Anda di halaman 1dari 2
KEMENTERIAN AGAMA. PONDOK PESANTREN SALAFIYAH. (J NUR HIDAYAH > - Kampung Bukit Bencah Ketari Desa Bencah Kelubi 7 Kecamatan Tapung Kabupaten Kampar Provinsi Riau "AKREDITSI B" Contact Person: 0812 768107 RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN ASRAMA PONDOK PESANTREN No Uraian Pekerjaan Volume T_|PEKERJAAN PERSIAPAN/ PEMBERSIHAN LOKASI 1 |Upah Penumbangan Pohon 1 Keg | 1.000.000] 7.000.000] 2 |Upah Pembersihan Lokasi 1 Keg | 1.000.000] 1.000.000] [Subtotal 2.000.000} I |PEKERJAAN GALIAN DAN URUGAN 1_|Upah Penggalian 4 hr 200.000] 800.000] 2 [Upah Penimbunan 2 ‘org 500.000] 7.000.000] 3 [Tanah Timbun 5 trip 200.000] 1.000.000] [Sutotal 2.800.000) Ii |PEKERJAAN PONDASI DAN BETON 1 |Besi 10 30 big 90.000 2.700.000} 2 [Besi 8 25 big 60.000 1.500.000} 3 [Semen 20 sak, 85.000 1.700.000} 4 _|[Sirtu Cor 7 bie 730.000) 910.000) 5 [rik 4 kbk 150.000 600.000] 6 |Papan mal 20 Tbr 60.000 7.200.000} [Subtotal 8.610.000) Iv |PEKERJAAN DINDING DAN PLESTERAN 1_[Besi Tiang 10 68 big 90.000 6.120.000) 2 [Besi 8 352 tg 60.000 3.120.000} 3 [Batu Bata 20000 [bh 500) 0.000.000] 4 [Papan mal 20 Tbr 60.000] 1.200.000] 5 |Papan Balok 30 Tbr 60.000] 7.800.000] 6 [Pasir Pasang 50 bk 710.000] 5.500.000} 7 |Sirtu Cor 18 bk 130.000] 2.340.000] [Semen 120 | ~ sak 85.000 0.200.000] ‘Subtotal '40.280.000] ‘V_|PEKERJAAN ATAP DAN PLAFON 1 |Kayu 6x12x4 38 big 30.000] 5.220.000] 2 |Kayu Sx10x4 36. big 65.000| 2.340.000) 3 [Papan 7x25x4 12 Tbr 93.000] 1.116.000] 4 [Seng 7,25 | kodi_| 1.900.000] 13.75.00] 5 _|Paku 4 inchi 10 20.000] 200.000) 6 [Paku 3 inchi 5 20.000] 100.000] 7 [Paka 2,5 inchi 8 20.000] 160,000] 8 |Paku Seng 17 25.000] 425.000) ‘9 [Seng bola-bola 6 Tbr 48.000| 288.000) 10 [Kayu 4x6x4 95 big 35.000] 3.325.000] 11 [Poliwood 30 Tbr 76.000] 2.280.000] 12 [Paku Poliwood 3 kg 25.000] 75.000] [Subtotal 29.304.000) Vi |PEKERJAAN KUNSEN, PINTU, JENDELA 6 KUNCI 1 |Kunsen 17 Ibg 300.000 5.100.000) 2 [Jendela 16 Tbr 400.000} 6.400.000) 3 [Pint 2 Tor__| 1.200.000 2.400.000) 4 [Kunci Jendela 32 bh 30.000] 960.000} [Kunci Pintu 2 bh 250.000| 500.000] 6 |[Kait Jendela 32 bh, 10.000] 320.000] [Subtotal 5.680.000] [Vit |PEKERJAAN LANTAT 1 [Keramik 100) ‘kth 70.000) '7,000.000) 2 [Semen 25 sak 85.000 2.125.000} 3 [Pasir Haius 2 kbke 110.000 220.000) [Subtotal 9.345.000} |Vili| PEKERJAAN PENGECETAN 1_|Cat Tembok 5 gin 400.000] 2.000.000} 2 |Cat Minyak 20 ke 70.000| 1.400.000] 3 [Subtotal 3.400.000) Ix |PEKERJAAN PENGECETAN 1 [Upah Tukang dan Finishing 60 Br 700.000] 42,000.00] “42,000.00 150.019.000 ALIM MHD. FAZRI ANDI NUR HRP, S.H

Anda mungkin juga menyukai