactive Power Control of Three Gorges-Shanghai HVDC Transmission System Discussion about Controlling Sub-synchronous Oscillation at Xingan HVDC Project The Principle of Open Line Test and the Protection on HVDC Redundancy Problem of MACH2 Control System Rehabilitation Project & New Control Application on Hokkaido -Honshu HVDC Link in Japan Application of Reactive Power Control in TianShengQiao Converter Station Analysis of Pole Control Redundant Configuration in Gao-Zhao HVDC Project The Reactive Power Control Fault Analysis and Improvement Advice in HVDC Transmission System Back to Back Converter Station Reactive Power Control Analysis Analysis and Research on DC Line Reducing Voltage Recovery Sequence of GuizhouGuangdong HVDC Project Simulation and Study on the Influence of DC Voltage Measurement Error in the HVDC System Startup Test after Maintenance in 2007 for 3GG HVDC Link The Summary about SIEMENS DC Measuring System in the CSG HVDC Projects OCT Fault and Strategy Analysis in SGCCs HVDC Projects The Reliability Analysis of the HVDC Converter Stations Risks Resulted in Bipole Forced Outage and Suggestions for Solutions Maintenance for HVDC Control & Protection System Optimization Measures in the Establishment of the Practical and Efficient Real-time HVDC Simulation System Commissioning and Improvement of the Last Beaker Trip Equipment in BTB HVDC Project The Reliability Analysis of Redundancy Scheme in HVDC Protection Optimization Study on Voltage Level and Transmission Capacity of Jinsha River HVDC
29.
5-1-04
Yoriko Shinki
XIE Guoping YANG Yu XIE Guoping LING Yun Takehisa SAKAI ZHANG YinYong ZHAI Yongchang HUANG Junbo
Kansai Electric Power Co., Japan CEPRI SPSC CEPRI SGOC EPDC, Japan SPSC SPSC SPSC
38. 39.
5-2-1-09 5-2-1-10
SGOC SPSC
OU Kai-jian YANG Wankai HE Fang JIANG Jiusong GU Shuyang JI Xiaotong SHEN Zhigang LIU Yun
14
No.
51.
Serial
5-2-3-08
First Author
Thompson, Peter
Company
Transpower NZ Ltd, New Zealand Great River Energy, USA Tokyo Electric Power Company, Japan ESBI Engineering Ltd, Northern Ireland Furnas, Brazil South Africa SwePol Link Ab Sweden SGDC SPSC SPSC
Title
System Transpower NZ Ltd Pole 2 Performance
52. 53.
5-2-3-09 5-2-3-10
Life Extension of CU HVDC System Operation Experiences and Replacement Planning of Shin-Shinano Frequency Converter Station-1
54.
5-2-3-11
Smith, Maurice
HVDC Operational Experience in Brazil Apollo Converter Station Refurbishment Project (Cahora Bassa HVDC Scheme) SPL filter reactors, HVDC cable, return cables,
61. 62. 63. 64. 65. 66. 67. 68. 69. 70. 71.
5-2-4-04 5-2-4-05 5-2-4-06 5-2-4-07 5-2-4-08 5-2-4-09 5-2-4-10 5-2-4-11 5-2-4-12 6-1-01 6-1-02
WANG Delin CAO Jifeng LI Shuyong KUANG Jianrong CHEN Hongzhi HE jie YAO Meng ZHOU Xiangsheng WEI Xing ZUO Ganqing ZHOUYang
SGCC SPSC SPSC SPSC SPSC SPSC SGOC SPSC SPSC SPSC SPSC
75.
6-2-03
LIU Gengsheng
SPSC
15
No.
76. 77.
Serial
6-2-04 6-2-05
First Author
MENG Qingdong XIE Yubing
Company
CEPRI SPSC
Title
DC Development and Application of Field Testing Apparatus for Staged Line to Ground Fault The Design Fault of the Warning Circuit of the Transformer Cooling System and the Remedy Plans Study on the Influence of Zhebei - Shanghai 1000kV AC Lines on the Parallel UHVDC Transmission Lines and Its Mitigation Research on Live Working Inspection of Defective Insulators on 500kV DC Transmission Line Cross channel link evaporative coolers Baltic Cable Application of Traveling Wave Fault Location in Tianguang HVDC System Silicone Rubber, RTV and Booster shed Performance History of DC Line Fault Locators within Manitoba Hydro Mitigation of DC Current Flow on the AC Distribution System near our Ground Electrode Site Oteranga Bay Cable Station Roof Bushing Recoating 2005 Analysis of Field and Corona Effects of High Voltage Transmission Lines
78.
6-2-06
LI Xinnian
CEPRI
ZHAO Huazhong Emilie,Thiollet Brewitz, Jan LIN Zhibo Recksiedler, Les Tom,Radford Goerss, Jud
SPSC TSO - RTE , French Sweden SPSC Manitoba Hydro, Canada Manitoba Hydro, Canada Great River Energy ,USA New Zealand Manitoba HVDC Research Centre Inc. Canada Great River Energy ,USA Manitoba Hydro, Canada Transpower NZ Ltd, New Zealand ABB AB
86. 87.
6-2-14 6-2-15
Ground Electrode Problems CU HVDC Nelson River Electrodes HVDC 2007 Conference Charter Presentation HVDC User's Group Protocol Rev 1 ABB the World Leader in HVDC Control Upgrades Upgradation of an HVDC System HVDC Users Conference 2007 AREVA T&D Presentation
SIEMENS LTD.,China
AREVA T&D
96.
7-1-07
-------
97.
7-1-08
-------
Xian Electric Manufacturing Corp. China Nanjin NARIRELAYS Electric CO., LTD. China Baoding Tianwei Baobian Electric Co. ,Ltd. China TBEA Shengyang Transformer Group Co., Ltd. China
Introduction of Xian Electric Manufacturing Corp. Introduction of Nanjin NARI-RELAYS Electric CO.,LTD Introduction of Electric Co.,Ltd. Baoding Tianwei Baobian
16
No.
98.
Serial
7-1-09
First Author
-------
Company
XJ Group Corporation. China
------
Title
Introduction of XJ Group Corporation
99.
7-1-10
------
Leaders address
17