LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 2.65 0.70 1.86 0.00 0.00 0.70 1.86
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 0.75 0.76 0.57 0.00 0.00 0.76 0.57
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 1.13 0.65 0.73 0.00 0.00 0.65 0.73
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 0.94 0.68 0.64 0.00 0.00 0.68 0.64
414,085,000.00 5.47 3.80 0.00 3.80
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.02 0.00 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 0.81 0.00 0.00 0.00 0.00 0.00 0.00
63,358,049.39 0.84 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.26 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 0.88 0.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 1.14 0.00 0.00 0.00
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71,774.21 22,568,682.59 0.30 0.00 0.00 122.66 0.12 122.66 0.12
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 1.30 60.80 0.25 122.66 0.51 183.46 0.76
121,213,903.24 1.60 0.25 0.62 0.88
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 6.20 225.93 5.85 13.25 0.34 239.18 6.20
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 1.17 0.00 0.00 24.22 0.52 24.22 0.52
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 0.51 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 1.96 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.10 36.00 0.10 0.00 0.00 36.00 0.10
752,628,712.63 9.94 5.96 0.86 6.82
MC-05
PAKET
PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
MC-05
LINGKUP
REKONTRUKSI JALAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.76 1.29 0.00 0.00 0.76 1.29
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.65 1.67 0.00 0.00 0.65 1.67
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.68 1.46 0.00 0.00 0.68 1.46
414,085,000.00 12.44 8.64 0.00 8.64
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.76 1.29 0.00 0.00 0.76 1.29
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.65 1.67 0.00 0.00 0.65 1.67
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.68 1.46 0.00 0.00 0.68 1.46
414,085,000.00 12.44 8.64 0.00 8.64
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.76 1.29 0.00 0.76 1.29
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.65 1.67 0.00 0.00 0.65 1.67
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.68 1.46 0.00 0.00 0.68 1.46
414,085,000.00 12.44 8.64 0.00 8.64
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
Disetujui Oleh
Diperiksa Oleh Diajukan Oleh
Direksi Lapangan
Konsultan Supervisi Kontraktor Pelaksana
PPK 2.3 Provinsi Maluku Utara
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
DEDIK SETYOBUDI, ST BAHRUDIN LOHA
NIP. 19850519 201412 1 002
Quantity Engineer Quantity Control
DEDIK SETYOBUDI, ST BAHRUDIN LOHA
Quantity Engineer Quantity Control
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.76 1.29 0.00 0.76 1.29
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.65 1.67 0.00 0.65 1.67
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.68 1.46 0.00 0.68 1.46
414,085,000.00 12.44 8.64 0.00 8.64
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
Disetujui Oleh
Direksi Lapangan Diperiksa Oleh Diajukan Oleh
PPK 2.3 Provinsi Maluku Utara Konsultan Supervisi Kontraktor Pelaksana
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
NIP. 19850519 201412 1 002 DEDIK SETYOBUDI, ST BAHRUDIN LOHA
Quantity Engineer Quantity Control
DEDIK SETYOBUDI, ST BAHRUDIN LOHA
Quantity Engineer Quantity Control
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
REKONSTRUKSI JALAN
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 200,865,000.00 200,865,000.00 6.03 0.70 4.22 0.00 0.00 0.70 4.22
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 56,400,000.00 56,400,000.00 1.69 0.76 1.29 0.00 0.00 0.76 1.29
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 85,320,000.00 85,320,000.00 2.56 0.65 1.67 0.00 0.00 0.65 1.67
1.21 Manajemen Mutu LS 1.00 71,500,000.00 71,500,000.00 2.15 0.68 1.46 0.00 0.00 0.68 1.46
414,085,000.00 12.44 8.64 0.00 8.64
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 42.00 43,269.22 1,817,307.24 0.05 0.00 0.00 0.00 0.00 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 43.00 1,431,180.05 61,540,742.15 1.85 0.00 0.00 0.00 0.00 0.00
63,358,049.39 1.90 0.00 0.00 0.00
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 10.00 1,960,810.29 19,608,102.90 0.59 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu M3 41.25 1,612,488.06 66,515,132.48 2.00 0.00 0.00 0.00 0.00 0.00
86,123,235.38 2.59 0.00 0.00 0.00
6.1.(1) Lapis Resap Pengikat - Aspal Cair 1275.36 1 Sprayer 1 unit Weda Weda
2 Aspal Cair 1300 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.3.(6a) Laston Lapis Antara (AC-BC) 220 ton 1 AC-BC 220 ton Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 AMP 1
2 Finisher 1
3 Tandem Roller 1
4 PTR 1
5 Dump Truck 12
6 Sekop 10
7 Alat perata 6
8 Gerobak 2
9 Rambu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.1.(1) Lapis Resap Pengikat - Aspal Cair 1227.94 ltr 1 Sprayer 1 unit Weda Weda
2 Aspal Cair 1300 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : REKONTRUKSI JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
6.3.(6a) Laston Lapis Antara (AC-BC) 211.82 ton 1 AC-BC 215 ton Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 AMP 1
2 Finisher 1
3 Tandem Roller 1
4 PTR 1
5 Dump Truck 12
6 Sekop 10
7 Alat perata 6
8 Gerobak 2
9 Rambu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.1.(1) Lapis Resap Pengikat - Aspal Cair 1304.35 ltr 1 Sprayer 1 unit Weda Weda
2 Aspal Cair 1310 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.3.(6a) Laston Lapis Antara (AC-BC) 225 ton 1 AC-BC 225 ton Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 AMP 1
2 Finisher 1
3 Tandem Roller 1
4 PTR 1
5 Dump Truck 12
6 Sekop 10
7 Alat perata 6
8 Gerobak 2
9 Rambu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.1.(1) Lapis Resap Pengikat - Aspal Cair 1124.2 ltr 1 Sprayer 1 unit Weda Weda
2 Aspal Cair 1150 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : REKONTRUKSI JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
6.3.(6a) Laston Lapis Antara (AC-BC) 193.92 ton 1 AC-BC 200 ton Weda Weda
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 AMP 1
2 Finisher 1
3 Tandem Roller 1
4 PTR 1
5 Dump Truck 12
6 Sekop 10
7 Alat perata 6
8 Gerobak 2
9 Rambu 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : REKONTRUKSI JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 25 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-05
LINGKUP
PEMELIHARAAN RUTIN JALAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
Disetujui Oleh
Direksi Lapangan Diperiksa Oleh Diajukan Oleh
PPK 2.3 Provinsi Maluku Utara Konsultan Supervisi Kontraktor Pelaksana
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
NIP. 19850519 201412 1 002 DEDIK SETYOBUDI, ST BAHRUDIN LOHA
Quantity Engineer Quantity Control
BUKU LAPORAN MINGGUAN
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JALAN
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 23.98 1,960,810.29 47,021,046.31 2.66 0.00 0.00 0.00 0.00 0.00
47,021,046.31 2.66 0.00 0.00 0.00
Disetujui Oleh
Diperiksa Oleh Diajukan Oleh
Direksi Lapangan
Konsultan Supervisi Kontraktor Pelaksana
PPK 2.3 Provinsi Maluku Utara
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
DEDIK SETYOBUDI, ST BAHRUDIN LOHA
NIP. 19850519 201412 1 002
Quantity Engineer Quantity Control
Disetujui Oleh Diperiksa Oleh Diajukan Oleh
Direksi Lapangan Konsultan Supervisi Kontraktor Pelaksana
PPK 2.3 Provinsi Maluku Utara PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JALAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 25 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-05
LINGKUP
PEMELIHARAAN RUTIN KONDISI
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810,665.19 37,318,972.02 4.10 34.10 3.04 0.00 0.00 34.10 3.04
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810,665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 3.04 0.00 3.04
Disetujui Oleh
Direksi Lapangan Diperiksa Oleh Diajukan Oleh
PPK 2.3 Provinsi Maluku Utara Konsultan Supervisi Kontraktor Pelaksana
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
NIP. 19850519 201412 1 002 DEDIK SETYOBUDI, ST BAHRUDIN LOHA
Quantity Engineer Quantity Control
BUKU LAPORAN MINGGUAN
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810,665.19 37,318,972.02 4.10 34.10 3.04 0.00 0.00 34.10 3.04
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810,665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 3.04 0.00 3.04
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810,665.19 37,318,972.02 4.10 34.10 3.04 0.00 0.00 34.10 3.04
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810,665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 3.04 0.00 3.04
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810,665.19 37,318,972.02 4.10 34.10 3.04 0.00 0.00 34.10 3.04
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810,665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 3.04 0.00 3.04
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN KONDISI
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 46.04 810,665.19 37,318,972.02 4.10 34.10 3.04 0.00 0.00 34.10 3.04
5.1.(1) Lapis Pondasi Agregat Kelas A >10% M3 219.69 810,665.19 178,097,208.55 19.56 0.00 0.00 0.00 0.00 0.00 0.00
215,416,180.57 23.65 3.04 0.00 3.04
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN KONDISI
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.2 (4a) Aspal Cair untuk Precoated 53.63 ltr 1 Sprayer 1 unit
2 Aspal Cair 60 ltr
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
6.6.(1) CPHMA Kemasan Kantong 4.49 ton 1 CPHMA 5 ton Mafa Matuting
2 Tandem Roller 1 Unit
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN KONDISI
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Rambu 6
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN KONDISI
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 25 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-05
LINGKUP
PENUNJANGAN/HOLDING TREATMENT
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 122.66 6.42 122.66 6.42
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 60.79 13.92 122.66 28.08 183.45 41.99
121,213,903.24 88.44 13.92 34.50 48.41
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 0.00 0.00 67.55 3.54 67.55 3.54
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 60.79 13.92 34.66 7.93 95.45 21.85
121,213,903.24 88.44 13.92 11.47 25.39
Disetujui Oleh
Diperiksa Oleh Diajukan Oleh
Direksi Lapangan
Konsultan Supervisi Kontraktor Pelaksana
PPK 2.3 Provinsi Maluku Utara
PT. Anugerah Kridapradana Kso CV. Tunggal Jaya
PT. Anugerah Maesa Lestari
SUGIMIN SUKRI
DEDIK SETYOBUDI, ST BAHRUDIN LOHA
NIP. 19850519 201412 1 002
Quantity Engineer Quantity Control
BUKU LAPORAN MINGGUAN
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 67.55 3.54 35.66 1.87 103.21 5.40
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 95.45 21.85 35.66 8.16 131.11 30.01
121,213,903.24 88.44 25.39 10.03 35.42
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 103.21 5.40 19.45 1.02 122.66 6.42
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 131.11 30.01 19.45 4.45 150.56 34.46
121,213,903.24 88.44 35.42 5.47 40.89
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PENUNJANG/HOLDING TREATMENT
DIVISI 3. PEKERJAAN TANAH
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 314.44 71774.21 22,568,682.59 16.47 122.66 6.42 0.00 0.00 122.66 6.42
3.2.(2a) Timbunan Pilihan dari sumber galian M3 314.44 313,717.15 98,645,220.65 71.97 150.56 34.46 32.89 7.53 183.45 41.99
121,213,903.24 88.44 40.89 7.53 48.41
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Cutter aspal 1
2 Gerobak 2
3 Sekop 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.2.(2a) Timbunan Pilihan dari sumber galian 34.66 m3 1 Timbunan 36 m3 Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Tandem roller 1
2 Dump truk 1
3 Tangki air 1
4 Sekop 4
5 Gerobak 1
5 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Gerobak 4
3 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Cutter aspal 1
2 Gerobak 2
3 Sekop 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PENUNJANG/HOLDING TREATMENT
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
3.2.(2a) Timbunan Pilihan dari sumber galian 35.66 m3 1 Timbunan 37 m3 Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Tandem roller 1
2 Dump truk 1
3 Tangki air 1
4 Sekop 4
5 Gerobak 1
5 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Gerobak 4
3 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Cutter aspal 1
2 Gerobak 2
3 Sekop 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
3.2.(2a) Timbunan Pilihan dari sumber galian 19.45 m3 1 Timbunan 20 m3 Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Tandem roller 1
2 Dump truk 1
3 Tangki air 1
4 Sekop 4
5 Gerobak 1
5 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Gerobak 4
3 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pemotong rumput 10
2 Gerobak 4
3 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PENUNJANG/HOLDING TREATMENT
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
3.2.(2a) Timbunan Pilihan dari sumber galian 19.45 m3 1 Timbunan 20 m3 Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Tandem roller 1
2 Dump truk 1
3 Tangki air 1
4 Sekop 4
5 Gerobak 1
5 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PENUNJANG/HOLDING TREATMENT
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 25 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
MC-05
LINGKUP
PEMELIHARAAN BERKALA JEMBATAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 225.93 54.40 13.25 3.19 239.18 57.59
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 24.22 4.80 24.22 4.80
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 36.00 0.97 0.00 36.00 0.97
752,628,712.63 92.43 55.37 7.99 63.36
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 225.93 54.40 0.00 225.93 54.40
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 36.00 0.97 0.00 36.00 0.97
752,628,712.63 92.43 55.37 0.00 55.37
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 225.93 54.40 0.00 225.93 54.40
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 36.00 0.97 0.00 36.00 0.97
752,628,712.63 92.43 55.37 0.00 55.37
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 225.93 54.40 13.25 3.19 239.18 57.59
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 0.00 0.00 0.00
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 36.00 0.97 0.00 36.00 0.97
752,628,712.63 92.43 55.37 3.19 58.56
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
DIVISI 7. STRUKTUR
7.1.(10) Beton fc’10 Mpa M3 239.18 1,960,810.29 468,991,878.18 57.59 239.18 57.59 0.00 0.00 239.18 57.59
7.9.(1) Pasangan Batu M3 55.00 1,612,488.06 88,686,843.30 10.89 0.00 0.00 24.22 4.80 24.22 4.80
7.9.(1) Pasangan Batu >10% M3 23.87 1,612,488.06 38,482,027.55 4.73 0.00 0.00 0.00 0.00 0.00 0.00
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 100.00 1,485,885.50 148,588,550.00 18.25 0.00 0.00 0.00 0.00 0.00 0.00
7.13.(1) Sandaran ( Railing ) M1 36.00 218,872.60 7,879,413.60 0.97 36.00 0.97 0.00 0.00 36.00 0.97
752,628,712.63 92.43 58.56 4.80 63.36
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Excavator 1
2 Gerobak 2
3 Rambu 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 17.15 m2 1 Cat 2 gln Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Kuas 6
2 Pengaduk 2
3 Ember 2
4 Sapu 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 25 m2 1 Cat 2 gln Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Kuas 6
2 Pengaduk 2
3 Ember 2
4 Sapu 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN BERKALA JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
8.14.(2) Perbaikan Pipa Penyalur, Pipa Cucuran PVC diameter 1 18 m 1 Pipa PVC 20 m
2 Lem PVC
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gergaji 4
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengaduk 2
2 Sekop 2
3 Molen 1
4 Gerobak 1
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 42.77 m2 1 Cat 2 gln Mafa Matuting
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Kuas 6
2 Pengaduk 2
3 Ember 2
4 Sapu 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Molen 4
2 Gerobak 4
3 Sekop 8
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN BERKALA JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Molen 2
2 Sekop 4
3 Gerobak 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN BERKALA JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 25 Agustus 2019
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Molen 2
2 Sekop 4
3 Gerobak 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
8.3.(2a) Pengecatan dekoratif pada elemen struktur beton, tebal 100 µm M2 42.15
42.00
3.1.(1) Galian Biasa M3
1.80
8.2.(1) Penambalan (Patching) M3
8.14.(2) Perbaikan Pipa Penyalur, Pipa Cucuran PVC diameter 100 mm M 18.00
MC-05
LINGKUP
PEMELIHARAAN RUTIN JEMBATAN
NO KONTRAK : HK.02.03/498679/PPK.2.3/PKT-10
TANGGAL KONTRAK : 5 APRIL 2019
NILAI KONTRAK : Rp. 8.326.254.000
SUMBER DANA : APBN 2019
LAPORAN BULANAN
NO JENIS PEKERJAAN SAT HARGA s.d BULAN LALU BULAN INI s.d BULAN INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.60 0.26 0.30 0.13 0.90 0.39
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.40 0.54 0.30 0.41 0.70 0.95
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.49 0.42 0.30 0.26 0.79 0.68
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.30 0.66 0.30 0.66 0.60 1.31
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.30 0.81 0.30 0.81 0.60 1.62
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.25 0.31 0.30 0.38 0.55 0.69
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.20 0.33 0.30 0.50 0.50 0.83
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.30 0.33 0.30 0.33 0.60 0.67
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.30 0.41 0.55 0.75
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.30 0.35 0.60 0.69
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.30 0.35 0.60 0.69
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.30 0.35 0.30 0.35 0.60 0.70
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.30 0.36 0.60 0.72
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.50 0.47 0.30 0.28 0.80 0.75
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.30 0.37 0.30 0.37 0.60 0.74
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.50 0.46 0.30 0.28 0.80 0.74
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.30 0.38 0.30 0.38 0.60 0.75
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.80 0.96 0.10 0.12 0.90 1.08
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.30 2.81 0.30 2.81
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.30 0.30 0.30 0.30 0.60 0.60
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.30 0.36 0.60 0.72
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.50 0.42 0.30 0.25 0.80 0.67
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.30 0.41 0.55 0.75
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.25 1.07 0.30 1.29 0.55 2.36
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.30 0.82 0.30 0.82 0.60 1.63
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.25 1.33 0.30 1.60 0.55 2.93
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.25 0.65 0.30 0.78 0.55 1.44
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.30 0.96 0.50 1.61
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.21 0.39 0.30 0.57 0.51 0.97
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.25 0.37 0.30 0.44 0.55 0.81
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.25 0.63 0.30 0.76 0.55 1.39
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.15 0.38 0.30 0.75 0.45 1.13
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.15 0.31 0.30 0.63 0.45 0.94
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.15 0.12 0.30 0.24 0.45 0.37
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.30 0.22 0.45 0.33
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.15 0.12 0.30 0.23 0.45 0.35
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.15 0.10 0.30 0.19 0.45 0.29
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.15 0.10 0.30 0.20 0.45 0.30
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.15 0.14 0.30 0.28 0.45 0.42
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.15 0.19 0.30 0.38 0.45 0.56
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.15 0.17 0.30 0.34 0.45 0.50
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.30 0.22 0.45 0.33
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.15 0.12 0.30 0.24 0.45 0.36
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.15 0.20 0.30 0.39 0.45 0.59
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.15 0.52 0.30 1.04 0.45 1.55
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.10 0.21 0.30 0.63 0.40 0.84
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.07 0.14 0.30 0.63 0.37 0.76
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.30 0.22 0.30 0.22
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.60 0.26 0.30 0.13 0.90 0.39
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.40 0.54 0.30 0.41 0.70 0.95
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.49 0.42 0.30 0.26 0.79 0.68
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.30 0.66 0.30 0.66 0.60 1.31
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.30 0.81 0.30 0.81 0.60 1.62
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.25 0.31 0.30 0.38 0.55 0.69
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.20 0.33 0.30 0.50 0.50 0.83
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.30 0.33 0.30 0.33 0.60 0.67
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.30 0.41 0.55 0.75
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.30 0.35 0.60 0.69
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.30 0.35 0.30 0.35 0.60 0.69
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.30 0.35 0.00 0.30 0.35
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.00 0.30 0.36
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.50 0.47 0.00 0.50 0.47
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.30 0.37 0.00 0.30 0.37
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.50 0.46 0.00 0.50 0.46
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.30 0.38 0.00 0.30 0.38
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.80 0.96 0.00 0.80 0.96
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.00 0.00 0.00
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.30 0.30 0.00 0.30 0.30
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.00 0.30 0.36
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.50 0.42 0.00 0.50 0.42
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.00 0.25 0.34
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.25 1.07 0.00 0.25 1.07
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.30 0.82 0.00 0.30 0.82
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.25 1.33 0.00 0.25 1.33
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.25 0.65 0.00 0.25 0.65
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.00 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.21 0.39 0.00 0.21 0.39
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.25 0.37 0.00 0.25 0.37
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.25 0.63 0.00 0.25 0.63
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.15 0.38 0.00 0.15 0.38
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.15 0.31 0.00 0.15 0.31
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.15 0.12 0.00 0.15 0.12
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.15 0.12 0.00 0.15 0.12
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.15 0.10 0.00 0.15 0.10
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.15 0.10 0.00 0.15 0.10
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.15 0.14 0.00 0.15 0.14
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.15 0.19 0.00 0.15 0.19
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.15 0.17 0.00 0.15 0.17
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.15 0.12 0.00 0.15 0.12
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.15 0.20 0.00 0.15 0.20
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.15 0.52 0.00 0.15 0.52
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.10 0.21 0.00 0.10 0.21
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.07 0.14 0.00 0.07 0.14
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.90 0.39 0.00 0.90 0.39
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.70 0.95 0.00 0.70 0.95
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.79 0.68 0.00 0.79 0.68
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.60 1.31 0.00 0.60 1.31
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.60 1.62 0.00 0.60 1.62
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.55 0.69 0.00 0.55 0.69
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.50 0.83 0.00 0.50 0.83
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.60 0.67 0.00 0.60 0.67
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.55 0.75 0.00 0.55 0.75
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.60 0.69
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.60 0.69
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.30 0.35 0.30 0.35 0.60 0.70
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.30 0.36 0.60 0.72
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.50 0.47 0.30 0.28 0.80 0.75
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.30 0.37 0.30 0.37 0.60 0.74
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.50 0.46 0.30 0.28 0.80 0.74
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.30 0.38 0.30 0.38 0.60 0.75
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.80 0.96 0.10 0.12 0.90 1.08
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.00 0.00 0.30 2.81 0.30 2.81
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.30 0.30 0.30 0.30 0.60 0.60
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.30 0.36 0.30 0.36 0.60 0.72
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.50 0.42 0.00 0.50 0.42
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.00 0.25 0.34
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.00 0.25 1.36
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.25 1.07 0.00 0.25 1.07
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.30 0.82 0.00 0.30 0.82
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.25 1.33 0.00 0.25 1.33
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.25 0.65 0.00 0.25 0.65
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.00 0.20 0.64
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.21 0.39 0.00 0.21 0.39
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.25 0.37 0.00 0.25 0.37
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.25 0.63 0.00 0.25 0.63
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.15 0.38 0.00 0.15 0.38
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.15 0.31 0.00 0.15 0.31
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.15 0.12 0.00 0.15 0.12
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.15 0.12 0.00 0.15 0.12
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.15 0.10 0.00 0.15 0.10
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.15 0.10 0.00 0.15 0.10
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.15 0.14 0.00 0.15 0.14
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.15 0.19 0.00 0.15 0.19
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.15 0.17 0.00 0.15 0.17
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.15 0.12 0.00 0.15 0.12
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.15 0.20 0.00 0.15 0.20
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.15 0.52 0.00 0.15 0.52
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.10 0.21 0.00 0.10 0.21
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.07 0.14 0.00 0.07 0.14
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.90 0.39 0.00 0.90 0.39
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.70 0.95 0.00 0.70 0.95
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.79 0.68 0.00 0.79 0.68
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.60 1.31 0.00 0.60 1.31
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.60 1.62 0.00 0.60 1.62
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.55 0.69 0.00 0.55 0.69
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.50 0.83 0.00 0.50 0.83
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.60 0.67 0.00 0.60 0.67
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.55 0.75 0.00 0.55 0.75
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.60 0.69
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.60 0.69
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.60 0.70 0.00 0.60 0.70
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.60 0.72 0.00 0.60 0.72
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.80 0.75 0.00 0.80 0.75
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.60 0.74 0.00 0.60 0.74
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.80 0.74 0.00 0.80 0.74
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.60 0.75 0.00 0.60 0.75
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.90 1.08 0.00 0.90 1.08
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.30 2.81 0.00 0.30 2.81
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.60 0.60 0.00 0.60 0.60
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.60 0.72 0.00 0.60 0.72
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.50 0.42 0.30 0.25 0.80 0.67
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.25 0.34 0.30 0.41 0.55 0.75
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.25 1.36 0.30 1.63 0.55 2.99
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.25 1.07 0.30 1.29 0.55 2.36
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.30 0.82 0.30 0.82 0.60 1.63
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.25 1.33 0.30 1.60 0.55 2.93
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.25 0.65 0.30 0.78 0.55 1.44
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.20 0.64 0.30 0.96 0.50 1.61
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.21 0.39 0.30 0.57 0.51 0.97
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.25 0.37 0.30 0.44 0.55 0.81
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.25 0.63 0.00 0.25 0.63
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.15 0.38 0.00 0.15 0.38
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.15 0.31 0.00 0.15 0.31
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.15 0.12 0.00 0.15 0.12
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.15 0.12 0.00 0.15 0.12
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.15 0.10 0.00 0.15 0.10
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.15 0.10 0.00 0.15 0.10
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.15 0.14 0.00 0.15 0.14
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.15 0.19 0.00 0.15 0.19
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.15 0.17 0.00 0.15 0.17
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.00 0.15 0.11
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.15 0.12 0.00 0.15 0.12
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.15 0.20 0.00 0.15 0.20
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.15 0.52 0.00 0.15 0.52
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.10 0.21 0.00 0.10 0.21
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.07 0.14 0.00 0.07 0.14
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.00 0.00 0.00
LAPORAN MINGGUAN
NO JENIS PEKERJAAN SAT HARGA s.d MINGGU LALU MINGGU INI s.d MINGGU INI
VOLUME JUMLAH BOBOT JENIS KAPASITAS JUMLAH KONDISI
SAT VOLUME (%) VOLUME (%) VOLUME (%)
PEMELIHARAAN RUTIN JEMBATAN
DIVISI 10. PEKERJAAN PEMELIHARAAN
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 41,80 m LS 1.00 2,660,000.00 2,660,000.00 0.44 0.90 0.39 0.00 0.00 0.90 0.39
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.70 0.95 0.00 0.00 0.70 0.95
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8,20 m LS 1.00 5,218,181.82 5,218,181.82 0.86 0.79 0.68 0.00 0.00 0.79 0.68
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 20,90 m LS 1.00 13,300,000.00 13,300,000.00 2.19 0.60 1.31 0.00 0.00 0.60 1.31
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,80 m LS 1.00 16,418,181.82 16,418,181.82 2.70 0.60 1.62 0.00 0.00 0.60 1.62
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.55 0.69 0.00 0.00 0.55 0.69
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III bentang 15,80 m LS 1.00 10,054,545.45 10,054,545.45 1.65 0.50 0.83 0.00 0.00 0.50 0.83
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV bentang 10,60 m LS 1.00 6,745,454.55 6,745,454.55 1.11 0.60 0.67 0.00 0.00 0.60 0.67
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.55 0.75 0.00 0.00 0.55 0.75
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.00 0.60 0.69
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bentang 11,00 m LS 1.00 7,000,000.00 7,000,000.00 1.15 0.60 0.69 0.00 0.00 0.60 0.69
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11,10 m LS 1.00 7,063,636.36 7,063,636.36 1.16 0.60 0.70 0.00 0.00 0.60 0.70
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.60 0.72 0.00 0.00 0.60 0.72
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.80 0.75 0.00 0.00 0.80 0.75
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11,80 m LS 1.00 7,509,090.91 7,509,090.91 1.23 0.60 0.74 0.00 0.00 0.60 0.74
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,80 m LS 1.00 5,600,000.00 5,600,000.00 0.92 0.80 0.74 0.00 0.00 0.80 0.74
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.60 0.75 0.00 0.00 0.60 0.75
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.90 1.08 0.00 0.00 0.90 1.08
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentang 89,50 m LS 1.00 56,954,545.45 56,954,545.45 9.36 0.30 2.81 0.00 0.00 0.30 2.81
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,60 m LS 1.00 6,109,090.91 6,109,090.91 1.00 0.60 0.60 0.00 0.00 0.60 0.60
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11,50 m LS 1.00 7,318,181.82 7,318,181.82 1.20 0.60 0.72 0.00 0.00 0.60 0.72
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 m LS 1.00 5,090,909.09 5,090,909.09 0.84 0.80 0.67 0.00 0.00 0.80 0.67
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 13,00 m LS 1.00 8,272,727.27 8,272,727.27 1.36 0.55 0.75 0.00 0.00 0.55 0.75
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.55 2.99 0.00 0.00 0.55 2.99
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.55 2.99 0.00 0.00 0.55 2.99
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 52,00 m LS 1.00 33,090,909.09 33,090,909.09 5.44 0.55 2.99 0.00 0.00 0.55 2.99
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 m LS 1.00 26,090,909.09 26,090,909.09 4.29 0.55 2.36 0.00 0.00 0.55 2.36
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 26,00 m LS 1.00 16,545,454.55 16,545,454.55 2.72 0.60 1.63 0.00 0.00 0.60 1.63
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,00 m LS 1.00 32,454,545.45 32,454,545.45 5.33 0.55 2.93 0.00 0.00 0.55 2.93
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 m LS 1.00 15,909,090.91 15,909,090.91 2.61 0.55 1.44 0.00 0.00 0.55 1.44
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30,70 m LS 1.00 19,536,363.64 19,536,363.64 3.21 0.50 1.61 0.00 0.00 0.50 1.61
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah bentang 18,30 m LS 1.00 11,645,454.55 11,645,454.55 1.91 0.51 0.97 0.00 0.00 0.51 0.97
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 bentang 14,00 m LS 1.00 8,909,090.91 8,909,090.91 1.46 0.55 0.81 0.00 0.00 0.55 0.81
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung bentang 24,20 m LS 1.00 15,400,000.00 15,400,000.00 2.53 0.25 0.63 0.30 0.76 0.55 1.39
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 m LS 1.00 15,272,727.27 15,272,727.27 2.51 0.15 0.38 0.30 0.75 0.45 1.13
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.15 0.31 0.30 0.63 0.45 0.94
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata bentang 7,80 m LS 1.00 4,963,636.36 4,963,636.36 0.82 0.15 0.12 0.30 0.24 0.45 0.37
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.30 0.22 0.45 0.33
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7,40 m LS 1.00 4,709,090.91 4,709,090.91 0.77 0.15 0.12 0.30 0.23 0.45 0.35
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6,10 m LS 1.00 3,881,818.18 3,881,818.18 0.64 0.15 0.10 0.30 0.19 0.45 0.29
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,30 m LS 1.00 4,009,090.91 4,009,090.91 0.66 0.15 0.10 0.30 0.20 0.45 0.30
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 m LS 1.00 5,727,272.73 5,727,272.73 0.94 0.15 0.14 0.30 0.28 0.45 0.42
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,00 m LS 1.00 7,636,363.64 7,636,363.64 1.25 0.15 0.19 0.30 0.38 0.45 0.56
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 m LS 1.00 6,809,090.91 6,809,090.91 1.12 0.15 0.17 0.30 0.34 0.45 0.50
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.15 0.11 0.30 0.22 0.45 0.33
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 7,50 m LS 1.00 4,772,727.27 4,772,727.27 0.78 0.15 0.12 0.30 0.24 0.45 0.36
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 12,50 m LS 1.00 7,954,545.45 7,954,545.45 1.31 0.15 0.20 0.30 0.39 0.45 0.59
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 33,00 m LS 1.00 21,000,000.00 21,000,000.00 3.45 0.15 0.52 0.30 1.04 0.45 1.55
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.10 0.21 0.30 0.63 0.40 0.84
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 m LS 1.00 12,727,272.73 12,727,272.73 2.09 0.07 0.14 0.30 0.63 0.37 0.76
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 m LS 1.00 4,454,545.45 4,454,545.45 0.73 0.00 0.00 0.30 0.22 0.30 0.22
10.2.(1) Pemeliharaan Kinerja Jembatan Ake Weda Were bentang 0.3 1 Cat 2 gln
10.2.(2) Pemeliharaan Kinerja Jembatan Ake Goeng bentang 13, 0.3 2 Sapu 3 Buah
10.2.(3) Pemeliharaan Kinerja Jembatan Ake Musliku I bentang 8 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(4) Pemeliharaan Kinerja Jembatan Ake Musliku III bentang 0.3 1 Cat 2 gln
10.2.(5) Pemeliharaan Kinerja Jembatan Ake Tilope bentang 25,8 0.3 2 Sapu 3 Buah
10.2.(6) Pemeliharaan Kinerja Jembatan Ake Sosowomo II bentan 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(7) Pemeliharaan Kinerja Jembatan Ake Sosowomo III benta 0.3 1 Cat 2 gln
10.2.(8) Pemeliharaan Kinerja Jembatan Ake Sosowomo IV benta 0.3 2 Sapu 3 Buah
10.2.(9) Pemeliharaan Kinerja Jembatan Ake Sosowomo V bentan 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(10) Pemeliharaan Kinerja Jembatan Ake Sosowomo VI benta 0.3 1 Cat 2 gln
10.2.(11) Pemeliharaan Kinerja Jembatan Ake Sosowomo VII bent 0.3 2 Sapu 3 Buah
3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(12) Pemeliharaan Kinerja Jembatan Ake SP. 1A bentang 11, 0.3 1 Cat 2 gln
10.2.(13) Pemeliharaan Kinerja Jembatan Ake SP. 1B bentang 11, 0.3 2 Sapu 3 Buah
10.2.(14) Pemeliharaan Kinerja Jembatan Ake SP. 1C bentang 9,0 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 03 Agustus 2019
10.2.(15) Pemeliharaan Kinerja Jembatan Ake SP. 1D bentang 11, 0.3 1 Cat 2 gln
10.2.(16) Pemeliharaan Kinerja Jembatan Ake SP. 1E bentang 8,8 0.3 2 Sapu 3 Buah
3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(17) Pemeliharaan Kinerja Jembatan Ake Wairoro bentang 12 0.3 1 Cat 2 gln
10.2.(18) Pemeliharaan Kinerja Jembatan Ake SP.3 bentang 11,50 0.1 2 Sapu 3 Buah
3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(19) Pemeliharaan Kinerja Jembatan Ake Kesayangan bentan 0.3 1 Cat 2 gln
10.2.(20) Pemeliharaan Kinerja Jembatan Ake Taba II bentang 9,6 0.3 2 Sapu 3 Buah
10.2.(21) Pemeliharaan Kinerja Jembatan Ake Taba VI bentang 11 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(22) Pemeliharaan Kinerja Jembatan Waya Boli bentang 8,00 0.3 1 Cat 2 gln
10.2.(23) Pemeliharaan Kinerja Jembatan Waya Tomledi bentang 1 0.3 2 Sapu 3 Buah
10.2.(24) Pemeliharaan Kinerja Jembatan Kali Obe Besar bentang 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(25) Pemeliharaan Kinerja Jembatan Kali Mafa bentang 52,00 0.3 1 Cat 2 gln
10.2.(26) Pemeliharaan Kinerja Jembatan Kali Akelamo bentang 5 0.3 2 Sapu 3 Buah
10.2.(27) Pemeliharaan Kinerja Jembatan Kali Fida bentang 41,00 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(28) Pemeliharaan Kinerja Jembatan Kali Batonam bentang 2 0.3 1 Cat 2 gln
10.2.(29) Pemeliharaan Kinerja Jembatan Kali Pluan bentang 51,0 0.3 2 Sapu 3 Buah
10.2.(30) Pemeliharaan Kinerja Jembatan Kali Bibo bentang 25,00 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(31) Pemeliharaan Kinerja Jembatan Kali Air Wosi bentang 30 0.3 1 Cat 2 gln
10.2.(32) Pemeliharaan Kinerja Jembatan Kali Tima Tabahijrah be 0.3 2 Sapu 3 Buah
10.2.(33) Pemeliharaan Kinerja Jembatan Kali Ake Guraci 3 benta 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(34) Pemeliharaan Kinerja Jembatan Kali Matuting Tanjung b 0.3 1 Cat 2 gln
10.2.(35) Pemeliharaan Kinerja Jembatan Kali Lang bentang 24,00 0.3 2 Sapu 3 Buah
10.2.(36) Pemeliharaan Kinerja Jembatan Kali Ubo-Ubo bentang 2 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL.II PROV. MALUKU UTARA
PAKET : PRESERVASI RUAS JALAN WEDA-MAFA-MATUTING-SAKETA
LINGKUP : PEMELIHARAAN RUTIN JEMBATAN
PENYEDIA JASA : CV. TUNGGAL JAYA
KONSULTAN : PT. ANUGERAH KRIDAPRADANA KSO. PT. ANUGERAH MAESA LESTARI
LAPORAN HARIAN
TANGGAL 19 Agustus 2019
10.2.(37) Pemeliharaan Kinerja Jembatan Ake Loilo Balitata benta 0.3 1 Cat 2 gln
10.2.(38) Pemeliharaan Kinerja Jembatan Ake Maryam bentang 7, 0.3 2 Sapu 3 Buah
10.2.(39) Pemeliharaan Kinerja Jembatan Ake Guraci II bentang 7, 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(40) Pemeliharaan Kinerja Jembatan Ake Guraci I bentang 6, 0.3 1 Cat 2 gln
10.2.(41) Pemeliharaan Kinerja Jembatan Ake Risman bentang 6,3 0.3 2 Sapu 3 Buah
10.2.(42) Pemeliharaan Kinerja Jembatan Ake Husen bentang 9,00 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(43) Pemeliharaan Kinerja Jembatan Ake Taufik bentang 12,0 0.3 1 Cat 2 gln
10.2.(44) Pemeliharaan Kinerja Jembatan Ake Hardi bentang 10,70 0.3 2 Sapu 3 Buah
10.2.(45) Pemeliharaan Kinerja Jembatan Ake Hariadi bentang 7,0 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(46) Pemeliharaan Kinerja Jembatan Ake Sambiki IV bentang 0.3 1 Cat 2 gln
10.2.(47) Pemeliharaan Kinerja Jembatan Ake Sambiki I bentang 1 0.3 2 Sapu 3 Buah
10.2.(48) Pemeliharaan Kinerja Jembatan Ake Cabang II bentang 3 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 3
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
10.2.(49) Pemeliharaan Kinerja Jembatan Ake Durian III bentang 2 0.3 1 Cat 2 gln
10.2.(50) Pemeliharaan Kinerja Jembatan Ake Ono bentang 20,00 0.3 2 Sapu 3 Buah
10.2.(51) Pemeliharaan Kinerja Jembatan Ake Sumo bentang 7,00 0.3 3 Pengaduk 3 Buah
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Gerobak 2
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA
C. PEMAKAIAN PERALATAN
JENIS NO JENIS
NO CACAH AKTIF IDLE RUSAK
PERALATAN PERALATAN
1 Pengawas lapangan 1
2 Konsultan 1
3 Pelaksana 1
F. USUL/PENGAJUAN/INTRUKSI/KESEPAKATAN/PELAPORAN
DARI URAIAN TANDA TANGAN DAN NAMA JELAS
KONSULTAN PENGAWAS
PEMBERI TUGAS
G. CUACA
07.00 - 12.00
JAM KERJA
13.00 - 17.00
KONDISI CUACA