Maintenance Procedure for Hitachi Centrifugal Compressor (BCH type)

()BCH

Hitachi Plant Technologies, ltd.

Hitachi compressor line up


() )
Compressor Hi turbo compressor Centrifugal compressor Screw compressor DH-type centrifugal compressor Rechiprocating compressor

HORIZONTALL SPLIT

VERTCALLY SPLIT

VERTICALLY SPLIT
(BCH TYPE)

Maintenance
Safety first
4. INNER CASING .DIAPHRAGM

5. INTERMEDIATE CASING 11.Coupling

7. DRY GAS SEAL 9. Coupling hub


8. OIL SEAL LABYRINTH

12. IMPELLER SHAFT

10.BEARING

2.LABYRINTH

6. HEAD FLANG CASING

Safety first

Flow chart of compressor assembly


1.Assembly of diaphragm 2.Assembly of labyrinth
3.Measurement for Labyrinth clearance

4.Assembly of rotor and Inner casing

5. Installation of inner casing

Gas seal labyrinth

6.Assembly of head flange casing Oil seal labyrinth

9.Assembly of coupling HUB

7.Assembly of DRY GAS SEAL

10.Assembly of center tube 8. Assembly of Bearing

Flow chart of compressor assembly

1.Assembly of diaphragm
2.Assembly of labyrinth
3.Measurement for Labyrinth clearance

4.Assembly of rotor and Inner casing

5. Installation of inner casing

Gas seal labyrinth

6.Assembly of head flange casing Oil seal labyrinth

9.Assembly of coupling HUB

7.Assembly of DRY GAS SEAL

10.Assembly of center tube 8. Assembly of Bearing

1. Assembly of diaphragm
1.Set diaphragm on inner casing () 2, Check match mark ()

Diaphragm

3.Check level () Bearing

Flow chart of compressor assembly


1.Assembly of diaphragm

2.Assembly of labyrinth
3.Measurement for Labyrinth clearance 4.Assembly of rotor and Inner casing

5. Installation of inner casing

Gas seal labyrinth

6.Assembly of head flange casing Oil seal labyrinth

9.Assembly of coupling HUB

7.Assembly of DRY GAS SEAL

10.Assembly of center tube 8. Assembly of Bearing

2. Assembly of Labyrinth
1. Set labyrinth on inner casing.

Check match mark!

3. Measurement of Labyrinthclearance
1. Set upper and lower labyrinth on diaphragm. ()

2.Measure and record inside diameter of labyrinth using inside micrometer. (two place measurement) (2)

3. Measurement of Labyrinthclearance
3. Measure outside of impeller ()

(Labyrinth inside diameter )-(Impeller outside diameter)=Clearance

Check the allowable clearance on Clearance List


()

4. Assembly of rotor and inner casing.


1. Set rotor on labyrinth correctly ()

2. Use guide bolt

3.Confirm no discrepancy ()

5.Installation of inner casing


1. Set guide rail 2.Hook up inner casing horizontally ()

4.Install casing using Special tool 3.Set inner casing on guide rail () ()

5.Installation of inner casing


1.After install inner casing to balance labyrinth position, lift up the shaft a little. ( )

2.Check position of the inner casing ( )

6. Assembly head flange casing.


1. Set guide bolt 2. Lift up head flange using special tool. ()

3. Assemble head flange using fastening bolts and check head flange installed correctly ()

6. Assembly head flange casing.


4. Jack up shaft and set gas seal labyrinth

7.Assembly of DRYGAS SEAL


1. Measure rotor and casing position ()

2. Check thrust ring position ()

Jig

3.Set rotor positing Jig

7.Assembly of DRYGAS SEAL


4. Set dry gas seal and jig and check direction of rotation ()

Protection of casing

5.Set of dial gauge. Check no rotor movement ( ) 6.Install dry gas seal using special tool ()

7.Assembly of DRYGAS SEAL


7.After install dry gas seal disassemble installation plate ()

8.Set dry gas seal fixing parts. ()

7.Assembly of DRYGAS SEAL


9. Completion of dry gas seal assembly () 10. Set opposite side dry gas seal according to same procedure ()

8. Oil seal labyrinth


1.Set oil seal labyrinth and check match mark!

Guide bolt Lift up shaft with jack bolt

9.Assembly of Coupling HUB


1. Set special tool for hydro fitting of coupling hub

9.Assembly of Coupling HUB


2. Check no damage on shaft surface and inside of coupling hub with hand touch. ()

3. Repair by whetstone if necessary ()

9.Assembly of Coupling HUB


4. Blown inside of oil hole ()

5. Mount HUB on rotor Check match mark! ()

6. Check dimension after installation ()


Outside diameter

position

9.Assembly of Coupling HUB


7.Check outer diameter of rotor ()

8. Set oil pressure gauge and dial gauge. () 9. Install hub Check position with dial gauge ( )

9.Assembly of Coupling HUB


10.Check of dimension after install () (1)Keep pressure on pushing side (2)Release pressure on expanding side (1) (2)0

9.Assembly of Coupling HUB


11.After one hour, measure outer diameter of hub. (1)

Confirmation Outside diameter Amount of pushing. 12.After removing jig, check actual axial thrust movement ()

9.Assembly of Coupling HUB


13.Lock nut shall be tightened by jig ()

14. Tight lock bolts ()

10. Bearing
1. Measure bearing interference

2. Put Lead wire (Dia=0.36mm L= 40mm) on upper bearing housing. () 3. Install stainless steel liner (Thickness 0.2 to 0.3 mm thickness) (0.20.3)

(2) Measuring of Bearing Clearance.

Fix three lead wires on the shaft equally spaced with grease within the pad width. The diameter of lead wire is 0.36mm and its Length will be a one-fourth of perimeter. one-

() )

Tighten the set screw and adjust to make the clearance between the tip of special Bolt and the bottom of pad to 1.0-2.0mm. 1.0(1.02.0mm) 1.02.0 mm)

It confirms for surface Rotation instruction confirmation


() ) () )

Install the bearing cap and tighten it. Firstly fix with knock bolt, then tighten the set bolts. Refer to the relevant page for the tightening. Confirmation of position
() )

() ) () )

Lead wire

Measurement

Allowable clearance : Refer to clearance List


() )

11. Thrust Bearing

It confirms it in the drawing.

RTD and the instruction of the rotation are noted.

Paints for oil

Confirmation of mark

Inside of (0) mark

Attaches setscrew set

Thrust bearing collar

Attaches of lock nut

Fixation of key

Inside11Outside : 2 1 Inside 1 1 Outside 1

Fixationof RTDline Fixation RTD

Assembly of bearing cap

Measurementof thrust gap Measurement

12. Center tube


10-1. Assembly for center tube The one to confirm coupling assembly drawing.
()

Check on attaching parts


()

The diaphragm is set to the respect of guard.


()

The suitable mark of the hub and guard.


() )

Rubber hammer It puts it until the coupling bolts entertain


() )

It tightens with special spanner


() )

Special tool and the tightening torque.


() )

similar as for the other side.


() )

The coupling cover is attachment.


() )

13. Balance work

The final balance check


() )

Monitor

Flow chart of balance work


Balance of impeller

Confirmation

Over speed spin test

Balance of shaft
Magnetic particle examination

Assembly of impeller and shaft

Axis vibration measurement

Integrated balance

Balance of unit

Shaft

Size confirmation

Magnetic particle examination () ( )

Over speed spin test

Assembly of Impeller and shaft

Integrated balance

14. Axis vibration measurement

Axis vibration measurement


() )

After completing it, it protects it with the tape.


() )

It is recorded by the record.


() )