PEMERINTAH PROVINSI PAPUA

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


PERUMAHAN DAN KAWASAN PERMUKIMAN
BIDANG CIPTA KARYA
Jl. Sumatra No.15 Dok IV Telp.(0967)533419-Jayapura

GAMBAR RENCANA

PERENCANAAN TEKNIS PEMBANGUNAN JARINGAN AIR BERSIH/SPAM


DI KABUPATEN PUNCAK (TERSEBAR)

TAHUN ANGGARAN 2022


Keterangan :
Legend :

KOORDINAT RESERVOIR 3
S3°59'23.71"
E137°38'38.95"

Gambar Skala

PETA LOKASI NON SKALA

Lokasi

KABUPATEN PUNCAK

Mengetahui / Menyetujui :

KOORDINAT RESERVOIR 1
S3°59'48.39"
CV. AMALIE KOTEKA KONSULTAN
E137°38'52.61"

KOORDINAT RESERVOIR 2
S3°59'45.57"
E137°38'49.36" IRMAN HADI SARSANTO, ST
TEAM LEADER

Dibuat / Digambar :

KOORDINAT SUMBER AIR


S4°00'08.28"
E137°38'59.58"

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

BANGUNAN INTAKE

PIPA GIP 4" 200 M

PIPA DISTRIBUSI HDPE 3"


3550 M

RESERVOIR 20 M3

SUNGAI

KANTOR DISTRIK

PUSTU GOME

GEREJA
KOORDINAT RESERVOIR 3
S3°59'23.71"
E137°38'38.95" Gambar Skala

LAYOUT NON SKALA

Lokasi

KABUPATEN PUNCAK

Mengetahui / Menyetujui :

KOORDINAT RESERVOIR 1
S3°59'48.39" CV. AMALIE KOTEKA KONSULTAN
E137°38'52.61"

KOORDINAT RESERVOIR 2
S3°59'45.57"
E137°38'49.36" IRMAN HADI SARSANTO, ST
TEAM LEADER

Dibuat / Digambar :

KOORDINAT SUMBER AIR


S4°00'08.28"
E137°38'59.58"

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Gambar Skala

SKEMATIK SISTEM NON SKALA

Lokasi
Reservoir
Kap. 20 m3

INTAKE Pipa Distribusi HDPE Ø 3" KABUPATEN PUNCAK


Pipa GIP Ø 4" Pipa HDPE Ø 3"
DAERAH PELAYANAN

Sungai KORDINAT: KORDINAT:


S4°00'08.28" S3°59'48.39" Mengetahui / Menyetujui :
E137°38'59.58" E137°38'52.61"

CV. AMALIE KOTEKA KONSULTAN

IRMAN HADI SARSANTO, ST


TEAM LEADER

Dibuat / Digambar :

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Gambar Skala
SUNGAI C Pipa Overflow
B GIP Ø 4"
Pas. Batu Kali
PETA SITUASI/LAYOUT 1 : 100
INTAKE
20
20
Arah Aliran Air
Lokasi
INTAKE
200 120

A A 20
KABUPATEN PUNCAK
20
200
Mengetahui / Menyetujui :
Pipa Overflow
B GIP Ø 4"
CV. AMALIE KOTEKA KONSULTAN
C

20 200 20 20
IRMAN HADI SARSANTO, ST
TEAM LEADER
4"
Ø Dibuat / Digambar :
IP
G
ist
D
a
Pip

Doni Donatus Gobay,ST


Operator Cad

LAYOUT INTAKE Konsultan Perencana :

Skala 1 : 100
No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

150 20 200 20 Gambar Skala

60

POTONGAN 1 : 50
15 40 80 40

Pipa Over flow


GIP Ø 4" Lokasi
Pas. Batu Kali 85 20
1:4 20
30
200 30 KABUPATEN PUNCAK

Tangga Kontrol
GIP Ø 25 mm Ø10-20 Valve
150 Mengetahui / Menyetujui :
Pasangan
150
Bata 1 : 4
Valve
Pipa Inlet
Besi Ram 150 Ø10-20
90 Ø 12 - 10 CV. AMALIE KOTEKA KONSULTAN
Pipa Outlet Pipa Outlet
GIP Ø 4 21" GIP Ø 4" Pipa Penguras GIP Ø 4"
HDPE Ø 4"
Tanah Urug 25
25
25
Lantai Kerja Beton tumbuk t = 5
Pasir
cm Urug t = 5 cm IRMAN HADI SARSANTO, ST
20 20 130 20 50 20 20 60 TEAM LEADER
Beton Bertulang 1 : 2 : 3
Lantai Kerja Beton tumbuk t = 5 20 20 120 20 20 60 Dibuat / Digambar :
Pasir
cm Urug t = 5 cm
POTONGAN C-C
Skala 1 : 50
POTONGAN A-A
Skala 1 : 50
Doni Donatus Gobay,ST
Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

200
40 40

Kolam Mata Air


150

50
90 Pas. Batu

Gambar Skala

POTONGAN B-B 80
DETAIL 1 : 50
Skala 1 : 50

Lokasi
5

Ø10-20
Ø10-20
KABUPATEN PUNCAK
Ø10-20
Ø10-20

Mengetahui / Menyetujui :
Ø10-20 Valve
Ø10-20 Ø10-20
CV. AMALIE KOTEKA KONSULTAN
Ø10-20 157

PEMBESIAN PLAT DUCK PEMBESIAN PLAT LANTAI IRMAN HADI SARSANTO, ST


TEAM LEADER
Skala 1 : 50 Skala 1 : 50
20 Dibuat / Digambar :

DETAIL BOX VALVE


Skala 1 : 25
Doni Donatus Gobay,ST
Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

540

10 20 80 20 240 20 240 20 80

Pipa Inlet GIP Ø 6"


Pipa Peluap GIP Ø 2 1/2" B Gambar Skala
10
20

DENAH GROUND
1 : 50
RESEVOIR 20 M3
80

3
Lokasi
20

1
Pipa Penguras GIP Ø 2 2"
Pipa Outlet GIP Ø 2.5"
KABUPATEN PUNCAK
4

20
Mengetahui / Menyetujui :
250
290

80
Inlet
Outlet
CV. AMALIE KOTEKA KONSULTAN
A 60

20
2
20 120 Box Valve Uk. 70/80
60

Pompa Submersibel 1,5 Ltr


20

IRMAN HADI SARSANTO, ST


TEAM LEADER
1
80

Dibuat / Digambar :
20
10

Vent Pipa GIP Ø 50 mm


Tangga Besi Ulir Ø 16 mm
Manhole Uk. 60 x 60 cm

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Gambar Skala

TAMPAK 1 : 50

Lokasi

KABUPATEN PUNCAK

Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN

IRMAN HADI SARSANTO, ST


TEAM LEADER

Dibuat / Digambar :

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
540

20 240 20 240 20 Keterangan :


Legend :

Beton Bertulang, Camp. 1 : 2 : 3


Puddle Flange Pipa Peluap GIP Ø 2 21" Vent Pipa GIP Ø 2 21 "
Pipa Inlet GIP Ø 6" Penutup Manhole 60 x 60 cm
Water Stop Puddle Flange
Pipa Penguras GIP Ø 2 1/2"
15

Pipa Outlet GIP Ø 2 1/2"


II

25
Muka Air Gate Valve Ø 2 1/2"

30
30
Tangga Besi Ulir Ø 16 mm
185

185

30
160
I Gambar Skala

30

15
30
POTONGAN 1 : 40

15
15 20

Cor Lantai Kerja Beton Camp. 1 : 2 : 3, Tebal 5 cm Lokasi


Urugan Pasir Tebal 10 cm Puddle Flange
Urugan Tanah Kembali Pompa Submersible 1,5 Ltr
KABUPATEN PUNCAK
20 20 500 20 20 90 10 70 10

580 90
Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN

290

20 250 20
Penutup Manhole 60 x 60 cm
Pipa Outlet GIP Ø 2 1/2" IRMAN HADI SARSANTO, ST
TEAM LEADER
15

Water Stop
Dibuat / Digambar :
III Muka Air
Rabat Beton Tumbuk Camp. 1 : 3 : 5, Tebal 15 cm
Urugan Pasir Tebal 5 cm
80
Pas. Dinding Saluran Air
10 70 Beton Tumbuk Camp. 1 : 3 : 5, Tebal 10 cm
Urugan Pasir Saluran Air, Tebal 5 cm
185

195

IV
20 80 20 Muka Tanah

30
Doni Donatus Gobay,ST
V 10 20 10 Operator Cad
Urugan Tanah Kembali
85

10

Beton Bertulang Camp. 1 : 2 : 3, Tebal 15 cm


15 20

Konsultan Perencana :
Cor Lantai Kerja Beton Camp. 1 : 2 : 3, Tebal 5 cm
Urugan Pasir Tebal 10 cm

Pipa Penguras GIP Ø 2 21"


Tangga Besi Ulir Ø 16 mm
20 20 250 20 20
No. Lembar Jumlah Lembar
330

18
Urugan Pasir Tebal 5 cm
Plesteran Lantai Rabat 15 mm Rabat Beton Tumbuk Camp. 1 : 3 : 5, Tebal 15 cm
Urugan Tanah Kembali Urugan Pasir Saluran Air, Tebal 5 cm Keterangan :
Ø 12 - 20 cm Beton Tumbuk Camp. 1 : 3 : 5, Tebal 10 cm Legend :

Ø 12 - 20 cm Pas. Dinding Saluran Air


Gate Valve Ø 4"
20 120 20
Pipa Outlet GIP Ø 2 1/2"
Pipa Penguras GIP Ø 2 21"
Tangga Besi Ulir Ø 16 mm
Water Stop

30
Beton Bertulang Camp. 1 : 2 : 3

15

100
85
10
Gambar Skala
15 20

DETAIL
1 : 25
RESEVOIR 20 M3

Ø 12 - 20 cm
10 70 10
Ø 12 - 20 cm Lokasi
Cor Lantai Kerja Beton Camp. 1 : 2 : 3, Tebal 5 cm 90
Urugan Pasir Tebal 10 cm KABUPATEN PUNCAK

Mengetahui / Menyetujui :

Vent Pipa GIP Ø 2 21"


Puddle Flange Ø 10 - 20 cm Beton Bertulang Camp. 1 : 2 : 3 CV. AMALIE KOTEKA KONSULTAN
Sk Ø 10 - 20 cm Ø 10 - 20 cm Pipa Peluap GIP Ø 2 21"
Penutup Manhole Uk. 60 x 60 cm Ø 10 - 20 cm
4 - Ø 12 cm Sk Ø 10 - 20 cm Ø 10 - 20 cm

15
Muka Air Maximum 4 - Ø 12 cm
IRMAN HADI SARSANTO, ST
Ø 12 - 20 cm Beton Bertulang Camp. 1 : 2 : 3 TEAM LEADER
Tangga Besi Ulir Ø 16 mm Muka Air Maximum
Ø 12 - 20 cm Pipa Outlet GIP Ø 2 1/2"
Beton Bertulang Camp. 1 : 2 : 3
Dibuat / Digambar :
Beton Bertulang Camp. 1 : 2 : 3
Pipa Inlet GIP Ø 100 mm
20 60

Pas. Dinding Saluran Air


Beton Tumbuk Camp. 1 : 3 : 5, Tebal 10 cm
20 80 20
Urugan Pasir Saluran Air, Tebal 5 cm Pipa Outlet GIP Ø 2 1/2" Doni Donatus Gobay,ST
Rabat Beton Tumbuk Camp. 1 : 3 : 5, Tebal 15 cm
Pipa Penguras GIP Ø 2 1/2" Operator Cad
Urugan Pasir Tebal 5 cm
Beton Bertulang Camp. 1 : 2 : 3
Urugan Tanah Kembali
Ø 12 - 20 cm Konsultan Perencana :
Ø 12 - 20 cm
15 20

Tangga Besi Ulir Ø 16 mm


25

Water Stop
Beton Bertulang Camp. 1 : 2 : 3
10 20 10
5

No. Lembar Jumlah Lembar


Urugan Pasir Tebal 10 cm Ø 12 - 20 cm
Cor Lantai Kerja Beton Ø 12 - 20 cm
70 20 Camp. 1 : 2 : 3, Tebal 5 cm 18
B
540 Keterangan :
Legend :
20 240 20 240 25

20
Balok Uk. 20/20

Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm
Balok Uk. 20/20

Balok Uk. 20/20

Balok Uk. 20/20


Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm

Ø10 - 200 mm
290

250
A Gambar Skala

Ø10 - 200 mm

Ø10 - 200 mm PENULANGAN LANTAI 1 : 40

20
Balok Uk. 20/20
Lokasi

KABUPATEN PUNCAK

Mengetahui / Menyetujui :

B CV. AMALIE KOTEKA KONSULTAN


540

20 240 20 240 25
20

IRMAN HADI SARSANTO, ST


TEAM LEADER
Ø12 - 200 mm
Dibuat / Digambar :
Ø12 - 200 mm

Ø12 - 200 mm
290

250

Ø12 - 200 mm
Ø12 - 200 mm

Ø12 - 200 mm

A
Doni Donatus Gobay,ST

Ø12 - 200 mm

Ø12 - 200 mm
Operator Cad

Konsultan Perencana :
20

No. Lembar Jumlah Lembar

18
540
Keterangan :
Legend :
20 240 20 240 20
Vent Pipa GIP Ø 2 21"
Ø 10 - 20 cm Manhole Uk. 60 x 60 cm
Ø 10 - 20 cm Beton Bertulang Camp. 1 : 2 : 3

15
4 - Ø 10
Muka Air Sk Ø 10 - 20 cm

30
Ø 12 - 20 cm Ø 12 - 20 cm

30
Ø 12 - 20 cm Ø 12 - 20 cm
Water Stop Water Stop

185

30
235
Titik Berhenti Pengecoran Titik Berhenti Pengecoran
Tangga Besi Ulir Ø 16 mm
Gambar Skala

30
30
20 120
PENULANGAN

15
10
1 : 40
RESEVOIR 20 M3
15 20

Beton Bertulang Camp. 1 : 2 : 3, Tebal 15 cm


Cor Lantai Kerja Beton Camp. 1 : 2 : 3, Tebal 5 cm
Urugan Pasir Tebal 10 cm Lokasi
20 20 500 20 20
580
KABUPATEN PUNCAK

Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN


290

20 250 20
Beton Bertulang Camp. 1 : 2 : 3
Penutup Manhole Ø 10 - 20 cm
Tangga Besi Ulir Ø 16 mm Ø 10 - 20 cm IRMAN HADI SARSANTO, ST
TEAM LEADER
15

4 - Ø 10
Muka Air Sk Ø 10 - 20 cm
Dibuat / Digambar :

Ø 12 - 20 cm Ø 12 - 20 cm
Ø 12 - 20 cm Ø 12 - 20 cm
Water Stop Water Stop
185
235

Titik Berhenti Pengecoran Titik Berhenti Pengecoran

20 80 20 Doni Donatus Gobay,ST


Operator Cad
10

Beton Bertulang Camp. 1 : 2 : 3, Tebal 15 cm


15 20

Cor Lantai Kerja Beton Camp. 1 : 2 : 3, Tebal 5 cm Konsultan Perencana :


Urugan Pasir Tebal 10 cm

20 20 250 20 20
330

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Tanah Urug

50
Gambar Skala

Pipa
HDPE 3" GALIAN PIPA NON SKALA

Tanah Urug 20 Lokasi

KABUPATEN PUNCAK

20
Pipa
HDPE 1/2" Mengetahui / Menyetujui :

Tanah Urug
CV. AMALIE KOTEKA KONSULTAN

20

50
IRMAN HADI SARSANTO, ST
TEAM LEADER
Pipa
HDPE 4" Dibuat / Digambar :

20

Doni Donatus Gobay,ST


Operator Cad
GALIAN PIPA
Konsultan Perencana :
SKALA NST

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

B
600

Gambar Skala

Lokasi

500
KABUPATEN PUNCAK

Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN

A A
IRMAN HADI SARSANTO, ST
TEAM LEADER

Dibuat / Digambar :

B
TAMPAK DENAH RUMAH POMPA Doni Donatus Gobay,ST
SKALA 1 : 100 Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Seng Gelombang BJLS 0,3

Gording

RingBalk 15x20

Kolom 15x15

Pasangan Dinding Batu Tela 1:3

Sloof 15x20 Gambar Skala

Pas. Pondasi bt. kali 1 : 4

Aanstamping

Alas pasir

Lokasi

KABUPATEN PUNCAK

Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN

IRMAN HADI SARSANTO, ST


Seng Gelombang BJLS 0,3 TEAM LEADER

Gording
Dibuat / Digambar :
RingBalk 15x20

Kolom 15x15

Pasangan Dinding Batu Tela 1:3

Sloof 15x20

Doni Donatus Gobay,ST


Pas. Pondasi bt. kali 1 : 4
Operator Cad

Aanstamping
Konsultan Perencana :
Alas pasir

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

1. CLAMP SADLE 3 X 1/2 " ATAU 2" X 1/2" = 1 BH


2. MALE THREAD JOIN Ø1/2" = 3 BH
3. PIPA HDPE Ø1/2" = 10 M'
4. ELBOW ALL COMPRESSION 90° Ø1/2" = 5 BH
5. STOP KRAN (SEARAH) Ø1/2" = 1 BH
6. KNEE / BEND GIP 90° Ø1/2" = 2 BH
7. KRAN Ø1/2" = 1 BH 10
8. FEMALE THREAD JOIN Ø1/2" = 1BH
7
9. WATER METER 1/2" = 1 BH 14 Gambar Skala
10. SOCKET GIP Ø1/2" = 1 BH
11. BETON TUMBUK 1 : 3 : 5
12. BOX METER = 1 BH
6 DETAIL SAMBUNGAN RUMAH Non Skala
13. PIPA GIP Ø1/2" = 1 BH
14. DOBLE NIPPLE Ø1/2" = 1 BH
Lokasi

KABUPATEN PUNCAK

5 H
9 13 Mengetahui / Menyetujui :
4 2 8 4

CV. AMALIE KOTEKA KONSULTAN


12

40
4 4 6 IRMAN HADI SARSANTO, ST
15 40 15 TEAM LEADER

5 3 2 Dibuat / Digambar :

2
1
Doni Donatus Gobay,ST
Operator Cad

Konsultan Perencana :

DETAIL SAMBUNGAN RUMAH (SR)


SKALA NST

No. Lembar Jumlah Lembar

18
Keterangan :
Legend :

Engsel
Rangka Penutup
(Baja Siku 50.50.5)

Plat, tbl 3 mm

Beton 1 : 3 : 5

70
Gambar Skala

- BOX VALVE Non


- POTONGAN 1 - 1 Skala

10
Lokasi

10 60 10
KABUPATEN PUNCAK

POTONGAN 2 - 2 Mengetahui / Menyetujui :


NON SKALA

CV. AMALIE KOTEKA KONSULTAN

IRMAN HADI SARSANTO, ST


TEAM LEADER

Engsel Dibuat / Digambar :

Gate Valve Flange


Pipa

80

2 2
Doni Donatus Gobay,ST
Operator Cad

Konsultan Perencana :

80

BOX VALVE No. Lembar Jumlah Lembar


NON SKALA

18
DETAIL JUNCTION ACCESSORIES SYMBOL QTY Keterangan :
Legend :

HDPE Ø 3"
(Rencana)
Crossong Jalan
GIP Ø 4"
(Rencana)
Gambar Skala

NON
DETAIL JUNCTION

Lokasi

KABUPATEN PUNCAK

HDPE Ø 3"
(Rencana)
Mengetahui / Menyetujui :

CV. AMALIE KOTEKA KONSULTAN

JUNCTION 01
IRMAN HADI SARSANTO, ST
TEAM LEADER

Dibuat / Digambar :
HDPE Ø 3"
(Rencana)
HDPE Ø 3" (Rencana)

Doni Donatus Gobay,ST


Operator Cad

Konsultan Perencana :

No. Lembar Jumlah Lembar

18
JUNCTION 02