Anda di halaman 1dari 3

PT.

CITRA INDO KARYA


ABSEN HARIAN
PROYEK SIMPANG JAMBI
PERIODE :
HARI/ TANGGAL ABSEN LEMBUR KETERANGAN
K J S M S S R
NO NAMA

1 DEDEK/ PK
2 BIDIN/ PK
3
4
5
6
7

8 UMAR/ PELAKSANA
9 YADI/ PELAKSANA

10 ZAIPUL/ KONSULTAN
11 ROBI/ KONULTAN
12 ASRIL/ KONSULTAN

13 LISTRIK LEMBUR JUMLAH


PT. CITRA INDO KARYA
PEMAKAIAN MATERIAL
PROYEK SIMPANG JAMBI
PERIODE :
HARI/ TANGGAL
SISA
K J S M S S R
NO NAMA MINGGU PAKAI SISA KETERANGAN
LALU
P S P S P S P S P S P S P S
1 Semen
2 Pasir
3 Split 2-3
4 Split 1-2
5 Kayu 4/6
6 Papan 2/20
7 Besi 12
8 Besi 10
9 Besi 8
10 Besi 6
11 Multiplek 9 mm
12 Multiplek 12 mm
13 Paku 3"
14 Paku 4"
15
16
17
18
19
20
PT. CITRA INDO KARYA
ORDER & DROP MATERIAL
PROYEK SIMPANG JAMBI
PERIODE :
SISA HARI/ TANGGAL
ORDER K J S M S S R JUMLAH JUMLAH
NO NAMA KET
MINGGU ORDER DROP
LALU
O D O D O D O D O D O D O D
1 Semen
2 Pasir
3 Split 2-3
4 Split 1-2
5 Kayu 4/6
6 Papan 2/20
7 Besi 12
8 Besi 10
9 Besi 8
10 Besi 6
11 Multiplek 9 mm
12 Multiplek 12 mm
13 Paku 3"
14 Paku 4"
15
16
17
18
19
20

Anda mungkin juga menyukai