Anda di halaman 1dari 34
Prt P iE Tt a7 DAFTAR ISI Table of Content DAFTAR ISI Table of Content. 1 mt. PENDAHULUAN Introduction .. INFORMASI UMUM General Information Il. 1. DATA TIANG UJI Test Pile Data. 2. PERALATAN YANG DIGUNAKAN Equipment of PDA Test.. PELAKSANAAN PENGUJIAN Method Statement Ill, 1. PERSIAPAN PENGUJIAN, LAMPIRAN A : Data PDA & Capwap AppendixA = PDA & CAPWAP Data LAMPIRAN B __ : Spesifikasi alat PDA-8G Appendix B — : PDA-8G Specification LAMPIRAN C __: Data Keluaran Pile Driving Analyzer (PDA) Appendix — : Pile Driving Analyzer Output Quantities LAMPIRAN D — : KALIBRASI TRANSDUCER & ACCELEROMETER AppendixD —_: Transducer & Accelerometer Calibration LAMPIRAN E _: PENEMPATAN TRANSDUCER & ACCELEROMETER Appendix E Transducer & Accelerometer Plan / Placement PT: Megah Adti Karya ee L_PENDAHULUAN 4 Introduction Pile Driving Analyzer (PDA) adalah test tiang pondasi yang bertujuan untuk menentukan daya dukung tiang Pondasi, transfer energy yang dihasilkan oleh palu pancang, dil Pada saat test PDA dapat digunakan palu pemancangan sendiri dan apabila sudah tidak ada palu pemancangan maka dapat digunakan pal. yang disediakan khusus untuk test dengan berat minimum 1,5 persen (%) dari beban maksimum yang ingin dicapai. sinyal cepat regangan ya accelerometers menggunakan kabel dan bisa juga menggunakan radio, Program CAPWAP ® anallisis dari data PDA sangat penting. Program ini menyediakan_ distribusi tahanan tanah sepanjang pondasi. CAPWAP memberikan data grafik beban dengan penurunan. CAPWAP juga membuktikanhasil__ yang memuaskan untuk menentukan daya dukung maksimum tiang. Pile Driving Analyzer (PDA) Is a pile dynamic load test that aims to determine the pile maximum capacity, energy transfer from hammer to pile, ete. To cary out PDA test driven pile hammer can be used. When the piling rig is no Jonger on site, a drop hammer with a minimum weight of 1.5 percent 1%) of estimated ultimate pile capacity can be used, CAPWAP @ Program processed the PDA data further by carrying out signal matching process, This program provides the distribution of soil resistance along the pile. CAPWAP produces foad vs setlement curve, as well as capacity of the tested pile PT. Megah Adhi Karya ILINFORMAS! UMUM W.. General Information NAMA PROYEK . ee : PEMB. MAKO MENART 3 — SORONG 1.1. DATATIANG UII Test Pile Data Data tiang uji dapat dilihat pada tabel berikut: The test pile data are as follows: Panjang Rincian iBawan | faa, Tanggal inti Tiang/ Pie | Gages/ | TEP! | Hammer Test na Descriovon | Length een Tang / Date or 06 (13) (05 Oktober 2021 09 (54), 05 Oktober 2021 11.2. PERALATAN Equipment of PDA Test: a. PDA‘8G (Pile Driving Analyzer} PDA-8G (Pile Driving Analyzer] b. Dua buah strain transducer untuk mengukur gaya pada tiang uji ‘Strain transducer for measuring force (8) Dua buah accelerometer untuk mengukur cepat rambat gelombang Two accelerometer for measuring wave response on the pile d. Kabel / Pengirim signal tanpa kabel The connection cable/ Wireless Transmitter e.— Alat bor, angkur, baut, dill. Tools: equipment such as electric motor drill, bolt and nust, wrench, etc. PT. Megah Adli Kary WL Method Statement Pile Driving Analyzer sesuai dengan ASTM D4945 dan kode lainnya dan spesifikasi. The Pile Driving Analyzer conforms to ASTM D4945 and many other codes and specifications Ill | Persigpan Pengujian Testing Prepation Tiang uji harus mempunyai panjang diatas tanah atau air 3xDiameter atau minimal 1.5m, apabila kondisi tiang rata dengan tanah, maka diperlukan galian. Pada kondisi tiang dilaut maka harus diperhitungkan.waktu pasang surut air, agar “pada saat test berlangsung sensor tidak terendam air. Palu pancang dapat digunakan untuk memberikan g ida PDA. Khusus untuk Palu ini sendiri ha minimum 1.5% (satu koma lima persen) dari daya dukuing maksimum tiang. Saran palu yang digunakan adalah 2.0% (dua persen) dari daya dukung = maksimum —tiang agar diperoleh hasil_ yang maksimal dan mengurangi ketidak sentrisan_jatuh hammer. Lokasi test harus terdapat arus listrik 220v dengan daya sebesar 2200watt, untuk membantu pemasangan sensor pada tiang. Sediakan tenda untuk test PDA apabila cuaca panas dan pada kondisi cuaca hujan maka disarankan tidak dilakukan test karena dapat mengganggu terhadap hasil daya dukung. Pile test must have a minimum length of 3xDiameter or minimum 1.5m above soil or water surface. if top of pile located at or under ground level, then»soil around pile need to be excavated down 10 at least 3xDiameter. When Pile located on ocean or water level high tide position have to be taken into account, so that test sensors, will not submerge under water. = ‘be used to hammer d to PDA test. If piling @ then we can a to conduct PDA test. Weight of hammer for PDA test minimntim 1.5% fone point five percent) from maximum predicted capacity of pile. Recommended, weight of hammer is 2% (two percent) from maximum predicted capacity, so the hammer can deliver maximum load and reduce the effect of excentricity betwen the test pile and hammer. Electrical supply of 220v with 2200watt power is required for mounting sensors. Provide tent when the weather is hot and it is not advisable to do the test in raining condition, because it can interfere with the performance of the hammer in dilivering the energy to the pile. IIl 2 Petaksanaan Pengujian Testing Execution Monitor secara Menerus Monitor Pukulan Ulang Continues monitoring Redrive Monitoring Pasang strain tranduscer_ dan Pasang strain tranduscer dan accelerometer pada tiang uj. Masukan _ accelerometer pada tiang uji. Masukan data tiang pada komputer PDA, dan data tiang pada komputer PDA, dan kemudian lakukan pemukulan seperti kemudian lakukan pemukulan. pada pemancangan. Banyaknya pukulan tergantung pada Pada setiap pukulan data akan terbaca kondisi tiang uji. Untuk tiang bor rata- pada komputer PDA, dan akan rata dapat dilakukan 3-4 pukulan, dan dipantau oleh tim PDA. Apabilakondisi_ pada tiang pancang dapat diambil 20- sensor sudah dekat dengan tanah, 30 pukulan) Pada pukulan ulang ini maka sensor harus dilepas dan _diharapkan dayayyang diberikan cukup dipindakan pada posisi yang lebih agar tiang dapat, bergerak sejauh tinggi. 3mm. Test PDA selesal apabla data daya Test akan selesal apabila daya dukung dukung sudah tercap panjang ang I ai telah didapat atau tertanam — sudah i. dengan ng. tidak mampu untuk perhitungan ukul, Apabila kondisi tiang sudah n_untuk dipukul Attach straint elu dapat maka accelerometer on test pile. Input data dsararign agar tiang diperbaiki to PDA computer, and-start piling sebelum di pukul_ulang, atau test normaly. dilanjutkan pada titik lain. Every blow will be read on PDA computer, and will be monitored by Attach strain ‘tranduscer_— and PDA team. When sensors comenearto _accelerometer on test pile. Input data the ground surface. they need to be to PDA computter and start the test. detached and reinstalled on higer ‘The number of blows depend on the position on the pile. ype of pile tested For boredpile PDA test will be stopped when the normaly 3-4 blows is sufficent, and for ultimate pile capacity is reached or pile —_driven pile 20:30 blows is required. In ‘embeddded fength has reached the __ this restrike test the force given must designed level. be able to move the pile as far as 3mm. Test will be completed when the maximum capacity has been obtained or the pile head is damaged during restrike. If the condition of the pile is not possible to be restriked, it is suggested that pile be repaired before restriked, or test be continued at another pile. a PT. MEGAH ADHI KARYA IV.DISKUSt WV. Discussion IV. 1. Energi dan Tegangan pada Material Tiang Energy & Stress C06 (13) 09 (54) IV. 2, Daya Dukung Tiang C06 (13) 1D 09 (54) cr PT. MEGAH ADHI KARYA | a } | yA i I i \ PN) Bt a 7, N PT. MEGAH ADHI KARYA f i , | + | / | I Ronis 2 wie Par esa) Pile Dynamics, Inc. Pile Driving Analyzer ® (PDA) PEMB MAKO MENART 3 C06 (13) ey AT] Ives. m 5.17 mis) F23| Project information SEE HOTT Jo]2s.5 m c1c0fmm fre: 0 7] F239] PROJECT: PEMB MAKO MENART 3 RMX PILE NAME: C 06 (1) su DESC: SQUARE 25 DIESEL 2,57 ‘oMK PDA OWNER: Pile Dynamics, inc. DEN ‘SERIAL NUMBER: 4690 LE MK (OPERATOR: AAN esx FILE: C06 (13) pda TSK 50K2021 12.57.40 PM FX Blow number 7 Pile Properties Le aR eM SP ws we EN 2uC sc ie 235m 25.00 om2 352 vem2 2.40 uma 3787.8 m/s 3760.0 mis 158.0 trai 2.60 ms 60 242m Quantity Results Tin ei 21mm Omm 232 tm 22aMPa 41MPa 14510 Sensors ‘Ad (PRY: [K10464] 416 mul6.4ul5000g (1) VF F2: [R619] 04.9 PDICAL (1) FF1 9: [R610] 91.5 PDICAL (1) FFA ‘Ad (PR): (K10700] 384 m6. 4v/5000g (1) VEL CUP: OK vawanonmanameumnenor tame eT rt oe ag | wis iz Suduweq yas 201 a 2 | ups 260 “Sac wus yeus Say oo g | uu zers ‘0 201 . uw ieez even yeUS “Bay ce q uoyeuo} eo sees uoseL le a Guoyeu}eo sear sduog x . ee Ghoyeug 9 ‘seeng ilo doy 3 ae ‘Aero wien 3 . sugece -emueno sn gaze -pag neqa dod. euyeuoiy2, Boyds do, oO liysuo} zoe srnpon-3 so, § Woo ‘seubed OL i 7 wip 0'9¢9 ——_eary buyeeg pug amon ais a moor mea : st umes os 002 Osh OSS wee woupsaua nc : (suai) peor wigez — swomag'gin6uey | sounssauyeus | | | ay oor onus, ° 0 suse, oo oot do ong — suo} sued ed ‘suo oz aunt ~ 00 e702 @avMdvo WARN IHG HYD AI LE ‘even (us soe e0s0 me) £ mois 1sata Se BA¥NIDS fe) 90.0 te OA a PEMG MAKO MENARF 3; Pile: C 06 (13) ‘Test: 05-Oct-2021 12:37 ‘SQUARE 25 DIESEL 2,57; Blow: 7 CAPWAP(R) 2014-3 MECAH ADEE KARYA op: AAN bout the CAPWAP Results ‘tho CAPHAP program performs a signal matching or reverse analysis based on measurements taken on a deep foundation under an impact load. tho program is based on a one-dinenoional mathematical model. Under cortain conditions, the model only crudely approximates the often complex dynamic situations. ‘The CAPYAP analysis relies on the input of accurately measured dynamic data plus additional paraneters describing pile and soil behavior. If the field measurenents cf force and velocity are incorrect or were taken under inappropriate conditions (e.g., at an inappropriate time or with too much or too Little enargy) or if the input pile model is incorrect, then the solution cannot represent the actual e011 behavior. Generally tho CAPHAP analysis ie used to estimate the axial compressive pile capacity and the soil resistance distribution. The long-term capacity is best evaluated with reetrike tests since they incorporate soil strength changes (eot-up gains or relaxation losses) that occur after installation. ‘he calculated When uplift ie a controlling factor in the design, us uplift capacity should be made only after very careful anslysis of only good easurenent quality, and further used only with longer pile lengths and with nominally higher safaty factors ‘CAPHAP is also used to evaluate driving stresses along the length of the pile. However, it should be understood that the analysis is one dimensional and does not take into account bending effects or local contact stresses at the pile too. Furthermore, if the user of this software was not able to produce a solution with satisfactory signal “match quality” 0), then the associated CAPWAP results may bo unreliable. There is no absolute scale for solution acceptability but solutions with Mg above 5 are generally considered less reliable than those with lower MQ values end every effort should be made to improve the analysis, for example, by getting help from other independent exports. Considering the CAPWAP model Limitations, the nature of the input parameters, the complexity of the analysis procedure, and the need for a responsible application of the results to actual construction projects, it is recommended that at least one static load test be performed on sites whore Little experience exists with dynamic behavior of the soil resistance or when the experience of the analyzing engineer with both program use and result application is Limited. Finally, the CAPAP capacitics are ultimate values. They MUST be reduced by means ‘of an appropriate factor of safety to yield a design or working load. The selection of a factor of safety should consider the quality of the construction control, the variability of the site conditions, uncertainties in the lcads, the importance of structure and other factore. The CAPWAP results should be reviewed by the Engineer of Record with consideration of applicable geotechnical conditions including, but not Limited to, group effects, potential scttlenont from underlying compressible layers, soil resistances provided fron eny layers unsuitable for long term support, as woll as effective stress changes due to soil surcharges, excavation or change in water table elevation. ‘The CAPWAP analysis software ie one of many moans by which tho capacity of a deep foundation can be assessed. The engineer performing the analysis is responsible for proper software application and the analysis results. Pile Dynamics accepts no Liability whatsoever of any kind for the analysis solution and/or the application of the analysis result. Rnalysie® 06-Oct-2021 PEG NAKO MENART 3; Pile: C06 (13) SQUARE 25 DIESEL 2,57; Blow: 7 Test: 05-oct-2021 1: CcAPUAP (R) 2014-3 ‘MGAH ADEE ARTA. op: AA CAPWAP SUMMARY RESULTS ‘Total CAPWAP Capacity: 105.02) along Shaft 96.88; at Too 88.14 tons Soil Dist. Depth Ru Force ‘Sum Unit ‘Unit —Saith Sgant Bolow Below in Pile of | -Resiet. Rosist. Damping No. Gages Grado Ru (Depth) (Area) Factor = = tone tone tons tons/m _tons/nt fm 185.0 1 a4 2.8 3.04 182.0 3.04 1.10 1.10 0.57 2 Ba 4.8 1.80 180.2 4.84 0.88 0.88 0.57 3 12 6.9 0,02 180.2 4.86 0.01, 0.01, 0.57 4 9.2 8.9 0,00 380.2 4.86 0.00 0.00 0.00 5 «11.2 10.90.00 180.2 4.86 0.00 0.00 0.00 6 13.3 13.00 al 79.2 5.97 0.54 0.54 0.87 745.315.0484 174.2 10.81 2.37 2.37 0.57 8 474 «17.229 162.9 aa.t0 5.52 5.52 0.87 9 19.4 39.2 19.27 a8 41.27 9.38 9.38 0.87 yo 2S 25.97 07-8 G7.24 ARTE 12,7 0.57 1123.5 23.2 29.64 ee. 96.88 14.80 14.50 0.57 avg. Shaft 8.81 ans 48 0.57 Toe 98.14 1410.25 0.21 S041 Model Parenetere/Extensions Shaft __Too. ‘Quake (=m) 2.761 6.182 Case Damping Factor 0.95 0.32 Damping Type saiViec smith Unloading Quake (@ of loading quake) 30 100 Reloading Level (8 of Bu) 100100 Unloading Level (@ of Bu) 16 Soil Plug Weight (tons) 0.109 Capp match quality 2.27 (Wave Up Match) 7 RSA= 0 Observed: Final set = 0.100 may Blow Count 10000 b/m Computed: Final Sot = 0.100 mm; Blow Count == —=—«9999 b/m ‘ranecocor 2 (REIS) CAL AL qciosst) caus mast, Top Comp. Stross max. Comp. Stross max, Tens, Stee: max. Bnorgy (0) 91 Rp: 1,007 #3 (R610) 416; Rr: 1.00; n4 (10700) CAL: 204 0.2 tons/em? (n= 0.3 tons/en? (ae -0.03 tone/on? (Z= 2.30 tons-m; max. 37.2 me, max= 1.216 x Top) 15.3 m, T 36.7 mo) 17.4 m, T= 66.1 ms) Diop. (D¥)=21.201 am Measured Top Faalyeier 06-Oct-2021 PEMB MAKO MENART 3; Pile: C 06 (13) ‘SQUARE 25 DIESEL 2,57; Blow: 7 Test: 05-Oct-2021 12:37 ‘CAPWAP(R) 2014-3 MEGA ADEE KARYA op: BAN EXEREMA TABLE File Dist. max. min. max max, max. sgunt Belox Force. = Force. «Comp. Veloc. Displ. No. Gages stress 2 tons tons/en? tons/ca? __tons-m als am 1 1.0 8.6 0.2 -0.01 2.20 1.6 21.496 2 2.0 9.5 0.2 -0.02 2.26 1.6 20.835 4 aa -10.9 0.2 -0.02 2.07 1.5 19.502 5 sa 11.7 0.2 0.02 2.02 1.5 18.828 6 64 12.3 0.2 -0.02 1.92 14 18,149 7 7.2 158.3 -13.0 0.3 -0.02 «1.87 a 17.459 8 8.2 161.3 13.9 0.3 -0.02 2.81, 2.3 16.753 9 9.2 163.9 © -14.9 0.3 0.02 1.76 1.3 16.038 100.2 166.7 26.0 0.3 0.03 4.70 1.2 15.309 2169.4 27.0 0.3 -0.03 1.64 1.2 14.573 wz 2.3m -7.9 03-003 1.59 Li 13.928 1300«13.30 174.5 28.9 0.3 -0.03 1.53, 10 13.075 “43am. -19.5 0.3 -0.03 1.45 1.0 12.319 15 «15.3 -176.2~20.4 0.3 -0.03 1.38 0.9 11.559 16 «16.3 171.3 -20.0 0.3 -0.03 1.28 0.8 10.802 a7 17.173. 20.9 0.3 -0.03 0.8 10,043, 18 160.7 -18.9 0.3 -0,03 0.7 9.325 19 162.8 © -19.7 0.3 0.03 0.7 8.601, 20 142.6 -15.1 0.2 0.02 0.7 7.952, 21 146.6 -15.6 0.2 0.03 0.6 7.298 22 19.7 -8.7 0.2 © -0.01, 0.6 © 6.747 23 321.6 8 0.2 -0.01, 05 6.191 Absolute 35.3 0.3 (r= 36.7 my 274 0.03 (P= 66.1 ms) Wmalyaier 06-Oct-2021 FEMB MAKO MENARF 3; Pile: C 06 (13) Test: 05-Oct-2021 12:37 SQUARE 25 DIESEL 2,57; Blow: 7 ‘CAPWAP(R) 2014-3 ‘MECAH ADE KARYA, op: AN ‘CASE METHOD a= 00 Oa 02 0.3 0.4 05 0.6 0.7 08 0.9 = ies 192Ss«7@Ss7S—sATL:SC(isnT = 16359 sSG a mK 193 189-186-183, 18037774 ah 88s 196 193-9007 84 8178175173170 pag = 91 (tons); RAZ 189 (tons) Current CAPWAP Ra = 185 (tone) ; Corresponding J(RP)= 0.03; J(RK) = 0.24 wot Peltz FTL MSN SET = ma US, EB n/o | msstons.«s tone «stone «= mm = msm tona-m _ tons tone/mm 1.7 28.32 97 128= «145 21.281 0.401 0.200 2.32217 1a PILE PROPILE AND PILE MODEL. Depth rea EiNodales Spec. Weight Porim. a = ‘tons/on? ‘tons/m = 0.0 625.0 351.5 1.00 23.5 625.0 351.5 1.00 ‘Too Area 625.0 = Segant Dist. Impedance Imped. mension Compression Perim. © Wave Soil. Number B.G. Change lack EEf, Slack REE. speed Plug = tons/a/o . om = = m/e tone 1 2.0 58,00 0.00 0,00 0.000 -9.00 0.000 1.00 3787.8 0.000 2 2.0 $8.00 0.00 0.00 0.000 -0.00 0,000 1.00 3707.8 0.005 23° 23.5 58.00 0.00 000 0.000 0.00 0.000 1.00 3787.8 0.005 Wave Speed: Pile Top 3787.8, Elastic 3787.8, Overall 3787.8 m/s Pile Damping 2.00 , Time Incr 0,270 ms, 2U/e 12. ‘Total volune: 1.469 a!’ Volume ratio considering added impedance: 1.000 Page 4 Tnalysis? 06-Oct-2021 Pile Dynamics, Inc. Pile Driving Analyzer ® (PDA) PEMB MAKO MENART 3 D 09 (54) “GATS OOP \ve2a.5 m .14vs) -—— STEM OM Jo@23.5 m (100}mm) 77 Fa Project information PROJECT: PEM MAKO MENART 3 PILE NAME: D.09 4) DESC: SQUARE 25 DIESEL 2,67 PDA OWNER: Pile Dynamos, inc. ‘SERIAL NUMBER: 4690 LE ‘OPERATOR: AAN FILE: 0 09 (64) pda ‘050K1202" 12.06.25 PMA Blow number 14 Pile Properties LE 235m AR 626.002 EM 352 tom2 SP 2aoums ws 37a78m/s we 37600m/s ENC 58.0insim 2UC 12.60™me wc O60 iP 232m ‘Quantity Results RMX 173th RU 213! DMX 15mm FN Omm EMK 1.87 in esx 23.0Mea TSX 40MPa FX 148 tn Sonsors [At (PR): [K10461] 416 v6. 4u/5000g (1) VE 2: [R619] 04.9 PDICAL (1) FF 3: [R610] 901.5 POICAL (1) FFt 'A4 (PR): [K10700} 384 mv6.4v/5000g (1) VF CLP: 0K Verlon zat 24 ‘varoine wyoan aun ene aon up ge Sudweg ys 201, yp 220 “Sa ws yeus ‘Eny | ~ (uuu) juaurede|dsiq wysuo} g # wwowg-—— 052 00 oor (Guay) peor srosuag "9 yi6u27 on one rs sw goz| 1 favo oot S-p10z (wavMdvo WAMY> [HOW HVS bz02-P0-90 (90:21 $20290-S0 3804) »} ‘Mola $192 TASSIG sz THVNDS ‘(h9) 60 C ‘Ale 1C LUVNEWN ODVIN BS IMG MAKO MMART 3; Pile: D 09 (54) Test: 05-oct-2021 12:06 SQUARE 25 DIESEL 2,57; Blow: 14 ‘CAPWAP(R) 2014-3 MGR ADET KARYA op: ARN bout the CAPWAP Results ‘The CAPWAP program performs a signal matching or reverse analysis based on measuresente taken on a deep foundation under an impact load. The program ie based on @ one-dimensional mathematical model. Under certain conditions, the model only crudely approximates the often complex dynamic situations. ‘The CAPWAP analysis relies on the input of accurately measured dynanic data plus ‘additional paraneters describing pile and soil behavior. If the field measurenents of force and velocity are incorrect or were taken under inappropriate conditions (e.g-; at an inappropriate tine or with too much or too Little energy) or if the input pile model is incorrect, then the solution cannot represent the actual 2041 behavior. Gonerally the CAPWAP analysis is used to estimate the axial compressive pile capacity and the soil resistance distribution. The long-term capacity is best evaluated with rostrike tests since they incorporate soil strength changes (sot-up gains or relaxation losses) that occur after installation. The calculated load settlement graph does not consider creep or long term consolidation settlenants. When uplift ia a controlling factor in the design, use of the CAPHAP xesulte to assese uplift capacity should be made only after very careful analysis of only good mensurenont quality, and further used only with longor pile lengths and with nominally higher safety factors. CAPWAP is also used to evaluate driving stresses along the length of tho pile. Howaver, it should be understood that the analysis is one dimensional and doos not ‘take into account bending effects or local contact stresses at the pile toe. Furthermore, if the uoor of this software was not able to produce a solution with satisfactory signal “match quality” (#9), then the associated CAFWAP results may be unreliable. There is no absolute scale for solution acceptability but golutions with MQ above 5 are gonerally considered less reliable than those with lower MQ values and every effort should be made to improve the analysis, for example, by getting help from other independent experte Considering the CAPWAP model limitations, the nature of the input paransters, the complexity of the analysis procedure, and the need for a responsible application of the results to actual construction projects, it is recommended that at least ona static load test be performed on sites whare little experience existe with dynamic Behavior of the soil resistance or when the experience of the analyzing engineer with both program use and result application is limited. Finally, the CAPWAP capacities are ultinate values. They MUST be reduced by moans of an appropriate factor of safety to yield a design or working load. the selection of @ factor of safety should consider the quality of the construction control, the variability of the site conditions, uncortainties in the leads, the importance of structure and other factors. The CAPHAP results should be reviewed by the Engineer of Record with consideration of applicable geotechnical conditions including, but not Limited to, group effects, potential settlenent from underlying compressible layers, soil resistances provided from any layers unsuitable for long term support, ae well as offective etrees changes due to soil surcharges, excavation or change in water table elevation. ‘The CAPHAP analysis software io one of many moans by which the capacity of a doop foundation can be assessed. The engineer performing the analysis is responsible for proper software application and the analysis results. Pile Dynamics accepts no liability whateoover of any kind for the analysis solution and/or the application of tho analysis result. Rnalyeie: 06-Cot-202T FENG MAKO MENARF 3; Pile: D 09 (54) SQUARE 25 DIESEL 2,57; Blow: 14 Tost: 05-Cct-2021 12:06 ‘cAPWAP(R) 2014-3 MEGAH ADEE KARYA op: aa ‘CAPHAP SOYMARY RESULTS Jotal CAPWAP Capacity: 192.13; along Shaft 124.08; at Too 68.05 tons Soil Dist. Depth Ru Force: Sum unit. Unit Quake Sgunt_Bolow Below an Pile of Resist. Rosist. Wo. Gages Grade Ra (Depth) (Area) = a tone tone tons tons/m _tono/nt am 192.1 1 aa 2.8 7.67 188.5 7.61 27 2.77 2.026 2 Ba 4.8 5.22 179.2 12.89 2.55 2.55 2.025 3 12 6.9 2.29 177.0 = 15.18 1.12 1.2 2.025, 4 9.2 8.9 0.95 176.0 16.13 0.46 0.46 2.025 5 41.2 10.92.23 173.8 18.36 1.09 1.09 2.025 6 13.3 13.0 6.44 167.3 24.80, 3.15 3.15 2.025 7 15.3 15.0 2.72, 18a.6 37.52 6.22 6.22 2.025 © 47.4 7.4 84d 136,255.93, 9.01 9.01 2.025 9 19.4 «19.262 14.6 77.55 10.58 10.58 1.758, 100-215 21.2 23.09 91.5 100.64 11.30 11.30 0.949 1123.5 23.2 23.44 68.1 124.08 11.47 0.807 Avg. Shagt 11.28 5.35 5.351.548 Foe. 68.05 1088.80 1.016 Soil Model Paramoters/Extensions. Shaft Toe ‘Saith Damping Factor 0.27 0.95 case Damping Factor 0.58 ..aL Damping Type Viscous SatVieo Unloading Quake (8 of Loading quake) 7m 100 Reloading Level (8 of Ru) 100100 Unloading Level (8 of Ro) o CApWAP match quality = 338 (Wave Up Match) 7 BSA= 0 Gbeorved: Final set 0.100 mm; Blow Count. 10000 b/m Computed: Final Set = 0.100 ma; Blow Count. == 9999 b/w Beanedscer 2 (RIS) CAL: 94.9) RF: 1,00) #3 (R610) CAL: 93.5) RPL 1.00 [AL (10461) CAL: £16; AF: 1.00; ad (10700) CAL: 386; RF: 1.00 Top Comp. Stross = ——0.2 tons/axt (T+ 35.9 ma, max= 1.071 x Top) . Tans. Stress Energy (20%) = max. Comp. Stree: 0.3 tons/en* (z= 0.04 tons/em? (z= 1.55 tone-m; max. 13.3.m, = 37.5 ms) 13.3 m, T+ 59.1 ms) Moaured Top Displ. (DMK)=14.950 mm Bnalysie: 06-Oct-2021 EME MAKO MENART 3; Pile: D 09 (54) Tost: 05-Oct-2021 12:06 SQUARE 25 DIESEL 2,57; Blow: 14 ‘caPWAP(R) 2014-3, ‘MGGAH ADET KARYA op: AN EXERENMA TABLE Pile — min. max. me max. Sgant Force Fora = Comp. «Tens. Displ. Wo. Stress Strose tone __tone tons/em* tons/en? nfs = 1 107.4 -12.6 0.2 0.02, 1.2 15.412 2 150.7 -13.6 0.2 -0.02 1a 44.79 4 148.5 -15.5 0.2 -0.02 1.0 13.334 5 151.6 -16.2 0.2 -0.03 2.0 12,640 6 149.900 -17.2 0.2 -0.03 0.9 11.961 7 151.9 -18.3 0.2 ~0.03 0.9 11.269 e 151.9 -18.9 0.2 © -0.03 0.8 10.579 9 154.1 -20.3 0.2 0.03 0.8 9.876 10 155.0 -21.2 0.2 0.03 0.7 9.465 a 156.7 -21.6 0.3 0.03 0.7 8.aar Fra 156.1 -22.3 0.2 0.08 ©. 0.6 (7.716 2B -22.6 0.3 0.04 0.6 6.980 4 722.2 0.2 0.00 0. 0.5 6.262 15 22.5 0.2 -0.08 0. 0.5 | 5.534 16 21.8 0.2 © -0.03 oo. og 4.885 a -21.9 0.2 -0.08 0.3 4.169 18 -20.7 0.2 -0.03 0.3 3.556 19 6 20.8 0.2 0.03 0.22 0.3 2.940 20 0 19.4 0.2 0.03 0.15, 0.2 © 2.413 210 «2.5 113.0-49.4 0.2 0.038 0.12 0.2 1.883 2200 «25 ST ~A7.8 Ot © -0.03 0.07 oa” 1.452, 2300-235 82.4 7.9 0.1 © -0.03 0.05, oa Lowe Absolute: 13.3 0.3 (= 37.5 me) 13.3 0.08 @ 59.1 ms) Page 3 Bnalysist 06-Oct-2005 FEMB MAKO MENART 3; Pile: D 09 (54) ‘SQUARE 25 DIESEL 2,57; Blow: 14 Test: 05-Oct-2021 12:06 ‘cAPWAP(R) 2014-3 MGA ADEI KARYA op: aaN CASE METHOD a= 00 02 02 0.3 0.4 0.5 0.6 0.7 08 0.9 » aex 80, 178,—S77s275 aaah K ies 1s 180,ss78-—Ss176—=S 751737270468 "0 207208 209sOaassC ak 23S SS Ag = 50 (tons); RAZ = 181 (tons) Current CAPHAP Ru = 192 (tons); Corresponding J(RE)= 0.007 J(RX) = 0.00 a a a | m/e ms_-stons.«s tens, tons, «= m= sm tons~m tons tons/am 1.2 28.32 69 «128«S 146 14.950 0,104 0.100 1.87 209, 67 PILE PROFILE AND PILE MODEL Depth Brea E-Nodulus Spec. Weight Peoria. a ot tone/ent ‘tons/m* 2 0.0 625.0 351.5 2.403 1.00 23.5 625.0 351.5 2.403 1.00 ‘Toe Area 625.0 ot ‘top Segnent Length «1.02 m, Top Impedance 58 tons/n/o Wave Speed: Pile Top 3787.8, Elastic 3787.8, Overall 3787.8 n/s Pile Damping 2.00 &, Tine Ince 0.270 ms, 2U/¢ 12.4 ms ‘Total volume: 1.469 =! Volune ratio considering added impedance: 1.000 Page Bnalyeier 06-Oct-2021 PT. MEGAH ADH! KARYA } | MEGAH ADHI KARYA Found LZf/ Craters Pile Dynamics, tne. Pile Driving Analyzer® system Specifications (Models 8G) ‘September 2014 Physical: Size: 320 X 250 X 68 mm (12.6 x 9.8 x 2.7 inches) ‘Weight: 5 Kg (11 tbs) “Temperature range: 0 to 40°C (32 to 104° F) operating; -20 to 65°C (-4 to 149° F) storage Display: 26.4em (10.4%), sunlight readable, resolution 1024 X 768 Built in capaatve touch screen Video Outputs: HOME, VGA Power: 4 hour continuous data collection battery pack, 12 VDC car battery, or 100-240 VAC. Extra battery pack supplied. CCherging time: 6 Hours max. Electronic: - ‘Microsoft Windows® 7 Operating System {60 GB SSD intemal drive Ethernet port 4 USB ports ‘Analog signal conditioning filtering frequency response) 2.5 KHZ (-3 48) 16-bit A/D converter with sampling frequency of 10.24 MHz '8 channels with effective digitizing frequency of 10 KHz to 40 KHz selectable AK, 2K, or 4K data record sizes available Basic unit accuracy 2% Functional: Built in calibration test function Compatible with Smart (wireless) Sensors Wireless range up to 100 m (328 ft) 8 channels of data acquisition, universal (strain or acceleration), traditional or wireless ‘Automatic balancing of signals and signal conditioning Digital (software) integration of acceleration ‘Signal conditioning for force and acceleration have similar frequency response {intemal calibration check of strain and acceleration Signal amplification capability ‘Triggers on any attached strain transducers User adjustable pre-tigger buffer size High speed internet data transmission using SiteLink® Connect through broadband phone or other network device (additional desktop sharing software needed) ‘Dial up data transmission through data capable mobile phone connected via USB Other: ‘Operates in English, SI, or Metric units Optional external USB Keyboard, mouse, and WIF (802.11b,g,n) available Indudes both soft side carry-on luggage case and hard transit case Equipped for remote technical support using SiteLink Connect ‘Optional TeamViewer desktop sharing software license for use with SiteLnk Connect Fumished with licenses for PDA Software Suite (PDA-W, PDIPLOT and PDI Curves), GRLWEAP and CAPWAP® Full one year warranty PDA manual in PDF format and printed CAPWAP manual included + The PDA-8G is patented under the Remote Pile Driving Analyzer US Patent No. US 6301551 1 30725 Aurora Road * Cleveland, Ohio 44139 USA © +1-216-831-6131 Fax +1-216-831-0916 E-mail: info@pile.com * wwwpile.com | fe 3 PT. MEGAH ADHI KARYA eae Peet 8 7, ‘PT. MEGAH ADHI KARYA PDA Output Quantities The PDA computes the following quantities. The first letter generally indicates the variable type, 4e, F force, D displacement, E energy, R resistance, T time, V velocity. Bold and underline are more important. FMX the maximum measured compression uniform force at the transducer location. SX compression stress maximum (FMX/Area) (assumes uniform over section) EMX maximum energy transmitted past the transducers. DMX maximum downward displacement at the transducer location. DFN the final downward displacement at the transducer location. CIN maximum computed tension force below the transducers (superimposes compression in first 2L/C). TSX tension paws CTN/AR}. after 2L/C. m pile) (TSN = BPM hammer operating rate in blows per minute. STK stroke of ram (for open-end diesel hammers only) BTA pile integrity factor for pile damage analysis, (also BT2 for second damage} RMX maximum Case-Goble resistance (using JC) occurs at time TMX during blow. RX# is RMX with JC=0.# (i.e., RX6 is RMX with JC = 0.6) RSU the Case-Goble resistance using damping corrected for early unloading, /. e., velocity upward (negative) before the 21/C time. Primarily for piles with high friction. RU# is RSU with JC = 0.# (i.e., RU7 is RSU with JC = 0.7) PT. MEGAH ADHI KARYA Peer ets 71 WSN GEL? O1UO “PueIANSIO peoy eioiny SzZ0¢e “a1ep eAoge WON sie Z JO) PIJeA S| SPEOYHIED SIy “LSIN 0} 91Qe892)) juewidinbe 389} UM payesqyeo sem yndyno asoym xog UOHeIqHeD Wad e Buisn COCO VU WH uo payeiqueo sem 370697 “OqQuINN [ees 98 lepow ‘@lezAjeuy BuIA Old 9} }eU} SEyHAVd ‘oU] ‘soIWeUAG ald LE 39.6 ft fe 9229 ine en koa SE Kees ig tere ne nes on Ease 30.3 Kaset Tiezooub one 30 DL -39 Br 2? te 0.00} 4 ea TR BeRe| iva goo 219 Bice 5997 So3/ Ts 12 2 Lp o.00 ee => 8374 $997 _are| F880 ya 1000 pram EF 2:8 INU SO-OFF_FL-OFF pR-OFF| UMX EMX: 4.4 FIX 0.3 MEX= 68 ANX 133 FUP= 1.00 ACCEPT LES ‘AGCELERONETER CALIBRATION SERIAL NUMBER: cALIBRATION FACTOR: Ppa OPERATOR: Wo1.8.1- Traceable ISs46 «OF. e tb are: RONSV | SSRDSASSEN OP: LAINE twer!5. 017 ‘Smart Sensor rromennea ty AW) crcvawe BEM S Certificate of Calibration PO asd Pile Dynamics, Inc. Serial Number: R613 PDI Gage Factor: 94.9 mes Certificate of Calibration Cransducer Model: 201 Transducer Serial Number: R610 PDI Gage Factor: 91.5 pe/V on 817T sed Noy ome aN General Gage f Calloration Curve Suan (mia sivain) Transducer Output (mV) LCC Stancan’ Deviation: 7.742087 E-7 Sinatra ay Temperature (C¥ 26.8 Meat Linear Correlation Coeilivient (LCCr 9.999839 Calibrated By: Kay To! : KLO700 LP 0.00 fe 2] 4°3°° wn so00 ummm Hf 9:89 27] 4.1 FMX= 63 AMNX= 129 IEMX= 0.2 MEX= 123 FUP= 1.01 “ACCELEROHETER GALIOnATION Wises Traceable ‘SERIAL NUMDEN: Oo 7o< Set clr eee ers re: /ALUAEAO ‘Smart Sensor ‘Smart Chip Programmed By 1 /U «on CRC Value BCS PT. MEGAH ADHI KARYA dna anaes MEGAH ADHI KARYA Strain and Acceleration Sensors for the Pile Driving Analyzer* and other applications Strain Transducers and Accelerometers manufactured by Pile Dynamics are reliable, convenient to install and remove, and highty durable, Available in traditional (cabled) and smart (wireless) models, ACCURACY: PDI sensors collect axially accurate signals at high micro-stain (trait transclucers) and “Q” (arcelerometers} loves TRACEABILITY: PD! sensors are traceable to Netonal nstiute of Standards ant Techniclogy «NIST specifications, Cafiation sheets are furmished with each sensor. Pie Dynamics recommends that sensors be recalibrated at least every twa years, accordance wth ASTW! #945, VERSATILY: 1 adaition to collecting data for use by the Pie Dnving Analyzer POAX, acceler te also used with the SPT Analyzer, along wth a specully instrumented SPT tod (strain gages glued to the rod are used i lieu of strain transclucers for this applicaton}. PDI strain transelucers are also compabble wth other appheations requiring st ‘measurements, such as static oud monitoring ancl structural monitoring of fcdges and other structures, SMART (WIRELESS) ‘Smart accelerometers and strain transducers are compatible with wireless lyansmitters, dispensing with the use of cables to connect them to the PDA. They send data to a PDA model PAX up to 100 m avray. The PDA recognizes the sensors, knows to which channel of data acquisition each is connected, | and reads their number, calibration, and date of last calibration, TRADITIONAL (CABLED) Traditional sensors are appropriate for PDA tests ‘requiring 8 channels of data acquisition, for use with the SPT Analyzer and for use with PDA models | ‘other than the PAX. INSTALLATION I When used for Dynamic Foundation Testing oF Pile Driving Monitoring, accelerometers and strain wansaucers ae bolted to the foundation, usualy about 2 to 3 dameters below the top. Stan tramsclucers are attached symmetrically about the neutral ans ofthe foundation to account for bending effects, and accelerometers are attached ea the siran transducers, Iwo oF 4 pats of sensors are used, depending on the testing situation _xtachment procedure varies depending onthe fype of foundation, buts vovcesrcm aa ssenealy quick oy Steel pipe piles: de and tap hoes, magnetic drting guide avalable . (ge pes Steel H pes: bil clenarce oes an install bots rus Tiere Timber piles: dil holes with lag bolts ee Concrete piles and shafts cit Poles and embed archers: metal ding guide Fores hg available Dailled shatts, augered cast in place spiral welded piles and ather non uniform foundations: 4 strain transducers are recommended to assess bending stresses along 2 axes Quality Assurance for Deep Foundations Cleveland Oto USA itosptecom tel /-216-831-6131 — wwwrpile.com Pile Dynamics, Ine : rely and ped akel et Bree ~ Specifications Piezoelectric Accelerometer Avice a taking Mounting Cistem alana Block 25 x 25 x 25 mn) iret ntegral impedance converting crore Cable: Sieded, standard kerngth 800mm (adtona) or 20smm Sensitivity: Nominal 1.0 m'g with 10 4D. has vokage put Range: 5,000 g {Umit 10,0000) Fredquency Range: 0.25 to 7000 Hz resonant fe Temperature Ranges 500 120°C operating Time Constant: Nervnaly 3s Attachment Method: Bots to pe Options: Fl waterproofing, ext 40 kHz) bie length Wireless Transmitter (Far use with Smart si sucers crt PDA ono PAX; | channel of strain dlata acquisitio 1 channel of PE 0° 1 channel of PR acceleration data acquisition 24 bit A/D converter with 2 channels at up to 20Kl4z sample rate per channel 1K, 2K, and 4K data record sizes available ~ user selectable Data transmission: via a standard rio protocol Radio transmission range: 106m (328 tect) Power: Low power processor and builtin 3.7 V battery for up to 8.5 hours run lime during constant data acquisition. Option ‘extended use battery for up to 24 hours fun tine Size: 180 x 92 x 25.4 mm {71 x 36 x 10 in) Weight: 0.45 Kg (Ib) ‘Temperature range: 9 srometers arid C operating, -20" to 65°C storage Piezoresistive Accelerometer (Model k) Avasabte as tracktionat or smart Mounting: Custom alurinum block (45 x 25 x 30 mm) Circuit: Full britge Cables Shielded, standard length 900m (tradtional) or 205m Sensitivity: Nominally 0,07 mvg with 6.4 VD.C. input Range: 20,000 g

Anda mungkin juga menyukai