Anda di halaman 1dari 6

RENCANA ANGGARAN BIAYA

KEGIATAN : PENGEMBANGAN SEKOLAH/MADRAS


PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU
LOKASI : MIS AL MIFTAHUDDIN
TAHUN ANGGARAN 2019

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME (RP)
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasang Bouwplank m1 67.000 Rp 29,350.00
SUBTOTAL (I) PEKERJAAN PESIAPAN
II PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi m3 57.040 Rp 39,750.00
2 Mengurug kembali galian pondasi m3 19.013 Rp 13,220.00
3 Urugan pasir bawah pondasi m3 7.760 Rp 117,900.00
4 Urugan tanah peninggian lantai disiram m3 43.200 Rp 91,550.00
5 Pemadatan tanah m3 43.200 Rp 29,500.0
SUBTOTAL (II) PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PASANGAN
1 Pasangan batu kosong m3 15.520 Rp 298,600.00
2 Pasangan pondasi batu 1 pc : 5 ps m3 23.580 Rp 518,140.00
3 Pasangan dinding 1/2 bata 1 pc : 5 ps m2 314.798 Rp 87,684.00
4 Pasangan dinding 1/2 bata 1 pc : 3 ps m2 30.600 Rp 93,231.00
SUB TOTAL (III) PEKERJAAN PASANGAN
IV PEKEJAAN BETON
1 Sloop 13/20 m3 2.496 Rp 3,547,293.57
2 Kolom 13/20 m3 2.309 Rp 5,284,875.07
3 Balok 13/20 m3 0.936 Rp 4,468,325.79
4 Kolom praktis 10/10 m3 0.342 Rp 6,936,237.76
5 Kolom struktur 15/15 (selasar) m3 0.810 Rp 4,793,455.69
6 Balok ring, geuvel 10/15 m3 2.853 Rp 6,918,469.95
SUB TOTAL (IV) PEKERJAAN BETON
V PEKERJAAN PLESTERAN DAN LANTAI
1 Pek. Lantai keramik 40x40 (Lt.1+Lt.2) m2 210.930 Rp 144,564.00
2 Plesteran m2 535.156 Rp 42,271.00
3 Acian plesteran m2 535.156 Rp 23,425.00
SUB TOTAL (V) PEKERJAAN PLESTERAN DAN LANTAI
VI PEKERJAAN KAYU DAN ALUMINIUM
1 Listplank kayu klas II m' 58.000 Rp 61,750.00
2 Kusen kayu klas II m3 1.609 Rp 6,103,562.50
3 Daun jendela kaca m2 32.130 Rp 332,100.00
4 Daun pintu panil m2 4.920 Rp 466,640.00
5 Pek. Ventilasi krepyek m2 17.280 Rp 268,450.00
6 Kaca polos 3 mm m2 30.900 Rp 138,667.50
SUB TOTAL (VI) PEKERJAAN KAYU DAN ALUMINIUM
VII PEKERJAAN ATAP / PLAFOND
1 Pek. Rangka baja ringan m2 336.394 Rp 225,000.00
2 Atap genteng pejaten lokal m2 336.394 Rp 61,835.00
3 Bubungan genteng pejaten m' 26.000 Rp 37,280.00
4 Plafond calsiboard 3,5 mm rangka kayu m2 279.200 Rp 80,620.00
5 List gifsum C7 m' 234.000 Rp 25,090.00
SUB TOTAL (VII) PEKERJAAN ATAP / PLAFOND
VIII PEKERJAAN BESI
1 Kunci pintu 2 slang besar bh 3.000 Rp 161,070.00
2 Engsel pintu bh 9.000 Rp 39,722.50
3 Engsel jendela bh 66.000 Rp 23,200.00
4 Hak angin kecil bh 66.000 Rp 27,500.00
5 Grendel kecil bh 66.000 Rp 21,545.00
SUB TOTAL (VIII) PEKEJAAN BESI BAJA
IX PEKERJAAN INSTALASI LISTRIK
1 Titik lampu + instalasi bh 12.000 Rp 173,500.00
2 Lampu SL 18 watt bh 12.000 Rp 39,900.00
3 Saklar dobell bh 2.000 Rp 55,000.00
4 Saklar tunggal bh 3.000 Rp 55,000.00
5 Stop kontak bh 3.000 Rp 56,000.00
SUB TOTAL (IX) PEKERJAAN INSTALASI LISTRIK
X PEKERJAAN PENGECATAN
1 Cat tembok m2 535.156 Rp 20,644.00
2 Cat plapond m2 279.200 Rp 20,644.00
3 Cat kayu m2 116.274 Rp 27,950.00
SUB TOTAL (X) PEKERJAAN PENGECATAN
XI PEKERJAAN PENGADAAN MEUBELAIR
1 Meja belajar bh 36.000 Rp 650,000.00
2 Kursi siswa bh 72.000 Rp 175,000.00
3 Meja kerja 1/2 biro bh 3.000 Rp 725,000.00
4 kursi kerja bh 3.000 Rp 250,000.00
5 lemari kelas bh 3.000 Rp 1,350,000.00
6 Tempat sampah bh 3.000 Rp 100,000.00
7 Papan tulis (whiteboard) bh 3.000 Rp 350,000.00
SUB TOTAL (XI) PEKERJAAN PENGADAAN MEUBLAELAIR
TOTAL : I + II + III + IV + V + VI + VII + VIII + IX + X + XI
PEMBULATAN
AH
3 LOKAL

TOTAL HARGA

Rp 1,966,450.00
Rp 1,966,450.00

Rp 2,267,340.00
Rp 251,351.86
Rp 914,904.00
Rp 3,954,960.00
Rp 1,274,400.00
Rp 8,662,955.86

Rp 4,634,272.00
Rp 12,217,741.20
Rp 27,602,747.83
Rp 2,852,868.60
Rp 47,307,629.63

Rp 8,854,044.75
Rp 12,202,776.54
Rp 4,182,352.94
Rp 2,372,193.31
Rp 3,882,699.11
Rp 19,738,394.77
Rp 51,232,461.42

Rp 30,492,884.52
Rp 22,621,579.28
Rp 12,536,029.30
Rp 65,650,493.10

Rp 3,581,500.00
Rp 9,820,632.06
Rp 10,670,373.00
Rp 2,295,868.80
Rp 4,638,816.00
Rp 4,284,825.75
Rp 35,290,489.72

Rp 75,688,650.00
Rp 20,800,922.99
Rp 969,280.00
Rp 22,509,104.00
Rp 5,871,060.00
Rp 125,839,016.99

Rp 483,210.00
Rp 357,502.50
Rp 1,531,200.00
Rp 1,815,000.00
Rp 1,421,970.00
Rp 5,608,882.50

Rp 2,082,000.00
Rp 478,800.00
Rp 110,000.00
Rp 165,000.00
Rp 168,000.00
Rp 3,003,800.00

Rp 11,047,760.46
Rp 5,763,804.80
Rp 3,249,858.30
Rp 20,061,423.56

Rp 23,400,000.00
Rp 12,600,000.00
Rp 2,175,000.00
Rp 750,000.00
Rp 4,050,000.00
Rp 300,000.00
Rp 1,050,000.00
Rp 44,325,000.00
Rp 408,948,602.78
Rp 408,940,000.00
REKAPITULASI RUANG KELAS BARU

KEGIATAN : ........................
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU
LOKASI : ...................
SUMBER DANA :

NO URAIAN KEGIATAN TOTAL HARGA

I PEKERJAAN PERSIAPAN Rp 1,966,450.00


II PEKERJAAN TANAH DAN PASIR Rp 8,662,960.27
III PEKERJAAN PASANGAN Rp 47,307,585.79
IV PEKERJAAN BETON Rp 51,231,917.99
V PEKERJAAN PELESTERAN DAN LANTAI Rp 65,650,476.67
VI PEKERJAAN KAYU DAN ALUMUNIUM Rp 35,290,489.72
VII PEKERJAAN ATAP/PLAFOND Rp 125,839,014.12
VIII PEKRJAAN BESI Rp 5,608,882.50
IX PEKERJAAN INSTALASI LISTRIK Rp 3,003,800.00
X PEKERJAAN PENGECATAN Rp 20,061,418.40
XI PEKERJAAN PENGADAAN MEUBLELAIR Rp 44,325,000.00

REAL COST Rp 408,947,995.46

JUMLAH Rp 408,947,995.46
PEMBULATAN Rp 408,940,000.0

TERBILANG : Empat Ratus Delapan Juta Sembilan Ratus Empat Puluh Ribu Rupiah

.........., ...................2018
Disetujui oleh : Dibuat oleh,
Kepala Sekolah Tim Teknis Sekolah

............................. ............................
Estimator

Anda mungkin juga menyukai