PEMBANGUNAN JARINGAN GAS BUMI UNTUK
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA
‘SEMARANG DAN KAB.WAJO (11.152 SR)
of A
PENGUJIAN - PEKERJ/
JAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
No DOKUMEN
Kontraktor Job Nomor
JRG3-KWN-0000-CN-PR-O:
PEMILIK PROYEK
PENYEDIA JASA
27 °
(01900.5P/PPK-EPC/Jargas3/2022
Page 1 of 7
+ DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMENTERIAN
ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KSO WASKITA-NOOREL
S| eand ts hop BPR [OL aE £
3 va orev wake
Tso Raven Te
Rev. DESKRIPS! TANGGAL eyPEMBANGUNAN JARINGAN GAS BUMI UNTUK
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA A
SEMARANG DAN KAB.WAJO(11.152SR) | 2
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
No DOKUMEN Rev. Kontraktor Job Nomor
JRG3-KWN-0000-CN-PR.027 ° 01900.SP/PPK-EPC/targas3/2022 | Page 2 of 7
LEMBAR REVISI
Rev No Date Description
x 17/08/2022 _| Tssued for Review
20/05/2022 | Issued for Review
0 23/05/2022 | Issued for ApprovalPEMBANGUNAN JARINGAN GAS BUM UNTUK
RUMAH TANGA DI KAB. INDRAMAYU,KOTA
‘SEMARANG DAN KAB.WAJO (11.152 SR)
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
Ne DOKUMEN Rev. Ventvaior Job Nomar]
Page 3 of 7
JRG3-KWN-0000-CN-PR-027 oO 01900.SP/PPK-EPC/Jargas3/2022
DAFTAR ISI
DAFTAR ISI...
1
2,
3,
4,
5,
6
TUIUAN..
RUANG LINGKUP..
DEFINISI
KODE, STANDAR, DAN REFERENS|
KETENTUAN UMUM ...
PEMERIKSAAN.PEMBANGUNAN JARINGAN GAS BUMI UNTUK | AJ
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA
epson SEMARANG DAN KAB.WAJO (11.152 SR)
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
ev. intraktor Job Nomor
No DOKUMEN Ri Kontral eaekat7
JRG3-KWN-0000-CN-PR-027 0 (01900.sP/PPK-EPC/Jargas3/2022
1, TUJUAN
Memberikan panduan umum kegiatan Holiday Test pada konstruksi pipa baja untuk
sistem jaringan pipa distribusi gas bumi dan Fasilitas Penunjangnya khususnya
Pembangunan Jaringan Gas untuk Rumah Tangga Skema APBN.
2. RUANG LINGKUP
Bab ini meliputi persyaratan-persyaratan minimum kegiatan Holiday Test pada
konstruksi pipa baja baik pada coating pipa mainline maupun field joint coating untuk
sistem jaringan pipa distribusi gas bumi dan Fasilitas Penunjangnya.
3. DEFINISI
3.1 DITJEN MIGAS adalah Direktorat Jenderal Minyak dan Gas Bumi Kementerian Energi
dan Sumber Daya Mineral Republik indonesia sebagai Regulator.
3.2 Migas adalah Direktorat Jenderal Minyak dan Gas Bumi Kementerian Energi dan
‘Sumber Daya Mineral Republik indonesia sebagai Pemilik Proyek/Pemberi Kerja.
3.3. PPK adalah Pejabat Pembuat Komitmen, yaitu Pejabat yang ditunjuk mewakili Migas
dan bertanggung jawab atas pelaksanaan pengadaan Pekerjaan konstruksi.
3.4 Pekerjaan adalah Pembangunan Jaringan Gas Bumi untuk Rumah Tangga Skema APBN,
3.5 Pengawas adalah Ketua Tim Pengawas (KTP), Construction Area Superintendent (CAS),
dan/atau konsultan pengawas/Project Management Consultant (PMC) yang berkontrak
dengan PPK untuk mengawasi pekerjaan.
3.6 Penyedia adalah Pihak yang bertanggung jawab menyediakan barang dan jasa serta
melakukan pemasangan beserta pengujiannya sesuai dengan kontrak dengan PPK.
3.7 Pemberi kerja adalah pihak yang mempekerjakan tenaga kerja dengan membayar upah
‘atau imbalan dalam bentuk lain.
3.8 Manufaktur adalah pihak yang memproduksi barang tertentu dengan pemrosesan
material dasar, komponen ~ komponen atau perakitan beserta pengujiannya.
3.9. Field Joint Coating (FIC) adalah proses pemasangan coating pada sambungan pipa,
fitting (elbow, tee, dan reducer), dan permukaan lain yang belum tercoating yang
dilakukan di lapangan.
3.10 Pemanasan Awal adalah pemanasan yang dilakukan pada daerah coating sebelum
proses FIC dilakukan.
3.11 Pemanasan Akhir adalah pemanasan yang dilakukan untuk merekatkan material
coating pada sambungan pipa atau fitting.
3.12 Pelaksana FIC adalah orang yang kompeten mengaplikasikan material FIC sesuai
rekomendasi praktis pabrik.PEMBANGUNAN JARINGAN GAS BUM UNTUK : AJ
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA
SEMARANG DAN KAB.WAJO (11.152 SR) >
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
jor Job Nomor
___No DOKUMEN. [ Rev. [Kontrak ranbar
IRG3-KWN-0000-CN-PR-027_ | 0 01900.5P/PPK-£PC/argas3/2022
4, KODE, STANDAR, DAN REFERENS!
ASTM-A 499 Method of measurement of Coating Thickness by the
‘Magnetic Method: Non-Magnetic Coatings on
magnetic Basis metals
ASTM-D 4285 Test method for indicating Oil or Water in Compressed
air
ASTM-D 4417 Field Measurement of Surface Profile of Blast Cleaned
Steel
ASTM-€ 337 Test for Relative Humidity by Wet-and-Dry Bulb
Psychrometer
180 8501-1 Rust grades and preparation of uncoated stee!
substrates and steel substrates after overall removal of
previous coatings
1s0 8502-3 Preparation of steel substrates before application of
paints and related products -- Tests for the assessment
of surface cleanliness — Part 3: Assessment of dust on
steel surfaces prepared for painting (pressure-sensitive
tape method)
NACE RPO274 High Voltage Electrical inspection of Pipeline Coatings
NACE MRO274 Polyolefin Code-Applied Tape for Underground or
‘Submerged Pipelines Coating System
PKP-CTE-ON-CS-001 Konstruksi Pipa Baja di Darat pada Sistem Jaringan Pipa
Distribusi Gas Bumi dan Fasilitas Penunjangnya
SSPC-SP1 Solvent Cleaning
SSPC-SP3 Power Too! Cleaning
SSPC-SP10 ‘Near White Blast Cleaning
SSPC-SP11 Power Too! Cleaning to Bare Metal
SSPC-VISL Visual Standards for Blasted SurfacesPEIMBANGUNAN JARINGAN GAS BUMI UNTUK as
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA f
SEMARANG DAN KAB.WAJO (11.152 SR)
PR AMYTHAS [80 WasKrTa- NOOREL
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
UME I Kontraktor Job Nomor
No DOKUMEN Rev. bapibery
JRG3-KWN-0000-CN-PR-027 o (01900.5P/PPK-EPC/Jargas3/2022
SSPC-VIS3 Visual Standards for Power and Hand Tool Cleaned
Steel
5. KETENTUAN UMUM
5.1 Holiday test untuk coating pipa mainline dilakukan sebelum Penurunan Pipa. Apabila
terdapat kerusakan coating, maka harus segera diperbaiki. Setelah dilakukan perbaikan,
pemeriksaan kembali dengan menggunakan holiday detector harus dilakukan.
5.2. FIC secara umum digunakan untuk perlindungan Koros! pada sambungan pengelasan
dengan menggunakan material Heat Shrink Sleeve, wrapping atau material lain yang.
disetujui Pemberi Kerja.
5.3 Untuk pipa baja yang memiliki ukuran diameter lebih kecil dari 6 inci, maka sambungan
ipa dapat diproteksi menggunakan wrapping tape. Sedangkan untuk pipa baja yang
memiliki ukuran diameter 6 inci atau lebih, sambungan pipa harus diproteksi
‘menggunakan Heat Shrink Sleeve.
5.4 FIC harus dilakukan hanya pada lasan yang telah lulus Pengujian Tidak Merusak (NDT)
5.5 Sebelum melaksanakan pekerjaan FIC, prosedur, material dan personil harus
dikualifikasi dan disetujui oleh Pemberi Kerja.
5.6 Production Qualification Test (PAT) dapat dilakukan pada mainline atau pipa dummy.
Pipa dummy yang digunakan untuk PQT harus memiliki spesifikasi, diameter dan
ketebalan yang sama dengan pipa yang digunakan pada produksi.
5.7 PQT harus dilakukan untuk setiap merek dan jenis coating.
5.8 Untuk penerapan blasting, Penyedia harus menyediakan tenda pelindung berikut APD
yang sesuai,
5.9 Pekerjaan di dalam galian harus menggunakan proteksi galian yang telah diatur sesuai
dengan Dokumen Pekerjaan Penggalian Galian Pipa (Trenching), Dokumen No. JRG3-
KWN-0000-CN-PR-007.
5.10 Prosedur keselamatan dan kesehatan pada pekerjaan ini harus mengacu pada Dokumen
Sistem Manajemen Keselamatan dan Kesehatan Kerja serta Lingkungan Pekerjaan
Konstruksi, Dokumen No. JRG3-KWN-0000-HS-PR-001.
6. PEMERIKSAAN
6.1 FIC harus diinspeksi secara visual untuk memastikan coating dalam keadaan kontinyu,
overlap minimum terpenuhi dan tidak ada cekungan, coldspots, gelembung, lubang,
‘burn holes atau tanda adanya kebocoran yang terlihat.
6.2 Holiday test 100% harus dilakukan setelah lulus pemeriksaan visual, baik untuk coating
pipa mainline maupun field joint coating. Seluruh permukaan sambungan lapanganPEMBANGUNAN JARINGAN GAS BUMI UNTUK i a/
RUMAH TANGGA DI KAB. INDRAMAYU,KOTA !
‘SEMARANG DAN KAB.WAJO (11.152 SR)
PENGUJIAN - PEKERJAAN HOLIDAY TEST THREE LAYER COATING PIPA BAJA
No DOKUMEN Rev. Kontraktor Job Nomor
IRG3
KWN-0000-CN-PR-027 ° (01900.SP/PPK-EPC/iargas3/2022 Page 7 of 7
63
64
65
yang di-coating harus diperiksa untuk holiday atau diskontinuitas lainnya pada tegangan
15 kV sesuai dengan metode yang ditetapkan. Coiled spring pada alat holiday test yang
digunakan harus sesuai dengan diameter pipa yang akan diyji
eel Test harus dilakukan satu kali setiap SO joint atau kelipatannya untuk memastikan
kualitas produksi.Jika produksi FIC dibawah 50 joint, maka Peel Test cukup dilakukan 1
kali.
Bila hasil Pee! Test tidak sesuai dengan ketentuan manufaktur, maka 2 (dua) Peel Test
tambahan harus diambil dan joint tambahan tersebut ditentukan oleh Pemberi Kerja
Apabila pengujian tambahan tersebut masih tidak memenuhi kriteria penerimaan,
maka Penyedia harus melakukan evaluasi terhadap seluruh kegiatan FIC meliputi
prosedur, material dan personil dan bertanggung jawab terhadap segala resiko yang
terjadi.
Hasil evaluasi harus diserahkan ke Pemberi Kerja untuk mendapatkan persetujuan.