Rencana Struktur Organisasi Lab & Material Preparasi

Grade Control & QC


Dedik Dermady 1

Laboratorium Material & Preparasi


Analis Kimia 2 GC Officer 2
Group 1 0 Group 1 0
Group 2 0 Group 2 0
Opr Prep 2 Operator Sampler 2
Group 1 0 Group 1 0
Group 2 0 Group 2 0
Operator TerpalMan 4
Total Karyawan Keseluruhan Group 1 0
Group 2 0
Supervisor 1
Forman 4
Operator 8
Total 13
* Asumsi kerja Operator Satu Hari di bagi 2 Shift
* Kapasitas Produksi +/- 30.000 MT/bulan