KETERANGAN
ATAP ALDERON
TALANG BELAKANG L3
564
TINGGI RING BALOK L.3
750 1400
+9409 -6261
H H
CEILING EL.+6.025 EL.+6.025
HOLLOW FRAME 4X4
80
2650
TINGGI TIANG PAGAR L3 +7643
360
120
HOLLOW FRAME 6X4
HOLLOW FRAME 3X3
905
40 DITEL POT. LISPLANG DPN B
EL.+3.375
FFL.
EL.+3.375
FFL.
185
100 SKALA 1:25 2
TINGGI TERAS L.3 +6473 16
+3375
300
15
TINGGI TALANG L.3
925
+6133
285 14 EL.+3.100
G TINGGI PLAPON KMR DEPAN L.2 +5848 13 G
CEILING EL.+2.700 12 CEILING
HOLLOW FRAME 4X4 11 EL.+2.500 HOLLOW FRAME 4X4
2200 10
60
750 9
40
8
200
2700
2500
6
2050 DITEL POT. CONCRET ROOF B
5
SKALA 1:25 2
4
3
+3488 80
2
1 EL.-0.50
+3108 80 FFL GL.
LEVEL KRAMIK L.2 +3148
551
-360
LEVEL TERAS DEPAN L.2 +2608
F +2477 80 F
851
LANTAI KERJA
ROCK
FOUNDATION
+1546 80
TANAH URUGAN
PIPA HAND RELING
1084
+382 -2766
LEVEL L.UTAMA
EL. +382, FFL.
382
-662
E -862 E
-912
-662 DITEL POT. TMBK TNGGA B
SKALA 1:25 2
A
SKALA 1:25 2
1 3 5 6 7 8
A A
1 2 3
1 2 3 4 5 6 7
8
300 650
1700 970 1475 1525 3380 3650
A
300 LOBANG ANGIN (WIND HOLE)
3500 GENTENG BETON FLAT fin.nodrop abu abu
RAFTER BAJA RINGAN TALI AIR LEBAR 20mm DALAM 20mm CONCRETE ROOF
1825
2332
EL.+0.150
FFL.
EL.+0.150
FFL.
TINGGI DINDING L.3 +10155
B
01
1400
DN
850
850
747
D B 200 D
TINGGI TOPI L3 (CONCRETE ROOF) EL,+9123
850
+9305
201
200
TINGGI KUDA KUDA +9104
BATH ROOM
100
REV. Tgl/Bln/Thn DESKRIPSI
755
2200
EL,+8623
EL.+0.150
FFL.
1278
850
3775
717
1575
2100
B +7825
850
02
C 600
1025
BATH ROOM
EL.+0.150
FFL. 300
300
KETINGGIAN KOLOOM FARIASI EL,+6800
405
375
1 2 3 4 5 6 7 8 LEVEL DUDUKAN KUDA KUDA EL. +6395
205 EL,+6148 TINGGI PLAPON TERAS SAMPING
LEVEL KANOPI BETON TERAS DEPAN L.2
342
DENAH LANTAI 3 EL. +6190,FFL
EL.+6.148
OWNER/CLIENT
324
C SKALA 1:100
TINGGI PLAPON TERAS DEPAN EL, +5866
13 EL,+5806 TINGGI TOPI BELAKANG C
12 CONCRETE ROOF
CEILING EL.+5,687 11
HOLLOW FRAME 4X4 10
9 EL,+5006 RUSMAN
CONCRETE RINGBEAM 8
3000
1 A 2 3 4 5 A 6 7 A
7
PROJECT NAME
3 8
2658
1 2 FIN. CAT
2536
12700
8000
300 1400 970 7030 3000 CONCRETE SLAB
A CONCRETE BEAM RUMAH TINGGAL
UP
RAILING 40
1825
80 130
2332
BATH ROOM
BATH ROOM DN 300 DN
FFL
630
DINING ROOM
EL.+0.150
900
EL.+0.150
FFL. LEVEL KRAMIK L.2 EL.+3330,FFL
80
EL,+3148 FFL PROJECT ADDRESS
FFL. 3
100
448
B
540
01 2
680
551
400
BATH ROOM 100
1400
295
B
B B
7000
850
295
851
2200
295
EL.+0.150 EL.+0.150
TANAH URUGAN
BATH ROOM
FFL. FFL. 80
2500
JUDUL GAMBAR
295
SKALA
850
2408
2268
FFL.
C
295
717
BATH ROOM
294
1266
1575
1575
EL.+0.150
FFL. B EL.+200 SEKSEN B-1
850
295
02
D FFL.
UKURAN KERTAS ASLI ISO A1 594x841mm
295
BATH ROOM 200 900
FFL.
300
1400 970 1475 2975 2580 3000 LEVEL JALAN
TANAH URUGAN
Tgl/Bln/Thn UKURAN
1 2 3 4 5 6 7 8 DIGAMBAR KERTAS
-662
PONDASI SETEMPAT
-912 PERANCANG
A A
A1
TANAH ASLI
DIPERIKSA
DENAH LANTAI 2 2670 4450 2496 3075 DISETUJUI
SKALA 1:100 POTONGAN B
SKALA 1:25 2 NO. GAMBAR
1 3 6 7 8 ARC- 001
12 11 10 9 8 7 6 5 4 3 2 1