Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA

PEKERJAAN EXHAUST BAKERY


PADALARANG

Harga Satuan Jumlah Total


NO JENIS PEKERJAAN VOL SAT Bahan Upah Bahan Upah Bahan & Upah
Rp. Rp. Rp Rp Rp

I PERALATAN UTAMA
Pengadaan dan Jasa Pemasangan

Fan
1 Kode : EF 1 UNIT 7,500,000 500,000 7,500,000 500,000 8,000,000
Type/ Model : BIFURCATED/ TDB
Merk : KRUGER
Air flow : 2,700 CFM
Staic Press. : 1,2 inch wg
V/Ph/Hz : 220/1/50
Total I 7,500,000 500,000 8,000,000
II PEKERJAAN DUCTING
LANTAI BASEMENT
1 Ducting Exhaust & Fresh Air bahan BJLS (Merk Lokfom), tanpa insulasi finish cat zinchromate
- BJLS 60 - UK. 14" X 12" 3 m' 188,500 84,500 565,500 253,500 819,000
- BJLS 60 - UK. 16" X 16" 2 m' 232,000 104,000 464,000 208,000 672,000
- BJLS 60 - UK. 22" X 16" 13 m' 275,500 123,500 3,581,500 1,605,500 5,187,000
2 Volume Damper (VD)
- 10" X 10" 1 bh 320,000 25,000 320,000 25,000 345,000
- 12" X 12" 1 bh 384,000 25,000 384,000 25,000 409,000
3 Exhaust Hood + Pemasangan dgn Gantungan Sling diam.10
- Ukuran 1600wx1300dx500h, bahan BJLS 100 - tanpa Grease Filter 1 bh 3,625,000 750,000 3,625,000 750,000 4,375,000
- Ukuran 1550wx800dx500h, bahan BJLS 100 - lengkap dengan Grease Filter 1 bh 2,937,500 750,000 2,937,500 750,000 3,687,500
3 Starter Panel - DOL STATER 1 bh 1,500,000 150,000 1,500,000 150,000 1,650,000
4 Kabel Power dan kontrol, merk Supreme
Exhaust Fan - Tipe Bifurcated
- Ukuran : NYY 3 x 2,5 mm² 50 m 35,000 5,000 1,750,000 250,000 2,000,000
Total II 15,127,500 4,017,000 19,144,500
TOTAL 22,627,500 4,517,000 27,144,500
PPN 10% 2,262,750 451,700 2,714,450
GRAND TOTAL 24,890,250 4,968,700 29,858,950
DIBULATKAN 24,891,000 4,969,000 29,860,000

Toserba Yogya Ciranjang 1/1 Tata Udara

Anda mungkin juga menyukai