Anda di halaman 1dari 117

KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR

PEKERJAAN : KANTOR LURAH WUNDUMBATU


LOKASI : KOTA KENDARI
KONTRAK : 117/Kontrak/Sekda/VIII/2019
ADDENDUM :
NILAI KONTRAK : Rp. 672.563.000,00
PELAKSANA : CV. PELANGI
TANGGAL : 7 AGUSTUS 2019
:
SELESAI : 19 DESEMBER 2019

SUMBER DANA : APBD DIREKTUR


TAHUN : 2019
BULAN : I (PERTAMA)
PERIODE :
UNTUK KONTRAKTOR
FISIK : SEPTEMBER - OKTOBER
BULAN I : I (PERTAMA) : 7 AGUST. - 31 AGUST.
: I (PERTAMA)
: 7 AGUST. - 13 AGUST. Kendari, 13 Agustus 2019

: II (KE DUA)
: 14 AGUST. - 21 AGUST. Kendari, 21 Agustus 2019

: III (KE TIGA)


: 22 AGUST. - 28 AGUST. Kendari, 28 Agustus 2019

: IV (KE EMPAT)
: 29 AGUST. - 31 AGUST. Kendari, 31 Agustus 2019

: OKTOBER - NOPEMBER
BULAN II : II (KE DUA) : 1 SEP. - 30 SEP.
: V (KE LIMA)
: 1 SEP. - 7 SEP. Kendari, 7 September 2019

: VI (KE ENAM)
: 8 SEP. - 15 SEP. Kendari, 15 September 2019

: VII (KE TUJUH)


: 16 SEP. - 22 SEP. Kendari, 22 September 2019

: VIII (KE DELAPAN)


: 23 SEP. - 30 SEP. Kendari, 30 September 2019

BULAN III : III (KE TIGA) : 1 OKT. - 31 OKT.


: IX (KE SEMBILAN)
: 1 OKT. - 7 OKT. Kendari, 7 Oktober 2019

: X (KE SEPULUH)
: 8 OKT. - 15 OKT. Kendari, 15 Oktober 2019

: XI (KE SEBELAS)
: 16 OKT. - 22 OKT. Kendari, 22 Oktober 2019

: XII (KE DUA BELAS)


: 23 OKT. - 31 OKT. Kendari, 31 Oktober 2019

BULAN IV : IV (KE EMPAT) : 1 NOP. - 30 NOP.


: XIII (KE TIGA BELAS)
: 1 NOP. - 7 NOP. Kendari, 7 Nopember 2019

: XIV (KE EMPAT BELAS)


: 8 NOP. - 15 NOP. Kendari, 15 Nopember 2019

: XV (KE LIMA BELAS)


: 16 NOP. - 22 NOP. Kendari, 22 Nopember 2019

: XVI (KE ENAM BELAS)


: 23 NOP. - 30 NOP. Kendari, 30 Nopember 2019

BULAN V : V (KE LIMA) : 1 DES. - 19 DES.


: XVII (KE TUJUH BELAS)
: 1 DES. - 7 DES. Kendari, 7 Desember 2019

: XVIII (KE DELAPAN BELAS)


: 8 DES. - 15 DES. Kendari, 15 Desember 2019

: XIX (KE SEMBILAN BELAS)


: 16 DES. - 19 DES. Kendari, 19 Desember 2019
PENGADAAN BANGUNAN GEDUNG KANTOR
KANTOR LURAH WUNDUMBATU

117/Kontrak/Setda/VIII/2019

Rp. 672.563.000,00
CV. PELANGI
7 AGUSTUS 2019

19 DESEMBER 2019

MUHAMMAD AMIN CV. PLADESY CONSULTAN :


Direktur CV. PELANGI : 7 AGUSTUS 2019
Jalan Drs. H. Abd. Silondae Nomor 08 Kota Kendari GALIH ADI SULIATYO, S.Pd.
FARIS ASDINAR, ST. ASHAR BANI MUHLIS, S.Ars.
RISKI KURNIAWAN, ST. UNTUK KONSULTAN
: SEPTEMBER - OKTOBER
: I (PERTAMA) : 7 AGUST. - 5 SEP.
: I (PERTAMA)
: 7 AGUST. - 13 AGUST. Kendari, 13 Agustus 2019

: II (KE DUA)
: 14 AGUST. - 21 AGUST. Kendari, 21 Agustus 2019

: III (KE TIGA)


: 22 AGUST. - 28 AGUST. Kendari, 28 Agustus 2019

: IV (KE EMPAT)
25 : 29 AGUST. - 5 SEP.. Kendari, 5 September 2019

: OKTOBER - NOPEMBER
: II (KE DUA) : 6 SEP. - 5 OKT.
: V (KE LIMA)
: 6 SEP. - 12 SEP. Kendari, 12 September 2019

: VI (KE ENAM)
: 13 SEP. - 20 SEP. Kendari, 20 September 2019

: VII (KE TUJUH)


: 21 SEP. - 27 SEP. Kendari, 27 September 2019

: VIII (KE DELAPAN)


30 : 28 SEP. - 5 OKT. Kendari, 5 Oktober 2019

: III (KE TIGA) : 6 OKT. - 4 NOP.


: IX (KE SEMBILAN)
: 6 OKT. - 12 OKT. Kendari, 12 Oktober 2019

: X (KE SEPULUH)
: 13 OKT. - 20 OKT. Kendari, 20 Oktober 2019

: XI (KE SEBELAS)
: 21 OKT. - 27 OKT. Kendari, 27 Oktober 2019

: XII (KE DUA BELAS)


31 : 28 OKT. - 4 NOP. Kendari, 4 Nopember 2019

: IV (KE EMPAT) : 5 NOP. - 30 NOP.


: XIII (KE TIGA BELAS)
: 5 NOP. - 11 NOP. Kendari, 11 Nopember 2019

: XIV (KE EMPAT BELAS)


: 12 NOP. - 19 NOP. Kendari, 19 Nopember 2019

: XV (KE LIMA BELAS)


: 20 NOP. - 26 NOP. Kendari, 26 Nopember 2019

: XVI (KE ENAM BELAS)


30 : 27 NOP. - 30 NOP. Kendari, 30 Nopember 2019
116
: V (KE LIMA) : 5 NOP. - 4 DES.
: XVII (KE TUJUH BELAS)
: 5 DES. - 11 DES. Kendari, 11 Desember 2019

: XVIII (KE DELAPAN BELAS)


: 12 DES. - 19 DES. Kendari, 19 Desember 2019
: 7 AGUSTUS 2019
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN MINGGUA

KEGUIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGG. : KOTA KENDARI
LOKASI : 117/Kontrak/Sekda/VIII/2019

KONTRAK
NO. URAIAN PEKERJAAN SAT VOLUME JUM. HARGA BOBOT
HARGA SAT. (Rp.)
(Rp.) %
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pek. Pembongkaran Gedung Lama Ls 1.00 7,000,000.00 7,000,000.00 1.14
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00 0.18
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00 0.08
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00 0.82
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00 0.28
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00 0.02
JUMLAH I 15,399,500.00 2.52
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Garis M3 54.00 70,800.00 3,823,200.00 0.63
2 Pek. Urugan Tanah Didatangkan M3 159.39 117,400.00 18,712,394.29 3.06
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 246,100.00 8,145,910.00 1.33
JUMLAH II 30,681,504.29 5.02
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN
1 Pas. Batu Kosong M3 15.50 501,100.00 7,767,050.00 1.27
2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 894,800.00 51,889,452.00 8.49
3 Pas. Dinding Trasram 1:2 M2 16.30 121,700.00 1,983,710.00 0.32
4 Pas. Dinding Bata 1:5 M2 323.70 108,500.00 35,121,450.00 5.74
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 72,100.00 770,028.00 0.13
6 Pek. Plesteran Dinding 1:5 M2 647.40 65,500.00 42,404,700.00 6.94
JUMLAH III 139,936,390.00 22.89
IV PEKERJAAN BESI DAN BETON
1 Pek. Beton Sloof 15/20
- Bekisting M2 30.30 206,317.10 6,251,408.13 1.02
- Besi Beton Kg 951.02 18,400.00 17,498,694.40 2.86
- Beton K175 M3 4.50 1,202,200.00 5,409,900.00 0.88
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58 1.90
- Besi Beton Kg 834.30 18,400.00 15,351,210.97 2.51
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00 0.68

1 2 3 4 5 6 7

3 Pek. Beton Kolom Teras 20/20


- Bekisting M2 13.20 286,564.30 3,782,648.76 0.62
- Besi Beton Kg 348.71 18,400.00 6,416,319.20 1.05
- Beton K175 M3 1.20 1,202,200.00 1,442,640.00 0.24
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 286,564.30 91,700.58 0.01
- Besi Beton Kg 251.66 18,400.00 4,630,617.60 0.76
- Beton K175 M3 0.32 1,202,200.00 384,704.00 0.06
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 291,500.00 539,275.00 0.09
- Besi Beton Kg 535.76 18,400.00 9,857,978.48 1.61
- Beton K175 M3 1.50 1,202,200.00 1,803,300.00 0.29
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 291,500.00 9,881,850.00 1.62
- Besi Beton Kg 1067.65 18,400.00 19,644,686.40 3.21
- Beton K175 M3 4.58 1,202,200.00 5,506,076.00 0.90
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 358,000.00 8,033,520.00 1.31
- Besi Beton Kg 311.74 18,400.00 5,736,016.00 0.94
- Beton K175 M3 2.24 1,202,200.00 2,692,928.00 0.44
8 Pek. Rabat Beton Bawah Lantai M3 12.88 964,882.29 12,427,683.84 2.03
JUMLAH IV 153,201,323.94 25.06
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 245,100.00 104,584,170.00 17.11
2 Pek. Pas. Atap Zincalum M2 426.70 162,900.00 69,509,430.00 11.37
3 Pas. Nok/Jurai Luar Atap M1 53.30 189,900.00 10,121,670.00 1.66
4 Talang Patahan/Jurai Dalam M1 12.40 42,200.00 523,280.00 0.09
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 45,900.00 3,717,900.00 0.61
JUMLAH V 188,456,450.00 30.82
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES
1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00 1.06
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00 0.62
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 1,064,600.00 3,193,800.00 0.52
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 679,600.00 1,359,200.00 0.22
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00 0.45
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00 0.35
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 981,700.00 2,945,100.00 0.48
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00 0.55
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00 3.33
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 207,600.00 415,200.00 0.07
JUMLAH VI 46,752,700.00 7.65

1 2 3 4 5 6 7
VII PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 128,300.00 577,350.00 0.09
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16 1.04
JUMLAH VII 6,959,732.16 1.14
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00 0.12
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00 0.54
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00 0.46
4 Pek. Pasangan Kloset Jongkok Bh 1.00 396,900.00 396,900.00 0.06
5 Pek. Pasangan Kran Air Bh 2.00 15,000.00 30,000.00 0.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00 0.03
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00 0.80
JUMLAH VIII 12,371,200.00 2.02
IX PEKERJAAN PENGECATAN, FINISHING, DLL
1 Pek. Cat Dinding Tembok M2 662.59 25,400.00 16,829,836.80 2.75
2 Pek. Cat Listplank M2 16.40 32,500.00 533,000.00 0.09
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00 0.05
JUMLAH IX 17,662,836.80 2.89
REAL COST 611,421,637.18
PPN 10% 61,142,163.72
100.00
TOTAL COST (A+B) 672,563,800.90
DIBULATKAN 672,563,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTA

SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI


Nip. 19791017 200604 1 016 Site Engineer
AAN PEKERJAAN MINGGUAN

MINGGUAN : I (PERTAMA)
PERIODE : 7 AGUST. - 13 AGUST.
S/D MINGGU LALU: - %
MINGGU INI : 1.19 %
S/D MINGGU INI : 1.19 %
REALISASI TERLAKSANA
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT % BOBOT % BOBOT %
VOLUME VOLUME VOLUME
TERCAPAI TERTIMB. TERCAPAI TERTIMB. TERCAPAI TERTIMB.

8 9 10 11 12 13 14 15 16

- - - 1.00 100.00 1.14 1.00 100.00 1.14


- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 0.10 10.00 0.03 0.10 10.00 0.03
- - - 1.00 100.00 0.02 1.00 100.00 0.02
- 1.19 1.19

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- 1.19 1.19

Kendari, 13 Agustus 2019


Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI

ASHAR BANI RISKI KURNIAWAN, ST


Site Engineer Pelaksana
PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Peninjauan Lokasi Pekerjaan
3 Tukang Batu Orang
4 Tukang Kayu Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Papan Nama Proyek
3 Tukang Batu Orang Pembuatan Direksi Keet / Gudang
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 3 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang Pembongkaran Bangunan Lama
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang Pembongkaran Bangunan Lama
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang Pembongkaran Bangunan Lama
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang Pembongkaran Bangunan Lama
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang Pembongkaran Bangunan Lama
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Pipa Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG CERAH Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pembuatan Direksi Keet / Gudang
3 Tukang Batu Orang
4 Tukang Plafond Orang
5 Tukang Besi Orang
6 Tukang Kayu 2 Orang
7 Tukang Cat Orang
8 Operator Alat Berat Orang
9 Pekerja 2 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis
CUACA SIANG CERAH DINAS PU KOTA KENDARI
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH .MUHAMMAD RIZAL, ST .KUSNADI KAMIL, ST., M.Si
Nip. 19800223 201907 1 001 Nip. 19800418 200903 1 002
R A N H A R I A N NOMOR : 01

HARI : RABU
NGUNAN GEDUNG KANTOR
TANGGAL : 7 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 02

HARI : KAMIS
NGUNAN GEDUNG KANTOR
TANGGAL : 8 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019
PENGADAAN BAHAN PENGADAAN ALAT
JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Kayu Dolken 30 Btg Alat Tuk. Kayu 2 Set


Papan 3 M3 Alat Bantu 1 Set
Balok 8/12 2 M3
Paku Campur

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 03

HARI : JUMAT
NGUNAN GEDUNG KANTOR
TANGGAL : 9 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Tuk. Batu 2 Set
Alat Bantu 1 Set
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 04

HARI : SABTU
NGUNAN GEDUNG KANTOR
TANGGAL : 10 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Tuk. Batu 2 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 05

HARI : MINGGU
NGUNAN GEDUNG KANTOR
TANGGAL : 11 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Tuk. Batu 2 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 06

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 12 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Tuk. Batu 2 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 07

HARI : SELASA
NGUNAN GEDUNG KANTOR
TANGGAL : 13 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Tuk. Batu 2 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI
MUHLIS, S.Ars. RISKI KURNIAWAN, ST
Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 08

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 19 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Kayu 2 Set


Alat Bantu 1 Set

Konsultan Pengawas Kontraktor Pelaksana


CV. FIKRINDO KONSULTAN CV. FAJAR BERKARYA

USNADI KAMIL, ST., M.Si ASHAR BANI NOVIANDI


. 19800418 200903 1 002 Pengawas Lapangan Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN MINGGUA

KEGUIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGG. : KOTA KENDARI
LOKASI : 117/Kontrak/Sekda/VIII/2019

KONTRAK
NO. URAIAN PEKERJAAN SAT VOLUME JUM. HARGA BOBOT
HARGA SAT. (Rp.)
(Rp.) %
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pek. Pembongkaran Gedung Lama Ls 1.00 7,000,000.00 7,000,000.00 1.14
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00 0.18
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00 0.08
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00 0.82
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00 0.28
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00 0.02
JUMLAH I 15,399,500.00 2.52
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Garis M3 54.00 70,800.00 3,823,200.00 0.63
2 Pek. Urugan Tanah Didatangkan M3 159.39 117,400.00 18,712,394.29 3.06
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 246,100.00 8,145,910.00 1.33
JUMLAH II 30,681,504.29 5.02
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN
1 Pas. Batu Kosong M3 15.50 501,100.00 7,767,050.00 1.27
2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 894,800.00 51,889,452.00 8.49
3 Pas. Dinding Trasram 1:2 M2 16.30 121,700.00 1,983,710.00 0.32
4 Pas. Dinding Bata 1:5 M2 323.70 108,500.00 35,121,450.00 5.74
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 72,100.00 770,028.00 0.13
6 Pek. Plesteran Dinding 1:5 M2 647.40 65,500.00 42,404,700.00 6.94
JUMLAH III 139,936,390.00 22.89
IV PEKERJAAN BESI DAN BETON
1 Pek. Beton Sloof 15/20
- Bekisting M2 30.30 206,317.10 6,251,408.13 1.02
- Besi Beton Kg 951.02 18,400.00 17,498,694.40 2.86
- Beton K175 M3 4.50 1,202,200.00 5,409,900.00 0.88
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58 1.90
- Besi Beton Kg 834.30 18,400.00 15,351,210.97 2.51
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00 0.68

1 2 3 4 5 6 7

3 Pek. Beton Kolom Teras 20/20


- Bekisting M2 13.20 286,564.30 3,782,648.76 0.62
- Besi Beton Kg 348.71 18,400.00 6,416,319.20 1.05
- Beton K175 M3 1.20 1,202,200.00 1,442,640.00 0.24
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 286,564.30 91,700.58 0.01
- Besi Beton Kg 251.66 18,400.00 4,630,617.60 0.76
- Beton K175 M3 0.32 1,202,200.00 384,704.00 0.06
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 291,500.00 539,275.00 0.09
- Besi Beton Kg 535.76 18,400.00 9,857,978.48 1.61
- Beton K175 M3 1.50 1,202,200.00 1,803,300.00 0.29
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 291,500.00 9,881,850.00 1.62
- Besi Beton Kg 1067.65 18,400.00 19,644,686.40 3.21
- Beton K175 M3 4.58 1,202,200.00 5,506,076.00 0.90
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 358,000.00 8,033,520.00 1.31
- Besi Beton Kg 311.74 18,400.00 5,736,016.00 0.94
- Beton K175 M3 2.24 1,202,200.00 2,692,928.00 0.44
8 Pek. Rabat Beton Bawah Lantai M3 12.88 964,882.29 12,427,683.84 2.03
JUMLAH IV 153,201,323.94 25.06
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 245,100.00 104,584,170.00 17.11
2 Pek. Pas. Atap Zincalum M2 426.70 162,900.00 69,509,430.00 11.37
3 Pas. Nok/Jurai Luar Atap M1 53.30 189,900.00 10,121,670.00 1.66
4 Talang Patahan/Jurai Dalam M1 12.40 42,200.00 523,280.00 0.09
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 45,900.00 3,717,900.00 0.61
JUMLAH V 188,456,450.00 30.82
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES
1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00 1.06
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00 0.62
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 1,064,600.00 3,193,800.00 0.52
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 679,600.00 1,359,200.00 0.22
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00 0.45
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00 0.35
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 981,700.00 2,945,100.00 0.48
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00 0.55
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00 3.33
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 207,600.00 415,200.00 0.07
JUMLAH VI 46,752,700.00 7.65

1 2 3 4 5 6 7
VII PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 128,300.00 577,350.00 0.09
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16 1.04
JUMLAH VII 6,959,732.16 1.14
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00 0.12
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00 0.54
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00 0.46
4 Pek. Pasangan Kloset Jongkok Bh 1.00 396,900.00 396,900.00 0.06
5 Pek. Pasangan Kran Air Bh 2.00 15,000.00 30,000.00 0.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00 0.03
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00 0.80
JUMLAH VIII 12,371,200.00 2.02
IX PEKERJAAN PENGECATAN, FINISHING, DLL
1 Pek. Cat Dinding Tembok M2 662.59 25,400.00 16,829,836.80 2.75
2 Pek. Cat Listplank M2 16.40 32,500.00 533,000.00 0.09
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00 0.05
JUMLAH IX 17,662,836.80 2.89
REAL COST 611,421,637.18
PPN 10% 61,142,163.72
100.00
TOTAL COST (A+B) 672,563,800.90
DIBULATKAN 672,563,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTA
SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI
Nip. 19791017 200604 1 016 Site Engineer
AAN PEKERJAAN MINGGUAN

MINGGUAN : II (KE DUA)


PERIODE : 14 AGUST. - 21 AGUST.
S/D MINGGU LALU: 1.19 %
MINGGU INI : 5.53 %
S/D MINGGU INI : 6.72 %
REALISASI TERLAKSANA
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT % BOBOT % BOBOT %
VOLUME VOLUME VOLUME
TERCAPAI TERTIMB. TERCAPAI TERTIMB. TERCAPAI TERTIMB.

8 9 10 11 12 13 14 15 16

1.00 100.00 1.14 - - - 1.00 100.00 1.14


- - - 1.00 100.00 0.18 1.00 100.00 0.18
- - - 1.00 100.00 0.08 1.00 100.00 0.08
- - - 1.00 100.00 0.82 1.00 100.00 0.82
0.10 10.00 0.03 0.05 5.00 0.01 0.15 15.00 0.04
1.00 100.00 0.02 - - - 1.00 100.00 0.02
1.19 1.09 2.28

- - - 31.40 58.15 0.36 31.40 58.15 0.36


- - - - - - - - -
- - - 1.90 5.74 0.08 1.90 5.74 0.08
- 0.44 0.44

- - - 5.70 36.77 0.47 5.70 36.77 0.47


- - - 24.10 41.56 3.53 24.10 41.56 3.53
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 3.99 3.99

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

1.19 5.53 6.72

Kendari, 21 Agustus 2019


Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI
ASHAR BANI RISKI KURNIAWAN, ST
Site Engineer Pelaksana
PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pemasangan Bouw Plank
3 Tukang Batu 2 Orang Galian Tanah Pondasi
4 Tukang Kayu Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 2 Orang
4 Tukang Kayu Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG CERAH Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Galian Tanah Pondasi
3 Tukang Batu 1 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu 2 Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG CERAH Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH S Y A H R I R, ST.,MT.
Pengawas Lapangan
R A N H A R I A N NOMOR : 08

HARI : RABU
NGUNAN GEDUNG KANTOR
TANGGAL : 14 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Batu 2 Set


Pasir 1 Ret Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 09

HARI : KAMIS
NGUNAN GEDUNG KANTOR
TANGGAL : 15 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019
PENGADAAN BAHAN PENGADAAN ALAT
JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Semen 30 Zak Alat Tuk. Batu 2 Set


Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 10

HARI : JUMAT
NGUNAN GEDUNG KANTOR
TANGGAL : 16 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Batu 2 Set


Alat Bantu 1 Set
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 11

HARI : SABTU
NGUNAN GEDUNG KANTOR
TANGGAL : 17 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Batu 2 Set


Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 12

HARI : MINGGU
NGUNAN GEDUNG KANTOR
TANGGAL : 18 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Pasir Pasang 2 Ret Alat Tuk. Batu 2 Set


Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 13

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 19 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Batu 2 Set


Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 14

HARI : SELASA
NGUNAN GEDUNG KANTOR
TANGGAL : 20 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Batu 2 Set


Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI
MUHLIS, S.Ars. RISKI KURNIAWAN, ST
Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 15

HARI : RABU
NGUNAN GEDUNG KANTOR
TANGGAL : 21 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Batu 2 Set


Pasir 1 Ret Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN MINGGUA

KEGUIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGG. : KOTA KENDARI
LOKASI : 117/Kontrak/Sekda/VIII/2019

KONTRAK
NO. URAIAN PEKERJAAN SAT VOLUME JUM. HARGA BOBOT
HARGA SAT. (Rp.)
(Rp.) %
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pek. Pembongkaran Gedung Lama Ls 1.00 7,000,000.00 7,000,000.00 1.14
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00 0.18
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00 0.08
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00 0.82
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00 0.28
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00 0.02
JUMLAH I 15,399,500.00 2.52
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Garis M3 54.00 70,800.00 3,823,200.00 0.63
2 Pek. Urugan Tanah Didatangkan M3 159.39 117,400.00 18,712,394.29 3.06
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 246,100.00 8,145,910.00 1.33
JUMLAH II 30,681,504.29 5.02
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN
1 Pas. Batu Kosong M3 15.50 501,100.00 7,767,050.00 1.27
2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 894,800.00 51,889,452.00 8.49
3 Pas. Dinding Trasram 1:2 M2 16.30 121,700.00 1,983,710.00 0.32
4 Pas. Dinding Bata 1:5 M2 323.70 108,500.00 35,121,450.00 5.74
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 72,100.00 770,028.00 0.13
6 Pek. Plesteran Dinding 1:5 M2 647.40 65,500.00 42,404,700.00 6.94
JUMLAH III 139,936,390.00 22.89
IV PEKERJAAN BESI DAN BETON
1 Pek. Beton Sloof 15/20
- Bekisting M2 30.30 206,317.10 6,251,408.13 1.02
- Besi Beton Kg 951.02 18,400.00 17,498,694.40 2.86
- Beton K175 M3 4.50 1,202,200.00 5,409,900.00 0.88
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58 1.90
- Besi Beton Kg 834.30 18,400.00 15,351,210.97 2.51
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00 0.68

1 2 3 4 5 6 7

3 Pek. Beton Kolom Teras 20/20


- Bekisting M2 13.20 286,564.30 3,782,648.76 0.62
- Besi Beton Kg 348.71 18,400.00 6,416,319.20 1.05
- Beton K175 M3 1.20 1,202,200.00 1,442,640.00 0.24
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 286,564.30 91,700.58 0.01
- Besi Beton Kg 251.66 18,400.00 4,630,617.60 0.76
- Beton K175 M3 0.32 1,202,200.00 384,704.00 0.06
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 291,500.00 539,275.00 0.09
- Besi Beton Kg 535.76 18,400.00 9,857,978.48 1.61
- Beton K175 M3 1.50 1,202,200.00 1,803,300.00 0.29
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 291,500.00 9,881,850.00 1.62
- Besi Beton Kg 1067.65 18,400.00 19,644,686.40 3.21
- Beton K175 M3 4.58 1,202,200.00 5,506,076.00 0.90
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 358,000.00 8,033,520.00 1.31
- Besi Beton Kg 311.74 18,400.00 5,736,016.00 0.94
- Beton K175 M3 2.24 1,202,200.00 2,692,928.00 0.44
8 Pek. Rabat Beton Bawah Lantai M3 12.88 964,882.29 12,427,683.84 2.03
JUMLAH IV 153,201,323.94 25.06
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 245,100.00 104,584,170.00 17.11
2 Pek. Pas. Atap Zincalum M2 426.70 162,900.00 69,509,430.00 11.37
3 Pas. Nok/Jurai Luar Atap M1 53.30 189,900.00 10,121,670.00 1.66
4 Talang Patahan/Jurai Dalam M1 12.40 42,200.00 523,280.00 0.09
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 45,900.00 3,717,900.00 0.61
JUMLAH V 188,456,450.00 30.82
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES
1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00 1.06
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00 0.62
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 1,064,600.00 3,193,800.00 0.52
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 679,600.00 1,359,200.00 0.22
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00 0.45
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00 0.35
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 981,700.00 2,945,100.00 0.48
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00 0.55
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00 3.33
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 207,600.00 415,200.00 0.07
JUMLAH VI 46,752,700.00 7.65

1 2 3 4 5 6 7
VII PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 128,300.00 577,350.00 0.09
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16 1.04
JUMLAH VII 6,959,732.16 1.14
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00 0.12
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00 0.54
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00 0.46
4 Pek. Pasangan Kloset Jongkok Bh 1.00 396,900.00 396,900.00 0.06
5 Pek. Pasangan Kran Air Bh 2.00 15,000.00 30,000.00 0.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00 0.03
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00 0.80
JUMLAH VIII 12,371,200.00 2.02
IX PEKERJAAN PENGECATAN, FINISHING, DLL
1 Pek. Cat Dinding Tembok M2 662.59 25,400.00 16,829,836.80 2.75
2 Pek. Cat Listplank M2 16.40 32,500.00 533,000.00 0.09
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00 0.05
JUMLAH IX 17,662,836.80 2.89
REAL COST 611,421,637.18
PPN 10% 61,142,163.72
100.00
TOTAL COST (A+B) 672,563,800.90
DIBULATKAN 672,563,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTA
SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI
Nip. 19791017 200604 1 016 Site Engineer
AAN PEKERJAAN MINGGUAN

MINGGUAN : III (KE TIGA)


PERIODE : 22 AGUST. - 28 AGUST.
S/D MINGGU LALU: 6.72 %
MINGGU INI : 2.25 %
S/D MINGGU INI : 8.97 %
REALISASI TERLAKSANA
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT % BOBOT % BOBOT %
VOLUME VOLUME VOLUME
TERCAPAI TERTIMB. TERCAPAI TERTIMB. TERCAPAI TERTIMB.

8 9 10 11 12 13 14 15 16

1.00 100.00 1.14 - - - 1.00 100.00 1.14


1.00 100.00 0.18 - - - 1.00 100.00 0.18
1.00 100.00 0.08 - - - 1.00 100.00 0.08
1.00 100.00 0.82 - - - 1.00 100.00 0.82
0.15 15.00 0.04 0.05 5.00 0.01 0.20 20.00 0.06
1.00 100.00 0.02 - - - 1.00 100.00 0.02
2.28 0.01 2.30

31.40 58.15 0.36 22.60 41.85 0.26 54.00 100.00 0.63


- - - - - - - - -
1.90 5.74 0.08 2.20 6.65 0.09 4.10 12.39 0.17
0.44 0.35 0.79

5.70 36.77 0.47 5.80 37.42 0.48 11.50 74.19 0.94


24.10 41.56 3.53 5.10 8.79 0.75 29.20 50.35 4.27
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
3.99 1.22 5.22

- - - - - - - - -
- - - 220.70 23.21 0.66 220.70 23.21 0.66
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 0.66 0.66

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

6.72 2.25 8.97

Kendari, 28 Agustus 2019


Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI
ASHAR BANI RISKI KURNIAWAN, ST
Site Engineer Pelaksana
PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 2 Orang Pekerjaan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG CERAH Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pekerjaan Sumur Bor
3 Tukang Batu 1 Orang Galian Tanah Pondasi
4 Tukang Kayu Orang
5 Tukang Besi Orang
6 Tukang Sumur Bor 1 Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 3 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis
CUACA SIANG CERAH DINAS PU KOTA KENDARI
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
CERAH .MUHAMMAD RIZAL, ST .KUSNADI KAMIL, ST., M.Si
Nip. 19800223 201907 1 001 Nip. 19800418 200903 1 002
R A N H A R I A N NOMOR : 16

HARI : KAMIS
NGUNAN GEDUNG KANTOR
TANGGAL : 22 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Besi 8 50 Btg Alat Tuk. Besi 2 Set


Besi 12 100 Btg Alat Tuk. Batu 3 Set
Kawat Bendrat Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 17

HARI : JUMAT
NGUNAN GEDUNG KANTOR
TANGGAL : 23 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019
PENGADAAN BAHAN PENGADAAN ALAT
JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 18

HARI : SABTU
NGUNAN GEDUNG KANTOR
TANGGAL : 24 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 19

HARI : MINGGU
NGUNAN GEDUNG KANTOR
TANGGAL : 25 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 20

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 26 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Besi 2 Set


Pasir Pasang 1 Ret Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 21

HARI : SELASA
NGUNAN GEDUNG KANTOR
TANGGAL : 27 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 22

HARI : RABU
NGUNAN GEDUNG KANTOR
TANGGAL : 28 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Besi 2 Set


Pasir Pasang 1 Ret Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI
MUHLIS, S.Ars. RISKI KURNIAWAN, ST
Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 15

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 21 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Batu 2 Set


Alat Tuk. Bor 1 Set
Alat Bantu 1 Set

Konsultan Pengawas Kontraktor Pelaksana


CV. FIKRINDO KONSULTAN CV. FAJAR BERKARYA

USNADI KAMIL, ST., M.Si ASHAR BANI NOVIANDI


. 19800418 200903 1 002 Pengawas Lapangan Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN MINGGUA

KEGUIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGG. : KOTA KENDARI
LOKASI : 117/Kontrak/Sekda/VIII/2019

KONTRAK
NO. URAIAN PEKERJAAN SAT VOLUME JUM. HARGA BOBOT
HARGA SAT. (Rp.)
(Rp.) %
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pek. Pembongkaran Gedung Lama Ls 1.00 7,000,000.00 7,000,000.00 1.14
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00 0.18
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00 0.08
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00 0.82
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00 0.28
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00 0.02
JUMLAH I 15,399,500.00 2.52
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Garis M3 54.00 70,800.00 3,823,200.00 0.63
2 Pek. Urugan Tanah Didatangkan M3 159.39 117,400.00 18,712,394.29 3.06
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 246,100.00 8,145,910.00 1.33
JUMLAH II 30,681,504.29 5.02
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN
1 Pas. Batu Kosong M3 15.50 501,100.00 7,767,050.00 1.27
2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 894,800.00 51,889,452.00 8.49
3 Pas. Dinding Trasram 1:2 M2 16.30 121,700.00 1,983,710.00 0.32
4 Pas. Dinding Bata 1:5 M2 323.70 108,500.00 35,121,450.00 5.74
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 72,100.00 770,028.00 0.13
6 Pek. Plesteran Dinding 1:5 M2 647.40 65,500.00 42,404,700.00 6.94
JUMLAH III 139,936,390.00 22.89
IV PEKERJAAN BESI DAN BETON
1 Pek. Beton Sloof 15/20
- Bekisting M2 30.30 206,317.10 6,251,408.13 1.02
- Besi Beton Kg 951.02 18,400.00 17,498,694.40 2.86
- Beton K175 M3 4.50 1,202,200.00 5,409,900.00 0.88
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58 1.90
- Besi Beton Kg 834.30 18,400.00 15,351,210.97 2.51
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00 0.68

1 2 3 4 5 6 7

3 Pek. Beton Kolom Teras 20/20


- Bekisting M2 13.20 286,564.30 3,782,648.76 0.62
- Besi Beton Kg 348.71 18,400.00 6,416,319.20 1.05
- Beton K175 M3 1.20 1,202,200.00 1,442,640.00 0.24
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 286,564.30 91,700.58 0.01
- Besi Beton Kg 251.66 18,400.00 4,630,617.60 0.76
- Beton K175 M3 0.32 1,202,200.00 384,704.00 0.06
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 291,500.00 539,275.00 0.09
- Besi Beton Kg 535.76 18,400.00 9,857,978.48 1.61
- Beton K175 M3 1.50 1,202,200.00 1,803,300.00 0.29
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 291,500.00 9,881,850.00 1.62
- Besi Beton Kg 1067.65 18,400.00 19,644,686.40 3.21
- Beton K175 M3 4.58 1,202,200.00 5,506,076.00 0.90
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 358,000.00 8,033,520.00 1.31
- Besi Beton Kg 311.74 18,400.00 5,736,016.00 0.94
- Beton K175 M3 2.24 1,202,200.00 2,692,928.00 0.44
8 Pek. Rabat Beton Bawah Lantai M3 12.88 964,882.29 12,427,683.84 2.03
JUMLAH IV 153,201,323.94 25.06
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 245,100.00 104,584,170.00 17.11
2 Pek. Pas. Atap Zincalum M2 426.70 162,900.00 69,509,430.00 11.37
3 Pas. Nok/Jurai Luar Atap M1 53.30 189,900.00 10,121,670.00 1.66
4 Talang Patahan/Jurai Dalam M1 12.40 42,200.00 523,280.00 0.09
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 45,900.00 3,717,900.00 0.61
JUMLAH V 188,456,450.00 30.82
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES
1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00 1.06
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00 0.62
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 1,064,600.00 3,193,800.00 0.52
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 679,600.00 1,359,200.00 0.22
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00 0.45
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00 0.35
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 981,700.00 2,945,100.00 0.48
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00 0.55
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00 3.33
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 207,600.00 415,200.00 0.07
JUMLAH VI 46,752,700.00 7.65

1 2 3 4 5 6 7
VII PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 128,300.00 577,350.00 0.09
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16 1.04
JUMLAH VII 6,959,732.16 1.14
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00 0.12
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00 0.54
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00 0.46
4 Pek. Pasangan Kloset Jongkok Bh 1.00 396,900.00 396,900.00 0.06
5 Pek. Pasangan Kran Air Bh 2.00 15,000.00 30,000.00 0.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00 0.03
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00 0.80
JUMLAH VIII 12,371,200.00 2.02
IX PEKERJAAN PENGECATAN, FINISHING, DLL
1 Pek. Cat Dinding Tembok M2 662.59 25,400.00 16,829,836.80 2.75
2 Pek. Cat Listplank M2 16.40 32,500.00 533,000.00 0.09
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00 0.05
JUMLAH IX 17,662,836.80 2.89
REAL COST 611,421,637.18
PPN 10% 61,142,163.72
100.00
TOTAL COST (A+B) 672,563,800.90
DIBULATKAN 672,563,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTAN
SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI
Nip. 19791017 200604 1 016 Site Engineer
AAN PEKERJAAN MINGGUAN

MINGGUAN : IV (KE EMPAT)


PERIODE : 29 AGUST. - 31 AGUST.
S/D MINGGU LALU: 8.97 %
MINGGU INI : 5.92 %
S/D MINGGU INI : 14.89 %
REALISASI TERLAKSANA
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT % BOBOT % BOBOT %
VOLUME VOLUME VOLUME
TERCAPAI TERTIMB. TERCAPAI TERTIMB. TERCAPAI TERTIMB.

8 9 10 11 12 13 14 15 16

1.00 100.00 1.14 - - - 1.00 100.00 1.14


1.00 100.00 0.18 - - - 1.00 100.00 0.18
1.00 100.00 0.08 - - - 1.00 100.00 0.08
1.00 100.00 0.82 - - - 1.00 100.00 0.82
0.20 20.00 0.06 0.05 5.00 0.01 0.25 25.00 0.07
1.00 100.00 0.02 - - - 1.00 100.00 0.02
2.30 0.01 2.31

54.00 100.00 0.63 - - - 54.00 100.00 0.63


- - - - - - - - -
4.10 12.39 0.17 1.36 4.11 0.05 5.46 16.50 0.22
0.79 0.05 0.85

11.50 74.19 0.94 4.00 25.81 0.33 15.50 100.00 1.27


29.20 50.35 4.27 17.20 29.66 2.52 46.40 80.01 6.79
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
5.22 2.85 8.06

- - - 30.30 100.00 1.02 30.30 100.00 1.02


220.70 23.21 0.66 502.70 52.86 1.51 723.40 76.07 2.18
- - - - - - - - -

- - - - - - - - -
- - - 158.10 18.95 0.48 158.10 18.95 0.48
- - - - - - - - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
0.66 3.01 3.68

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8.97 5.92 14.89

Kendari, 31 Agustus 2019


Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI
ASHAR BANI RISKI KURNIAWAN, ST
Site Engineer Pelaksana
PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah S Y A H R I R, ST.,MT.
Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah MUHAMMAD RIZAL, ST.
Nip. 19800223 201907 1 001 Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah MUHAMMAD RIZAL, ST.
Nip. 19800223 201907 1 001 Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah MUHAMMAD RIZAL, ST.
Nip. 19800223 201907 1 001 Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Pekerjaan Coor Sloof
3 Tukang Batu 3 Orang Perakitan Tulangan Kolom
4 Tukang Kayu Orang Pasangan Pondasi Batu Gunung
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah MUHAMMAD RIZAL, ST.
Nip. 19800223 201907 1 001 Pengawas Lapangan

PEMERINTAH KOTA KENDARI

L A P O R A N H A R I A N
SEKRETARIAT DAERAH
Konsultan Pengawas
CV. PLADESY CONSULTAN KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
No. Kontrak : KONTRAK : 117/Kontrak/Sekda/VIII/2019
Tanggal : 7 AGUSTUS 2019 NILAI KONTRAK : Rp. 672.563.000,00
Kontraktor Pelaksana PELAKSANA : CV. PELANGI
CV. FAJAR BERKARYA

No. Kontrak : 117/Kontrak/Sekda/VIII/2019


Tanggal : 7 AGUSTUS 2019

NO. TENAGA KERJA JUMLAH URAIAN PEKERJAAN VOLUME SAT.

1 Pelaksana 1 Orang
2 Kepala Tukang 1 Orang Perakitan Tulangan Kolom
3 Tukang Batu 3 Orang Pasangan Pondasi Batu Gunung
4 Tukang Kayu Orang
5 Tukang Besi 2 Orang
6 Tukang Sumur Bor Orang
7 Tukang Cat Orang
8 Tukang Listrik Orang
9 Pekerja 4 Orang
10 Mandor 1 Orang
11 Driver Orang
PAGI Direksi Teknis Konsultan Supervisi
CUACA SIANG Cerah Dinas PU Kota Kendari CV. PLADESY CONSULTAN
MALAM
Hari sepenuhnya dapat dipergunakan
untuk bekerja karena :
Cerah MUHAMMAD RIZAL, ST.
Nip. 19800223 201907 1 001 Pengawas Lapangan
R A N H A R I A N NOMOR : 23

HARI : KAMIS
NGUNAN GEDUNG KANTOR
TANGGAL : 29 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 5 Ret Alat Tuk. Besi 2 Set


Pasir Pasang 1 Ret Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 24

HARI : JUMAT
NGUNAN GEDUNG KANTOR
TANGGAL : 30 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019
PENGADAAN BAHAN PENGADAAN ALAT
JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 25

HARI : SABTU
NGUNAN GEDUNG KANTOR
TANGGAL : 31 AGUSTUS 2019

BULAN : AGUSTUS

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 26

HARI : MINGGU
NGUNAN GEDUNG KANTOR
TANGGAL : 1 SEPTEMBER 2019

BULAN : SEPTEMBER

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 5 Ret Alat Tuk. Besi 2 Set


Pasir Pasang 1 Ret Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 27

HARI : SENIN
NGUNAN GEDUNG KANTOR
TANGGAL : 2 SEPTEMBER 2019

BULAN : SEPTEMBER

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 28

HARI : SELASA
NGUNAN GEDUNG KANTOR
TANGGAL : 3 SEPTEMBER 2019

BULAN : SEPTEMBER

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Batu Gunung 3 Ret Alat Tuk. Besi 2 Set


Pasir Pasang 1 Ret Alat Tuk. Batu 3 Set
Suplit 2 Ret Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 29

HARI : RABU
NGUNAN GEDUNG KANTOR
TANGGAL : 4 SEPTEMBER 2019

BULAN : SEPTEMBER

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI
MUHLIS, S.Ars. RISKI KURNIAWAN, ST
Pengawas Lapangan Pelaksana

R A N H A R I A N NOMOR : 30

HARI : KAMIS
NGUNAN GEDUNG KANTOR
TANGGAL : 5 SEPTEMBER 2019

BULAN : SEPTEMBER

TAHUN : 2019

PENGADAAN BAHAN PENGADAAN ALAT


JUMLAH JUMLAH
JENIS BAHAN JENIS ALAT
DITERIMA DITOLAK DITERIMA DITOLAK

Alat Tuk. Besi 2 Set


Alat Tuk. Batu 3 Set
Alat Bantu 1 Set

Konsultan Supervisi Kontraktor Pelaksana


CV. PLADESY CONSULTAN CV. PELANGI

MUHLIS, S.Ars. RISKI KURNIAWAN, ST


Pengawas Lapangan Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN BULANAN

KEGUIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGG. : KOTA KENDARI
LOKASI : 117/Kontrak/Sekda/VIII/2019

KONTRAK
NO. URAIAN PEKERJAAN SAT VOLUME JUM. HARGA BOBOT
HARGA SAT. (Rp.)
(Rp.) %
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pek. Pembongkaran Gedung Lama Ls 1.00 7,000,000.00 7,000,000.00 1.14
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00 0.18
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00 0.08
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00 0.82
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00 0.28
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00 0.02
JUMLAH I 15,399,500.00 2.52
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Garis M3 54.00 70,800.00 3,823,200.00 0.63
2 Pek. Urugan Tanah Didatangkan M3 159.39 117,400.00 18,712,394.29 3.06
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 246,100.00 8,145,910.00 1.33
JUMLAH II 30,681,504.29 5.02
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN
1 Pas. Batu Kosong M3 15.50 501,100.00 7,767,050.00 1.27
2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 894,800.00 51,889,452.00 8.49
3 Pas. Dinding Trasram 1:2 M2 16.30 121,700.00 1,983,710.00 0.32
4 Pas. Dinding Bata 1:5 M2 323.70 108,500.00 35,121,450.00 5.74
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 72,100.00 770,028.00 0.13
6 Pek. Plesteran Dinding 1:5 M2 647.40 65,500.00 42,404,700.00 6.94
JUMLAH III 139,936,390.00 22.89
IV PEKERJAAN BESI DAN BETON
1 Pek. Beton Sloof 15/20
- Bekisting M2 30.30 206,317.10 6,251,408.13 1.02
- Besi Beton Kg 951.02 18,400.00 17,498,694.40 2.86
- Beton K175 M3 4.50 1,202,200.00 5,409,900.00 0.88
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58 1.90
- Besi Beton Kg 834.30 18,400.00 15,351,210.97 2.51
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00 0.68

1 2 3 4 5 6 7

3 Pek. Beton Kolom Teras 20/20


- Bekisting M2 13.20 286,564.30 3,782,648.76 0.62
- Besi Beton Kg 348.71 18,400.00 6,416,319.20 1.05
- Beton K175 M3 1.20 1,202,200.00 1,442,640.00 0.24
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 286,564.30 91,700.58 0.01
- Besi Beton Kg 251.66 18,400.00 4,630,617.60 0.76
- Beton K175 M3 0.32 1,202,200.00 384,704.00 0.06
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 291,500.00 539,275.00 0.09
- Besi Beton Kg 535.76 18,400.00 9,857,978.48 1.61
- Beton K175 M3 1.50 1,202,200.00 1,803,300.00 0.29
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 291,500.00 9,881,850.00 1.62
- Besi Beton Kg 1067.65 18,400.00 19,644,686.40 3.21
- Beton K175 M3 4.58 1,202,200.00 5,506,076.00 0.90
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 358,000.00 8,033,520.00 1.31
- Besi Beton Kg 311.74 18,400.00 5,736,016.00 0.94
- Beton K175 M3 2.24 1,202,200.00 2,692,928.00 0.44
8 Pek. Rabat Beton Bawah Lantai M3 12.88 964,882.29 12,427,683.84 2.03
JUMLAH IV 153,201,323.94 25.06
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 245,100.00 104,584,170.00 17.11
2 Pek. Pas. Atap Zincalum M2 426.70 162,900.00 69,509,430.00 11.37
3 Pas. Nok/Jurai Luar Atap M1 53.30 189,900.00 10,121,670.00 1.66
4 Talang Patahan/Jurai Dalam M1 12.40 42,200.00 523,280.00 0.09
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 45,900.00 3,717,900.00 0.61
JUMLAH V 188,456,450.00 30.82
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES
1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00 1.06
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00 0.62
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 1,064,600.00 3,193,800.00 0.52
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 679,600.00 1,359,200.00 0.22
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00 0.45
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00 0.35
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 981,700.00 2,945,100.00 0.48
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00 0.55
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00 3.33
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 207,600.00 415,200.00 0.07
JUMLAH VI 46,752,700.00 7.65

1 2 3 4 5 6 7
VII PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 128,300.00 577,350.00 0.09
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16 1.04
JUMLAH VII 6,959,732.16 1.14
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00 0.12
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00 0.54
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00 0.46
4 Pek. Pasangan Kloset Jongkok Bh 1.00 396,900.00 396,900.00 0.06
5 Pek. Pasangan Kran Air Bh 2.00 15,000.00 30,000.00 0.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00 0.03
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00 0.80
JUMLAH VIII 12,371,200.00 2.02
IX PEKERJAAN PENGECATAN, FINISHING, DLL
1 Pek. Cat Dinding Tembok M2 662.59 25,400.00 16,829,836.80 2.75
2 Pek. Cat Listplank M2 16.40 32,500.00 533,000.00 0.09
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00 0.05
JUMLAH IX 17,662,836.80 2.89
REAL COST 611,421,637.18
PPN 10% 61,142,163.72
100.00
TOTAL COST (A+B) 672,563,800.90
DIBULATKAN 672,563,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Asisten Teknis Direksi Teknis
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari
SEKO KAIMUDDIN HARIS, ST. MPW SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT.
Nip. 19791017 200604 1 016 Nip. 19750409 201001 2 007
NAAN PEKERJAAN BULANAN

BULANAN : I (PERTAMA)
PERIODE : 7 AGUST. - 31 AGUST.
S/D BULAN LALU: - %
BULAN INI : 14.89 %
S/D BULAN INI : 14.89 %
REALISASI TERLAKSANA
S/D BULAN LALU BULAN INI S/D BULAN INI
BOBOT % BOBOT % BOBOT %
VOLUME VOLUME VOLUME
TERCAPAI TERTIMB. TERCAPAI TERTIMB. TERCAPAI TERTIMB.

8 9 10 11 12 13 14 15 16

- - - 1.00 100.00 1.14 1.00 100.00 1.14


- - - 1.00 100.00 0.18 1.00 100.00 0.18
- - - 1.00 100.00 0.08 1.00 100.00 0.08
- - - 1.00 100.00 0.82 1.00 100.00 0.82
- - - 0.25 25.00 0.07 0.25 25.00 0.07
- - - 1.00 100.00 0.02 1.00 100.00 0.02
- 2.31 2.31

- - - 54.00 100.00 0.63 54.00 100.00 0.63


- - - - - - - - -
- - - 5.46 16.50 0.22 5.46 16.50 0.22
- 0.85 0.85

- - - 15.50 100.00 1.27 15.50 100.00 1.27


- - - 46.40 80.01 6.79 46.40 80.01 6.79
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 8.06 8.06

- - - 30.30 100.00 1.02 30.30 100.00 1.02


- - - 723.40 76.07 2.18 723.40 76.07 2.18
- - - - - - - - -

- - - - - - - - -
- - - 158.10 18.95 0.48 158.10 18.95 0.48
- - - - - - - - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 3.68 3.68

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- 14.89 14.89

Kendari, 31 Agustus 2019


Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI
ASHAR BANI RISKI KURNIAWAN, ST
Site Engineer Pelaksana
MONTHLY CERTIFICATE 01
PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD
LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

I PEKERJAAN PERSIAPAN / PENDAHULUAN Total Rp. 15,399,500.00


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Pembongkaran Gedung Lama Ls 1.00 1.00 7,000,000.00 7,000,000.00


2 Pek. Pembersihan Lokasi Ls 1.00 1.00 1,100,000.00 1,100,000.00
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.00 500,000.00 500,000.00
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 1.00 5,000,000.00 5,000,000.00
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 0.25 1,699,500.00 424,875.00
6 Papan Nama Kegiatan Ls 1.00 1.00 100,000.00 100,000.00

JUMLAH TERLAKSANA 14,124,875.00


PERSENTASE TERLAKSANA 91.72

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

II PEKERJAAN TANAH DAN PASIR Total Rp. 30,681,504.29


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Galian Tanah Pondasi Garis M3 54.00 54.00 70,800.00 3,823,200.00


2 Pek. Urugan Tanah Didatangkan M3 159.39 - 117,400.00 -
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 33.10 5.46 246,100.00 1,343,706.00

JUMLAH TERLAKSANA 5,166,906.00


PERSENTASE TERLAKSANA 16.84

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN Total Rp. 139,936,390.00
KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pas. Batu Kosong M3 15.50 15.50 501,100.00 7,767,050.00


2 Pas. Pondasi Batu Gunung 1 : 5 M3 57.99 46.40 894,800.00 41,518,720.00
3 Pas. Dinding Trasram 1:2 M2 16.30 - 121,700.00 -
4 Pas. Dinding Bata 1:5 M2 323.70 - 108,500.00 -
5 Pek. Plesteran Dinding Trasram 1:2 M2 10.68 - 72,100.00 -
6 Pek. Plesteran Dinding 1:5 M2 647.40 - 65,500.00 -

JUMLAH TERLAKSANA 49,285,770.00


PERSENTASE TERLAKSANA 35.22

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

IV PEKERJAAN BESI DAN BETON Total Rp. 153,201,323.94


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Beton Sloof 15/20


- Bekisting M2 30.30 30.30 206,317.10 6,251,408.13
- Besi Beton Kg 951.02 723.40 18,400.00 13,310,560.00
- Beton K175 M3 4.50 - 1,202,200.00 -
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 - 286,564.30 -
- Besi Beton Kg 834.30 158.10 18,400.00 2,909,040.00
- Beton K175 M3 3.48 - 1,202,200.00 -
3 Pek. Beton Kolom Teras 20/20
- Bekisting M2 13.20 - 286,564.30 -
- Besi Beton Kg 348.71 - 18,400.00 -
- Beton K175 M3 1.20 - 1,202,200.00 -
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 0.32 - 286,564.30 -
- Besi Beton Kg 251.66 - 18,400.00 -
- Beton K175 M3 0.32 - 1,202,200.00 -
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 1.85 - 291,500.00 -
- Besi Beton Kg 535.76 - 18,400.00 -
- Beton K175 M3 1.50 - 1,202,200.00 -
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 33.90 - 291,500.00 -
- Besi Beton Kg 1,067.65 - 18,400.00 -
- Beton K175 M3 4.58 - 1,202,200.00 -
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 22.44 - 358,000.00 -
- Besi Beton Kg 311.74 - 18,400.00 -
- Beton K175 M3 2.24 - 1,202,200.00 -
8 Pek. Rabat Beton Bawah Lantai M3 12.88 - 964,882.29 -

JUMLAH TERLAKSANA 22,471,008.13


PERSENTASE TERLAKSANA 14.67

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI
SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

V PEKERJAAN KUDA-KUDA DAN ATAP Total Rp. 188,456,450.00


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Rangka Atap Baja Ringan Zincalum M2 426.70 - 245,100.00 -


2 Pek. Pas. Atap Zincalum M2 426.70 - 162,900.00 -
3 Pas. Nok/Jurai Luar Atap M1 53.30 - 189,900.00 -
4 Talang Patahan/Jurai Dalam M1 12.40 - 42,200.00 -
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 81.00 - 45,900.00 -

JUMLAH TERLAKSANA -
PERSENTASE TERLAKSANA -

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES Total Rp. 46,752,700.00


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 - 6,500,000.00 -


2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 - 1,260,700.00 -
3 Pek. Pas. Kusen/Pintu P3 Unit 3.00 - 1,064,600.00 -
4 Pek. Pas. Kusen/Pintu P4 Unit 2.00 - 679,600.00 -
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 - 2,737,600.00 -
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 - 2,138,700.00 -
8 Pek. Pas. Kusen/Jendela J1 Unit 3.00 - 981,700.00 -
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 - 1,670,500.00 -
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 - 2,034,000.00 -
11 Pek. Pas. Kusen/Ventilasi V1 Unit 2.00 - 207,600.00 -

JUMLAH TERLAKSANA -
PERSENTASE TERLAKSANA -

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

VII PEKERJAAN KERAMIK LANTAI DAN DINDING Total Rp. 6,959,732.16


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Kramik Lantai 30/30 cm KM/WC M2 4.50 - 128,300.00 -


2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 - 379,903.70 -

JUMLAH TERLAKSANA -
PERSENTASE TERLAKSANA -

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

VIII PEKERJAAN SANITAIR Total Rp. 12,371,200.00


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 - 750,000.00 -


2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 - 3,300,000.00 -
3 Pek. Pasangan Kloset Duduk Bh 1.00 - 2,794,300.00 -
4 Pek. Pasangan Kloset Jongkok Bh 1.00 - 396,900.00 -
5 Pek. Pasangan Kran Air Bh 2.00 - 15,000.00 -
6 Pek. Floor Drain Bh 4.00 - 50,000.00 -
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 - 4,900,000.00 -

JUMLAH TERLAKSANA -
PERSENTASE TERLAKSANA -

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


LOKASI : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

IX PEKERJAAN PENGECATAN, FINISHING, DLL Total Rp. 17,662,836.80


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 Pek. Cat Dinding Tembok M2 662.59 - 25,400.00 -


2 Pek. Cat Listplank M2 16.40 - 32,500.00 -
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 - 300,000.00 -

JUMLAH TERLAKSANA -
PERSENTASE TERLAKSANA -

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI

SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Diketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
PEMERINTAH KOTA KENDARI
SEKRETARIAT DAERAH
Alamat : Jalan Drs. Abd. Silondae Nomor 08 Kota Kendari

MONTHLY CERTIFICATE 01

PEKERJAAN : PENGADAAN BANGUNAN GEDUNG KANTOR SUMBER DANA : APBD


NO. PAKET : KANTOR LURAH WUNDUMBATU TAHUN : 2019
NO. KONTRAK : 117/Kontrak/Sekda/VIII/2019 BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 672.563.000,00 PERIODE : 7 AGUST. - 31 AGUST.
PELAKSANA : CV. PELANGI

REKAPITULASI
KONTRAK AWAL KONTRAK TERLAKSANA
NO. URAIAN PEKERJAAN
JUMLAH (Rp.) BOBOT (%) JUMLAH (Rp.) BOBOT (%)

1 2 3 4 5 6
I PEKERJAAN PERSIAPAN / PENDAHULUAN 15,399,500.00 2.52 14,124,875.00 2.31
II PEKERJAAN TANAH DAN PASIR 30,681,504.29 5.02 5,166,906.00 0.85
III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN 139,936,390.00 22.89 49,285,770.00 8.06
IV PEKERJAAN BESI DAN BETON 153,201,323.94 25.06 22,471,008.13 3.68
V PEKERJAAN KUDA-KUDA DAN ATAP 188,456,450.00 30.82 - -
VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES 46,752,700.00 7.65 - -
VII PEKERJAAN KERAMIK LANTAI DAN DINDING 6,959,732.16 1.14 - -
VIII PEKERJAAN SANITAIR 12,371,200.00 2.02 - -
IX PEKERJAAN PENGECATAN, FINISHING, DLL 17,662,836.80 2.89 - -

A REAL COST 611,421,637.18 91,048,559.13


B PPN 10 % 61,142,163.72 9,104,855.91
100.00 14.89
C TOTAL COST 672,563,800.90 100,153,415.04
D DIBULATKAN 672,560,000.00 100,150,000.00
S/D BULAN LALU 0.00
PROSENTASE PENCAPAIAN FISIK (%) BULAN INI 14.89
S/D BULAN INI 14.89
POTONGAN-POTONGAN S/D BULAN LALU BULAN INI S/D BULAN INI
MONTHLY CERTIFICATE (MC) 100,153,415.04 100,153,415.04
UANG MUKA (30%) 30,046,024.51 30,046,024.51
UANG RETENSI (5%) 5,007,670.75 5,007,670.75
JUMLAH POTONGAN - 35,053,695.27 35,053,695.27
JUMLAH YANG DIBAYARKAN SAMPAI DENGAN BULAN INI 65,099,719.78 65,099,719.78
DIBULATKAN 65,099,000.00 65,099,000.00

TERBILANG : ENAM PULUH LIMA JUTA RUPIAH SEMBILAN PULUH SEMBILAN RIBU RUPIAH

Diperiksa Oleh : Dibuat Oleh :


Asisten Teknis Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
SEKRETARIAT DAERAH Dinas PU Kota Kendari CV. PLADESY COSULTANT CV. PELANGI
Kota Kendari

SRI KUSUMAYANTI, ST. SYAHRIR, ST., MT. GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN
Nip. 19750409 201001 2 007 Direktur Direktur

Di Ketahui Oleh : Disetujui Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI

A M H A R, S.Sos. SEKO KAIMUDDIN HARIS, ST. MPW


Nip. 19731231 199803 1 023 Nip. 19791017 200604 1 016
TIME SCHEDULLE
PEKERJAAN : KANTOR LURAH WUNDUMBATU
LOKASI : KOTA KENDARI

JANGKA WAKTU PELAKSANAAN


BOBOT
No. JENIS PEKERJAAN MINGGU MINGGU MINGGU
(%) I II III IV V VI VII VIII IX X XI

I PEKERJAAN PERSIAPAN / PENDAHULUAN 2.52 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

II PEKERJAAN TANAH DAN PASIR 5.02 1.67 1.67 1.67

III PEKERJAAN PASANGAN BATU, DINDING DAN 22.89 1.00 2.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00 2.00

IV PEKERJAAN BESI DAN BETON 25.06 1.00 2.00 2.00 2.00 3.00 3.00 3.00 3.00 2.00

V PEKERJAAN KUDA-KUDA DAN ATAP 30.82

VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN 7.65 1.91 1.91 1.91


Rencana
Realisasi
VII PEKERJAAN KERAMIK LANTAI DAN DINDING 1.14

VIII PEKERJAAN SANITAIR 2.02

IX PEKERJAAN PENGECATAN, FINISHING, DLL 2.89

T O T A L (Dibulatkan) 100.00
RENCANA PROGRES FISIK KOMULATIF (%) % 0.14 2.81 4.81 4.14 6.05 6.05 7.05 5.14 6.14 6.14 5.81
RENCANA PROGRES FISIK MINGGUAN (%) 0.00 0.14 2.95 7.77 11.91 17.96 24.01 31.06 36.20 42.34 48.48 54.29
REALISASI PROGRES FISIK MINGGUAN (%) % 1.19 6.72 8.97 14.89
DEVIASI PROGRES FISIK MINGGUAN (%) 0.00 1.05 3.76 1.20 2.99

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTANT

SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI


Nip. 19791017 200604 1 016 Site Engineer
ME SCHEDULLE
BULAN : I (PERTAMA)
PERIODE : 7 AGUST. - 31 AGUST.

JANGKA WAKTU PELAKSANAAN


MINGGU MINGGU MINGGU SKALA
XII XIII XIV XV XVI XVII XVIII
100
0.14 0.14 0.14 0.14 0.14 0.14 0.14
90

80

1.89
70

4.05 60

7.71 7.71 7.71 7.71 50

1.91 40
Rencana
30
1.14
20
1.01 1.01
10
0.72 0.72 0.72 0.72
0

6.08 8.86 8.86 8.57 8.57 3.91 0.86


60.37 69.23 78.09 86.65 95.22 99.13 100.00

Kendari, 31 Agustus 2019


Dibuat Oleh :
Kontraktor Pelaksana
CV. PELANGI

RISKI KURNIAWAN, ST
Pelaksana
CONTRACT CHANGE ORDER (CCO)

KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN KANTOR LURAH WUNDUMBATU
TAHUN ANGGARAN : 2019
LOKASI : KOTA KENDARI
###

KONTRAK AWAL
No Uraian Pekerjaaan Sat Vol Harga Satuan Jumlah Harga
( Rp) ( Rp)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembongkaran Gedung Lama Ls 1.00 - -
2 Pek. Pembersihan Lokasi Ls 1.00 1,100,000.00 1,100,000.00
3 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 500,000.00 500,000.00
4 Pek. Pembuatan/Sewa Barak Kerja/Gudang Bahan Ls 1.00 5,000,000.00 5,000,000.00
5 Administrasi, Dokumentasi & Pelaporan Ls 1.00 1,699,500.00 1,699,500.00
6 Papan Nama Kegiatan Ls 1.00 100,000.00 100,000.00

II PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi Garis M3 80.08 70,800.00 5,669,664.00
2 Pek. Urugan Tanah Didatangkan M3 125.75 117,400.00 14,763,050.00
3 Pek. Urugan Pasir Alas Pondasi dan Alas Lantai M3 20.14 246,100.00 4,956,454.00

III PEKERJAAN PASANGAN BATU, DINDING DAN PLESTERAN


1 Pas. Batu Kosong M3 16.17 501,100.00 8,102,787.00
2 Pas. Pondasi Batu Gunung 1 : 5 M3 83.06 894,800.00 74,322,088.00
3 Pas. Dinding Trasram 1:2 M2 16.80 121,700.00 2,044,560.00
4 Pas. Dinding Bata 1:5 M2 335.68 108,500.00 36,421,280.00
5 Pek. Plesteran Dinding Trasram 1:2 M2 33.60 72,100.00 2,422,560.00
6 Pek. Plesteran Dinding 1:5 M2 671.36 65,500.00 43,974,080.00
7 Pek. List Profil Dinding dan Teras Ls 1.00 2,000,000.00 2,000,000.00

IV PEKERJAAN BESI DAN BETON


1 Pek. Beton Sloof 15/20
- Bekisting M2 30.80 206,317.10 6,354,566.68
- Besi Beton Kg 805.45 18,400.00 14,820,280.00
- Beton K175 M3 4.62 1,202,200.00 5,554,164.00
2 Pek. Beton Kolom 15/20
- Bekisting M2 40.60 286,564.30 11,634,510.58
- Besi Beton Kg 834.30 18,400.00 15,351,210.97
- Beton K175 M3 3.48 1,202,200.00 4,183,656.00
3 Pek. Beton Kolom Teras 20/20
- Bekisting M2 12.80 286,564.30 3,668,023.04
- Besi Beton Kg 158.05 18,400.00 2,908,197.62
- Beton K175 M3 0.64 1,202,200.00 769,408.00
KONTRAK AWAL
No Uraian Pekerjaaan Sat Vol Harga Satuan Jumlah Harga
( Rp) ( Rp)
1 2 3 4 5 6
4 Pek. Beton Kolom 13,5/13,5
- Bekisting M2 15.12 286,564.30 4,332,852.22
- Besi Beton Kg 292.54 18,400.00 5,382,822.62
- Beton K175 M3 1.02 1,202,200.00 1,226,965.32
5 Pek. Beton Balok Tengah/Latei 10/15, Kuda-kuda beton 10/15
- Bekisting M2 19.82 291,500.00 5,776,072.50
- Besi Beton Kg 647.70 18,400.00 11,917,694.68
- Beton K175 M3 1.98 1,202,200.00 2,382,159.30
6 Pek. Beton Ringbalk 13,5/20
- Bekisting M2 26.50 291,500.00 7,724,750.00
- Besi Beton Kg 623.70 18,400.00 11,476,159.70
- Beton K175 M3 3.58 1,202,200.00 4,300,870.50
7 Pek. Beton Plat Dak, T=10cm
- Bekisting M2 15.05 358,000.00 5,386,110.00
- Besi Beton Kg 209.01 18,400.00 3,845,768.40
- Beton K175 M3 1.50 1,202,200.00 1,808,709.90
8 Pek. Rabat Beton Bawah Lantai M3

V PEKERJAAN KUDA-KUDA DAN ATAP


1 Pek. Rangka Atap Baja Ringan Zincalum M2 425.29 245,100.00 104,239,069.20
2 Pek. Pas. Atap Zincalum M2 425.29 162,900.00 69,280,066.80
3 Pas. Nok/Jurai Luar Atap M1 60.00 189,900.00 11,394,000.00
4 Talang Patahan/Jurai Dalam M1 6.00 42,200.00 253,200.00
5 Pek. List Plank 1 x 25 Papan Calsiboard M1 83.00 45,900.00 3,809,700.00

VI PEKERJAAN KUSEN, PINTU, VENTILASI DAN ACCESSORIES


1 Pek. Pas. Pintu Kaca Tempered P1 Unit 1.00 6,500,000.00 6,500,000.00
2 Pek. Pas. Kusen/Pintu P2 Unit 3.00 1,260,700.00 3,782,100.00
3 Pek. Pas. Kusen/Pintu P3 Unit 2.00 1,064,600.00 2,129,200.00
4 Pek. Pas. Kusen/Pintu P4 Unit 4.00 679,600.00 2,718,400.00
5 Pek. Pas. Kusen/Pintu/Partisi PR1 Unit 1.00 2,737,600.00 2,737,600.00
6 Pek. Pas. Kusen/Pintu/Partisi PR2 Unit 1.00 2,138,700.00 2,138,700.00
7 Pek. Pas. Kusen/Pintu/Partisi PR3 Unit 1.00 3,459,700.00 3,459,700.00
8 Pek. Pas. Kusen/Jendela J1 Unit 2.00 981,700.00 1,963,400.00
9 Pek. Pas. Kusen/Jendela J2 Unit 2.00 1,670,500.00 3,341,000.00
10 Pek. Pas. Kusen/Jendela J3 Unit 10.00 2,034,000.00 20,340,000.00
11 Pek. Pas. Kusen/Ventilasi V1 Unit 4.00 207,600.00 830,400.00

VII PEKERJAAN KERAMIK LANTAI DAN DINDING


1 Pek. Kramik Lantai 30/30 cm KM/WC M2 9.00 128,300.00 1,154,700.00
2 Pek. Granit Dinding 60/60 cm KM/WC M2 16.80 379,903.70 6,382,382.16
KONTRAK AWAL
No Uraian Pekerjaaan Sat Vol Harga Satuan Jumlah Harga
( Rp) ( Rp)
1 2 3 4 5 6
VIII PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air bersih 1/2" Ls 1.00 750,000.00 750,000.00
2 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 4" Ls 1.00 3,300,000.00 3,300,000.00
3 Pek. Pasangan Kloset Duduk Bh 1.00 2,794,300.00 2,794,300.00
4 Pek. Pasangan Kloset Jongkok Bh 3.00 396,900.00 1,190,700.00
5 Pek. Pasangan Kran Air Bh 4.00 15,000.00 60,000.00
6 Pek. Floor Drain Bh 4.00 50,000.00 200,000.00
7 Pek. Pembuatan Septik Tank + Resapan Unit 1.00 4,900,000.00 4,900,000.00

IX PEKERJAAN PENGECATAN, FINISHING, DLL


1 Pek. Cat Dinding Tembok M2 671.36 25,400.00 17,052,544.00
2 Pek. Cat Listplank M2 16.60 32,500.00 539,500.00
3 Pek. Pembersihan Akhir/Perapihan Ls 1.00 300,000.00 300,000.00

JUMLAH HARGA 611,421,637.18


PPn 10% 61,142,163.72
JUMLAH HARGA TOTAL 672,563,800.90
DIBULATKAN 672,560,000.00

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Asisten Teknis Direksi Teknis
SEKRETARIAT DAERAH KOTA KENDARI SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari

SEKO KAIMUDDIN HARIS, ST. MPW SRI KUSUMAYANTI, ST. S Y A H R I R , ST., MT.
Nip. 19791017 200604 1 016 Nip. 19750409 201001 2 007
RDER (CCO)

MBATU

KONTRAK CCO
Vol Harga Satuan Jumlah Harga Selisih Harga Keterangan
( Rp) ( Rp)
7 8 9 10 11

1.00 7,000,000.00 7,000,000.00 7,000,000.00 BERTAMBAH


1.00 1,100,000.00 1,100,000.00 - TETAP
1.00 500,000.00 500,000.00 - TETAP
1.00 5,000,000.00 5,000,000.00 - TETAP
1.00 1,699,500.00 1,699,500.00 - TETAP
1.00 100,000.00 100,000.00 - TETAP

54.00 70,800.00 3,823,200.00 (1,846,464.00) BERKURANG


159.39 117,400.00 18,712,394.29 3,949,344.29 BERTAMBAH
33.10 246,100.00 8,145,910.00 3,189,456.00 BERTAMBAH

15.50 501,100.00 7,767,050.00 (335,737.00) BERKURANG


57.99 894,800.00 51,889,452.00 (22,432,636.00) BERKURANG
16.30 121,700.00 1,983,710.00 (60,850.00) BERKURANG
323.70 108,500.00 35,121,450.00 (1,299,830.00) BERKURANG
10.68 72,100.00 770,028.00 (1,652,532.00) BERKURANG
647.40 65,500.00 42,404,700.00 (1,569,380.00) BERKURANG
0.00 2,000,000.00 - (2,000,000.00) BERKURANG

30.30 206,317.10 6,251,408.13 (103,158.55) BERKURANG


951.02 18,400.00 17,498,694.40 2,678,414.40 BERTAMBAH
4.50 1,202,200.00 5,409,900.00 (144,264.00) BERKURANG

40.60 286,564.30 11,634,510.58 - TETAP


834.30 18,400.00 15,351,210.97 - TETAP
3.48 1,202,200.00 4,183,656.00 - TETAP

13.20 286,564.30 3,782,648.76 114,625.72 BERTAMBAH


348.71 18,400.00 6,416,319.20 3,508,121.58 BERTAMBAH
1.20 1,202,200.00 1,442,640.00 673,232.00 BERTAMBAH
KONTRAK CCO
Vol Harga Satuan Jumlah Harga Selisih Harga Keterangan
( Rp) ( Rp)
7 8 9 10 11

0.32 286,564.30 91,700.58 (4,241,151.64) BERKURANG


251.66 18,400.00 4,630,617.60 (752,205.02) BERKURANG
0.32 1,202,200.00 384,704.00 (842,261.32) BERKURANG

1.85 291,500.00 539,275.00 (5,236,797.50) BERKURANG


535.76 18,400.00 9,857,978.48 (2,059,716.20) BERKURANG
1.50 1,202,200.00 1,803,300.00 (578,859.30) BERKURANG

33.90 291,500.00 9,881,850.00 2,157,100.00 BERTAMBAH


1067.65 18,400.00 19,644,686.40 8,168,526.71 BERTAMBAH
4.58 1,202,200.00 5,506,076.00 1,205,205.50 BERTAMBAH

22.44 358,000.00 8,033,520.00 2,647,410.00 BERTAMBAH


311.74 18,400.00 5,736,016.00 1,890,247.60 BERTAMBAH
2.24 1,202,200.00 2,692,928.00 884,218.10 BERTAMBAH
12.88 964,882.29 12,427,683.84 12,427,683.84 BERTAMBAH

426.70 245,100.00 104,584,170.00 345,100.80 BERTAMBAH


426.70 162,900.00 69,509,430.00 229,363.20 BERTAMBAH
53.30 189,900.00 10,121,670.00 (1,272,330.00) BERKURANG
12.40 42,200.00 523,280.00 270,080.00 BERTAMBAH
81.00 45,900.00 3,717,900.00 (91,800.00) BERKURANG

1.00 6,500,000.00 6,500,000.00 - TETAP


3.00 1,260,700.00 3,782,100.00 - TETAP
3.00 1,064,600.00 3,193,800.00 1,064,600.00 BERTAMBAH
2.00 679,600.00 1,359,200.00 (1,359,200.00) BERKURANG
1.00 2,737,600.00 2,737,600.00 - TETAP
1.00 2,138,700.00 2,138,700.00 - TETAP
0.00 3,459,700.00 - (3,459,700.00) BERKURANG
3.00 981,700.00 2,945,100.00 981,700.00 BERTAMBAH
2.00 1,670,500.00 3,341,000.00 - TETAP
10.00 2,034,000.00 20,340,000.00 - TETAP
2.00 207,600.00 415,200.00 (415,200.00) BERKURANG

4.50 128,300.00 577,350.00 (577,350.00) BERKURANG


16.80 379,903.70 6,382,382.16 - TETAP
KONTRAK CCO
Vol Harga Satuan Jumlah Harga Selisih Harga Keterangan
( Rp) ( Rp)
7 8 9 10 11

1.00 750,000.00 750,000.00 - TETAP


1.00 3,300,000.00 3,300,000.00 - TETAP
1.00 2,794,300.00 2,794,300.00 - TETAP
1.00 396,900.00 396,900.00 (793,800.00) BERKURANG
2.00 15,000.00 30,000.00 (30,000.00) BERKURANG
4.00 50,000.00 200,000.00 - TETAP
1.00 4,900,000.00 4,900,000.00 - TETAP

662.59 25,400.00 16,829,836.80 (222,707.20) BERKURANG


16.40 32,500.00 533,000.00 (6,500.00) BERKURANG
1.00 300,000.00 300,000.00 - TETAP

611,421,637.18 0.00
61,142,163.72 0.00
672,563,800.90 0.00
672,560,000.00 -

Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI

GALIH ADI SULIATYO, S.Pd. MUHAMMAD AMIN


Direktur Direktur
BACK UP DATA
KEGIATAN : PENGADAAN BANGUNAN GEDUNG KANTOR
PEKERJAAN : KANTOR LURAH WUNDUMBATU
TAHUN ANGGARAN : 2019
LOKASI : KOTA KENDARI

NO URAIAN PEKERJAAN / GAMBAR PERH


II ###
1 ### Pondasi Garis
a= 0.80 +
2

2 ### Area A = 9
3
1.5
Area B = 11
Area C = 2
3.5
Alur Pondasi = 54.06

Volume Pondasi Yang Tertimbun


a= 0.25 +
2

Maka Volume Total =

3 ### Pondasi = 139.50 x


Lantai = 12.0 x
3.00 x
5.00 x

NO URAIAN PEKERJAAN / GAMBAR PERH

III ###
1 ### Area A = 139.50

2 ### Area A= 0.25 +


2

3 ### = 9.10
4 ### Panjang Dinding = 111.50
Ruangan = 111.50
= 6.00
Kuda Depan = 1.20
0.75
0.80
Kuda Samping = 0.80
0.35
0.80

Luasan Kusen =
P1 = 2.55
P2 = 1.3
P3 = 0.9
P4 = 0.8
J1 = 1.15
J2 = 2.3
J3 = 2.6
V = 0.6
KM = 9.10

Maka Luas Dinding= 444.18

NO URAIAN PEKERJAAN / GAMBAR PERH

5 ### = 9.10

6 ### Luasan Dinding dikali 2 Sisi


= 323.71

IV ###
1 ###
### = 150.50 x

### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,


Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Besi 12 = 150.50 x

Besi 8 = 0.55 x

### = 150.50 x

2 ###
### = 116.00 x

### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,


Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Besi 12 = 116.00 x

Besi 8 = 0.55 x

NO URAIAN PEKERJAAN / GAMBAR PERH

### = 116.00 x

3 ###
### = 0.80 x

### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,


Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Besi 12 = 30.00 x

Besi 8 = 0.74 x

### = 0.20 x

4 ###
### = 36.00 x

### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,


Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Besi 12 = 36.00 x

Besi 8 = 0.45 x

### = 36.00 x

NO URAIAN PEKERJAAN / GAMBAR PERH

5 ###
### = 36.00 x
### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,
Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Balok Tengah = 35
Balok Latei = 60.5
Kuda-Kuda = 9.9
Besi 12 = 105.40 x

Besi 8 = 0.45 x

### = 105.40 x

6 ###
### = 170.50 x

### Berat Jenis 1 Batang Besi Dia. 12 mm Adalah 10,


Berat Jenis 1 Batang Besi Dia. 8 mm Adalah 4,74
Besi 12 = 170.50 x

Besi 8 = 0.60 x

NO URAIAN PEKERJAAN / GAMBAR PERH

### = 170.50 x

7 ###
### Teras Depan = 17.7
8.7

### Dalam 1 M2 Menggunakan Besi =


Panjang Besi =

Maka Berat Besi =

### = 22.44 x

8 ### Gedung = 20
Teras Depan = 5.5
Teras Samping = 2

273.5

### ###
1 ### Depan = 14.4 x

4.7 +
2

Kiri = 22.4 +
2

7.4 +
2

NO URAIAN PEKERJAAN / GAMBAR PERH

Belakang= 14.4 x

4.7 +
2

Kanan = 22.4 +
2

7.4 +
2

Pengurangan
Teras Depan = 5.4
Teras Samping = 5.4

= 436.44

2 ### Depan = 14.4 x

4.7 +
2

Kiri = 22.4 +
2

7.4 +
2

Belakang= 14.4 x
4.7 +
2

NO URAIAN PEKERJAAN / GAMBAR PERH

Kanan = 22.4 +
2

7.4 +
2

Pengurangan
Teras Depan = 5.4
Teras Samping = 5.4

= 436.44

3 ### = 8.30 x
8.00 +

4 ### = 3.80 +

5 ### = 11.00 +

### ###
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!

NO URAIAN PEKERJAAN / GAMBAR PERH

### ###
### ### KM / WC = 1.5 x

### ### KM / WC = 9.40


### ###
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!
### ### = #REF! #REF!

### ###
### ### Volume Plester Dinding Trasram + Volume Pleste
= 16.38 +

### ### = 81.10 x

Disetujui Oleh : Diperiksa Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi
SEKRETARIAT DAERAH KOTA KENDARI Dinas PU Kota Kendari CV. PLADESY COSULTA

SEKO KAIMUDDIN HARIS, ST. MPW S Y A H R I R , ST., MT. ASHAR BANI


Nip. 19791017 200604 1 016 Site Engineer
ATA

PERHITUNGAN VOLUME

0.75
x 0.50 x 139.50 = 54.06 M3

x 12 x 0.7 = 75.6 M3
x 2 x 0.7 = 4.2 M3
x 4.5 x 0.3 = 2.025 M3
x 12 x 0.6 = 79.2 M3
x 5 x 0.55 = 5.5 M3
x 5 x 0.3 = 5.25 M3
/ 4 = 13.51 M3
185.2891 M3
ang Tertimbun
0.45
x 0.50 x 139.50 = 24.41 M3

185.29 - 24.41 = 160.88 M3

0.75 x 0.05 = 5.23 M3


20.00 x 0.1 = 24.00 M3
2.00 x 0.1 = 0.60 M3
7.00 x 0.1 = 3.50 M3
33.33 M3

PERHITUNGAN VOLUME

x 0.75 x 0.15 = 15.69375 M3

0.75
x 0.85 x 139.50 = 59.29 M3

x 1.8 = 16.38 M2
Tinggi Dinding = 4 - (0,15 + 0,20)
x 3.65 = 406.98 M2
x 2 = 12.00 M2
x 5 = 6.00 M2
x 5 = 3.75 M2
x 11 = 8.80 M2
x 3 = 2.40 M2
x 3 = 1.05 M2
x 4 = 3.20 M2
444.18 M2

x 2.2 x 1 = 5.61 M2
x 2.7 x 3 = 10.53 M2
x 2.7 x 3 = 7.29 M2
x 2.25 x 2 = 3.60 M2
x 2.15 x 3 = 7.42 M2
x 2.15 x 2 = 9.89 M2
x 1.75 x 13 = 59.15 M2
x 0.5 x 2 = 0.60 M2
x 1.8 = 16.38 M2
120.47 M2
- 120.47 = 323.71 M2

PERHITUNGAN VOLUME

x 1.8 = 16.38 M2

x 2 = 647.42 M2

0.20 x 2.00 = 60.2 M2

ng Besi Dia. 12 mm Adalah 10,7 Kg


ng Besi Dia. 8 mm Adalah 4,74 Kg
5 : 12 x 10.7 = 670.98 Kg
M1 Kg

1003 : 12 x 4.74 = 217.90 Kg


M1 Kg
888.88 Kg

Maka 888.88 x 1.1 = 977.77 Kg

0.15 x 0.20 = 4.52 M3

0.40 x 2.00 = 92.8 M2

ng Besi Dia. 12 mm Adalah 10,7 Kg


ng Besi Dia. 8 mm Adalah 4,74 Kg
6 : 12 x 10.7 = 620.60 Kg
M1 Kg

773 : 12 x 4.74 = 167.93 Kg


M1 Kg
788.53 Kg

Maka 788.53 x 1.1 = 867.39 Kg

PERHITUNGAN VOLUME

0.15 x 0.20 = 3.48 M3

10.00 x 3.00 = 24.00 M2

ng Besi Dia. 12 mm Adalah 10,7 Kg


ng Besi Dia. 8 mm Adalah 4,74 Kg
10 : 12 x 10.7 = 267.50 Kg
M1 Kg

200 : 12 x 4.74 = 58.46 Kg


M1 Kg
325.96 Kg

Maka 325.96 x 1.1 = 358.56 Kg

0.20 x 3.00 x 10 = 1.20 M3

0.10 x 2.00 = 7.20 M2

ng Besi Dia. 12 mm Adalah 10,7 Kg


ng Besi Dia. 8 mm Adalah 4,74 Kg
6 : 12 x 10.7 = 192.60 Kg
M1 Kg

240 : 12 x 4.74 = 42.66 Kg


M1 Kg
235.26 Kg

Maka 235.26 x 1.1 = 258.79 Kg

0.10 x 0.10 = 0.36 M3

PERHITUNGAN VOLUME

0.15 x 2.00 = 10.80 M2


ng Besi Dia. 12 mm Adalah 10,7 Kg
ng Besi Dia. 8 mm Adalah 4,74 Kg

4 : 12 x 10.7 = 375.93 Kg
M1 Kg

702 : 12 x 4.74 = 124.78 Kg


M1 Kg
500.71 Kg

Maka 500.71 x 1.1 = 550.78 Kg

0.10 x 0.15 = 1.58 M3

0.20 x 2 = 68.20 M2

ng Besi Dia. 12 mm Adalah 10,7 Kg


ng Besi Dia. 8 mm Adalah 4,74 Kg
5 : 12 x 10.7 = 760.15 Kg
M1 Kg

1003 : 12 x 4.74 = 237.71 Kg


M1 Kg
997.86 Kg

Maka 997.86 x 1.1 = 1,097.64 Kg

PERHITUNGAN VOLUME

0.14 x 0.20 = 4.60 M3

x 0.85 = 15.045 M2
x 0.85 = 7.395 M2
22.44 M2

gunakan Besi = 25.7 M1


22.44 x 25.7 = 576.708 M2

576.708 : 12 x 7.4 = 355.64 Kg


M1 Kg

0.10 = 2.24 M3

x 12 = 240 M2
x 5 = 27.5 M2
x 3 = 6 M2
273.5 M2

x 0.05 = 13.68 M2

8.3 : 2 = 59.76 M2

2 x 3.12 = 10.45 M2

8 x 8.3 = 126.16 M2

4.1 x 3.8 = 21.85 M2

PERHITUNGAN VOLUME

8.3 : 2 = 59.76 M2

2 x 3.12 = 10.45 M2

8 x 8.3 = 126.16 M2

4.1 x 3.8 = 21.85 M2


436.44 M2

x 2.1 : 2 = 5.67 M2
x 1.5 : 2 = 4.05 M2
9.72 M2
- 9.72 = 426.72 M2

8.3 : 2 = 59.76 M2

2 x 3.12 = 10.45 M2

8 x 8.3 = 126.16 M2

4.1 x 3.8 = 21.85 M2

8.3 : 2 = 59.76 M2
2 x 3.12 = 10.45 M2

PERHITUNGAN VOLUME

8 x 8.3 = 126.16 M2

4.1 x 3.8 = 21.85 M2


436.44 M2

x 2.1 : 2 = 5.67 M2
x 1.5 : 2 = 4.05 M2
9.72 M2
- 9.72 = 426.72 M2

4.00 = 33.20 M1
4.70 + 7.40 = 20.10 M1
53.30 M1

3.80 + 3.12 + 3.12 = 13.84 M1

26.50 + 16.40 + 27.20 = 81.10 M1

PERHITUNGAN VOLUME

3 = 4.5 M2

x 1.8 = 16.92 M2
nding Trasram + Volume Plester Dinding 1 : 5
647.42 = 663.80 M2

0.25 = 20.28 M2

Dibuat Oleh :
Konsultan Supervisi Kontraktor Pelaksana
CV. PLADESY COSULTANT CV. PELANGI

ASHAR BANI RISKI KURNIAWAN, ST


Site Engineer Pelaksana

Anda mungkin juga menyukai