Anda di halaman 1dari 1

TANAH URUG DIPADATKAN TANAH URUG DIPADATKAN

LANTAI KERJA LANTAI KERJA


50 250 50 50 250 50
WIREMESH M6 WIREMESH M6
4 D16 4 D16

80

80
500

500
D13-100 D13-200
100 50

100 50
4 D16 4 D16
370 370

TUMPUAN LAPANGAN

DETAIL SLOOF TIPE ST1


SKALA 1 : 20

TANAH URUG DIPADATKAN TANAH URUG DIPADATKAN


LANTAI KERJA LANTAI KERJA
50 250 50 50 250 50
WIREMESH M6 WIREMESH M6
3 D13 5 D13
80

80
500

500

D10-100 D10-200
100 50

100 50

5 D13 3 D13
370 370

TUMPUAN LAPANGAN

DETAIL SLOOF TIPE S3


SKALA 1 : 20

Keterangan : Kegiatan : Disetujui : Nama Gambar : No Gambar : Revisi :


PERENCANAAN DWI CIPTA
SARANA KEGIATAN IBADAH
KONSULINDO PRIMA
KEPALA Building Studio
PEMBANGUNAN MUSHOLLA SMK NEGERI 1 BUKITTINGGI Consulting, Planning, Supervision
Pekerjaan : DETAIL 27/STR
AHMAD KARIM BALOK SLOOF
SMK NEGERI 1 BUKITTINGGI
Drafter MARET SAPTONO, S.Pd.

Lokasi : JALAN ISKANDAR TEJA SUKMANA Bill Of Quantity DEVI OLIVIA KUMALA, S.Pd.
PADANG GAMUAK Drs. MUHAMMAD DININ
KOTA BUKITTINGGI NIP. 196408171989031030 Skala :
Constructur AZMI ZAIN, ST. 1 : 20

Anda mungkin juga menyukai