REKAPITULASI TOTAL

BILL OF QUANTITY (BOQ)

PEKERJAAN KONSTRUKSI PENYELESAIAN GEDUNG BELAKANG


DINAS KOPERASI DAN UMKM PROVINSI JAWA BARAT
JL. SOEKARNO HATTA NO. 705 BANDUNG
TAHUN ANGGARAN 2017
JUMLAH HARGA
NO URAIAN PEKERJAAN SUB TOTAL TOTAL
(Rp.) (Rp.)
1 2 3 4

I PEKERJAAN PERSIAPAN -
II PEKERJAAN ARSITEKTURAL -
II.1 LANTAI I
A. PEKERJAAN DINDING -
B. PEKERJAAN LANTAI -
C. PEKERJAAN PLAFOND -
D. PEKERJAAN KACA,KUSEN DAN ALAT PENGGANTUNG -
E. PEKERJAAN PENGECATAN -
F. PEKERJAAN SANITAIR -
II.2 LANTAI 2
A. PEKERJAAN DINDING -
B. PEKERJAAN LANTAI -
C. PEKERJAAN PLAFOND -
D. PEKERJAAN KUSEN DAN ALAT PENGGANTUNG -
E. PEKERJAAN PENGECATAN -
F. PEKERJAAN SANITAIR FIXTURES -
III PEKERJAAN FASADE MUKA BANGUNAN -
IV PEKERJAAN ENTRANCE -
V PEKERJAAN JEMBATAN PENGHUBUNG -

VI PEKERJAAN MEKANIKAL ELEKTRIKAL -


A. PEKERJAAN PANEL DAYA -
B. PEKERJAAN KABEL DAYA -
C. PEKERJAAN INSTALASI PENERANGAN & KOTAK KONTAK -
D. PEKERJAAN INSTALASI SISTEM TATA UDARA -
E. PEKERJAAN INSTALASI DATA ( LOCAL AREA NETWORK )
E.1 LANTAI-1 -
E.2 LANTAI-2 -
F. PEKERJAAN INSTALASI AIR BERSIH -
G. PEKERJAAN INSTALASI AIR KOTOR & AIR HUJAN -
I. PEKERJAAN INSTALASI TELEPON -
J. PEKERJAAN INSTALASI CCTV ( CLOSSED CIRCUIT TELEVISION ) -
VII PEKERJAAN SITE DEVELOPMENT -
A PEKERJAAN TAMAN -
B PEKERJAAN KOLAM -
C PEKERJAAN RABAT DAN SALURAN -
VIII PEKERJAAN LAIN-LAIN -

JUMLAH -
PPN 10% -
JUMLAH TOTAL -
DIBULATKAN -
Terbilang :

Bandung, 2017
dibuat oleh,
PT/ CV/,……

Nama
Direktur/Direktris