Design of steel tubular scaffold floor height of 36 meters

Source:scaffolding Time:3/30/2011 Hits: tag:scaffolding Scaffolding of a project reference to "norms" and "check standard" structural design and construction. The design of engineering scaffold 36 meters below with floor-double steel scaffolding, 36 meters above the use of cantilever-style steel scaffold. Use of steel scaffolding, fasteners were detected qualified. Design of steel tubular scaffold floor height of 36 meters, select 48 3.5 pipe, pole of the vertical distance 1.50m, pole of the horizontal distance 1.05m, pole steps away from the 1.80m, with a 2-step 3 piece wall cross, vertical spacing 3.60m, the level spacing of 4.50m. Construction of uniformly distributed load for the 3.0KN / , the design while construction of two layers. Scaffold with 1.5m 1m chip pieces of bamboo scaffold, 25 meters below the shop for 6 layers over layers of 25 meters above the shop. Protective railings railings and retaining pin and the frame body of the same material used in the 48 3.5 steel, two steps above the layers of settings. Dense mesh-style safety net with fire-retardant safety net, outside closed set. Bridging the interval set in step 4. Horizontal brace set around the corner, the middle of every 6 to set a cross.

Third, the scaffolding calculated 1. Longitudinal horizontal bar (large bar) is calculated: Vertical horizontal bar in accordance with the three-span continuous beam intensity and deflection calculations, large bar in a small bar above. Scaffold ledger in accordance with the above films and live load uniform load calculated as a large bar of the moment and deformation. (1) The value of uniform load The weight of the standard value of ledger P1 = 0.038KN / m Scaffold standard value Load film P2 = 0.35 1.5 / 3 = 0.175KN / m Live load standard value Q = 3.0 1.5 / 3 = 1.50 KN / m

Static load calculation q1 = 1.2 (0.038 +0.175) = 0.256 KN / m Live load calculations q2 = 1.4 1.5 = 2.10 KN / m (2) Strength Maximum bending moment to consider three-span continuous beam under uniform load moment. The largest bending moment across M1max = 0.08 q1L2 +0.10 q2L2 = (0.08 0.256 +0.10 2.1) 1.52 = 0.519 KN m Supports maximum bending moment M2max =- 0.10 q1L2-0.117 q2L2 = (-0.10 0.256-0.117 2.1) 1.52 = 0.610 KN m Select bearing the maximum bending moment and the strength of bending moment in crosschecking: = M / W = 0.610 103/5.08 = 120.1N / mm 2 < p> Strength to meet the requirements. (3) Deflection Static load standard value q1 = 0.038 +0.175 = 0.213 KN / m Live load standard value q2 = 1.5 KN / m max = 0.677 q1L4/100EI +0.990 q2L4/100EI = (0.677 0.213 +0.99 1.5) 15004 / (100 206000 12900) = 3.30 mm The maximum deflection of a large bar with 10 mm less than the 1500/150, meet the requirements.

Anda mungkin juga menyukai