CONTAINMENT SYSTEM
ELEMENTS
Vaulted Fuel Containment System
(AST)
Fuel Level Tertiary Armored Over-spill/ Overfill
Gauge Inspection/ Containment Box equipped
Capped Monitoring with fill port, over- spill drain
Standard Vent for Primary Tank valve, & over-fill protection
Option Port
Primary Tank Emergency Vent valve
Ports
Interstitial Leak Detector
Secondary Containment
& Monitoring Port
Chamber Emergency
Vent
Manway
Service Line
Supply
Secondary
Containment
Chamber
Insulation
Reinforcing
Exhaust Vent
Spill
Bucket Fill
Primary Entrance Manway
Catastrophic
Manway Port Overfill
Air Intake Vent
Line to Island
Dispenser
Directs Fuel
To Secondary
Containment
Chamber
Sump Inspection
Drain
3 Vault Elements Confidential September 13, 2008
Island Form with Spill Containers