Diagram Kode (Lonjor) Keterangan (Meter) (Meter) 1 5.20 3 15.6 Panel Ke Mesin 2 6.30 3 18.9 3 2.40 1 2.4 Kabel Pengering 1 4 3.70 1 3.7 Kabel Pengering 2 5 5.20 1 5.2 Kabel Pengering 3 6 3.70 3 11.1 A 3.50 2 7 B 9.10 2 18.2 C 8.80 2 17.6 D 12.60 2 25.2 E 12.60 2 25.2 PKG Ke Panel F 8.60 2 17.2 G 1.00 2 2 H 2.50 2 5 I 1.70 2 3.4 J 4.30 2 8.6 K 2.00 2 4 Jumlah 190.30 Sisa Kabel 9.70
Pejabat Pelaksana Teknis Kegiatan (PPTK BLUD) Balikpapan, Agustus 2022
PEMERINTAH PROVINSI KALIMANTAN TIMUR Konsultan Supervisi Kontraktor Pelaksana RSUD DR. KANUJOSO DJATIWIBOWO BALIKPAPAN CV. INDRA JAYA MANDIRI KONSULTAN PT. AGUNG TETRADAHAYU TEKNIK
TUKMIN, SE. AGUS DARMAWAN, ST BUDIONO
Nip. 198740720199703 008 Site Engineer Pelaksana Lapangan