JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
KECAMATAN TEUPAH TENGAH
1. PUSTU BATU - BATU
A. REHABILITASI BANGUNAN PUSTU BATU - BATU
I. PEKERJAAN PERSIAPAN 7.281.988,00
II. PEKERJAAN PASANGAN DAN PLESTERAN 1.853.976,00
III. PEKERJAAN LANTAI 26.979.306,79
IV. PEKERJAAN ATAP DAN PLAFOND 28.497.968,35
V. PEKERJAAN KUSEN, PINTU DAN JENDELA 32.822.521,41
VI. PEKERJAAN PENGECATAN 25.896.820,35
VII. PEKERJAAN INSTALASI LISTRIK 5.732.236,00
VIII. PEKERJAAN INSTALASI AIR BERSIH 2.207.239,00
IX. PEKERJAAN INSTALASI AIR KOTOR 8.449.340,17
X. PEKERJAAN BOX PLAT 13.278.669,83
153.000.065,90
2, PUSTU KAHAD
A. REHABILITASI BANGUNAN PUSTU KAHAD
I. PEKERJAAN PERSIAPAN 7.301.988,00
II. PEKERJAAN PASANGAN DAN PLESTERAN 8.651.888,00
III. PEKERJAAN LANTAI 19.548.188,65
IV. PEKERJAAN ATAP DAN PLAFOND 37.948.538,04
V. PEKERJAAN KUSEN, PINTU DAN JENDELA 18.648.222,54
VI. PEKERJAAN PENGECATAN 17.302.251,98
VII. PEKERJAAN INSTALASI LISTRIK 4.260.116,00
VIII. PEKERJAAN INSTALASI AIR BERSIH 2.565.511,00
IX. PEKERJAAN INSTALASI AIR KOTOR 8.216.503,17
X. PEKERJAAN RABAT BETON 1.795.738,00
126.238.945,38
3, PUSTU MATANURUNG
A. REHABILITASI BANGUNAN PUSTU MATANURUNG
I. PEKERJAAN PERSIAPAN 7.301.988,00
II. PEKERJAAN PASANGAN DAN PLESTERAN 1.235.984,00
III. PEKERJAAN LANTAI 22.107.578,21
IV. PEKERJAAN ATAP DAN PLAFOND 30.817.311,24
V. PEKERJAAN KUSEN, PINTU DAN JENDELA 19.964.111,41
VI. PEKERJAAN PENGECATAN 21.838.916,09
VII. PEKERJAAN INSTALASI LISTRIK 4.005.389,00
VIII. PEKERJAAN INSTALASI AIR BERSIH 1.814.731,00
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
IX. PEKERJAAN INSTALASI AIR KOTOR 8.103.051,17
X. PEKERJAAN RABAT BETON 2.671.429,50
119.860.489,62
RISWANDI
Direktur