Anda di halaman 1dari 19
CAWANGAN KEJURUTERAAN ae JABATAN KESIHATAN NEGERI SARAWAK PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL LIMBANG ‘SCHEDULE A: PRELIMINARIES AND GENERAL ITEMS. torn Description Unit ayy, Rate (RM) ‘Amount (RM) a [General requirements 10 20 30 40 50 60 70 80 90 109 INates: The items asset out inthe B.Q. shall apply tothe whole ofthe Works contained in the |Contrect and the Contractor shal allow for compliance withthe sare and for any cost incured in connection therewith. The amounts inserted by the Contractor for such items shall be deemed to aoply to the whole ofthe Works carried out under this Contract. Ste visit and project bret shal be attended by tendererimanufacturerivendor. All puted Jtems such as measurement, toms quantiy, products quay, existing drawing dimension, electrical oad and et. shall be clarifed from the tenderer detal inspection and approved by MOH technical team within the site vst and during the process of works. Each tem shall be individual priced. Buk pricing for sections, trades, laroups or pages of tems shall not be allowed and no subsequent claims for loss or Jexpense andior profit shall be entertained fr fallure to comply with this clause lwnere any tems left unpiced, i shal be deemed that the cost of such tem has been stowed for elsewhere within this document. No subsequent claims arising out of expense Jando oss incurred against such unpriced item shall be entertained Notwithstanding the above clauses, the S.O. reserves the right to request from the [Contractor the detailed breakdown of the pricing for toms or rates inthe B.. fr his JPerusal. The detailed breakdown pricing may be used as a basis fr the administration of Where any priced item inthe B.Q. has not been executed on ste by the |Contractor, the cost of such priced item shall accordingly be deducted from the Contact |All tems priced shall be deemed to include compliance with the provisions of the contract, statutes, reguiatio, bylaws or any order or arectve lesued by public autnoty or public [service company and other related legislation curently in fore. |The Contractor shall tal imes comply with the provisions of all egslton, regulations an by-taws current in force. [The Contractor shal submit tothe S.0. for his approval the Programme of Works , Method statement, Contractors organisation chat, Schedules and Quality Assurance Plan for [Al product provided must comply green erterialecolabelenergy or water efficient product [CONTRACTUAL REQUIREMENTS 20 30 a) » 40 insurance Polick a) insurance against personal injuries and damage to properties based on ful valve of [Contract Sum (e) Workmens’ Compensation, based on estimated total earnings of Contractor's workers. Progress Reports Monthy submission of progress reports inclusive of progress photographs in sotcopy and three (3) printed copies Site Preparations {To suoply and instal project signboard and safey signage To supply and install hoarding with 10 ftheight [ste Survey and Setting Out TAWATANKUAS, ie Contact sat enya lereasuneyorte Eston ee - |commencement and seting out of the Works. ts 2, 000-00) B00: 00 600-60 200 00 3 ,000- 20] HOSPLTAL LTM2ANG $2500 LEMBANG CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL LIMBANG SCHEDULE A: PRELIMINARIES AND GENERAL ITEMS. tor Descrition unit | Qty. | Rate (RM) | Amount (RI) ‘A___[General requirements 6.0 [Temporary Diversion And Relocation Of Existing Overhead And Underground Services [The Contractor shall enquire from the various authorities and make arrangements forthe disconnection, removal, relocaton and reconnection of services and | 1g | 4 pay all necessary cost and fees in connection therewith and make gcod all damage 26. |specied 5,000 eO 60. [Protection Dust protection Provide dust-proot sereans, bukhaads and covers to protect existing fishes and the cae 4 5000-00 lmmmediate envionment from dust and debris, 7.0 |Cleantiness of ste (a) Removal of rubbish and construction debs out of Ste and hospital compound throughout the construction perod. Contractor to provide constuction / rubbish bins [throughout the construction period and keep the Site, adjacent reads and footpaths ets. clean during the progress ofthe works. (e) As the works near completion and before final inspection, the contractor shal replace materials, oquipoment future and fitings, damaged or scratched during constuction fo) Contractor shall remove temporary protection and meke good detects before Jcomemcing final cleaning (6) Final cleaning shall remove dust, stains, paint spots, sole, grease, fingerprints including fish material, less and etc es] 5,000°00 20 {snop drawing [Conratee to rovde shop ravings/ehematc drawing formachanical yet, eccal sytem design echorate diagram cable rove, eable ayturkng design, SSBB desgn ee ciagram and et), roofing, cold water system and sewerage sytem (manhole w ining) | “% | * oo beter commencement of wars, JAtelevant shop cringe nave to aproved by relvant Professional ghee. No works salve caries ot unl he ravart enon cranngs have been approved by PLE 90 la) Testing and Commisioning (TC) shall be witnessed by MOH technical team, users, |concession company and other related partes. Contacto to provide related equipments land tools for T&C ouroose. reaee eiccdoo |b) TEC willbe consist of Medical Gas Analysis Test, Mechanical test for HVAC. Alltest & B tools shal be provided and witnessed by MOH technical eam, such as: Intrument cerifcat, test resuts and certifications shall be submited with hand over documents, 10.0. [Handling Over Document |Operation and maintenence manual cw as-bult drawings for ALL works (including |ArchtecUstrctural pian, Layout plan, schematic wiring iagram, cable route plan, etc.)as | LS | 1 1,500 -00 |descrbed below. One (1) set of orsinl copy i) Thee (3) sets of Duplicated Original copy i) One (1) sets of al relatea documents in softcopy Total of BQ Schedule A carried to Grand Summary} 32/800 -00, JAWATANY PEMBUKAAN LIMBANG 98700 LIMBANS CAWANGAN KEJURUTERAAN i~ Ses ar eects ee oO PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL LIMBANG ‘SCHEDULE B: DEMOLITION , SITE CLEARANCE AND EXCAVATION Description unit | aty. | Rate(RM] Amount (RM) 20 30 ems Yor demolton and ste clearance shallbe doomed to hide daposal ot he \raterals arising |General Clearance [Ste clearing ofthe required area of undergrowth bushes, shrubs, grass Jetc,remove and dispose off from al working areas, slopes ete. to contract's own Jdumping ground lion an Labour equipment materials, lant and all cost in demolishing. hacking aismanting removing ,cartng away all remaining debris ll necessary protecton |works to existing finishes and make good all adjacent works citrubed to their loriginal conditions, all as described and tothe satsfacton ofthe Superintending lotfoer. Demolition of existing wal, door and others archtecture component include lexistng Mechanical (favallable) and Electrical (relocate if required by S.O ) [cared out without interuption tothe normal operation ofthe hosptal Jother works [Any other toms of work with monetary value not included in the foregoing but [seemed necessary forthe completion ofthe work as provided inthe Orawings and [Specifications, the Contractor shall list such items below together with thet |monetary column end carries to colection.The Engineer shall reserve the right to Jequest for breakdown of altems of costs that may be listed herein below ts 20,0030 services to sult existing site conditions and the design ofthe extension shall be ts 20,000-00 30,000 00 Total of BQ Schedule B carried to Grand Summary| TAWATANKUASA PEM® HOSPLTAL LIMBANS 58700 LI IMBANG CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK oy @ PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL. SCHEDULE ¢ : BUILDING, CIVIL AND ARCHITECTURE WORKS (Extension Building) tem Description unit | ay. Rate (RM) 10 a 0 ol @ ) 44 13 14 18 20 30 3a 40 42 [Aiow for construction joint between existing and new stuclure Induding hacked off lexiting concrete and recast back complete wih all necossary ting and ting laccessones REINO: |General Rates shal include fr: placing in postion; making good after removal of formwork and| |casing in all required tome to conform to structural and excavated tolerences: [Rates shal include making and transporting of formwork, ol, naiis Mex rauo tor rentorced concrete shall be 7:2'3 ana wan concrete shall be 12:8 oy Rates shall include for cleaning, fabrication, placing, the provision for all necessan| temporary faings and supports including tie wire and char supports, laps and wastage [Al rvintorcing bars shal be high strength bars lAtow for concrete testing Lean concrete (Grade 16) in Somm thick binging Reinforced concrete (Grade 30) in sub-structural works such as pad footings, column] stumps, and the like including formwork as detailed in the drawing and superintending| Jotficer’s instructions and satisfactory [Reinforced concrete (Grade 30) in sub-sructural works such as ground beams, apron] slabs and the like incluting formwork as detailed in the drawing and superintending loticers instructions and satisfactory. Reinforced concrete (Grade 30) in super-structural worke such ae columns, stifeners| lanc the like including formworks as dotaiad in the drawing and superintending officer instructions and satisfactory, [Reinforced concrete (Grade 30) in super-structural works such as suspended slab, beams and the like as detailed in the drawing and superintenaing officer's instructions land satisfactory High tensile stee! bars in reinforcement to concrate work for column, beam, pile cap, slabs generally including all cutting, bedding and placing in position ta) mm Diameter Co) 1omm Diameter (c) 12mm Diameter (¢) 16mm Diameter |e) 20mm Diameter |Ant Termite Treatment To carried out ant temite treatment by an approved soil treatment specialist contractor] (ates shat alow for @ warranty period of 1 years) to all areas as required including preparation of surface 10 receive treatment working progressively to accomodate the construction works orn sections, all a described in accordance with approved practc| [and to the satisfaction af tho S.0 |Water Proofing Membrane Layer [Supply and install water proofing membrane ayer, all as described in accordance vith lapproved practice and tothe satisfaction ofthe S.0 |wauis To supply and install brick wall (115 mm thick) to all external and internal walls and] [selected intemal partion wall as inccated in the Drawing complete wih a lay of Gar oot course, 63m wise ‘Exmet” reinforcement wre mesh at yen fou eeuram A, |The walls shall be fished piasterwork (smooth metél Foil. fii suraces and rough wooden towel fished to external sytaces:} ma | 3.00 ma | 15.00 ms | 2100 ma | 400 ma | 36.00 220.00 3300.00 200.00 7280.00 35.00 Ssaa5 az 230.00 325.00 a 2 325.00 8 206 “00 [250-00 |350-00 1350-00 '350:00 4,008-00, 400-00 15,260" 00] 7.35004 1, 4oo 20} 2, 60-0q 5,000: 16,000. 'k, 000 8, 000 + 1000 *« 4,000 -oG 1, 900 <0) 26,000 1 nos of Essential supply bed headlight switch IMGPS Plant Room for Oxygen and Medical Air ‘To upgrade existing manual manifold to Automatic Change Over Manifold |Contol Panel (Eight (8) cylinders primary supely manifold for Oxypen (02) low related accessories. IManifots Headers 2x8 ‘To upgrade existing manual manifold fo Automatic Change Over Manifold [Contr Pane! (Tent (10) cyincers primary supply manifold for Medical Ai (02) low related accessories, IManfolé Headers 2x 10 Lor Ser tor Lor 2,800 +00 4 | tyleo -00 | #+400-¢0} 40 [Other Works [Any other tems of work with monetary value not nuded inthe foregoing bal |doomed necessary for the completion ofthe work as provided in the Drawings| land Specifications, the Contracir shall ist such kems below together wit] Inet monetary column and caried to colection The Engineer shall reserve the] att to request for breakdown ofall tems of costs that mav be listed herein Total of BQ Schedule € carried to Grand Summary| Wy 1125-0 PLYAL LTMBANG 98700 LiMBaNG Bie CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL ‘SCHEDULE F : ELECTRICAL WORKS em Description unit | aty. | Rate (eam | Amount (RM) 1.0 |UNIVTERRUPTED POWER SUPPLY (UPS) 77 |Suppiy,istallaion, toting & commasioning of one (unit oT ZORVA, Tres Jphase Uninterupted Power Supply (UPS) of folowing specification. This sytem sal be porate rom tre to tne in fe vor | + 911000 -.00] I) Rated Capacky: 240V (Sogle Phase), TOKVA line once ts deemed to include: (supp, deliver, install VRLA Seales Lead Acid maintenance-fee batteries as} battery banks for backup time of at 60 minutes under 80% loed condition off OKVA capacity (b)instatation of fabrication of metal rac/shelves with a coating of acid resistan paint and fited with insulators to prevent the ces coming Into contact with th meta (o)]instaiation of External bypass system for 10KVA UPS including cabling and al required reinstatement works upon completion of installations work. (q|isstalaton work of OC breaker, DC cabling and all necessary UPS| |cebinastwiings and other necessary components 2.0 |MAIN SWITCH BOARD, SUB-SWITCH BOARD & SUBMAIN CABLE. 27, [Distribution Board, DBIUPS ICU tor_|—7 aTscared To fabricate, supply instalaton, testing & commissioning of New dedicated 1 |way 408 SPN metal clad Distribution Board for UPS Supply cv MCCB, [double ELCB, internal wing, isolator, RCCB, assortment of miniature circu breakers (MCE), earthing system and all associated accessories including load balancing and other related works |Accepted brands ~ MEM, Hager and ABB 22 |Distribution Board, DBVENCU vor | 14 3.200-00 [To fabrcete, supply, instalation, testing & commissioning of New dedicated 1 |way 408 TPN metal cad Distrbution Board for Essential Supply ow MCCE, |double ELCB, internal winng, isolator, RCCB, assortment cf minature circuit breakers (MCE), earthing systom and all associated accessories including load balancing and othe related works [Accepted brands - MEM, Hager and ABB. 23 |oisibuton Boar, oBNENCU vor | 1 3,200 -06] To tasicate, sup, natalatn,estg &commisioning of New deviated }xs 408 TPW ral cls itouton Soar for Noma! Supply cw MOSS eoubie £1.C8, mira wing, sla, RCCE,atsrment of nature sreut breakers (MCB) enrting sytem anda esocatedsccessones coding load balancing and oer related wks [Accepted brands MEM Hager and ABS 2.4 {Approved Submain cable as per following speciicasion inclusive of cable tray, lundergroundGW HOPE, trunking cond, termination, and all required reinstatement works upon completion of installations work. 2441 20x 10mm XLPEISWAVPVC Armoureé cabo tapping from NearesrE-SSBto] mM | 56 |e, 2S, ten to DBLUPSIICU poo utce 242 40 x 1ommt XLPE/SWAVPVC Armoured cable tapping tom MSB(AMF)2 | mM | 60 | 192-60] 8,100-06 oerencu 243/46 x 16mm xLPEISWAPVC Armoured cable tappng om NewestFeeser | _m | 18 | 103.00 1,520-06 Parte DBNENCU ash LoT | 4 3,500 ‘od LAVA TANK! 25 |Tosupoy and istataton of Approves Suge, Prselan Pave hevshe Jsscodtiedacassoron and ther sioowana PART HGSPLYAL LEMBANG wis CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK PROJECT: GADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL. SCHEDULE F : ELECTRICAL WORKS tem Description unit [avy Rate (RM) ‘Amount (IM) 3.0 _|INTERNAL LOW-VOLTAGE ELECTRICAL SYSTEM [SuppWy,nstalation, testing & commissioning of flowing Rems wih New wring cable run in Concealed high mpact UPVC conduit lw switch plates, socket patos and other associated accessories. Althe wiring works shall run in suspended trunking above the ceilng as per MOH approval + Allneniy installed socket outst & suitcnshallbe labeled for GENSET/ ESSENTIAL socket (Red), UPS (Yellow) and also exeut labeling |x ICU Bechead consist of Snas UPS, Snas Essential and 2nos Normal Sockets 31 |13A socket outlet point using 2 x 2.5mm? PVC cable & protective conductoy| NOS | 25 [ol fush mounted switch socket 32 |13A socket outlet (UPS/ESSENTIALINORMAL) point using 2 x 26men* PuC| Nos | 48 |cabe & protective conductor ol fush mounted switch socket Bedhead 33 [208 ‘solstor point using 2 x 4mm? PVC cable & protective conductor cw) NOS | 3 Jdouble pole switch with neon ight incicstor as per MOH approval for folowing| locaton 3.4 {Lighting point using 2 x 1.5mm? PVC cable & protective conductor cw -way/| NOS | 24 away fush swien 35 Lighting point using 2 x 1.5mm PVC cable & protective conductor chv fush| NOS | 4 |sitch for BED Lame 36 |Lighting point using 2 x 1.5mm? PVC cable & protective conductor fo] NOS | 6 lemergency ightExi signage 3.7 |Lghting point using 2x1.5mm2 PVC cable & protective conductor ctw 108) Nos | 3 switch and photocell sensor for corridor iahting 3.8 |Weter heater point chw 204 double pole switch with neon light indicator, 4mm) NOS | 5 PVC cable [Electrical Fittings. |Supply, instalation, testing & commyssioning of following electrical tings as| Per MOH approval 39 |Approved 3 x 18 watt Master LED tube TS (Unbreakable type tube body) civ) NOS | 12 Isealed enciosed Recessed light tings and aseaciated accessories (Suttabl| for cleanroom application) 3.10 [Approved 2 x 18 watt Master LED tube TS (Unbreakable type tube body) cw] NOS | 12 sealed enciosed Recessed ight fitings and associated accessories, 3.11 |Approved 1 x 18 watt LED TB (LED Unbreakable type tube bocy) aw] Nos | 3 weatherproof batten and associated accessories for coridor 3.12 Approved Emergency Light fitings (LED Type) with sof contained cw sealea} NOS | 4 3:nr maintenance free sealed load-ocid batiery, charger and control unt cn} [sickle charging & over-charge protection. TAWATANKUASA 201.15 352.0) 422-20) Nq.85 Wa -e5 ‘49-85 (ua. es| e755] 368.09] 280.05 330-09 180 ¢0| 5,029.45 (aga yo, V 449-99] 3.596 -4o 559 Ho FAA SY 4-56 437 95 PETAL LIMBANG, 23F i] fem | is9 CAWANGAN KEJURUTERAAN Some JABATAN KESIHATAN NEGERI SARAWAK D PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL. [SCHEDULE F : ELECTRICAL WORKS. tem Description unit [aty. | Rate (Rm) | Amount (RM) 3:13 [Approved LED KELUARVExt Signage wih sei conlained ow sealed Sh] NOS | 2 | 345.00] S80-00 maintenance tr sealed load-acé battery, charger and contro unt elv trl [charging & overcharge protection, 3.14 |water Hester [Approved instant electrical shower heater cAv fexble hose, hand shower| set | 5 | 480-00| 340.00 lnoler. ll necessary accessory and elated works 40 |SECURITY, NETWORK & COMMUNICATION SYSTEM 7" |Acaess Control System fro cesign, sunny, install testng and commissioning of Approved Doo] eT | 2 | Cooo.oq '2.0c0.00 |Accoss Contel System fer Door panl at enzance to changing room for ICU [The price is deemed to include a) Proximity reader complete with Keypad, Intercom system, proximiy| lcardnoken (e) Door Bol, push button, Emergency Lock fc) Other necessary components and all required reinstatement works upon| completion of istastions work, 42 | Network System [Sup0), instal, testng and commissioning of Network Post tapping from] Lor | 4 3,500 -a9| nearest Sewer chy al associates Components, accessores and eabing| jworks as approved by SO 43 |Extension/Telephone Line [Supply install, testing and commissioning of telephone lines inciucing wiring] Lor | 1 + 1300-00] Jand connection work ftom the Operator room to ICU complete with the) totiowing works / components according tothe instructions of the SO: - + Phone points using 4/0.63mm PVK cable cl telephone socket +2 Set of Phone Set 6.0 [other Works [Any other Rems of work with monetary value not incladed inthe foregoing bi [deemed necessary forthe completion of the work as provided in the Drawings| Jand Speciicatons, the Contractor shal lst such items below together wth) Iter monetary colurmn and carried to collection The Engineer shall eserve the| right to request for breakdown of all tems of costs that may be listed herein [Total of BQ Schedule F carried to Grand Summary #449725] TAWATANKUASA w6s19 CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMEAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL ‘SCHEDULE G : FURNITURES AND FITTINGS Description Unit Qty. Rate (RW) “Amount (RM) 10 4 12 13 20 30 34 32 33 40 4“ 42 43 50 54 60 on 70 7A 72 73 80 Note: Contractors must submit catalogue and sample forall furniture andl {xtures items to be installed on the client for selection of types, colours | material and etc. before commencement of work. Supply and insta the folowing bul in funiture striclly in accordance with S.0°s requirements including al painting or staining work and al necessary fitings ano fixing accessories. [Pantry [To supply & construct tabletop concrete bench 3000(L) x 600(W) x 9004) nm} Include bottom cabinet as per 8.0 representative's instructions. [To supply and install top mount stainless steel Kitchen single sink bow or lapproved equivalent on table incusve al necessary works and accessories [To supply and install chrome plated water tap for kichen/panty sink inclusive al Jnecessary pining works Icabinet Linen [To supply & install cabinet nen 2650(L) x 6000W) x 1800(H) mm as per S.O| Jrepresentatve's instructions. lorie [To supaly and install 1.20m (L) x 0.75m (0) x 0.75m (H) office table a8 per 5.0 representative's instructions and approved design [To design, supply & construct 3.0m (L) x 0.40m (D) x 0.5m{H) Overnead Wal} Mounted Cabnet as par S.O representative's instructions and approved [To suppl and install medium back executive chair Nurses counter ICU [To supoly and install Ushape nurses counter 270mm (L) x 150mm (W) x} |soomm (4) as per S.0 representative's instuctons and satisfactions }To supply & install cabinet linen 20004L) x €00(W) x 1800(H) mm as per $0] Jopresentatve's instructions, {To supply and install mecium back executive chair |store, [To supply and instal! Heavy Duty ShoWving Rack (4 shelves) overall size 2.0m] (t)x0:9m (0) x 1.8m (H) including all necessary fixing accessories Notice [To supoly and install 1.2m (H) x 1.8m (W) notice board wit aluminium frame} [cabinet (Velvet Board) with 28 necessary fing and fxing accessories |SIGNAGES FOR BUILOINGS. [Rate for intemal and external signages shall be deemed to include fing |Note: Contractors must submit catalogue forthe cent for selection, Jextemal Sionages To supply and instal external signage (dual language) for bullings wh all necessary works. intnsive care uit (ICU) signage (External) with size 1 46m (L) x 0.6m (W) x }tomm (7) Acryke signage come wah Stainless Stee! Wall Mount Standoff Screw [Room name signage with size 0.40m (L) x 0:2m (WW) x 10mm (T) Acrylic sionage come witn Staniess Stee! Wall Mount Standof! Screw (It of sgnage to be approved by user department) Directional Signage wih arrows (lst of signage to be approved by user TAWATAY StatfLocker Ls To supply & instal 2 Comparmens Stet Locker as per 8 representa instructions Lot Lot Lot Let pat o> eek 2024 | 3 000-00 ' 500-04 260 -00| 260-00] 1 200 -00] 5000 860-00 1 500 -09 450-00 430-00 2 000-00 4 500-00 % 00-00 1 080-00 4 000-00 2 000-06 ' 440-00 3 666-00 500-00 520-00 600-00 156-06 1300-00 Eevee He AL LIMBANG 93700 LEMBANG mis (CAWANGAN KEJURUTERAAN Sages JABATAN KESIHATAN NEGERI SARAWAK Ce) PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICL), HOSPITAL. : FURNITURES AND FITTINGS Description Unit_| ay. | Rate (RM) [Amount (RM) 9.0 [Other Works JAny other ters of work with monetary value not included in the foregoing but Jdeemad necessary for the completion of the work as provided in the Drawing land Specifications, the Contractor shal lst such items below together with thei monetary column and carted to collection The Engineer shall reserve the right to request or breakdown of alltems of costs that may be Ksted herein below [Total of BA Schedule G carried to Grand Summary 33,060 00 AWATANIUASA AN SEGUT HARSA ITAL LIMBANG 88709 LIMBANG isis CAWANGAN KEJURUTERAAN JABATAN KESIHATAN NEGERI SARAWAK PROJECT: CADANGAN MEMINA DAN MENYIAPKAN BANGUNAN TAMBAHAN UNTUK INTENSIVE CARE UNIT (ICU), HOSPITAL LIMBANG GRAND SUMMARY Item Description ‘Amount (RM) 10 20 30 50 60 70 80 90 |SCHEDULE A: PRELIMINARIES AND GENERAL ITEMS |SCHEDULE B: DEMOLITION , SITE CLEARANCE AND EXCAVATION |SCHEDULE ¢ : BUILDING, CIVIL AND ARCHITECTURE WORKS (Extension Bulking) |SCHEOULE D: PLUMBING AND SANIRATY WORKS. |SCHEDULE E : MECHANICAL WORKS |SCHEDULE F: ELECTRICAL WORKS [SCHEDULE G: FURNITURES AND FITTINGS lPROVISIONAL SUM 32,200-00 60,000-00 B18 ,590: 00 67, 800-00 Mu 135 00 89, WAT 36 32,060 -00 RM 20,000.00 Grand Summary) pu Tat PR Project Period! 30 TOTAL IN WORDS: RINGGIT MALAYSIA {Wu SATUS SEMBIWLAN PULUH TUSUH RIBU LAPAN RATUS LAPAN PULWH DUA DAN! —DuA SIGNATU ESO ‘STAMP OF TENDERER CS: iy A) oare 11 /oa facat 43) PULUH LIMA SEN SAHAJA JRE OfTENDERER TAWATANKUASA HOSPLTAL LIMBANS 98700 LIMBANG wis

Anda mungkin juga menyukai