I Pengecatan Tanggul
1 Cat Tembok 10.00 Phell 275,000 2,750,000 Cat Full keseluruhan
2 Peralatan -
-Kuas Roll 5.00 Bh 30,000 150,000
-Bros Tangkai 3.00 Bh 25,000 75,000
-Ember Cat Rool 5.00 Bh 15,000 75,000
Jumlah 3,073,000
Total 10,323,000