A. TENAGA
B. BAHAN
1. Gorong-Gorong Kotak Unit 1,0000
2. Beton, fc’10 Mpa (M47) M3 0,0800
3. Bahan Pilihan (M09) M3 0,0700
C. PERALATAN
1. Tamper (E25) jam 0,0217
2. Crane 10-15 Ton (E07) jam 0,1004
3. Mini Excavator 40-60 HP (E10a) jam 0,0351