Anda di halaman 1dari 1

KETERANGAN

KT = PIPA KOTORAN TYPE AW


10 KG/CM2

SALURAN DALAM SITE


R. ALAT KT Ø 4 INCH - KE SEPTICKTANK TEMPAT
+ 0.55
SAMPAH
R. OPERASI WC WC WC WC
R. PERSIAPAN ± 0.00 ± 0.00 ± 0.00 ± 0.00
+ 0.55
+ 0.55 LIFT R. TUNGGU POLI. 1 POLI. 2 POLI. 3 POLI. 4
R. INAP VIP R. INAP R. INAP R. INAP + 0.05 + 0.05 + 0.05 + 0.05 + 0.05

PEMBUANGAN AIR
TOILET + 0.05 + 0.05 + 0.05 + 0.05
+ 0.50 NURSE

LIMBAH
STATION
IGD KORIDOR KORIDOR
+ 0.55 + 0.05 + 0.05
KASIR
+ 0.05
R. INAP VIP R. INAP R. INAP R. INAP LOBBY
RUANG + 0.05 + 0.05 + 0.05 + 0.05 + 0.05 APOTEK TOILET
PERAWATAN ± 0.00
+ 0.55 + 0.05 POLI. 5 POLI. 6
R. DOKTER REKAM + 0.05 + 0.05
+ 0.55 WC WC WC WC MEDIS R. JANITOR
± 0.00 ± 0.00 ± 0.00 ± 0.00 + 0.05 ± 0.00

AMBULANCE
TERAS
± 0.00

DROP OFF

PEKERJAAN
POS JAGA

PARKIRAN RODA 4 SEBARIS TERAS


± 0.00 PEMBANGUNAN RUMAH SAKIT
KHUSUS BEDAH

PARKIRAN RODA 2
R. JENAZAH LOKASI
+ 0.05
KOTA BANDA ACEH

GAS MEDIS
DISETUJUI
+ 0.05
AREA PARKIRAN RODA 4
GENSET GUDANG
+ 0.05
SALURAN DALAM SITE
dr. SUHARDI M. YUNUS
OWNER
Direncanakan Nama
Arsitektur ARS.USK. 08
Drafter TIM

RENCANA LAYOUT AIR LIMBAH DAN SALURAN SKALA KODE GAMBAR NOMOR

Skala 1 : 200