NO. Uraian Pekerjaan SAT Kontrak Bobot (%) Add 1
NO. Uraian Pekerjaan SAT Kontrak Bobot (%) Add 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
VOLUME VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 182 189 196 203 210 217 224 231 238 245 252 259 266 273 280 287 294 301 308 315 322 329 336 343 350 357 364 371 378 385 392 399 406 413 420 KETERANG
KONTRAK ADD 1 (%) AN
6-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 20-Feb 27-Feb 6-Mar 13-Mar 20-Mar 27-Mar 3-Apr 10-Apr 17-Apr 24-Apr 1-May 8-May 15-May 22-May 29-May 5-Jun 12-Jun 19-Jun 26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 5-Mar 12-Mar 19-Mar 26-Mar 2-Apr 9-Apr 16-Apr 23-Apr 30-Apr 7-May 14-May 21-May 28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul 9-Jul 16-Jul 23-Jul 30-Jul 6-Aug 13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec 31-Dec
DIVISI 1. UMUM
100
1.2 Mobilisasi LS 1.00 1.00 0.33 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.098
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 1.00 0.23 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 9.00 0.00 0.001 0.001 0.001
90
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1g) Pengujian Coliform Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1h) Pengujian E.Coli Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 9.00 9.00 0.01 0.003 0.003 0.003
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00 9.00 0.00 0.001 0.001 0.001
80
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 - -
1.17.(3b) Pengujian Sulfuroksida (SO2) Buah 9.00 9.00 0.00 0.001 0.001 0.001
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 1.00 0.57 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
1.21 Manajemen Mutu LS 1.00 1.00 0.25 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 19,749.75 15,122.25 0.54 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.136 0.034 0.034 0.034 0.034 0.034
60
2.2.(1) Pasangan Batu dengan Mortar M3 9,747.30 6,656.58 4.89 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306 0.306
3.1.(1) Galian Biasa M3 701,616.10 622,377.45 20.29 0.136 0.156 0.156 0.156 0.156 0.156 0.156 0.156 0.156 0.156 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 1.581
3.1.(2) Galian Batu Lunak M3 49,517.25 49,517.25 2.48 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.062 0.062 0.062 0.062 0.062 0.124 0.124 0.124 0.124 0.124 0.248 0.248 0.248 0.248 0.248
3.1.(3) Galian Batu M3 112,864.69 112,864.69 13.28 0.070 0.330 0.379 0.483 0.603 0.609 0.619 0.659 0.300 0.200 0.367 0.495 0.442 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.315 0.315 0.315 0.315 0.315 0.629 0.629 0.629 0.629 0.629 0.629 0.911
3.2.(1a) Timbunan Biasa dari Sumber Galian 0 23,423.85 1.74 0.012 0.012 0.012 0.012 0.012 0.012 0.023 0.023 0.023 0.023 0.023 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.093 0.093 0.093 0.093 0.093 0.093 0.186 0.186 0.255
50
3.2.(1b) Timbunan Biasa dari hasil galian M3 107,769.75 23,726.82 0.31 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 43,701.75 61,806.25 7.35 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.163 0.327 0.327 0.327 0.327 0.327 0.327 0.327
3.3.(1) Penyiapan Badan Jalan M2 167,851.00 42,971.00 0.07 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
3.4.(2) Pemotongan Pohon Pilihan diameter 15 - 30 cm (Item Baru) Btg 484.00 0.01 0.003 0.003 0.003 0.003 0.003
3.4.(3) Pemotongan Pohon Pilihan diameter >30 - 50 cm (Item Baru) Btg 209.00 0.02 0.005 0.005 0.005
3.4.(4) Pemotongan Pohon Pilihan diameter >50 - 75 cm (Item Baru) Btg 61.00 0.01 0.004 0.004 0.004
40
3.4.(5) Pemotongan Pohon Pilihan diameter >75 cm (Item Baru) Btg 7.00 0.00 0.001 0.001 0.001
5.1.(1) Lapis Pondasi Agregat Kelas A M3 25,025.00 25,025.00 10.92 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.262 0.262 0.262 0.262 0.262 0.262 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 1.048 0.437
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 125,125.00 125,125.00 2.06 0.025 0.025 0.025 0.025 0.025 0.049 0.049 0.049 0.049 0.049 0.049 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.198 0.255
6.3(3) Lataston Lapis Aus (HRS-WC) Ton 13,951.44 13,951.44 19.03 0.228 0.228 0.228 0.228 0.228 0.457 0.457 0.457 0.457 0.457 0.457 0.457 0.457 0.457 0.457 0.457 0.914 0.914 0.914 0.914 0.914 0.914 0.914 1.827 2.360 2.284
30
6.3.(8) Bahan anti pengelupasan Kg 2,260.13 2,260.13 0.15 0.002 0.002 0.002 0.002 0.002 0.004 0.004 0.004 0.004 0.004 0.004 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.015 0.019
DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur fc’30 Mpa M3 495.46 192.59 0.54 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045
7.1 (7a) Beton Struktur, fc’20 MPa M3 113.05 97.24 0.26 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
7.1.(8) Beton Struktur, fc’15 Mpa M3 720.00 1.29 0.214 0.214 0.214 0.214 0.214 0.214
7.1.(10) Beton, fc’10 Mpa M3 34.95 24.69 0.03 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
20
7.3 (1) Baja Tulangan Polos BjTP 280 Kg 8,549.72 18,259.21 0.27 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
7.3.(2) Baja Tulangan Sirip BjTS 280 Kg 55,491.74 42,604.83 0.65 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054
7.9.(1) Pasangan Batu M3 9,596.40 11,799.32 8.60 0.215 0.215 0.215 0.215 0.215 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188
7.10.(3a) Bronjong dengan Kawat yang Dilapisi Galvanis (Item Baru) M3 500.00 0.38 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038
7.15.(1) Pembongkaran Pasangan Batu (Item Baru) M3 282.11 0.09 0.031 0.031 0.031
7.15.(2) Pembongkaran Beton (Item Baru) M3 23.52 0.01 0.004 0.004 0.004
10
DIVISI 9. PEKERJAAN HARIAN
9.2.(1) Marka Jalan Termoplastik M2 5,505.36 5,505.36 1.01 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 50.00 60.00 0.06 0.031 0.031
9.2.(7) Rel Pengaman M1 2,000.00 2,000.00 2.13 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0
Progres Fisik Mingguan 0.046 0.046 0.046 0.046 0.195 0.303 0.563 0.612 0.696 0.816 0.824 0.869 0.909 0.928 1.289 1.488 1.615 1.563 0.995 0.883 0.945 1.076 1.066 1.066 1.063 1.199 1.199 1.199 1.199 1.760 1.538 2.000 2.276 2.421 2.659 2.582 2.515 2.833 2.956 3.251 3.304 2.957 2.880 3.095 2.430 2.889 3.036 2.847 2.847 3.158 4.038 2.802 3.211 3.369 3.018 0.734 0.734 0.587 0.399 0.129
Kumulatif Fisik Mingguan 0.05 0.09 0.14 0.18 0.38 0.68 1.25 1.86 2.55 3.37 4.19 5.06 5.97 6.90 8.19 9.68 11.29 12.85 13.85 14.73 15.68 16.75 17.82 18.89 19.95 21.15 22.35 23.55 24.74 26.50 28.04 30.04 32.32 34.74 37.40 39.98 42.50 45.33 48.28 51.53 54.84 57.80 60.68 63.77 66.20 69.09 72.13 74.97 77.82 80.98 85.02 87.82 91.03 94.40 97.42 98.15 98.88 99.47 99.87 100.00
FRANKY SIMAMORA, ST. M.Eng Ir. SYAIFUL HADI ANTONIUS NARENDRA S.S, ST
NIP. 19850331 201012 1 004 Supervision Engineer GENERAL SUPERINTENDENT