Anda di halaman 1dari 24

VAULTED FUEL

CONTAINMENT SYSTEM
ELEMENTS
Vaulted Fuel Containment System
(AST)
Fuel Level Tertiary Armored Over-spill/ Overfill
Gauge Inspection/ Containment Box equipped
Capped Monitoring with fill port, over- spill drain
Standard Vent for Primary Tank valve, & over-fill protection
Option Port
Primary Tank Emergency Vent valve
Ports
Interstitial Leak Detector
Secondary Containment
& Monitoring Port
Chamber Emergency
Vent
Manway

Service Line
Supply
Secondary
Containment
Chamber

Insulation

Primary containment Tanks

Reinforcing

2 Vault Elements Confidential September 13, 2008


Vaulted Fuel Containment System
(UST)

Exhaust Vent
Spill
Bucket Fill
Primary Entrance Manway
Catastrophic
Manway Port Overfill
Air Intake Vent

Line to Island
Dispenser

Directs Fuel
To Secondary
Containment
Chamber

Sump Inspection
Drain
3 Vault Elements Confidential September 13, 2008
Island Form with Spill Containers

4 Vault Elements Confidential September 13, 2008


Dispenser Sump Detail

5 Vault Elements Confidential September 13, 2008


Island Details

6 Vault Elements Confidential September 13, 2008


Dispenser Sumps with Overfill Valve

7 Vault Elements Confidential September 13, 2008


Sump Boot Detail with UPP Piping

8 Vault Elements Confidential September 13, 2008


2” Ball Valve for Sump Overfill

9 Vault Elements Confidential September 13, 2008


Grate Assembly with Spill Bucket

10 Vault Elements Confidential September 13, 2008


Pipe Chase Piping Details

11 Vault Elements Confidential September 13, 2008


Pipe Chase with Emergency Venting

12 Vault Elements Confidential September 13, 2008


Catastrophic Overfill Details

13 Vault Elements Confidential September 13, 2008


Vault Entry

14 Vault Elements Confidential September 13, 2008


Entry Ladder & Light Switch

15 Vault Elements Confidential September 13, 2008


Vault Interior

16 Vault Elements Confidential September 13, 2008


Vault Vapor Sensor

17 Vault Elements Confidential September 13, 2008


Explosion Proof Fixture

18 Vault Elements Confidential September 13, 2008


Exterior Epoxy Coating

19 Vault Elements Confidential September 13, 2008


Primary Steel Tank

20 Vault Elements Confidential September 13, 2008


Steel Tank Pipe Chase

21 Vault Elements Confidential September 13, 2008


Vault Drain Sump Detail

22 Vault Elements Confidential September 13, 2008


Poured Base

23 Vault Elements Confidential September 13, 2008


THANK YOU

24 Vault Elements Confidential September 13, 2008

Anda mungkin juga menyukai