PROJECT WORKSHOP 3 BAYS, SITE BPAC - LAHAT
JUMLAH /
NO ITEM SAT
QTY
STATUS
DISETUJUI
APPROVED
CATATAN / REMARKS
NAMA PROYEK
PROJECT NAME
PERSETUJUAN MATERIAL
MATERIAL APPROVAL
PROJECT WORKSHOP 3 BAYS, SITE BPAC - LAHAT
JUMLAH /
NO ITEM SAT
QTY
STATUS
DISETUJUI
APPROVED
CATATAN / REMARKS
NAMA PROYEK
PROJECT NAME
PERSETUJUAN MATERIAL
MATERIAL APPROVAL
PROJECT WORKSHOP 3 BAYS, SITE BPAC - LAHAT
JUMLAH /
NO ITEM SAT
QTY
1 Besi dia 16 mm
2 Behel Round Bar di 10 mm
3 Anchort Bolt Bolt Dia. 19-900 @ 4 ea/tiang
4 Wiremesh M10
5 Wiremesh M8
6 Plastik Cor
STATUS
DISETUJUI
APPROVED
CATATAN / REMARKS
NAMA PROYEK
PROJECT NAME
PERSETUJUAN MATERIAL
MATERIAL APPROVAL
PROJECT WORKSHOP 3 BAYS, SITE BPAC - LAHAT
JUMLAH /
NO ITEM SAT
QTY
1 Hebel
2 Batu Bata
3 Porland Semen Eks. Batu Raja
4 Pasir Pasang (Lahat)
5 Batu Split 1:2
STATUS
DISETUJUI
APPROVED
CATATAN / REMARKS