Anda di halaman 1dari 2

Sector Wastewater Wastewater

Branch Cape Town

TITLE AND BRIEF DESCRIPTION OF PROJECT Vissershok Leachate Treatment Plant: Detailed design for new 3 400m /day SBR with reverse osmosis treatment Various Improvements to WWTW: Repair of clarifier, new belt press, maturation pond bypass, new MCC and other miscellaneous work at 7 WWTW Vissershok Leachate Treatment Plant: Process analysis and bottlenecks study for leachate treatment plant eZakheni WWTW: Process analysis and bottlenecks study for 12Ml/d WWTW uThukela DM WWTWs: Assessment and refurbishment of 10 sewage treatment plants (0.5Ml/d to 12 Ml/d) Kirkwood Regional WWTW: Design and documentation for new 2 Ml/d WWTW St Ansgars: Specification and implementation of a 70m /d package WWTW Malmesbury WWTW: Conceptual design for upgrade to 10 Ml/d using MBR technology (Subconsulting) eMbalenhle WWTW: Feasibility study, prelim and detailed design, documentation and contract administration for new 16 Ml/d BNR AS module (Phase 1 completed Sept 06 (Project on hold)) Scottsdene WWTW: Options analysis and Preliminary Design for upgrade to 13 Ml/d Maseru Sewage Treatment: Preparation of an EU Funding Application for a major Wastewater Project on behalf of the Lesotho Government Leandra WWTW: Design, documentation and contract administration for new BNR AS 2.8 Ml/d module Goudkoppies, Oliefantsvlei and Northern Works: Various mechanical refurbishment and repairs Drakenstein Prison, Upgrade of WWTW and sewerage network: Design and contract administration for 3 Ml/d BNR AS WWTW and ancillary sewerage network improvements Northern Works Sludge Dams: Removal and disposal of sludge from storage dams Maseru Industrial Effluent Study: Feasibility study into recycling of wastewater from textile industry Goudkoppies Sludge Study: Investigation into sludge disposal options at Goudkoppies WWTW Northern Works Unit 4 Chlorination tank: Design and contract administration for new 3500m3 Chlorine contact tank Northern Works Unit 3 Degritters: Design and contract administration for 3 new 180 Ml/d degritters Northern Works Unit 4 Aerators: Design and contract administration for replacement of aerators on unit 4 to improve oxygen transfer efficiency Northern Works PST Sludge screens: Design and contract administration for 4 new sludge screens treating PST underflow Northern Works Balancing tank control: Design and contract administration for balancing tank controls Northern Works Bottlenecks Study: Investigation into capacity bottlenecks at the 450Ml/d Northern Works Sludge Study: Investigation into sludge disposal options Kirkwood Regional WWTW: Design and documentation for new 2 Ml/d WWTW Hankey WWTW: Design and documentation for new 1 Ml/d WWTW Vissershok Leachate Treatment Plant: Process analysis and bottlenecks study of existing SBR leachate treatment plant uThukela DM WWTWs: Assessment and refurbishment of 10 sewage treatment plants (0.5Ml/d to 12 Ml/d) St Ansgars: Specification and implementation of a 70m3/d package WWTW Malmesbury WWTW: Conceptual design for upgrade to 10 Ml/d (Subconsulting) eMbalenhle WWTW: Feasibility study, prelim and detailed design, documentation and contract administration for new 16 Ml/d BNR AS module Scottsdene WWTW: Options analysis and Preliminary Design for upgrade to 13 Ml/d Maseru Sewage Treatment: Preparation of an EU Funding Application for a major Wastewater Project on behalf of the Lesotho Government Leandra WWTW: Design, documentation and contract administration for new BNR AS 2.8 Ml/d module Goudkoppies, Oliefantsvlei and Northern Works: Various mechanical refurbishment and repairs Drakenstein Prison, Upgrade of WWTW and sewerage network: Design and contract administration for 3 Ml/d BNR AS WWTW and ancillary sewerage network improvements Northern Works Sludge Dams: Removal and disposal of sludge from storage dams Maseru Industrial Effluent Study: Feasibility study into recycling of wastewater from textile industry Goudkoppies Sludge Study: Investigation into sludge disposal options at Goudkoppies WWTW
3

VALUE OF CONTRACT R 18,000,000 R 26,000,000

Year of Completion Current

CLIENT City of Cape Town, City of Cape Town,

Cape Town Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater Cape Town Cape Town Cape Town Cape Town Cape Town Cape Town

Current R 150,000 Apr-08 R 200,000 Mar-08 R 7,000,000 Jan-08 R 5,500,000 Mar-08 R 3,000,000 Mar-07 R 100,000 Dec-06 R 60,000,000 Govan Mbeki Municipality, Ninham Shand (Subconsulting) Gauteng Department of Education Cacadu District Municipality, Uthukela DM, Uthukela DM, City of Cape Town,

Wastewater Cape Town Wastewater Wastewater Cape Town Wastewater Wastewater Cape Town Cape Town Cape Town

On Hold R 160,000 Dec-05 R 700,000 Jun-06 R 6,500,000 Jul-06 R 3,000,000 Jul-05 R 11,000,000 Department of Public Works Johannesburg Water Govan Mbeki Municipality, European Investment Bank City of Cape Town,

Wastewater Cape Town Wastewater Wastewater Wastewater Wastewater Cape Town Wastewater Wastewater Cape Town Wastewater Cape Town Wastewater Wastewater Wastewater Wastewater Wastewater

Aug-05 R 1,300,000 Sep-05 R 220,000 Apr-05 R 200,000 Jun-04 R 4,600,000 Nov-03 R 6,600,000 Feb-04 R 5,000,000 Jun-03 R 1,700,000 Jun-03 R 1,200,000 Feb-04 R 150,000 May-03 R 260,000 May-03 R 5,500,000 Mar-08 R 2,300,000 Dec-04 R 150,000 R 7,000,000 R 3,000,000 R 100,000 R 60,000,000 R 160,000 R 700,000 Jun-06 R 6,500,000 R 3,000,000 Jul-06 Jul-05 Govan Mbeki Municipality, Johannesburg Water Dec-06 City of Cape Town, Uthukela DM, Gauteng Department of Education Ninham Shand (Subconsulting) Govan Mbeki Municipality, City of Cape Town European Investment Bank Cacadu District Municipality, Cacadu District Municipality, Johannesburg Water, Johannesburg Water, Johannesburg Water, Johannesburg Water, Johannesburg Water, Johannesburg Water, Johannesburg Water, Johannesburg Water, Water and Sewage Authority, Maseru Johannesburg Water

Cape Town Cape Town Cape Town

Cape Town

Cape Town Cape Town Cape Town Cape Town Cape Town

Wastewater Wastewater Wastewater Wastewater

Cape Town Pietermaritzburg Johannesburg Cape Town

Wastewater Wastewater

Johannesburg Cape Town

Dec-05

Wastewater Wastewater Wastewater

Pietermaritzburg Johannesburg Johannesburg

R 11,000,000 Aug-05 R 1,300,000 R 220,000 R 200,000 Sep-05 Apr-05 Jun-04

Department of Public Works

Wastewater Wastewater Wastewater Wastewater

Cape Town Johannesburg Pietermaritzburg Johannesburg

Johannesburg Water Water and Sewage Authority, Maseru Johannesburg Water

Schedule of Experience (5) (version 1).xls

1 of 2

Sector

Branch

TITLE AND BRIEF DESCRIPTION OF PROJECT Northern Works Unit 4 Chlorination tank: Design and contract administration for new 3500m3 Chlorine contact tank Northern Works Unit 3 Degritters: Design and contract administration for 3 new 180 Ml/d degritters Northern Works Unit 4 Aerators: Design and contract administration for replacement of aerators on unit 4 to improve oxygen transfer efficiency Northern Works PST Sludge screens: Design and contract administration for 4 new sludge screens treating PST underflow Northern Works Balancing tank control: Design and contract administration for balancing tank controls Northern Works Bottlenecks Study: Investigation into capacity bottlenecks at the 450Ml/d Northern Works Sludge Study: Investigation into sludge disposal options Kirkwood Regional WWTW: Design and documentation for new 2 Ml/d WWTW Hankey WWTW: Design and documentation for new 1 Ml/d WWTW Driftsands WWTW: Design and documentation for 6Ml/d upgrade Ceres WWTW: Upgrade from a 6 Ml/d to a 12 Ml/d activated sludge plant with composting facility Llandudno WWTW: Upgrade to a 500m3/d WWTW using Rotating Disc Technology Stellenbosch WWTW: Upgrade to a 26 Ml/d Activated sludge plant

VALUE OF CONTRACT R 4,600,000

Year of Completion

CLIENT Johannesburg Water

Wastewater Wastewater

Johannesburg Johannesburg

Nov-03 R 6,600,000 R 5,000,000 Jun-03 R 1,700,000 Jun-03 R 1,200,000 R 150,000 R 260,000 R 5,500,000 R 2,300,000 R 9,000,000 R 12,000,000 R 5,000,000 R 10,000,000 Feb-04 May-03 May-03 Mar-06 Dec-04 Dec-01 Aug-98 Dec-00 Dec-94 Johannesburg Water Johannesburg Water Johannesburg Water Cacadu District Municipality, Cacadu District Municipality, Nelson Mandela Metropolitan Municipality Ceres Municipality City of Cape Town Stellenbosch Municipality Johannesburg Water Feb-04 Johannesburg Water Johannesburg Water

Wastewater

Johannesburg

Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater Wastewater

Johannesburg Johannesburg Johannesburg Johannesburg Port Elizabeth Port Elizabeth Port Elizabeth Cape Town Cape Town Cape Town

Schedule of Experience (5) (version 1).xls

2 of 2

Anda mungkin juga menyukai