Designation Qualification Experience Last Updated : : : : Engineer IV BE Industrial Electronics 6 years 21-Nov-2006

Capability Matrix
PLC Programming HMI Operating Systems Programming Languages PLC Systems Panel Interface DCS Systems Industrial Networks Instrumentation : : : : : : : : : All IEC1131-3 programming languages (Structured Text, Ladder Logic, Instruction List, Function Blocks, SFC), PID Loop Control etc. PID Loop Control, Networking etc. Wonderware InTouch, DigiVis, Process Portal A/B Microsoft Windows (2000,Server2003,98, NT) TC++, Java, VB AB (Allen Bradley) PLCs, Siemens S5/S7 Siemens Logo, ABB Advant Fieldbus100, ABB AdvaSoft 2.0, ABB Application Builder 4.0, ABB Control Builder F/M, Mitsubishi Fx N2 Panel Builder 2.5 (Allen Bradley) ABB Advant OCS, ABB Freelance2000, ABB AC800F, ABB IIT800XA System, ABB AC70/100/160 , RS232/485, ABB DigiNet, ABB Control Net Conventional Flow/Level/Pressure/Temperature, Control Valves

Experience Profile
Sr # Year Project Name (End Use-Country) As Project Manager Basic Engineering : Hardware and Software Selection ( AC110 Controller, S800 IOs with Advant Fieldbus100 network) 1 2006 Stock Preparation Plant (Century Paper & Board Mills- Pakistan) Detail Engineering: Programming of AC110 ABB PLC using AdvaSoft 2.0, Designing of HMI based on Process Portal B, Complete panel designing including IO wiring diagram and Power distribution diagram. Commissioning : Supervision of Field Wiring termination, Configuration of Advant Field bus 110, Loop Testing and Functional Testing and startup. Role in Project

FRM # : HR-WI-07-ED (03) Issue # : 00

Page 1 of 2

Khalid Mehmood
As Senior Design and Application Engineer Application Designing: I got three month training on ABB 800XA System with BMI (Bulk Mineral Industries) Library at ABB University Switzerland. And then design the application of 8000 IO DCS system according to the standard of BMI Library. Out of these 8000 IO plant I was solely responsible for 4000 IOs portion of the plant. Application was design using AC800M professional (Control Builder M) and HMI by using Process Portal A (Graphic Builder Pro). Commissioning: The plant was running on old ABB Adavnt OCS system, We commissioned the whole plant in just 10days annul shutdown, During commissioning I was responsible for planning and scheduling, supervising of new hardware installation, configuration of ABB Control Network (Fiber Optics) and Plant network (Ethernet) and profibus network Installation and configuration of new hardware including CPU (AC864/860), Communication interface card (CI801, CI830), IO Cards (S800 IOs). I also perform Loop test and function test as a team leader. As a Manager I&C I was responsible for to Installation of 1600 I/O DCS (FATEK) and 850 I/O PLC (Mitsubishi) systems. Including Installation of Control panels and Marshalling panels, Installation of Hardware (Controller, IO cards) in the panels and Supervision of cable lying, cable termination. Installation and Configuration of Field, Instrumentation and Control Valve, Configuration of PLCs, Loop testing and Function testing Commissioning. As Control System Manager The plant was dismantled from USA Alabama Mobile, My basic responsibilities were to alter and redesign the Automation system, which was originally based on FOXBORO IA series DCS and Honeywell 620 PLC system. I worked with process engineers to redraw P& IDs, Process flow Diagram, Loop Drawing and logic flow diagrams. I was leading the team of instrument engineers and technicians for overhauling, testing and calibrating the field instrument and Control valves. Design 3000 IO DCS system Architecture based on ABB AC800F controller and S800 IOs. Design Control and marshalling panels, design application using Control Builder F and HMI using Digi Vis. Application Design Engineer My Major responsibilities were to programming, configuration and commissioning of 1400 I/O DCS System (Freelance 2000, ABB). Basic design and training were provided by Bhend Automation AG Switzerland. 5 1999-2 Chemi Viscose Fiber Pakistan I was also responsible to program PLCs (Mitsubishi FX, GX, and Omron). Supervision of cable lying, Field cable termination, installation of Field Instruments, calibrate field instrument (Mag flow, Vortex Flow, PT, TT and DP transmitter) by using Field communicator WinComm ( for Andress_Hauser) and BrainNet (for Yokogawa).

2005-6

PLC Upgrading Project (Askari Cement Ltd. Pakistan)

2004-5

Ghuni Float Glass Pakistan

2003-4

Rehmat Nazir Rayon Pakistan

FRM # : HR-WI-07-ED (03) Issue # : 00