Anda di halaman 1dari 3

House # 74/16-B Gali Piran Wali,Mohallah Sabri

Dist. M.B.Din, Punjad, Pakistan ID 34401-7044031-7 Phone # :+92300-9198529, ahmadfraz23@yahoo.com

Malakwal,

Father Name: Date Of Birth: Nationality:

Iftikhar Ahmad 18 May 1981 Pakistan

Marital Status: Married Languages: English, Urdu, Punjabi,Sindhi

AHMAD FRAZ KHAN QUANTIY SURVEYOR


EDUCATION. Diploma of associate Engineer (Civil) 1996-1999
From Punjab Board of Technical Education Lahore. Matriculation (Science) from BISE Gujranwala. 1996

Computer Skills.

Auto CAD (2D & 3D) Complete. Ms Office (M/S Word, M/S Excel & Power Point). Internet, (Searching Browsing, E-mailings & Outlook Express.) Good Command on Installation of Windows & Different Software. Eagle Points Road Calc Module (Plan, Profile, and X-Sec Plotting including Quantity takeoff, Coordinate sheet data. Eagle Points COGO (Coordinate Geometry) for Creating, editing, adjusting and adjusting Closed & open Traverses. April 2010 to date Position:

Highways & Bridges Project Client

ENGINEERING CONSULTANTS INTERNATIONAL (ECIL) Pvt Ltd

Quantity Surveyor.

At Muzaffarabad Azad Kashmir Rehablitation and Reconstruction of Muzaffarabad Authmuqam Road 76.6 km Including Five Major Bridges. EARTHQUAKE REHABLITATION AND RECONSTRUCTION AUTHORITY (ERRA-EEAP) July 2008 to April 2010 Position:

Oil & GAS FIELD.


Projects.

PIPELINK Construction (Pvt) Limited(Sukkur).

Quantity Surveyor with Additional Job of Chief Surveyor.

At Sawan Gas Field, Khairpur, Sindh Sawan Gas Compression Plant Project, Khairpur Sawan-13 Wellhead Development & Gas Pipe Line-3 Km Project. Tajjal-1 Wellhead Development & Gas Pipe Line20 Km Project. Wartsila Engine Cooling System Up-gradation Project. At Kadanwari Gas Field, Khairpur, Sindh Latif North-1 Wellhead Development & Gas Pipe Line20 Km Project. Miano-13 Wellhead Development & Gas Pipe Line2.50 Km Project July, 2002 to December 2007Agha Construction Company (Quetta Balochistan) Position: Chief Surveyor

Highways & Bridges

Const. /Black Toping of Vinder Kanraj Duddar Road (KM 25+000 to KM 51+000) distt. Lasbela, Balochistan. Const. of two BRIDGES (240.225 and 90.10 meter in length) over Naari River and Kumbri Nallah in distt. Sibbi. Construction of BRIDGE (200-meter length) over (Dali Stream) distt. Khraran. Rural road construction project (KM 16+700 to KM 21+000) distt. Kharan. Construction of BRIDGE (150 meter in length) over nallah (NAAL KAUR) distt. Khuzdar & Construction/Black Toping of Khuzdar Naal Road 22 KM distt. Khuzdar

Responsibilities as as Quantity Surveyor

Aug.1999 to 2002 SAARCO Position: Surveyor of Highways & Bridges Preparation of EPCs (Escalation). Such as Steel Calculation, Cement Calculation. Fuel, Labor and Bitumen Calculations as per Contract Clause-70. Prepare the Variation Orders as per Contract Clause-50. Preparation of shop drawing of Structure like Retaining/Breast walls, Culverts, Bridges and Building with Auto Cad. Preparation of Bar Bending Schedule. Preparation of Working Schedule and Claim for Extension of Time (EOT). Quantity takeoff from Drawings such as Earth Work, Sub Base, Base Course, Black Top, Stone Masonry/Rcc Retaining/Breast walls, Culverts, Bridges and etc. Quantity takeoff from Drawings such as Load bearing RCC Structures Turbo Compressors,Vessels,Cellos,Coolers & Column Foundations Preparation of Volume sheet of Quantity takeoff from Construction Drawings. Quantity Takeoff of Electrical & Instrument (E&I) Building RCC Frame Structure . Developing strong Relationships with the Clients and subcontractors. Inspecting and then valuing construction works Writing reports on and advising on construction costs. Produce monthly cost & value reports, quarterly reports & cash flow information. Handling quantity surveying, project costing and budgeting and contract administration. Attend site valuation for internal claims and site measurement. Responsible to prepare sub contract agreements. Analyze the scope of tender and sourcing for supplier & sub contractor. Responsible for preparing tender cost and bidding documentation. Handling progress claims and payment. Review & Preparation Variation Order (VO) as per FIDIC Clause 13. Review & Preparation Claims as per FIDIC Clause. Review & Preparation IPCs as per FIDIC Clause. Review & Preparation of Rate Analysis of Different items of Work. Co-ordinate the engineering activities involved in the preparation of proposals to achieve a technically Sound Specification and competitive price within the time allocated. Participations in progress review meetings with client, sub contractors and other stakeholders. Preparation on presentations and site visits for tendering, feasibility reports and its estimations. Fulfill the duties of Engineers representative as prescribed by the FIDIC Contract Conditions.

Responsibilities as as Chief Surveyor

Preparing survey data from available Contract / Shop Drawings. Define the roles and responsibilities of surveyor teams. Visiting project site to prepare the distribution of works between the surveyor teams. Check the calibration of Surveyor equipments and certificate validity. Preparing the team to establish the benchmark (control station) according to the Contract drawings. Maintain field book on site for daily surveying activities. Download daily surveying data from total station to PC (into SDR format) Providing data to design team for producing drawings and as-built drawings. Worked Out design Surveys of Highways & Bridges (Topography, Alignment & Construction Surveys). Worked Out Construction Surveys of Highways & Bridges Traversing for H/ways by means of a Total Station. In hilly & plane areas. Plotting of Surveyed data.(Plans & Profiles, X-Sections & long Sections, Horizontal & Vertical Curves. Participated in joint Surveys with Consultants Representatives. Worked out also Quantity Surveys of Highways, Culverts, and Bridges & Causeways etc. Worked out daily, weekly and monthly Progress reports Prepared IPCs of the Projects