PEKERJAAN :
PENYEDIA :
KONSULTAN :
LAPORAN HARIAN
TANGGAL:…… S/D …………
No. Jenis Pekerjaan Jumlah Lokasi No. Jenis Jumlah Lokasi Awal Lokasi Tujuan
C. PEMAKAIAN PERALATAN
F. USUL/PENGAJUAN/INSTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
JAM KERJA
KONDISI CUACA
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 Err:509 0.70 1.86 0.00 Err:509 0.70 Err:509
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 Err:509 0.41 0.31 0.20 Err:509 0.61 Err:509
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 Err:509 0.30 0.34 0.20 Err:509 0.50 Err:509
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 Err:509 0.36 0.34 0.20 Err:509 0.56 Err:509
414,085,000.00 Err:509 2.84 Err:509 Err:509
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
63,358,049.39 Err:509 Err:509 Err:509 Err:509
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
86,123,235.38 Err:509 Err:509 Err:509 Err:509
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 Err:509 0.00 Err:509 29.50 Err:509 29.50 Err:509
121,213,903.24 Err:509 Err:509 Err:509 Err:509
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 Err:509 0.00 Err:509 225.93 Err:509 225.93 Err:509
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
752,628,712.63 Err:509 Err:509 Err:509 Err:509
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 Err:509 0.70 1.86 0.00 Err:509 0.70 Err:509
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 Err:509 0.41 0.31 0.00 Err:509 0.41 Err:509
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 Err:509 0.30 0.34 0.10 Err:509 0.40 Err:509
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 Err:509 0.36 0.34 0.10 Err:509 0.46 Err:509
414,085,000.00 Err:509 2.84 Err:509 Err:509
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
63,358,049.39 Err:509 Err:509 Err:509 Err:509
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
86,123,235.38 Err:509 Err:509 Err:509 Err:509
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 Err:509 0.00 Err:509 12.50 Err:509 12.50 Err:509
121,213,903.24 Err:509 Err:509 Err:509 Err:509
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 Err:509 0.00 Err:509 78.00 Err:509 78.00 Err:509
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509
752,628,712.63 Err:509 Err:509 Err:509 Err:509
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 Err:509 0.70 1.86 #REF! #REF! #REF! #REF!
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 Err:509 0.41 0.31 #REF! #REF! #REF! #REF!
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 Err:509 0.40 0.34 #REF! #REF! #REF! #REF!
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 Err:509 0.46 0.34 #REF! #REF! #REF! #REF!
414,085,000.00 Err:509 2.84 #REF! #REF!
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
63,358,049.39 Err:509 Err:509 #REF! #REF!
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
86,123,235.38 Err:509 Err:509 #REF! #REF!
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 Err:509 12.50 Err:509 #REF! #REF! #REF! #REF!
121,213,903.24 Err:509 Err:509 #REF! #REF!
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR -
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 Err:509 78.00 Err:509 #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF!
752,628,712.63 Err:509 Err:509 #REF! #REF!
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 Err:509 #REF! 1.86 #REF! #REF! #REF! #REF!
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 Err:509 #REF! 0.31 #REF! #REF! #REF! #REF!
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 Err:509 #REF! 0.34 #REF! #REF! #REF! #REF!
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 Err:509 #REF! 0.34 #REF! #REF! #REF! #REF!
414,085,000.00 Err:509 2.84 #REF! #REF!
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
63,358,049.39 Err:509 #REF! #REF! #REF!
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
86,123,235.38 Err:509 #REF! #REF! #REF!
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
121,213,903.24 Err:509 #REF! #REF! #REF!
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
752,628,712.63 Err:509 #REF! #REF! #REF!
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 Err:509 #REF! 1.86 #REF! #REF! #REF! #REF!
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 Err:509 #REF! 0.31 #REF! #REF! #REF! #REF!
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 Err:509 #REF! 0.34 #REF! #REF! #REF! #REF!
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 Err:509 #REF! 0.34 #REF! #REF! #REF! #REF!
414,085,000.00 Err:509 2.84 #REF! #REF!
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
63,358,049.39 Err:509 #REF! #REF! #REF!
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
86,123,235.38 Err:509 #REF! #REF! #REF!
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
121,213,903.24 Err:509 #REF! #REF! #REF!
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 Err:509 #REF! #REF! #REF! #REF! #REF! #REF!
752,628,712.63 Err:509 #REF! #REF! #REF!
MC-03
PAKET
PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
MC-03
LINGKUP
REKONTRUKSI JALAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.41 0.69 0.20 0.34 0.61 1.03
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.30 0.77 0.20 0.51 0.50 1.28
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.36 0.77 0.20 0.43 0.56 1.20
414,085,000.00 12.44 6.46 1.28 7.74
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.41 0.69 0.00 0.00 0.41 0.69
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.30 0.77 0.10 0.26 0.40 1.03
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.36 0.77 0.10 0.21 0.46 0.99
414,085,000.00 12.44 6.46 0.47 6.93
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.41 0.69 0.10 0.17 0.51 0.86
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.40 1.03 0.10 0.26 0.50 1.28
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.46 0.99 0.10 0.21 0.56 1.20
414,085,000.00 12.44 6.93 0.64 7.57
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.51 0.86 0.10 0.17 0.61 1.03
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.50 1.28 0.00 0.00 0.50 1.28
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.56 1.20 0.00 0.00 0.56 1.20
414,085,000.00 12.44 7.57 0.17 7.74
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.61 1.03 0.00 0.00 0.61 1.03
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.50 1.28 0.00 0.00 0.50 1.28
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.56 1.20 0.00 0.00 0.56 1.20
414,085,000.00 12.44 7.74 0.00 7.74
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 12 m3 1 Cutter aspal 1 Unit Weda Weda
2 Excavator 1 unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : REKONTRUKSI JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 15 m3 1 Cutter aspal 1 Unit Weda Weda
2 Excavator 1 unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 20 m3 1 Cutter aspal 1 Unit Weda Weda
2 Excavator 1 unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 8 m3 1 Cutter aspal 1 Unit Weda Weda
2 Excavator 1 unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : REKONTRUKSI JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 6
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-03
LINGKUP
PEMELIHARAAN RUTIN JALAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-03
LINGKUP
PEMELIHARAAN RUTIN KONDISI
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810665.19 37,318,972.02 4.10 0.00 0.00 28.00 2.49 28.00 2.49
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 0.00 2.49 2.49
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810665.19 37,318,972.02 4.10 0.00 0.00 12.00 1.07 12.00 1.07
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 0.00 1.07 1.07
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810665.19 37,318,972.02 4.10 12.00 1.07 16.00 1.42 28.00 2.49
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 1.07 1.42 2.49
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810665.19 37,318,972.02 4.10 28.00 2.49 0.00 0.00 28.00 2.49
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 2.49 0.00 2.49
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810665.19 37,318,972.02 4.10 28.00 2.49 0.00 0.00 28.00 2.49
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 2.49 0.00 2.49
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 5
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Dump truck 1
2 Sapu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Dump truck 1
2 Sapu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Dump truck 1
2 Sapu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Dump truck 1
2 Sapu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN KONDISI
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Sekop 5
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.2 (4a) Aspal Cair untuk Precoated 105 ltr 1 Sprayer 1 unit
2 Aspal Cair 200 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.6.(1) CPHMA Kemasan Kantong 20.7 ton 1 CPHMA 25 ton Weda Mafa
2 Tandem Roller 1 Unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.6.(1) CPHMA Kemasan Kantong 16.56 ton 1 CPHMA 20 ton Weda Mafa
2 Tandem Roller 1 Unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.2 (4a) Aspal Cair untuk Precoated 105 ltr 1 Sprayer 1 unit
2 Aspal Cair 110 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN KONDISI
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
6.6.(1) CPHMA Kemasan Kantong 20.7 ton 1 CPHMA 21 ton Weda Mafa
2 Tandem Roller 1 Unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1. Bekas kantong aspal dan bekas galian aspal dibuang jauh dari badan jalan
MC-03
LINGKUP
PENUNJANGAN/HOLDING TREATMENT
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 0.00 0.00 0.00
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 0.00 0.00 29.50 6.75 29.50 6.75
121,213,903.24 88.44 0.00 6.75 6.75
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 0.00 0.00 0.00
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 0.00 0.00 12.50 2.86 12.50 2.86
121,213,903.24 88.44 0.00 2.86 2.86
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 0.00 0.00 0.00 0.00
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 12.50 2.86 6.50 1.49 19.00 4.35
121,213,903.24 88.44 2.86 1.49 4.35
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 0.00 0.00 0.00 0.00
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 19.00 4.35 6.40 1.46 25.40 5.81
121,213,903.24 88.44 4.35 1.46 5.81
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 0.00 0.00 0.00 0.00
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 25.40 5.81 4.10 0.94 29.50 6.75
121,213,903.24 88.44 5.81 0.94 6.75
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Baby Roller 1
2 Tangki air 1
3 Sekop 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PENUNJANG/HOLDING TREATMENT
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Baby Roller 1
2 Tangki air 1
3 Sekop 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Baby Roller 1
2 Tangki air 1
3 Sekop 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Baby Roller 1
2 Tangki air 1
3 Sekop 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PENUNJANG/HOLDING TREATMENT
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-03
LINGKUP
PEMELIHARAAN BERKALA JEMBATAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 0.00 0.00 225.93 54.40 225.93 54.40
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 0.00 0.00 0.00 0.00 0.00 0.00
752,628,712.63 92.43 0.00 54.40 54.40
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 0.00 0.00 78.00 18.78 78.00 18.78
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 0.00 0.00 0.00 0.00 0.00
752,628,712.63 92.43 0.00 18.78 18.78
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 78.00 18.78 35.00 8.43 113.00 27.21
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 0.00 0.00 0.00 0.00 0.00 0.00
752,628,712.63 92.43 18.78 8.43 27.21
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 113.00 27.21 56.00 13.48 169.00 40.69
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 0.00 0.00 0.00 0.00 0.00 0.00
752,628,712.63 92.43 27.21 13.48 40.69
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 169.00 40.69 56.93 13.71 225.93 54.40
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 0.00 0.00 0.00 0.00 0.00 0.00
752,628,712.63 92.43 40.69 13.71 54.40
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN BERKALA JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 50 m2 1 Cat 8 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 25 m2 1 Cat 5 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN BERKALA JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Vibrator 2
2 Perata kayu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 30 m2 1 Cat 8 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 30 m2 1 Cat 8 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 30 m2 1 Cat 8 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µ 30 m2 1 Cat 8 Gln
2 Pengaduk 4 Buah
3 Ember 2 Buah
4 Kuas 12 Buah
5 Sapu 1 Buah
6 Amplas 5 m2
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-03
LINGKUP
PEMELIHARAAN RUTIN JEMBATAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.00 0.00 0.60 0.26 0.60 0.26
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.20 0.27 0.20 0.27
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.00 0.00 0.49 0.42 0.49 0.42
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.00 0.00 0.20 0.44 0.20 0.44
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.00 0.00 0.20 0.54 0.20 0.54
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.25 0.31 0.25 0.31
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.00 0.00 0.20 0.33 0.20 0.33
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.00 0.00 0.30 0.33 0.30 0.33
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.25 0.34 0.25 0.34
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.00 0.00 0.30 0.35 0.30 0.35
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.00 0.00 0.30 0.35 0.30 0.35
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.00 0.00 0.30 0.35 0.30 0.35
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.30 0.36 0.30 0.36
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.50 0.47 0.50 0.47
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.00 0.00 0.30 0.37 0.30 0.37
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.00 0.00 0.50 0.46 0.50 0.46
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.30 0.38 0.30 0.38
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.80 0.96 0.80 0.96
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.00 0.00 0.30 0.30 0.30 0.30
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.30 0.36 0.30 0.36
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.00 0.00 0.50 0.42 0.50 0.42
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.25 0.34 0.25 0.34
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.25 1.36 0.25 1.36
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.25 1.36 0.25 1.36
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.25 1.36 0.25 1.36
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.00 0.00 0.25 1.07 0.25 1.07
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.00 0.00 0.30 0.82 0.30 0.82
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.00 0.00 0.25 1.33 0.25 1.33
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.00 0.00 0.25 0.65 0.25 0.65
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.00 0.00 0.20 0.64 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.00 0.00 0.21 0.39 0.21 0.39
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.00 0.00 0.10 0.04 0.10 0.04
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.10 0.14 0.10 0.14
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.00 0.00 0.10 0.09 0.10 0.09
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.00 0.00 0.10 0.22 0.10 0.22
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.00 0.00 0.10 0.27 0.10 0.27
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.10 0.13 0.10 0.13
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.00 0.00 0.10 0.17 0.10 0.17
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.00 0.00 0.10 0.11 0.10 0.11
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.10 0.14 0.10 0.14
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.10 0.09 0.10 0.09
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.00 0.00 0.10 0.09 0.10 0.09
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.10 0.13 0.10 0.13
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.00 0.00 0.10 0.10 0.10 0.10
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.00 0.00 0.10 0.12 0.10 0.12
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.00 0.00 0.10 0.08 0.10 0.08
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.00 0.00 0.10 0.14 0.10 0.14
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.10 0.54 0.10 0.54
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.10 0.54 0.10 0.54
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.00 0.00 0.10 0.54 0.10 0.54
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.00 0.00 0.10 0.43 0.10 0.43
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.00 0.00 0.10 0.27 0.10 0.27
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.00 0.00 0.10 0.53 0.10 0.53
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.00 0.00 0.10 0.26 0.10 0.26
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.00 0.00 0.10 0.32 0.10 0.32
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.00 0.00 0.10 0.18 0.10 0.18
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.10 0.04 0.20 0.09 0.30 0.13
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.10 0.14 0.10 0.14 0.20 0.27
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.10 0.09 0.10 0.09 0.20 0.17
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.10 0.22 0.10 0.22 0.20 0.44
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.10 0.27 0.10 0.27 0.20 0.54
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.10 0.13 0.10 0.13 0.20 0.25
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.10 0.17 0.10 0.17 0.20 0.33
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.10 0.11 0.10 0.11 0.20 0.22
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.10 0.14 0.10 0.14 0.20 0.27
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.10 0.12 0.10 0.12 0.20 0.23
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.10 0.12 0.10 0.12 0.20 0.23
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.10 0.12 0.10 0.12 0.20 0.23
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.10 0.12 0.10 0.12 0.20 0.24
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.10 0.09 0.10 0.09 0.20 0.19
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.10 0.12 0.10 0.12 0.20 0.25
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.10 0.09 0.10 0.09 0.20 0.18
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.10 0.13 0.10 0.13 0.20 0.25
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.10 0.12 0.10 0.12 0.20 0.24
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.10 0.10 0.10 0.10 0.20 0.20
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.10 0.12 0.10 0.12 0.20 0.24
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.10 0.08 0.10 0.08 0.20 0.17
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.10 0.14 0.10 0.14 0.20 0.27
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.10 0.54 0.10 0.54 0.20 1.09
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.10 0.54 0.10 0.54 0.20 1.09
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.10 0.54 0.10 0.54 0.20 1.09
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.10 0.43 0.10 0.43 0.20 0.86
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.10 0.27 0.10 0.27 0.20 0.54
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.10 0.53 0.10 0.53 0.20 1.07
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.10 0.26 0.10 0.26 0.20 0.52
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.10 0.32 0.10 0.32 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.10 0.18 0.10 0.19 0.20 0.37
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.30 0.13 0.20 0.09 0.50 0.22
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.20 0.27 0.00 0.00 0.20 0.27
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.20 0.17 0.19 0.16 0.39 0.33
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.20 0.44 0.00 0.00 0.20 0.44
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.20 0.54 0.00 0.00 0.20 0.54
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.20 0.25 0.05 0.06 0.25 0.31
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.20 0.33 0.00 0.00 0.20 0.33
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.20 0.22 0.10 0.11 0.30 0.33
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.20 0.27 0.05 0.07 0.25 0.34
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.20 0.23 0.10 0.12 0.30 0.35
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.20 0.23 0.10 0.12 0.30 0.35
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.20 0.23 0.10 0.12 0.30 0.35
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.20 0.24 0.10 0.12 0.30 0.36
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.20 0.19 0.10 0.09 0.30 0.28
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.20 0.25 0.10 0.12 0.30 0.37
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.20 0.18 0.10 0.09 0.30 0.28
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.20 0.25 0.10 0.13 0.30 0.38
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.20 0.24 0.30 0.36 0.50 0.60
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.20 0.20 0.10 0.10 0.30 0.30
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.20 0.24 0.10 0.12 0.30 0.36
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.20 0.17 0.20 0.17 0.40 0.33
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.20 0.27 0.05 0.07 0.25 0.34
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.20 1.09 0.05 0.27 0.25 1.36
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.20 1.09 0.05 0.27 0.25 1.36
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.20 1.09 0.05 0.27 0.25 1.36
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.20 0.86 0.05 0.21 0.25 1.07
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.20 0.54 0.10 0.27 0.30 0.82
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.20 1.07 0.05 0.27 0.25 1.33
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.20 0.52 0.05 0.13 0.25 0.65
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.00 0.00 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.20 0.37 0.01 0.02 0.21 0.39
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.50 0.22 0.10 0.04 0.60 0.26
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.20 0.27 0.00 0.00 0.20 0.27
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.39 0.33 0.10 0.09 0.49 0.42
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.20 0.44 0.00 0.00 0.20 0.44
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.20 0.54 0.00 0.00 0.20 0.54
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.25 0.31 0.00 0.00 0.25 0.31
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.20 0.33 0.00 0.00 0.20 0.33
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.30 0.33 0.00 0.00 0.30 0.33
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.00 0.00 0.25 0.34
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.00 0.00 0.30 0.35
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.00 0.00 0.30 0.35
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.30 0.35 0.00 0.00 0.30 0.35
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.00 0.00 0.30 0.36
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.30 0.28 0.20 0.19 0.50 0.47
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.30 0.37 0.00 0.00 0.30 0.37
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.30 0.28 0.20 0.18 0.50 0.46
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.30 0.38 0.00 0.00 0.30 0.38
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.50 0.60 0.30 0.36 0.80 0.96
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.30 0.30 0.00 0.00 0.30 0.30
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.00 0.00 0.30 0.36
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.40 0.33 0.10 0.08 0.50 0.42
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.00 0.00 0.25 0.34
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.00 0.25 1.36
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.00 0.25 1.36
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.00 0.25 1.36
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.25 1.07 0.00 0.00 0.25 1.07
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.30 0.82 0.00 0.00 0.30 0.82
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.25 1.33 0.00 0.00 0.25 1.33
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.25 0.65 0.00 0.00 0.25 0.65
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.00 0.00 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.21 0.39 0.00 0.00 0.21 0.39
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.00 0.00 0.00 0.00 0.00 0.00
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00 0.00
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10 0.1 1 Cat 2 Gln Weda Weda
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13, 0.1 2 Kuas 8 buah Weda Weda
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11 0.1 3 Sapu 2 buah Weda Weda
4 Kain bekas 1 buah Weda Weda
5 Pengaduk 2 buah Weda Weda
6 Ember cat 2 buah Weda Weda
7 Amplas 2 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 4
2 Rompi 4
3 Kaos tangan 8
4 sepatu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11 0.1 1 Cat 2 Gln Weda Weda
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m 0.1 2 Kuas 6 buah Weda Weda
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m 0.1 3 Sapu 2 buah Weda Weda
4 Kain bekas 1 buah Weda Weda
5 Pengaduk 2 buah Weda Weda
6 Ember cat 2 buah Weda Weda
7 Amplas 2 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 4
2 Rompi 4
3 Kaos tangan 8
4 sepatu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,0 0.1 1 Cat 4 Gln Mafa Mafa
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11, 0.1 2 Kuas 6 buah Mafa Mafa
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m 0.1 3 Sapu 2 buah Mafa Mafa
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m 0.1 4 Kain bekas 1 buah Mafa Mafa
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 0.095 5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 3 buah Mafa Mafa
7 Amplas 3 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 4
2 Rompi 4
3 Kaos tangan 8
4 sepatu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m 0.1 1 Cat 4 Gln Mafa Mafa
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 0.1 2 Kuas 6 buah Mafa Mafa
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 0.1 3 Sapu 2 buah Mafa Mafa
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m 0.1 4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 3 buah Mafa Mafa
7 Amplas 3 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m 0.1 2 Kuas 4 buah Mafa Mafa
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m 0.1 3 Sapu 2 buah Mafa Mafa
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m 0.1 4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 3 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 4
2 Rompi 4
3 Kaos tangan 8
4 sepatu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Juni 2019
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,8 0.2 1 Cat 6 Gln Weda Weda
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m 0.1 2 Kuas 12 buah Weda Weda
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m 0.1 3 Sapu 3 buah Weda Weda
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 0.1 4 Kain bekas 2 buah Weda Weda
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m 0.1 5 Pengaduk 4 buah Weda Weda
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12, 0.1 6 Ember cat 4 buah Weda Weda
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15 0.1 7 Amplas 4 biji Weda Weda
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10 0.1
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 12
2 Rompi 12
3 Kaos tangan 24
4 sepatu 12
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13, 0.1 1 Cat 6 Gln Weda Weda
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11 0.1 2 Kuas 12 buah Weda Weda
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11 0.1 3 Sapu 3 buah Weda Weda
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m 0.1 4 Kain bekas 2 buah Weda Weda
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m 0.1 5 Pengaduk 4 buah Weda Weda
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m 0.1 6 Ember cat 4 buah Weda Weda
7 Amplas 4 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 8
2 Rompi 8
3 Kaos tangan 16
4 sepatu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m 0.1 1 Cat 4 Gln Weda Weda
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m 0.1 2 Kuas 8 buah Weda Weda
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m 0.1 3 Sapu 1 buah Weda Weda
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m 0.1 4 Kain bekas 1 buah Weda Weda
5 Pengaduk 2 buah Weda Weda
6 Ember cat 2 buah Weda Weda
7 Amplas 2 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 8
2 Rompi 8
3 Kaos tangan 16
4 sepatu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m 0.1 2 Kuas 6 buah Mafa Mafa
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m 0.1 3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 8
2 Rompi 8
3 Kaos tangan 16
4 sepatu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m 0.1 2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 0.1 2 Kuas 6 buah Mafa Mafa
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 0.1 3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m 0.1 1 Cat 4 Gln Mafa Mafa
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m 0.1 2 Kuas 8 buah Mafa Mafa
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m 0.1 3 Sapu 2 buah Mafa Mafa
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m 0.1 4 Kain bekas 2 buah Mafa Mafa
5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 3 buah Mafa Mafa
7 Amplas 3 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m 0.1 1 Cat 6 Gln Mafa Mafa
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m 0.1 2 Kuas 12 buah Mafa Mafa
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m 0.1 3 Sapu 4 buah Mafa Mafa
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 0.1 4 Kain bekas 4 buah Mafa Mafa
5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 4 buah Mafa Mafa
7 Amplas 4 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 8
2 Rompi 8
3 Kaos tangan 16
4 sepatu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,8 0.2 1 Cat 2 Gln Weda Weda
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m 0.19 2 Kuas 8 buah Weda Weda
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12, 0.05 3 Sapu 2 buah Weda Weda
4 Kain bekas 1 buah Weda Weda
5 Pengaduk 2 buah Weda Weda
6 Ember cat 2 buah Weda Weda
7 Amplas 2 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10 0.1 1 Cat 2 Gln Weda Weda
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13, 0.05 2 Kuas 8 buah Weda Weda
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11 0.1 3 Sapu 2 buah Weda Weda
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11 0.1 4 Kain bekas 1 buah Weda Weda
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m 0.1 5 Pengaduk 2 buah Weda Weda
6 Ember cat 2 buah Weda Weda
7 Amplas 2 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m 0.1 1 Cat 4 Gln Weda Weda
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m 0.1 2 Kuas 12 buah Weda Weda
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m 0.1 3 Sapu 4 buah Weda Weda
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m 0.1 4 Kain bekas 2 buah Weda Weda
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m 0.1 5 Pengaduk 4 buah Weda Weda
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m 0.3 6 Ember cat 4 buah Weda Weda
7 Amplas 4 biji Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 12
2 Rompi 12
3 Kaos tangan 24
4 sepatu 12
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,6 0.1 1 Cat 4 Gln Mafa Mafa
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11 0.1 2 Kuas 6 buah Mafa Mafa
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 0.2 3 Sapu 2 buah Mafa Mafa
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 1 0.05 4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 3 buah Mafa Mafa
6 Ember cat 3 buah Mafa Mafa
7 Amplas 3 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 12
2 Rompi 12
3 Kaos tangan 24
4 sepatu 12
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 0.05 1 Cat 4 Gln Mafa Mafa
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m 0.05 2 Kuas 6 buah Mafa Mafa
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m 0.05 3 Sapu 2 buah Mafa Mafa
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m 0.05 4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 10
2 Rompi 10
3 Kaos tangan 20
4 sepatu 10
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m 0.05 2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 10
2 Rompi 10
3 Kaos tangan 20
4 sepatu 10
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m 0.05 1 Cat 2 Gln Mafa Mafa
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 0.01 2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 0.1 1 Cat 2 Gln Mafa Mafa
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8 0.1 2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Juni 2019
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,0 0.2 1 Cat 2 Gln Mafa Mafa
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,8 0.2 2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m 0.3 1 Cat 2 Gln Mafa Mafa
2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m 0.1 1 Cat 2 Gln Mafa Mafa
2 Kuas 6 buah Mafa Mafa
3 Sapu 1 buah Mafa Mafa
4 Kain bekas 1 buah Mafa Mafa
5 Pengaduk 2 buah Mafa Mafa
6 Ember cat 2 buah Mafa Mafa
7 Amplas 2 biji Mafa Mafa
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Helm proyek 6
2 Rompi 6
3 Kaos tangan 12
4 sepatu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA