RAB Ruang Kasubag
RAB Ruang Kasubag
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014
II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00
VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00
II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00
V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00
VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00
DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon
Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00
II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00
V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00
VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Kepala Bidang Bina Teknik
Perumahan dan Permukiman
Ir. TETI MEIRAWATI Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si
NIP. 19670502 199703 2 004 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
II - 19
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 163,323.00
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 152,386.50
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 179,825.50
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 173,029.00
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 118,979.00
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 256,956.00
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 277,081.00
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 556,953.63
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 574,203.63
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 855,953.63
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 703,003.63
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 516,128.63
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 179,354.00
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 107,530.75
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 126,295.88
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 91,396.83
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 114,274.79
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 137,026.25
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 171,400.68
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 165,675.46
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 52,160.32
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 47,819.07
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 7,843.00
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 12,673.00
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 10,258.00
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 67,712.00
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 69,598.00
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 62,617.50
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 790,449.51
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 753,533.48
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,265,245.58
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 109,993.53
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 109,993.53
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 109,993.53
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,444,250.00
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,129,000.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 61,743.50
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 132,951.50
94 A.4.1.2.24. Upah 1 titik joint dengan sling 52,371.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 32,867.00
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 32,867.00
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 136,700.50
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 678,948.50
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 44,476.25
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 434,981.29
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,401,988.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,221,748.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 562,902.00
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 699,200.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 151,728.70
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,255,925.10
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 647,484.50
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 205,919.00
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 634,093.61
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 432,203.81
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 368,333.50
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 169,303.00
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 111,015.25
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 212,819.00
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 258,589.00
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 229,840.15
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 247,084.40
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 305,060.50
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 290,283.29
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 280,277.71
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 275,179.48
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 273,593.63
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 260,228.30
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 147,512.23
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 140,478.71
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 136,460.44
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 133,934.00
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 132,604.37
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 129,855.13
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 130,384.13
II - 20
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 116,694.02
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 117,903.61
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 102,475.86
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 106,234.03
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 90,200.63
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 90,172.25
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 77,878.25
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 77,918.20
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 152,261.44
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 152,261.44
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 246,914.20
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 296,715.81
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 302,767.69
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 79,598.03
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 71,867.04
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 68,537.90
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 66,252.42
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 64,973.60
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 63,942.27
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 63,381.24
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 62,820.21
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 65,501.64
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 63,060.25
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 56,732.15
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 57,560.84
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 96,172.99
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 77,612.13
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 88,612.56
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 86,981.73
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 85,532.35
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 80,679.46
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 39,754.10
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 67,745.06
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 178,790.50
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 178,790.50
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 52,091.44
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 30,570.86
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 14,584.30
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 63,741.97
170 A.4.4.2.27. Pemasangan 1 m2 acian 39,117.25
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 102,883.31
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 133,741.26
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 114,036.01
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 149,783.76
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 505,897.36
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 221,660.83
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 203,928.06
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm 345,013.51
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 218,533.64
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 101,027.56
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 137,770.06
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 81,394.73
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 274,114.06
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,117,860.43
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 189,054.25
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 116,650.25
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 346,725.00
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 346,725.00
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 251,267.53
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 244,528.53
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 397,547.53
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm 398,582.53
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 251,267.53
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm 245,678.53
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,226,728.63
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 510,954.83
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 150,634.19
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 147,281.94
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 194,959.50
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 240,384.50
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 84,479.00
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 43,424.00
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 62,629.00
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 170,652.53
II - 21
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 751,985.58
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 179,596.08
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 760,929.13
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 60,168.00
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 733,654.00
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 370,024.00
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 113,045.00
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 60,835.00
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 251,965.00
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 41,411.50
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 623,714.00
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 18,055.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 51,301.50
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 65,745.50
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 46,195.50
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 96,830.00
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 108,330.00
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 112,930.00
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 67,217.50
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 45,735.50
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 49,415.50
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 48,507.00
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 54,027.00
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 39,307.00
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 41,883.00
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 42,619.00
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 45,195.00
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 55,867.00
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 40,043.00
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 40,411.00
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 43,355.00
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 44,459.00
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 47,403.00
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 199,766.50
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 178,376.50
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 174,811.50
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 114,206.50
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 114,206.50
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 114,206.50
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 111,711.00
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 107,076.50
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 97,750.00
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 108,928.00
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 147,568.00
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 112,976.00
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 116,536.40
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 103,155.00
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 86,503.00
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 85,146.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 52,969.00
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 285,223.00
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 32,786.50
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 15,719,350.00
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 8,012,050.00
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 413,149.00
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 344,149.00
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 767,050.00
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 564,190.00
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 905,050.00
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm 631,637.50
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 687,067.50
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 736,920.00
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 774,755.00
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 688,689.00
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 6,872,687.50
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 16,958,647.50
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 10,113,847.50
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 111,619.00
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 112,464.25
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 110,515.00
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 159,390.00
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 161,345.00
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 102,350.00
II - 22
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 102,350.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 194,189.00
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 378,965.25
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 394,105.00
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 56,614.50
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 345,414.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 215,510.00
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 122,774.00
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 151,524.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 91,535.40
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 43,769.00
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 60,329.00
290 A.4.6.2.8. Pemasangan 1 buah spring knip 48,829.00
291 A.4.6.2.9. Pemasangan 1 buah kait angin 32,154.00
292 A.4.6.2.10. Pemasangan 1 buah door closer 397,164.00
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 43,838.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 101,614.00
295 A.4.6.2.13. Pemasangan 1 buah door stop 61,640.00
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 492,614.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 200,813.00
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 104,961.65
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 119,825.40
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 218,670.20
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 496,967.90
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 194,304.00
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 352,647.50
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 289,179.00
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,560,912.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,651.50
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 14,846.50
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 15,536.50
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 47,000.50
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 63,836.50
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 33,281.00
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 45,776.56
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 21,096.75
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 44,967.88
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 31,677.90
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,129.60
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 11,010.10
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 17,850.30
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 8,981.50
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 131,905.00
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 35,443.00
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 69,126.50
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 73,848.40
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 34,569.00
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 169,682.50
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 153,226.00
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 2,257,335.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 1,974,113.00
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 497,556.13
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 442,816.13
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,221,481.13
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,395,112.73
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,259,710.00
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,259,710.00
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 376,165.00
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 949,670.00
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 766,000.63
338 A.5.1.1 14. Pemasangan 1 buah floor drain 110,515.00
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 489,661.38
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 787,844.88
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 922,067.13
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 67,487.75
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 71,645.00
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 83,545.20
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 159,321.00
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 245,364.00
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 367,942.50
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 501,457.50
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 20,389.50
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 23,190.90
II - 23
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 28,586.70
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 45,954.00
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 54,058.05
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 79,294.80
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 148,039.50
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 145,431.30
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 395,604.95
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 224,888.31
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1,068,990.32
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 194,016.56
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
361 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm 73,082.50
362 A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm 121,635.50
363 A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC Ø 110 mm 165,082.50
364 A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm 483,632.50
365 A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm 736,494.50
366 A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm 112,044.50
367 A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm 201,284.50
368 A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm 392,230.50
369 A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm 656,500.50
370 A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm 155,940.00
371 A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 100 mm 349,370.00
372 A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm 75,762.00
373 A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 150 mm 493,844.50
374 A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm 916,619.00
375 A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP Ø 250 mm 1,166,755.50
376 A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm 2,303,105.00
377 A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI Ø 125 mm 2,677,602.50
378 A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI Ø 150 mm 3,183,073.50
379 A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI Ø 200 mm 4,056,521.50
380 A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm 3,545,887.00
381 A.8.4.1.64 (K3) Pemasangan 1 m Pipa baja Ø 63 mm 274,183.00
382 A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm 355,971.00
383 A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm 423,706.00
384 A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm 506,034.50
385 A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm 836,498.50
386 A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm 1,049,501.50
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA
387 A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm 36,144.50
388 A.8.4.2.2 (K3) Pemotongan 1 m pipa PVC Ø 90 mm 76,084.00
389 A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm 110,814.00
390 A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm 369,598.50
391 A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm 579,703.50
392 A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm 35,827.10
393 A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm 134,469.50
394 A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm 22,758.50
395 A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm 334,431.50
396 A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm 513,153.00
397 A.8.4.2.33 (K3) Pemotongan 1 buah pipa GIP Ø 63 mm 101,039.00
398 A.8.4.2.34 (K3) Pemotongan 1 buah pipa GIP Ø 100 mm 291,582.50
400 A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm 430,445.00
401 A.8.4.2.37 (K3) Pemotongan 1 buah pipa GIP Ø 200 mm 839,477.00
402 A.8.4.2.38 (K3) Pemotongan 1 buah pipa GIP Ø 250 mm 1,086,416.50
517 A.8.4.2.39 (K3) Pemotongan 1 buah pipa GIP Ø 300 mm 85,146.00
518 A.8.4.2.40 (K3) Pemotongan 1 buah pipa GIP Ø 400 mm 124,050.50
519 A.8.4.2.41 (K3) Pemotongan 1 buah pipa GIP Ø 450 mm 142,876.00
520 A.8.4.2.42 (K3) Pemotongan 1 buah pipa GIP Ø 500 mm 159,125.50
521 A.8.4.2.43 (K3) Pemotongan1 buah pipa GIP Ø 600 mm 146,004.00
522 A.8.4.2.44 (K3) Pemotongan 1 buah pipa GIP Ø 800 mm 264,879.50
523 A.8.4.2.45 (K3) Pemotongan 1 buah pipa GIP Ø 900 mm 299,218.50
524 A.8.4.2.46 (K3) Pemotongan 1 buah pipa GIP Ø 1000 mm 333,649.50
525 A.8.4.2.47 (K3) Pemotongan 1 buah pipa GIP Ø 1100 mm 368,218.50
526 A.8.4.2.48 (K3) Pemotongan 1 buah pipa GIP Ø 1200 mm 402,649.50
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
414 A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm 4,381,649.50
415 A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm 7,707,196.50
416 A.8.4.3.3 (K3) Pemasangan 1 buah Valve Ø 250 mm 12,537,196.50
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
420 A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm 1,406.45
421 A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm 1,417.95
422 A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm 1,440.95
423 A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm 1,498.45
424 A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm 1,573.20
425 A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm 1,676.70
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
426 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 5,539,550.00
427 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 5,361,300.00
II - 24
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
- TAMBAHAN / LAIN-LAIN
428 - 1 Buah Pembuatan Papan Nama Proyek 383,582.50
429 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 380,735.10
430 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 160,499.46
431 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 314,699.94
432 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 39,278.25
433 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 56,350.00
434 ABK.990.07 Menurunkan 1 m2 atap genteng 2,146.67
435 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,593.33
436 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 82,493.33
437 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 7,053.33
438 SNI 2012 1 m³ Bongkaran Beton Bertulang 659,318.00
439 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 617,918.00
440 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 972,946.00
441 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 115,471.50
442 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 176,456.00
443 - 1 Bh Pekerjaan Stop Kontak 38,640.00
444 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 65,090.00
445 - 1 Unit Pekerjaan Sekring Kast 58,190.00
446 - 1 Bh Pekerjaan MCB Box 58,190.00
447 - 1 m' Pekerjaan Over Spaneng 38,778.00
448 - 1 Bh Pekerjaan Saklar Ganda 65,780.00
449 - 1 Bh Pekerjaan Saklar Tunggal 62,330.00
450 A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 1,049,616.50
JALAN LINGKUNGAN
451 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 112,170.61
452 Analisa EI-321.rob : Timbunan Biasa 344,172.18
453 Analisa EI-322.rob : Timbunan Pilihan 422,283.41
454 Analisa EI-331.rob : Penyiapan Badan Jalan 229.62
455 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 14,043.76
456 Analisa EI-612a : Lapis Perekat - Aspal Cair 14,487.43
457 Analisa EI-621 : Agregat Penutup BURTU 17,149.45
458 Analisa EI-631.rob : Latasir Kelas A (SS-A) 60,458.31
459 Analisa EI-632.rob : Latasir Kelas B (SS-B) 69,928.95
460 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,126,346.64
461 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,257,991.92
462 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 427,412.83
463 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,090,484.86
AIR TANAH DAN PERPIPAAN
464 AT.02 1 m' Pengeboran Ø 8'' (Daerah Pegunungan) 477,542.10
465 AT.02.rob.1 1 m' Pengeboran sederhana 238,771.05
466 AT.03 1 m' Reaming Ø 8-12'' 441,556.30
467 AT.07 1 m' Pengadaan dan pemasangan cassing pipa PVC 6'' 375,690.91
468 AT.09 1 m' Pengadaan dan pemasangan cassing pipa PVC 8'' 540,470.10
469 AT.12 1 m3 Pengadaan dan pemasangan gravel pack 2,986,412.00
470 AT.13 1 jam pencucian sumur 179,204.50
471 AT.14 1 jam Uji Pemompaan 179,204.50
472 - 1 m³ Galian tanah biasa 63,000.00
473 - 1 m³ Galian tanah keras / berbatu 83,960.00
474 - 1 m³ Galian tanah berbatu / bongkar jalan 126,000.00
475 - 1 m³ Urugan tanah kembali 25,200.00
476 - 1 m³ Buang tanah sisa galian 27,600.00
477 - 1 m³ Urugan pasir 257,640.00
478 - 1 m³ Beton tumbuk 1:3:5 798,465.00
479 - 1 m² Pasang bekisting 203,320.00
480 - 1 m³ Trush block 1,085,745.00
481 - 1 m² Plesteran 1:3 55,982.85
482 - 1 m³ Pasangan batu kali 1:4 921,410.00
483 - 1 m² Siaran batu muka 56,715.75
484 - 1 m³ Beton bertulang 1:2:3 846,040.00
485 - 1 kg Pembesian dengan besi polos atau besi ulir 15,625.00
486 - 1 m² Pekerjaan bekisting dari multiplek 6mm 389,450.00
487 - 1 m² Pasangan bata merah 1 : 4 tebal 1/2 bata 132,461.25
488 - 1 m² Pengecatan 22,244.00
489 - 10 cm Pengelasan 44,700.00
490 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 196,087.60
491 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 183,779.00
492 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 159,661.80
493 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 124,334.80
494 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 96,494.00
495 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 77,725.20
496 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 71,177.20
497 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 44,848.40
498 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 44,348.40
499 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 20,830.00
500 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 159,092.40
501 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 149,096.00
502 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 129,603.20
503 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 99,110.80
504 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 77,576.00
II - 25
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
505 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 62,590.80
506 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 57,724.40
II - 26
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
507 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 37,281.20
508 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 36,781.20
509 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 15,785.20
510 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa 140,647.60
511 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa 131,804.00
512 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa 114,616.80
513 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa 86,534.80
514 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa 68,144.00
515 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa 55,045.20
516 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa 51,017.20
517 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa 33,508.40
518 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa 33,008.40
519 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa 13,270.00
520 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 353,137.60
521 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 299,855.40
522 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 252,588.20
523 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 210,534.80
524 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 157,544.00
525 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 128,125.20
526 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 110,977.20
527 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 69,998.40
528 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 64,748.40
529 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 37,780.00
530 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 316,142.40
531 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 265,034.40
532 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 222,529.60
533 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 185,310.80
534 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 138,626.00
535 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 112,990.80
536 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 97,524.40
537 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 62,431.20
538 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 57,181.20
539 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 32,735.20
540 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa 297,697.60
541 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa 247,880.40
542 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa 207,543.20
543 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa 172,734.80
544 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa 129,194.00
545 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa 105,445.20
546 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa 90,817.20
547 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa 58,658.40
548 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa 53,408.40
549 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa 30,220.00
550 - 400 m' Pengetesan pipa PVC dia. 350 mm 3,636,500.00
551 - 400 m' Pengetesan pipa PVC dia. 300 mm 3,037,500.00
552 - 400 m' Pengetesan pipa PVC dia. 250 mm 2,470,000.00
553 - 400 m' Pengetesan pipa PVC dia. 200 mm 1,934,000.00
554 - 400 m' Pengetesan pipa PVC dia. 160 mm 1,238,250.00
555 - 400 m' Pengetesan pipa PVC dia. 110 mm 1,198,500.00
556 - 400 m' Pengetesan pipa PVC dia. 90 mm 1,119,750.00
557 - 400 m' Pengetesan pipa PVC dia. 63 mm 1,072,500.00
558 - 400 m' Pengetesan pipa PVC dia. 50 mm 1,035,750.00
559 - 1 unit perbaikan gate valve dia. 350mm 694,949.88
560 - 1 unit perbaikan gate valve dia. 300mm 679,199.88
561 - 1 unit perbaikan gate valve dia. 250mm 668,699.88
562 - 1 unit perbaikan gate valve dia. 200mm 652,949.88
563 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 462,760.51
564 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 380,624.11
565 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan 333,750.11
566 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan 264,583.71
567 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan 244,083.71
568 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan 173,308.51
569 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu 454,510.51
570 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu 374,874.11
571 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu 333,750.11
572 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu 264,583.71
573 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu 244,083.71
574 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu 173,308.51
575 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa 397,810.51
576 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa 329,514.11
577 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa 293,430.11
578 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa 241,903.71
579 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa 221,403.71
580 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa 158,188.51
581 - 1 unit pemasangan gate valve dia. 200 mm 629,637.51
582 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan 624,819.82
583 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 422,400.51
584 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 341,264.11
585 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan 304,140.11
586 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan 230,223.71
II - 27
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
587 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan 209,723.71
588 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu 481,528.00
II - 28
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
589 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu 422,400.51
590 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu 341,264.11
591 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu 304,140.11
592 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu 230,223.71
593 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu 209,723.71
594 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu 143,948.51
595 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa 365,560.51
596 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa 295,764.11
597 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa 263,680.11
598 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa 207,403.71
599 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa 186,903.71
600 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa 128,688.51
601 - 1 unit Pemasangan Box Street dia. 8" 200,591.82
602 - 1 unit Pemasangan Box Street dia. 6" 84,822.51
603 - 1 unit Pemasangan Box Street dia. 4" 71,723.71
604 - 1 unit Pemasangan Box Street dia. 3" 67,695.71
605 - 1 unit Pemasangan Box Street dia. 2" 50,186.91
606 - 1 unit Pemasangan Box Street dia. 1 1/2" 49,686.91
607 - 1 unit Pemasangan Box Street dia. 1" 29,948.51
608 - 1 unit Peninggian Box Street 129,163.16
609 - 1 unit Pemasangan wash out dia. 160 mm 545,816.51
610 - 1 unit Pemasangan wash out dia. 110 mm 441,276.91
611 - 1 unit Pemasangan wash out dia. 90 mm 396,783.31
612 - 1 unit Pemasangan wash out dia. 63 mm 292,751.71
613 - 1 unit Pemasangan wash out dia. 50 mm 270,251.71
614 - 18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal 4,119,498.40
615 - 18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal 6,352,818.40
616 - 18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal 7,391,812.00
617 - 18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal 9,218,740.00
618 - 18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal 12,936,258.40
619 - 18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal 13,549,138.00
620 - 18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal 15,303,190.00
621 - 18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal 16,011,916.00
622 - 1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR 116,600.40
623 - 1 unit Tiang Penyangga 714,620.00
Sumber, 2019
II - 29
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2019
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Dolken kayu Batang 1.250 65,000.00 81,250.00
f 8-10/400 cm
Semen portland Kg 2.500 1,420.00 3,550.00
Seng gelombang lbr 1.200 80,000.00 96,000.00
Pasir Beton m3 0.005 212,500.00 1,062.50
Koral Beton m3 0.009 200,000.00 1,800.00
Kayu 5/7 (kayu kelas III) m3 0.072 3,500,000.00 252,000.00
Paku biasa 2''-5'' Kg 0.060 20,000.00 1,200.00
Meni Besi ltr 0.450 44,000.00 19,800.00
JUMLAH HARGA BAHAN 456,662.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 521,462.50
E Overhead & Profit 15.00% 78,219.38
F Harga Satuan Pekerjaan (D+E) 599,681.88
III - 30
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Dolken kayu f Batang 1.000 65,000.00 65,000.00
8-10/400 cm
Semen portland Kg 2.000 1,420.00 2,840.00
Kawat duri M’ 25.000 14,700.00 367,500.00
Pasir beton m3 0.005 212,500.00 1,062.50
Koral beton m3 0.009 200,000.00 1,800.00
Paku biasa 2” – 5” Kg 0.060 20,000.00 1,200.00
JUMLAH HARGA BAHAN 374,402.50
C PERALATAN
III - 31
B BAHAN
Dolken kayu Ø Batang 1.250 65,000.00 81,250.00
8-10/400 cm
Kayu (kelas III) m3 0.180 3,500,000.00 630,000.00
Paku biasa Kg 0.080 20,000.00 1,600.00
besi strip Kg 1.100 13,750.00 15,125.00
semen portland Kg 3.000 1,420.00 4,260.00
pasir pasang m3 0.150 193,750.00 29,062.50
pasir beton m3 0.100 212,500.00 21,250.00
koral beton m3 0.150 200,000.00 30,000.00
bata merah bh 30.000 800.00 24,000.00
seng pelat lbr 0.250 38,000.00 9,500.00
jendela naco bh 0.200 3,000.00 600.00
kaca polos m2 0.080 75,000.00 6,000.00
kunci tanam bh 0.150 25,000.00 3,750.00
plywood 4 mm lbr 0.060 92,250.00 5,535.00
JUMLAH HARGA BAHAN 861,932.50
C PERALATAN
III - 32
Semen Portland Kg 10.500 1,420.00 14,910.00
Pasir beton m3 0.030 212,500.00 6,375.00
Koral beton m3 0.050 200,000.00 10,000.00
Seng gelombang Lbr 1.500 80,000.00 120,000.00
seng pelat Lbr 0.250 38,000.00 9,500.00
JUMLAH HARGA BAHAN 1,012,285.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
III - 33
A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 36,600.00
B BAHAN
Kayu papan kelas m3 0.036 3,500,000.00 126,000.00
III
Kayu balok 5/7 m3 0.014 3,500,000.00 49,000.00
kelas III
Paku biasa kg 0.080 20,000.00 1,600.00
JUMLAH HARGA BAHAN 176,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 80,600.00
B BAHAN
Batu belah 10/15 cm m3 0.150 300,000.00 45,000.00
Batu pecah mesin 2-3 cm m3 0.090 300,000.00 27,000.00
Pasir pasang m3 0.010 193,750.00 1,937.50
JUMLAH HARGA BAHAN 73,937.50
III - 34
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 110,000.00 440.00
Kepala Tukang L.03 0.002 120,000.00 240.00
Mandor L.04 0.042 120,000.00 5,040.00
JUMLAH TENAGA KERJA 9,080.00
B BAHAN
Kawat jaring Lbr 0.143 568,468.00 81,518.31
JUMLAH HARGA BAHAN 81,518.31
III - 35
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.375 80,000.00 30,000.00
Tukang L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 47,470.00
B BAHAN
Panel beton Lbr 0.986 103,000.00 101,558.00
pracetak
Kolom beton Batang 0.525 175,000.00 91,875.00
pracetak
Semen PC Kg 45.000 1,420.00 63,900.00
Pasir beton m3 0.074 212,500.00 15,725.00
Koral m3 0.146 200,000.00 29,200.00
JUMLAH HARGA BAHAN 302,258.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN
III - 36
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 92,040.00
B BAHAN
III - 37
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 4,600.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
III - 38
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug 1.200 193,700.00 232,440.00
JUMLAH HARGA BAHAN 232,440.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 122,400.00
B BAHAN
Kapur Padam/bakar m3 0.135 220,000.00 29,700.00
Pasir Pasang m3 0.400 193,750.00 77,500.00
Tanah Liat m3 0.948 150,000.00 142,200.00
JUMLAH HARGA BAHAN 249,400.00
III - 39
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 13,800.00
B BAHAN
Ijuk m3 6.000 18,000.00 108,000.00
JUMLAH HARGA BAHAN 108,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 23,000.00
B BAHAN
Sirtu m3 1.200 175,000.00 210,000.00
JUMLAH HARGA BAHAN 210,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 202.000 1,420.00 286,840.00
Pasir pasang m3 0.485 193,750.00 93,968.75
JUMLAH HARGA BAHAN 740,808.75
III - 40
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 193,750.00 100,750.00
JUMLAH HARGA BAHAN 692,210.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 136.000 1,420.00 193,120.00
Pasir pasang m3 0.544 193,750.00 105,400.00
JUMLAH HARGA BAHAN 658,520.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
III - 41
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 117.000 1,420.00 166,140.00
Pasir pasang m3 0.561 193,750.00 108,693.75
JUMLAH HARGA BAHAN 634,833.75
C PERALATAN
III - 42
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 61.000 1,420.00 86,620.00
Kapur m3 0.147 220,000.00 32,340.00
Pasir pasang m3 0.492 193,750.00 95,325.00
JUMLAH HARGA BAHAN 574,285.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 41.000 1,420.00 58,220.00
Kapur m3 0.131 220,000.00 28,820.00
Pasir pasang m3 0.523 193,750.00 101,331.25
JUMLAH HARGA BAHAN 548,371.25
C PERALATAN
III - 43
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 247.000 1,420.00 350,740.00
Pasir beton kg 869.000 151.79 131,901.79
III - 44
Kerikil (Maks 30 kg 999.000 222.22 222,000.00
mm)/menggunakan bt.pecah
mesin 2-3
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 715,391.79
C PERALATAN
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
1. Semen kg 276.000 1,420.00 391,920.00
Portland
2. Pasir beton kg 828.000 151.79 125,678.57
3. Kerikil kg 1,012.000 222.22 224,888.89
(Maks 30mm)
4. Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 753,237.46
C PERALATAN
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen portland kg 299.000 1,420.00 424,580.00
Pasir beton kg 799.000 151.79 121,276.79
Kerikil (Maks 30 mm) kg 1,017.000 222.22 226,000.00
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 782,606.79
III - 45
C PERALATAN
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,600.00
B BAHAN
Semen Portland kg 230.000 1,420.00 326,600.00
Pasir beton kg 893.000 151.79 135,544.64
Kerikil kg 1,027.000 148.15 152,148.15
(Maks 30 mm)/bukan bt.pecah 2-
3
Air Liter 200.000 50.00 10,000.00
JUMLAH HARGA BAHAN 624,292.79
C PERALATAN
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 326.000 1,420.00 462,920.00
Pasir beton kg 760.000 151.79 115,357.14
Kerikil (Maks kg 1,029.000 222.22 228,666.67
30mm)/menggunakan bt.pecah 2-
3
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 817,693.81
C PERALATAN
III - 46
A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 352.000 1,420.00 499,840.00
Pasir beton kg 731.000 151.79 110,955.36
Kerikil (Maks kg 1,031.000 222.22 229,111.11
30mm)
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 850,656.47
C PERALATAN
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 371.000 1,420.00 526,820.00
Pasir beton kg 698.000 151.79 105,946.43
Kerikil (Maks kg 1,047.000 222.22 232,666.67
30mm)
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 876,183.10
C PERALATAN
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 384.000 1,420.00 545,280.00
Pasir beton kg 692.000 151.79 105,035.71
III - 47
Kerikil kg 1,039.000 222.22 230,888.89
(Maksimum
30mm)
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 891,954.60
C PERALATAN
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)
Harga Jumlah
Uraian Kode Satuan Koefisien Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 406.000 1,420.00 576,520.00
Pasir beton kg 684.000 151.79 103,821.43
Kerikil (Maks kg 1,026.000 222.22 228,000.00
30mm)
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 919,091.43
C PERALATAN
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 413.000 1,420.00 586,460.00
Pasir beton kg 681.000 151.79 103,366.07
Kerikil (Maks kg 1,021.000 222.22 226,888.89
30mm)
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 927,464.96
C PERALATAN
III - 48
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan
sesuai Tabel berikut:
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,420.00 636,160.00
Pasir beton kg 667.000 151.79 101,241.07
Kerikil (maksimum kg 1,000.000 222.22 222,222.22
30 mm)
Bahan tambahan Liter 4.500 135,000.00 607,500.00
kimia (efoksi)
III - 49
Air Liter 200.000 50.00 10,000.00
JUMLAH HARGA BAHAN 1,577,123.29
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 400.000 1,420.00 568,000.00
Pasir beton m3 0.480 212,500.00 102,000.00
Kerikil (2cm/3cm) m3 0.800 200,000.00 160,000.00
Strorox – 100 kg 1.200 76,500.00 91,800.00
JUMLAH HARGA BAHAN 921,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu/Pipa L.02 OH 0.030 110,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Waterstop lebar m 1.050 50,000.00 52,500.00
150 mm
JUMLAH HARGA BAHAN 52,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
III - 50
Tukang Batu/Pipa L.02 OH 0.035 110,000.00 3,850.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 10,770.00
B BAHAN
Waterstop lebar m 1.050 125,000.00 131,250.00
200 mm
JUMLAH HARGA BAHAN 131,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang Batu L.02 OH 0.040 110,000.00 4,400.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Waterstop lebar m 1.050 115,000.00 120,750.00
230 mm - 320 mm
JUMLAH HARGA BAHAN 120,750.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang besi L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 14,620.00
B BAHAN
Besi beton kg 10.500 13,000.00 136,500.00
(polos/ulir)
Kawat beton kg 0.150 35,000.00 5,250.00
JUMLAH HARGA BAHAN 141,750.00
C PERALATAN
III - 51
A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang besi L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
Besi beton kg 10.500 13,000.00 136,500.00
(polos/ulir)
Kawat beton kg 0.100 35,000.00 3,500.00
JUMLAH HARGA BAHAN 140,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 7,870.00
B BAHAN
Jaring kawat kg 10.200 9,200.00 93,840.00
baja dilas
Kawat beton kg 0.050 35,000.00 1,750.00
JUMLAH HARGA BAHAN 95,590.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.040 3,500,000.00 140,000.00
Paku 5 – 10 cm kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 147,000.00
III - 52
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.045 3,500,000.00 157,500.00
Paku 5 cm – 10 cm kg 0.300 20,000.00 6,000.00
Minyak bekisting Liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 164,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 10,000.00 2,000.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 Lbr 0.350 92,250.00 32,287.50
mm
Dolken kayu f 8- Batang 2.000 65,000.00 130,000.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 387,287.50
C PERALATAN
III - 53
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
III - 54
Paku 5 cm – 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting Liter 0.200 10,000.00 2,000.00
Balok kayu kelas II m3 0.020 5,000,000.00 100,000.00
Plywood tebal 9 mm Lbr 0.350 92,250.00 32,287.50
Dolken kayu , f 8– 65,000.00 195,000.00
Batang 3.000
10 cm, panj4 m
Penjaga jarak bekisting/spacer 18,000.00 72,000.00
(dari besi/baut) Buah 4.000
III - 55
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
III - 56
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast in place). Indeks yang ada dalam pedoman ini hanya
untuk pekerjaan produksi yang dilakukan di lapangan, terutama untuk analisa cetakan (bekisting) pracetak baik untuk komponen kolom, balok
dan pelat.
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 80,000.00 10,560.00
Tukang batu L.02 OH 0.022 110,000.00 2,420.00
Kepala tukang L.03 OH 0.002 120,000.00 240.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Semen PC Kg 26.080 1,420.00 37,033.60
Pasir beton Kg 60.800 151.79 9,228.57
Kerikil (menggunakan bt. Pecah 2- Kg 82.320 222.22 18,293.33
3)
Air L 17.200 50.00 860.00
JUMLAH HARGA BAHAN 65,415.50
C PERALATAN
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 80,000.00 13,200.00
Tukang batu L.02 OH 0.028 110,000.00 3,080.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 17,600.00
B BAHAN
Semen PC Kg 32.600 1,420.00 46,292.00
Pasir beton Kg 76.000 151.79 11,535.71
Kerikil (maks 30mm) Kg 102.900 222.22 22,866.67
Air L 21.500 50.00 1,075.00
JUMLAH HARGA BAHAN 81,769.38
C PERALATAN
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 80,000.00 15,840.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
III - 57
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 21,030.00
B BAHAN
Semen PC Kg 39.120 1,420.00 55,550.40
Pasir beton Kg 91.200 151.79 13,842.86
Kerikil (maks 30mm) Kg 123.480 222.22 27,440.00
Air L 25.800 50.00 1,290.00
JUMLAH HARGA BAHAN 98,123.26
C PERALATAN
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 80,000.00 19,840.00
Tukang batu L.02 OH 0.041 110,000.00 4,510.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 26,390.00
B BAHAN
Semen PC Kg 48.900 1,420.00 69,438.00
Pasir beton Kg 114.000 151.79 17,303.57
Kerikil (maks 30 mm) Kg 154.350 222.22 34,300.00
Air L 32.250 50.00 1,612.50
JUMLAH HARGA BAHAN 122,654.07
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 149,044.07
E Overhead & Profit 15.00% 22,356.61
F Harga Satuan Pekerjaan (D+E) 171,400.68
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 80,000.00 560.00
Tukang kayu L.02 OH 0.076 110,000.00 8,360.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Lantai kerja t=10cm m3 0.008 864,676.71 6,917.41
Besi hollow (50 x 50 7,500.00 70,455.00
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi 5,000,000.00 25,000.00
7 m3 0.005
cm)
Phenol film 12 mm Lbr 0.080 245,000.00 19,600.00
Minyak cetakan
L 0.200 10,000.00 2,000.00
(bekisting)
Dinabolt Ø 12mm
buah 3.882 2,600.00 10,093.20
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 134,065.61
III - 58
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 144,065.61
E Overhead & Profit 15.00% 21,609.84
F Harga Satuan Pekerjaan (D+E) 165,675.46
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
III - 59
Tukang kayu L.02 OH 0.018 110,000.00 1,980.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 6,820.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
III - 60
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.069 80,000.00 5,520.00
Tukang batu L.02 OH 0.242 110,000.00 26,620.00
Tukang vibrator L.02 OH 0.138 110,000.00 15,180.00
Kepala tukang L.03 OH 0.037 120,000.00 4,440.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 60,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.213 110,000.00 23,430.00
Tukang vibrator L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor/Supervisor/ L.04 OH 0.073 120,000.00 8,760.00
Penyelia
JUMLAH TENAGA KERJA 54,450.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.067 140,000.00 9,380.00
Pembantu operator 80,000.00 5,360.00
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang batu L.02 OH 0.067 110,000.00 7,370.00
III - 61
Tukang ereksi L.02 OH 0.134 110,000.00 14,740.00
Kepala tukang L.03 OH 0.067 120,000.00 8,040.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 58,290.00
B BAHAN
Solar L 6.676 6,150.00 41,057.40
JUMLAH HARGA BAHAN 41,057.40
C PERALATAN
Sewa crane unit hari 0.067 3,900,000.00 261,300.00
Sewa pipe support buah 1.100 297,000.00 326,700.00
hari
JUMLAH HARGA ALAT 588,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.0 OH 0.061 140,000.00 8,540.00
Pembantu operator crane 8
L.0 OH 0.061 80,000.00 4,880.00
Pekerja 9
L.0 OH 0.061 80,000.00 4,880.00
Tukang batu 1
L.0 OH 0.061 110,000.00 6,710.00
Tukang ereksi 2
L.0 OH 0.122 110,000.00 13,420.00
Kepala tukang 2
L.0 OH 0.061 120,000.00 7,320.00
Mandor 3
L.0 OH 0.061 120,000.00 7,320.00
4 JUMLAH TENAGA KERJA 53,070.00
B BAHAN
Solar L 6.110 6,150.00 37,576.50
JUMLAH HARGA BAHAN 37,576.50
C PERALATAN
Sewa crane unit 0.061 3,900,000.00 237,900.00
hari
Sewa scaffolding unit 1.100 297,000.00 326,700.00
hari
JUMLAH HARGA ALAT 564,600.00
III - 62
Indeks kenaikan lantai ereksi komponen untuk balok pracetak
Indeks kenaikan lantai Indeks
La ereksi balok Lantai kenaika
nt n lantai
ai ereksi
balok
1 1 13 1.068
2 1 14 1.080
3 1 15 1.092
4 1 16 1.104
5 1 17 1.116
6 1 18 1.129
7 1 19 1.141
8 1.011 20 1.154
9 1.022 21 1.166
10 1.034 22 1.179
11 1.045 23 1.192
12 1.057 24 1.206
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.083 140,000.00 11,620.00
Pembantu operator L.09 OH 0.083 80,000.00 6,640.00
crane
Pekerja L.01 OH 0.083 80,000.00 6,640.00
Tukang batu L.02 OH 0.083 110,000.00 9,130.00
Tukang ereksi L.02 OH 0.166 110,000.00 18,260.00
Kepala tukang L.03 OH 0.083 120,000.00 9,960.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00
B BAHAN
Solar L 8.277 6,150.00 50,903.55
JUMLAH HARGA BAHAN 50,903.55
C PERALATAN
Sewa crane unit hari 0.083 3,900,000.00 323,700.00
III - 63
A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 6,150.00 11,666.55
JUMLAH HARGA BAHAN 11,666.55
C PERALATAN
Sewa crane unit hari 0.019 3,900,000.00 74,100.00
JUMLAH HARGA ALAT 74,100.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator
L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 6,150.00 11,666.55
JUMLAH HARGA BAHAN 11,666.55
C PERALATAN
Sewa crane unit hari 0.019 3,900,000.00 74,100.00
JUMLAH HARGA ALAT 74,100.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 6,150.00 11,666.55
JUMLAH HARGA BAHAN 11,666.55
III - 64
C PERALATAN
Sewa crane unit hari 0.019 3,900,000.00 74,100.00
JUMLAH HARGA ALAT 74,100.00
III - 65
A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.147 80,000.00 11,760.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,330.00
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012 5,000,000.00 60,000.00
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004 5,000,000.00 20,000.00
Paku (5 s.d.7) cm Kg 0.264 20,000.00 5,280.00
JUMLAH HARGA BAHAN 85,280.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.220 80,000.00 17,600.00
Tukang kayu L.02 OH 0.022 110,000.00 2,420.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 45,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi Profil Kg 1.150 14,000.00 16,100.00
JUMLAH HARGA BAHAN 16,100.00
III - 66
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi baja IWF Kg 1.150 14,000.00 16,100.00
JUMLAH HARGA BAHAN 16,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang besi L.03 OH 0.100 110,000.00 11,000.00
konstruksi
Kepala tukang L.03 OH 0.001 120,000.00 120.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 19,720.00
B BAHAN
Solar Liter 1.000 6,150.00 6,150.00
Minyak pelumas Liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 7,150.00
C PERALATAN
1. Sewa alat Jam 0.800 115,000.00 92,000.00
JUMLAH HARGA ALAT 92,000.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
III - 67
B BAHAN
Besi siku L 30.30.3 Kg 15.000 10,500.00 157,500.00
Besi pelat baja Kg 32.800 6,500.00 213,200.00
Kawat las Kg 0.050 27,000.00 1,350.00
JUMLAH HARGA BAHAN 372,050.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang las (bersertifikat) L.03 OH 0.020 120,000.00 2,400.00
III - 68
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang las biasa L.03 OH 1.200 110,000.00 132,000.00
Kepala tukang L.03 OH 0.120 120,000.00 14,400.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 243,120.00
B BAHAN
Pintu gulung besi m2 1.000 976,000.00 976,000.00
JUMLAH HARGA BAHAN 976,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.03 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 91,520.00
B BAHAN
Pintu lipat m2 1.000 2,710,000.00 2,710,000.00
JUMLAH HARGA BAHAN 2,710,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.03 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 104,480.00
B BAHAN
Sunscreen alluminium m2 1.000 385,000.00 385,000.00
JUMLAH HARGA BAHAN 385,000.00
C PERALATAN
III - 69
A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 80,000.00 3,440.00
Tukang khusus L.03 OH 0.043 110,000.00 4,730.00
alumunium
Kepala tukang L.03 OH 0.004 120,000.00 516.00
Mandor L.04 OH 0.002 120,000.00 252.00
JUMLAH TENAGA KERJA 8,938.00
B BAHAN
Profil alluminium m 1.100 110,000.00 121,000.00
Skrup fixer buah 2.000 400.00 800.00
Sealant Tube 0.060 20,000.00 1,200.00
JUMLAH HARGA BAHAN 123,000.00
C PERALATAN
III - 70
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 17,830.00
B BAHAN
Pintu alluminium m 4.400 110,000.00 484,000.00
Profil kaca m 4.500 12,400.00 55,800.00
Sealant Tube 0.270 20,000.00 5,400.00
JUMLAH HARGA BAHAN 545,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.03 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Venetions blinds dan m2 1.000 106,200.00 106,200.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 106,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang las L.03 OH 1.670 110,000.00 183,700.00
Kepala tukang L.03 OH 0.167 120,000.00 20,040.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 347,300.00
III - 71
B BAHAN
Besi strip kg 6.177 13,750.00 84,933.75
Pengelasan cm 27.080 4,400.00 119,152.00
JUMLAH HARGA BAHAN 204,085.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Jendela nako m2 1.100 163,200.00 179,520.00
(rangka + kaca 5 mm)
Paku skrup buah 10.000 400.00 4,000.00
1 cm – 2,5 cm
Besi strip m 7.000 13,750.00 96,250.00
JUMLAH HARGA BAHAN 279,770.00
C PERALATAN
III - 72
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Seng pelat m 1.050 38,000.00 39,900.00
Paku 1 cm - 2,5 cm kg 0.015 20,000.00 300.00
Papan kayu kelas II
m3 0.019 3,500,000.00 66,500.00
atau III
JUMLAH HARGA BAHAN 106,700.00
C PERALATAN
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 49,560.00
B BAHAN
Seng pelat m 1.050 38,000.00 39,900.00
Paku 1 cm – 2,5 cm kg 0.010 20,000.00 200.00
Besi strip kg 0.500 13,750.00 6,875.00
JUMLAH HARGA BAHAN 46,975.00
C PERALATAN
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
III - 73
Assesoris Ls 1.000 66,500.00 66,500.00
(perkuatan, las dll)
JUMLAH HARGA BAHAN 133,000.00
C PERALATAN
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
III - 74
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
III - 75
C PERALATAN
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
III - 76
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 800.00 112,000.00
Semen Portland Kg 18.500 1,420.00 26,270.00
Pasir pasang m3 0.122 193,750.00 23,637.50
JUMLAH HARGA BAHAN 161,907.50
C PERALATAN
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
III - 77
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
III - 78
C PERALATAN
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen Portland Kg 8.320 1,420.00 11,814.40
Pasir pasang m3 0.049 193,750.00 9,493.75
JUMLAH HARGA BAHAN 77,308.15
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
III - 79
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen Portland Kg 4.500 1,420.00 6,390.00
Kapur padam m3 0.015 220,000.00 3,300.00
Pasir pasang m3 0.050 193,750.00 9,687.50
JUMLAH HARGA BAHAN 75,377.50
C PERALATAN
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen merah Kg 0.014 1,420.00 19.88
Kapur padam m3 0.014 220,000.00 3,080.00
Pasir pasang m3 0.028 193,750.00 5,425.00
JUMLAH HARGA BAHAN 64,524.88
C PERALATAN
III - 80
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP
A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP
III - 81
B BAHAN
HB-15 buah 12.500 12.500 1,500.00 18,750.00
Semen Portland Kg 22.740 2.274 1,420.00 3,229.08
Pasir pasang m3 0.550 0.055 193,750.00 10,656.25
Besi angker diameter 8 Kg 0.280 0.280 13,000.00 3,640.00
JUMLAH HARGA BAHAN 36,275.33
C PERALATAN
III - 82
A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata rooster m3 30.000 2,400.00 72,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 193,750.00 6,781.25
JUMLAH HARGA BAHAN 94,401.25
C PERALATAN
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata berongga m3 30.000 2,400.00 72,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 193,750.00 6,781.25
JUMLAH HARGA BAHAN 94,401.25
III - 83
C PERALATAN
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.671 80,000.00 53,680.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
III - 84
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,640.00
B BAHAN
Bata ringan tebal 10cm buah 8.400 6,000.00 50,400.00
Mortar siap pakai Kg 0.063 3,750.00 236.25
JUMLAH HARGA BAHAN 50,636.25
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -
III - 85
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
III - 86
C PERALATAN
III - 87
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 3.456 1,420.00 4,907.52
PP m3 0.029 193,750.00 5,618.75
JUMLAH HARGA BAHAN 10,526.27
C PERALATAN
III - 88
A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm
III - 89
C PERALATAN
III - 90
B BAHAN
PC Kg 6.912 1,420.00 9,815.04
PP m3 0.035 193,750.00 6,781.25
JUMLAH HARGA BAHAN 16,596.29
C PERALATAN
III - 91
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
III - 92
C PERALATAN
III - 93
B BAHAN
Semen PC Kg 3.108 1,420.00 4,413.36
JUMLAH HARGA BAHAN 4,413.36
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
III - 94
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Semen PC Kg 3.250 1,420.00 4,615.00
JUMLAH HARGA BAHAN 4,615.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin abu-abu Bh 11.870 2,500.00 29,675.00
Semen Portland kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 193,750.00 8,718.75
JUMLAH HARGA BAHAN 52,593.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin abu-abu buah 26.500 2,000.00 53,000.00
Semen Portland kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 193,750.00 8,718.75
JUMLAH HARGA BAHAN 76,486.75
C PERALATAN
III - 95
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 38,220.00
B BAHAN
Ubin warna Bh 11.870 2,900.00 34,423.00
Semen Portland kg 10.000 1,420.00 14,200.00
Semen warna Kg 0.600 6,000.00 3,600.00
Pasir pasang M3 0.045 193,750.00 8,718.75
JUMLAH HARGA BAHAN 60,941.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin warna Bh 26.500 2,300.00 60,950.00
Semen Portland kg 10.400 1,420.00 14,768.00
Semen warna Kg 1.000 6,000.00 6,000.00
Pasir pasang M3 0.045 193,750.00 8,718.75
JUMLAH HARGA BAHAN 90,436.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
III - 96
B BAHAN
Ubin granit Bh 6.630 56,200.00 372,606.00
Semen Portland kg 9.800 1,420.00 13,916.00
Semen warna Kg 1.300 6,000.00 7,800.00
Pasir pasang M3 0.045 193,750.00 8,718.75
JUMLAH HARGA BAHAN 403,040.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 53.000 1,000.00 53,000.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 193,750.00 8,718.75
Semen warna Kg 2.750 6,000.00 16,500.00
JUMLAH HARGA BAHAN 89,848.55
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 46,200.00 48,510.00
Semen Portland Kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 193,750.00 8,718.75
Semen warna Kg 0.500 6,000.00 3,000.00
JUMLAH HARGA BAHAN 74,428.75
C PERALATAN
III - 97
A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 162,500.00 170,625.00
Semen Portland Kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 193,750.00 8,718.75
Semen warna Kg 0.500 6,000.00 3,000.00
JUMLAH HARGA BAHAN 197,111.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 11.870 4,000.00 47,480.00
Semen Portland Kg 14.150 1,420.00 20,093.00
Pasir pasang M3 0.039 193,750.00 7,556.25
Semen warna Kg 2.000 6,000.00 12,000.00
JUMLAH HARGA BAHAN 87,129.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
III - 98
B BAHAN
Plint keramik Bh 5.300 12,000.00 63,600.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 193,750.00 581.25
Semen warna Kg 0.025 6,000.00 150.00
JUMLAH HARGA BAHAN 65,950.05
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 10.600 9,000.00 95,400.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 193,750.00 581.25
Semen warna Kg 0.050 6,000.00 300.00
JUMLAH HARGA BAHAN 97,900.05
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 9,000.00 47,700.00
Semen Portland Kg 0.570 1,420.00 809.40
Pasir pasang M3 0.002 193,750.00 290.63
Semen warna Kg 0.013 6,000.00 78.00
JUMLAH HARGA BAHAN 48,878.03
C PERALATAN
III - 99
A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 156,060.00
B BAHAN
Internal cove Bh 5.300 15,000.00 79,500.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 193,750.00 581.25
Semen warna Kg 0.100 6,000.00 600.00
JUMLAH HARGA BAHAN 82,300.05
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Marmer Bh 1.060 800,000.00 848,000.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 193,750.00 8,718.75
Semen warna Kg 0.134 6,000.00 804.00
JUMLAH HARGA BAHAN 869,152.55
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 35,420.00
III - 100
B BAHAN
Karpet m2 1.050 100,000.00 105,000.00
Lem Kg 0.350 68,500.00 23,975.00
JUMLAH HARGA BAHAN 128,975.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Underlayer m2 1.050 50,000.00 52,500.00
Lem Kg 0.350 68,500.00 23,975.00
JUMLAH HARGA BAHAN 76,475.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 150,000.00 157,500.00
Lem Kg 0.600 68,500.00 41,100.00
JUMLAH HARGA BAHAN 198,600.00
C PERALATAN
III - 101
A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 150,000.00 157,500.00
Lem Kg 0.600 68,500.00 41,100.00
JUMLAH HARGA BAHAN 198,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 53.000 1,000.00 53,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 2.750 6,000.00 16,500.00
JUMLAH HARGA BAHAN 86,193.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 26.000 2,000.00 52,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 1.940 6,000.00 11,640.00
JUMLAH HARGA BAHAN 80,333.50
III - 102
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 3,400.00 180,200.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 2.750 6,000.00 16,500.00
JUMLAH HARGA BAHAN 213,393.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 106.000 1,700.00 180,200.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 2.900 6,000.00 17,400.00
JUMLAH HARGA BAHAN 214,293.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
III - 103
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 1,000.00 53,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 2.750 6,000.00 16,500.00
JUMLAH HARGA BAHAN 86,193.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 26.500 2,000.00 53,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 193,750.00 3,487.50
Semen warna Kg 1.940 6,000.00 11,640.00
JUMLAH HARGA BAHAN 81,333.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.300 80,000.00 104,000.00
Tukang batu L.02 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 191,100.00
B BAHAN
Marmer buah 1.060 800,000.00 848,000.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 193,750.00 4,843.75
Semen warna Kg 0.650 6,000.00 3,900.00
Paku 12 cm buah 3.030 400.00 1,212.00
JUMLAH HARGA BAHAN 875,620.55
C PERALATAN
III - 104
A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 147,000.00
B BAHAN
Bata pelapis buah 63.000 4,100.00 258,300.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 193,750.00 4,843.75
Semen warna Kg 2.750 6,000.00 16,500.00
JUMLAH HARGA BAHAN 297,308.55
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu paras buah 1.100 4,200.00 4,620.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 193,750.00 6,781.25
JUMLAH HARGA BAHAN 28,086.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu tempel hitam Buah 1.100 1,550.00 1,705.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 193,750.00 6,781.25
JUMLAH HARGA BAHAN 25,171.25
III - 105
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 31,260.00
B BAHAN
Vynil buah 11.870 11,000.00 130,570.00
Lem Kg 0.350 22,000.00 7,700.00
JUMLAH HARGA BAHAN 138,270.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.175 110,000.00 19,250.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 49,530.00
B BAHAN
Wallpaper m 2.200 70,000.00 154,000.00
Lem Kg 0.250 22,000.00 5,500.00
JUMLAH HARGA BAHAN 159,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
III - 106
B BAHAN
Floor harderner Kg 5.000 9,700.00 48,500.00
JUMLAH HARGA BAHAN 48,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.080 110,000.00 8,800.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Vynil buah 1.760 11,000.00 19,360.00
Lem Kg 0.080 22,000.00 1,760.00
JUMLAH HARGA BAHAN 21,120.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Papan kayu kelas 1 M3 0.003 9,500,000.00 28,500.00
Paku/skrup 5 cm Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 29,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
III - 107
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6 cm M2 1.010 50,000.00 50,500.00
Pasir beton M3 0.050 212,500.00 10,625.00
JUMLAH HARGA BAHAN 61,125.00
C PERALATAN
Peralatan % 0.100 61,125.00 6,112.50
JUMLAH HARGA ALAT 6,112.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm natural M2 1.010 62,000.00 62,620.00
Pasir beton M3 2.070 212,500.00 439,875.00
JUMLAH HARGA BAHAN 502,495.00
C PERALATAN
Peralatan % 0.100 502,495.00 50,249.50
JUMLAH HARGA ALAT 50,249.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6cm berwarna M2 1.010 57,000.00 57,570.00
Pasir beton M3 0.050 212,500.00 10,625.00
JUMLAH HARGA BAHAN 68,195.00
C PERALATAN
Peralatan % 0.100 68,195.00 6,819.50
JUMLAH HARGA ALAT 6,819.50
III - 108
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm berwarna M2 1.010 69,000.00 69,690.00
Pasir beton M3 2.070 212,500.00 439,875.00
JUMLAH HARGA BAHAN 509,565.00
C PERALATAN
Peralatan % 0.100 509,565.00 50,956.50
JUMLAH HARGA ALAT 50,956.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 12.000 51,000.00 612,000.00
Paku tripleks kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 613,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -
III - 109
A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 5.800 51,000.00 295,800.00
Paku tripleks kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 296,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Akustik Lembar 1.500 51,000.00 76,500.00
Paku tripleks kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 77,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Tripleks Lembar 0.375 84,000.00 31,500.00
Paku tripleks kg 0.030 20,000.00 600.00
JUMLAH HARGA BAHAN 32,100.00
III - 110
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 166,400.00
B BAHAN
Kayu papan m3 0.015 3,500,000.00 52,500.00
Paku tripleks kg 0.010 20,000.00 200.00
JUMLAH HARGA BAHAN 52,700.00
C PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang besi L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 104,000.00
III - 111
B BAHAN
Profil Allum "T" m 3.600 99,000.00 356,400.00
Kawat Ø 4 mm kg 0.150 35,000.00 5,250.00
Ramset Buah 1.050 200.00 210.00
Akustik 60 x 120 Lembar 1.500 51,000.00 76,500.00
JUMLAH HARGA BAHAN 438,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
List kayu profil m 1.05 4,800.00 5,040.00
Paku kg 0.010 20,000.00 200.00
JUMLAH HARGA BAHAN 5,240.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 900.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,110.00
B BAHAN
Genteng palentong buah 25.000 900.00 22,500.00
JUMLAH HARGA BAHAN 22,500.00
C PERALATAN
III - 112
A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng kodok buah 25.000 1,400.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng palentong buah 12.000 1,500.00 18,000.00
JUMLAH HARGA BAHAN 18,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung Buah 5.000 2,000.00 10,000.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 193,750.00 6,200.00
JUMLAH HARGA BAHAN 27,560.00
III - 113
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 5.000 4,000.00 20,000.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 193,750.00 6,200.00
JUMLAH HARGA BAHAN 37,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 4.000 6,000.00 24,000.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 193,750.00 6,200.00
JUMLAH HARGA BAHAN 41,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 110,000.00 7,370.00
III - 114
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Rooflight 90 x 180 Lbr 0.600 62,000.00 37,200.00
Paku biasa ½”-1” Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 38,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.500 32,000.00 16,000.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 18,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 32,000.00 19,200.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 21,600.00
C PERALATAN
III - 115
A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 32,000.00 19,200.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 21,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.750 32,000.00 24,000.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 26,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.350 32,000.00 11,200.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 13,600.00
III - 116
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.440 32,000.00 14,080.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 16,480.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
III - 117
B BAHAN
Asbes gel 92 x 250 Lbr 0.510 32,000.00 16,320.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 18,720.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.800 32,000.00 25,600.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 28,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.370 32,000.00 11,840.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 14,240.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
III - 118
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.380 32,000.00 12,160.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 14,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.460 32,000.00 14,720.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 17,120.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.490 32,000.00 15,680.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 18,080.00
C PERALATAN
III - 119
A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.570 32,000.00 18,240.00
Paku pancing 6 x 23 Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 20,640.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.400 62,000.00 148,800.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 151,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.100 62,000.00 130,200.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 132,600.00
III - 120
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.050 62,000.00 127,100.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 129,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 62,000.00 74,400.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 76,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
III - 121
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 62,000.00 74,400.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 76,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 62,000.00 74,400.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 76,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 26,540.00
B BAHAN
Nok paten 92 cm Lbr 1.100 62,000.00 68,200.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 70,600.00
C PERALATAN
III - 122
A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.100 62,000.00 68,200.00
Paku skrup 3,5” buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 70,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Genteng beton buah 11.000 5,000.00 55,000.00
Paku biasa 2”-5” Kg 0.030 20,000.00 600.00
JUMLAH HARGA BAHAN 55,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 1.300 48,000.00 62,400.00
Paku biasa ½”-1” Kg 0.200 20,000.00 4,000.00
JUMLAH HARGA BAHAN 66,400.00
III - 123
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 2.000 48,000.00 96,000.00
Paku biasa ½”-1” Kg 0.200 20,000.00 4,000.00
JUMLAH HARGA BAHAN 100,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.166 80,000.00 13,280.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 44,740.00
B BAHAN
Sirap kayu buah 30.000 1,650.00 49,500.00
Paku biasa ½”-1” Kg 0.200 20,000.00 4,000.00
JUMLAH HARGA BAHAN 53,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
III - 124
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Nok genteng beton buah 3.500 4,000.00 14,000.00
Paku biasa ½”-1” Kg 0.050 20,000.00 1,000.00
Semen PC Kg 10.800 1,420.00 15,336.00
Pasir pasang M3 0.032 193,750.00 6,200.00
Semen warna Kg 1.000 6,000.00 6,000.00
JUMLAH HARGA BAHAN 42,536.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.015 120,000.00 1,800.00
Mandor L.15 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 39,860.00
B BAHAN
Nok genteng metal buah 1.100 44,400.00 48,840.00
Paku biasa ½”-1” Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 49,840.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 41,220.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.400 80,000.00 32,000.00
Paku biasa ½”-1” Kg 0.050 20,000.00 1,000.00
Paku biasa 2”-5” Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 34,000.00
III - 125
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.060 110,000.00 6,600.00
Kepala tukang L.11 OH 0.006 120,000.00 720.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 17,640.00
B BAHAN
Seng gel 3”x6” Lbr 0.700 80,000.00 56,000.00
Paku biasa ½”-1” Kg 0.020 20,000.00 400.00
JUMLAH HARGA BAHAN 56,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 21,260.00
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300 80,000.00 24,000.00
Paku biasa ½”-1” Kg 0.040 20,000.00 800.00
JUMLAH HARGA BAHAN 24,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.750 110,000.00 82,500.00
III - 126
Kepala tukang L.11 OH 0.080 120,000.00 9,600.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 104,820.00
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050 136,000.00 142,800.00
Paku hak panjang 15 cm Kg 0.020 20,000.00 400.00
JUMLAH HARGA BAHAN 143,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.050 110,000.00 5,500.00
Kepala tukang L.11 OH 0.005 120,000.00 600.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Aluminium foil M2 1.050 9,000.00 9,450.00
JUMLAH HARGA BAHAN 9,450.00
C PERALATAN
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.000 110,000.00 2,310,000.00
Kepala tukang L.03 OH 2.100 120,000.00 252,000.00
Mandor L.04 OH 0.350 120,000.00 42,000.00
JUMLAH TENAGA KERJA 3,164,000.00
B BAHAN
Balok kayu m3 1.100 9,500,000.00 10,450,000.00
Paku 10 cm Kg 1.250 20,000.00 25,000.00
Lem kayu Kg 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 10,505,000.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 127
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,712,000.00
B BAHAN
Balok kayu m3 1.200 3,500,000.00 4,200,000.00
Paku 10 cm Kg 1.250 20,000.00 25,000.00
Lem kayu Kg 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 4,255,000.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Paku 5 – 7 cm Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 201,000.00
C PERALATAN
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 3,500,000.00 140,000.00
Paku 5 – 7 cm Kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 141,000.00
III - 128
C PERALATAN
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Lem kayu Kg 0.500 30,000.00 15,000.00
JUMLAH HARGA BAHAN 215,000.00
C PERALATAN
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.024 5,000,000.00 120,000.00
Lem kayu Kg 0.300 30,000.00 9,000.00
JUMLAH HARGA BAHAN 129,000.00
C PERALATAN
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
III - 129
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.064 5,000,000.00 320,000.00
Lem kayu Kg 0.500 30,000.00 15,000.00
JUMLAH HARGA BAHAN 335,000.00
C PERALATAN
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.03 OH 2.100 110,000.00 231,000.00
Kepala tukang L.03 OH 0.210 120,000.00 25,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 316,400.00
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 cm – 2,5 cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.500 30,000.00 15,000.00
Plywood tebal 4 mm Lembar 1.000 92,250.00 92,250.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 232,850.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.80 80,000.00 64,000.00
Tukang kayu L.03 OH 2.40 110,000.00 264,000.00
Kepala tukang L.03 OH 0.24 120,000.00 28,800.00
Mandor L.04 OH 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.026 5,000,000.00 128,000.00
Paku 1 cm – 2,5 cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.500 30,000.00 15,000.00
Plywood 4 mm Lembar 1.000 92,250.00 92,250.00
(90 x 220) cm
JUMLAH HARGA BAHAN 235,850.00
C PERALATAN
III - 130
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang kayu L.03 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 337,800.00
B BAHAN
Papan kayu m3 0.060 5,000,000.00 300,000.00
Paku 1 – 2,5 cm kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 303,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.025 9,500,000.00 237,500.00
Paku 1 – 2,5 cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.300 30,000.00 9,000.00
Teakwood 4 mm Lembar 1.000 65,000.00 65,000.00
90 x 220 cm
JUMLAH HARGA BAHAN 312,100.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 80,000.00 68,000.00
Tukang kayu L.03 OH 2.550 110,000.00 280,500.00
Kepala tukang L.03 OH 0.255 120,000.00 30,600.00
Mandor L.04 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 384,260.00
III - 131
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 – 2,5 cm kg 0.030 20,000.00 600.00
Lem kayu kg 0.800 30,000.00 24,000.00
Teakwood 4 mm Lembar 1.000 65,000.00 65,000.00
90 x 220 cm
Formika Lembar 0.500 214,600.00
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 598,860.00
E Overhead & Profit 15.00% 89,829.00
F Harga Satuan Pekerjaan (D+E) 688,689.00
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.200 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,808,000.00
B BAHAN
Balok kayu m3 1.100 3,500,000.00 3,850,000.00
Besi strip tebal 5 mm kg 15.000 13,750.00 206,250.00
Paku 12 cm kg 5.600 20,000.00 112,000.00
JUMLAH HARGA BAHAN 4,168,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.200 9,500,000.00 11,400,000.00
Besi strip tebal 5 mm kg 15.000 13,750.00 206,250.00
Paku 12 cm kg 5.600 20,000.00 112,000.00
JUMLAH HARGA BAHAN 11,718,250.00
C PERALATAN
III - 132
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.100 5,000,000.00 5,500,000.00
Besi strip tebal 5 mm kg 15.000 13,750.00 206,250.00
Paku 12 cm kg 3.000 20,000.00 60,000.00
JUMLAH HARGA BAHAN 5,766,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng 2 x 3 cm m3 0.036 35,000.00 1,260.00
Paku 5 dan 10 cm kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 76,260.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng (3 x 4) cm m3 0.057 35,000.00 1,995.00
Paku 5 dan 10 cm kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 76,995.00
III - 133
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Kayu kelas II m3 0.014 5,000,000.00 70,000.00
Paku 5 - 10 cm m3 0.057 20,000.00 1,140.00
JUMLAH HARGA BAHAN 71,140.00
C PERALATAN
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 57,600.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015 5,000,000.00 77,000.00
Paku 7 cm – 10 cm kg 0.200 20,000.00 4,000.00
JUMLAH HARGA BAHAN 81,000.00
C PERALATAN
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
III - 134
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 5,000,000.00 81,500.00
Paku 7 – 10 cm kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 86,500.00
C PERALATAN
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,000,000.00 54,000.00
Paku 5 dan 7 cm kg 0.100 20,000.00 2,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,000,000.00 55,000.00
Paku 5 dan 7 cm kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
III - 135
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 5,000,000.00 140,000.00
Paku 5 dan 10 kg 0.150 20,000.00 3,000.00
Plywood 4 mm, Lembar 0.860 92,250.00 79,335.00
120 x 240
Lem kayu kg 0.560 30,000.00 16,800.00
JUMLAH HARGA BAHAN 239,135.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 329,535.00
E Overhead & Profit 15.00% 49,430.25
F Harga Satuan Pekerjaan (D+E) 378,965.25
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang kayu L.03 OH 1.800 110,000.00 198,000.00
Kepala tukang L.03 OH 0.180 120,000.00 21,600.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 271,200.00
B BAHAN
Papan kayu m3 0.007 9,500,000.00 66,500.00
Paku 5 dan 10 kg 0.100 20,000.00 2,000.00
Paku skrup 10 cm kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 71,500.00
III - 136
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 11,330.00
B BAHAN
Plywood 4 mm m3 0.400 92,250.00 36,900.00
Paku 1 dan 2,5 kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 37,900.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Kunci tanam antik buah 1.000 222,000.00 222,000.00
JUMLAH HARGA BAHAN 222,000.00
C PERALATAN
III - 137
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 62,400.00
B BAHAN
Kunci tanam biasa buah 1.000 125,000.00 125,000.00
JUMLAH HARGA BAHAN 125,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci tanam KM buah 1.000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
III - 138
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Engsel pintu buah 1.000 60,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 32,460.00
B BAHAN
Engsel angin buah 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
III - 139
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Spring knip buah 1.000 22,000.00 22,000.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door closer set 1.000 280,000.00 280,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
III - 140
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 26,120.00
B BAHAN
Kunci slot buah 1.000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door holder buah 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
B BAHAN
Door stop buah 1.000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
III - 141
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Rel pintu sorong Set 1.000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 32,620.00
B BAHAN
Kunci lemari Set 1.000 142,000.00 142,000.00
JUMLAH HARGA BAHAN 142,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 3 mm m2 1.100 63,250.00 69,575.00
Sealant Kg 0.050 42,000.00 2,100.00
JUMLAH HARGA BAHAN 71,675.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
III - 142
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 5 mm m2 1.100 75,000.00 82,500.00
Sealant Kg 0.050 42,000.00 2,100.00
JUMLAH HARGA BAHAN 84,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.001 120,000.00 108.00
JUMLAH TENAGA KERJA 22,208.00
B BAHAN
Kaca tebal 8 mm m2 1.100 150,000.00 165,000.00
Sealant Kg 0.070 42,000.00 2,940.00
JUMLAH HARGA BAHAN 167,940.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 32,656.00
B BAHAN
Kaca buram 12 mm m2 1.100 360,500.00 396,550.00
Sealant Kg 0.070 42,000.00 2,940.00
JUMLAH HARGA BAHAN 399,490.00
C PERALATAN
III - 143
A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca cermin 5 mm m2 1.100 135,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 23,180.00
B BAHAN
Kaca cermin 8 mm m2 1.100 257,700.00 283,470.00
JUMLAH HARGA BAHAN 283,470.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca wireglassed 5 mm m2 1.100 210,000.00 231,000.00
JUMLAH HARGA BAHAN 231,000.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 144
A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 80,000.00 6,000.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,780.00
B BAHAN
Kaca patri 5mm m2 1.100 2,000,000.00 2,200,000.00
Sealant Kg 0.050 42,000.00 2,100.00
JUMLAH HARGA BAHAN 2,202,100.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Soda api Kg 0.050 25,000.00 1,250.00
JUMLAH HARGA BAHAN 1,250.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Sabun Kg 0.050 11,000.00 550.00
JUMLAH HARGA BAHAN 550.00
C PERALATAN
III - 145
A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 12,960.00
B BAHAN
Sabun Kg 0.050 11,000.00 550.00
JUMLAH HARGA BAHAN 550.00
C PERALATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.0 OH 0.070 80,000.00 5,600.00
Tukang cat 1
L.0 OH 0.009 110,000.00 990.00
Kepala tukang 2
L.0 OH 0.006 120,000.00 720.00
Mandor 3
L.0 OH 0.003 120,000.00 360.00
4 JUMLAH TENAGA KERJA 7,670.00
B BAHAN
Cat menie Kg 0.200 44,000.00 8,800.00
Plamuur Kg 0.150 20,000.00 3,000.00
Cat dasar Kg 0.170 44,000.00 7,480.00
Cat penutup (setara avian) Kg 0.260 48,000.00 12,480.00
Kuas buah 0.010 12,000.00 120.00
Pengencer Kg 0.030 24,000.00 720.00
Ampelas Lbr 0.200 3,000.00 600.00
JUMLAH HARGA BAHAN 33,200.00
C PERALATAN
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.0 OH 0.070 80,000.00 5,600.00
Tukang cat 1
L.0 OH 0.105 110,000.00 11,550.00
Kepala tukang 2
L.0 OH 0.004 120,000.00 480.00
Mandor 3
L.0 OH 0.003 120,000.00 360.00
4 JUMLAH TENAGA KERJA 17,990.00
B BAHAN
Cat menie Kg 0.200 44,000.00 8,800.00
Plamuur Kg 0.150 20,000.00 3,000.00
Cat dasar Kg 0.170 44,000.00 7,480.00
III - 146
Cat penutup (setara avian) Kg 0.350 48,000.00 16,800.00
Kuas buah 0.010 12,000.00 120.00
Pengencer Kg 0.030 24,000.00 720.00
Ampelas Lbr 0.200 3,000.00 600.00
JUMLAH HARGA BAHAN 37,520.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.063 120,000.00 7,560.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 18,050.00
B BAHAN
Teak oil L 0.360 30,250.00 10,890.00
JUMLAH HARGA BAHAN 10,890.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,080.00
B BAHAN
Politur L 0.150 37,950.00 5,692.50
Politur jadi L 0.372 43,100.00 16,033.20
Ampelas Lbr 2.000 3,000.00 6,000.00
JUMLAH HARGA BAHAN 27,725.70
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 120,000.00 720.00
III - 147
JUMLAH TENAGA KERJA 8,720.00
B BAHAN
Residu atau ter L 0.350 27,500.00 9,625.00
JUMLAH HARGA BAHAN 9,625.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.160 80,000.00 12,800.00
Tukang cat L.02 OH 0.160 110,000.00 17,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 32,680.00
B BAHAN
Vernis L 0.150 34,650.00 5,197.50
Dempul Kg 0.050 18,500.00 925.00
Ampelas Lbr 0.100 3,000.00 300.00
JUMLAH HARGA BAHAN 6,422.50
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,646.00
B BAHAN
Plamuur Kg 0.100 70,000.00 7,000.00
Cat dasar Kg 0.100 44,000.00 4,400.00
Cat penutup Kg 0.260 25,000.00 6,500.00
JUMLAH HARGA BAHAN 17,900.00
C PERALATAN
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
III - 148
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Cat dasar Kg 0.120 44,000.00 5,280.00
Cat penutup Kg 0.180 25,000.00 4,500.00
JUMLAH HARGA BAHAN 9,780.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Kalkarium Kg 0.100 18,500.00 1,850.00
JUMLAH HARGA BAHAN 1,850.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang cat L.02 OH 0.001 110,000.00 110.00
Kepala tukang L.03 OH 0.000 120,000.00 12.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 12,422.00
B BAHAN
Kapur sirih Kg 0.150 2,000.00 300.00
Ampelas Lbr 0.100 3,000.00 300.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 3,100.00
C PERALATAN
III - 149
A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.005 110,000.00 550.00
Kepala tukang L.03 OH 0.001 120,000.00 60.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 4,110.00
B BAHAN
Kapur sirih Kg 0.300 2,000.00 600.00
Ampelas Lbr 0.200 3,000.00 600.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 3,700.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Wall paper m2 1.200 70,000.00 84,000.00
Lem Kg 0.200 22,000.00 4,400.00
JUMLAH HARGA BAHAN 88,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Menie besi Kg 0.100 44,000.00 4,400.00
Kwas buah 0.010 12,000.00 120.00
JUMLAH HARGA BAHAN 4,520.00
III - 150
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.02 OH 0.023 120,000.00 2,700.00
Mandor L.04 OH 0.008 120,000.00 900.00
JUMLAH TENAGA KERJA 48,350.00
B BAHAN
Menie besi Kg 0.100 44,000.00 4,400.00
Pengencer L 0.010 24,000.00 240.00
Kwas buah 0.010 12,000.00 120.00
Perancah kayu m3 0.002 3,500,000.00 7,000.00
JUMLAH HARGA BAHAN 11,760.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 50,656.00
B BAHAN
Menie A Kg 0.100 44,000.00 4,400.00
Menie B Kg 0.100 44,000.00 4,400.00
Cat Kg 0.080 55,000.00 4,400.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 13,560.00
C PERALATAN
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
III - 151
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Cat Kg 0.300 55,000.00 16,500.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 16,860.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 132,000.00
B BAHAN
Cat dasar Kg 0.110 44,000.00 4,840.00
Cat antara Kg 0.170 35,000.00 5,950.00
Cat penutup Kg 0.080 55,000.00 4,400.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 15,550.00
C PERALATAN
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.700 110,000.00 77,000.00
Kepala tukang L.03 OH 0.070 120,000.00 8,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 119,800.00
B BAHAN
Cat dasar Kg 0.300 44,000.00 13,200.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 13,440.00
C PERALATAN
III - 152
A.4.7.1.22. Plituran 10 m2 dengan plitur melamic
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang cat L.02 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 1,636,000.00
B BAHAN
Wood filler kg 1.500 26,000.00 39,000.00
Woodstain kg 1.500 47,000.00 70,500.00
Sanding kg 1.500 48,000.00 72,000.00
Melamic kg 2.400 43,500.00 104,400.00
Thinner L 2.000 11,500.00 23,000.00
Ampelas Lbr 6.000 3,000.00 18,000.00
Lbr JUMLAH HARGA BAHAN 326,900.00
C PERALATAN
Compressor jam 68,310.00 -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 110,000.00 121,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 405,400.00
B BAHAN
Closet duduk Unit 1.000 1,237,000.00 1,237,000.00
Perlengkapan Ls 6% x closet 74,220.00 74,220.00
JUMLAH HARGA BAHAN 1,311,220.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 282,200.00
B BAHAN
Closet jongkok Unit 1.000 140,000.00 140,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 193,750.00 1,937.50
JUMLAH HARGA BAHAN 150,457.50
III - 153
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Closet jongkok Unit 1.000 100,000.00 100,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 193,750.00 1,937.50
Bata merah buah 7.000 800.00 5,600.00
JUMLAH HARGA BAHAN 116,057.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Urinoir Unit 1.000 649,000.00 649,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 193,750.00 1,937.50
Perlengkapan % 0.300 194,700.00 194,700.00
JUMLAH HARGA BAHAN 854,157.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
III - 154
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 280,700.00
B BAHAN
Wastafel Unit 1.200 686,000.00 823,200.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 193,750.00 1,937.50
Perlengkapan % 0.120 98,784.00 98,784.00
JUMLAH HARGA BAHAN 932,441.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan Ls 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan Ls 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN
III - 155
A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 80,700.00
B BAHAN
Bak air fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan % 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 40,800.00
B BAHAN
Bak cuci piring Unit 1.000 400,000.00 400,000.00
Waterdrain buah 1.000 385,000.00 385,000.00
JUMLAH HARGA BAHAN 785,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Bak cuci piring Unit 1.000 175,000.00 175,000.00
Waterdrain buah 1.000 385,000.00 385,000.00
Semen portland Kg 20.000 1,420.00 28,400.00
Pasir pasang M3 0.050 193,750.00 9,687.50
JUMLAH HARGA BAHAN 598,087.50
III - 156
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
B BAHAN
Floor drain Unit 1.000 82,500.00 82,500.00
JUMLAH HARGA BAHAN 82,500.00
C PERALATAN
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 80,000.00 172,800.00
Tukang batu L.02 OH 0.720 110,000.00 79,200.00
Kepala tukang L.03 OH 0.072 120,000.00 8,640.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 261,960.00
B BAHAN
Bata merah buah 40.000 800.00 32,000.00
Semen portland Kg 44.000 1,420.00 62,480.00
Pasir pasang M3 0.070 193,750.00 13,562.50
Pasir beton M3 0.060 212,500.00 12,750.00
Kerikil M3 0.070 200,000.00 14,000.00
Baja tulangan Kg 1.600 18,150.00 29,040.00
JUMLAH HARGA BAHAN 163,832.50
C PERALATAN
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang cat L.02 OH 1.500 110,000.00 165,000.00
III - 157
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 424,240.00
B BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen portland Kg 77.000 1,420.00 109,340.00
Pasir pasang M3 0.130 193,750.00 25,187.50
Pasir beton M3 0.090 212,500.00 19,125.00
Kerikil M3 0.020 200,000.00 4,000.00
Baja tulangan Kg 2.600 18,150.00 47,190.00
JUMLAH HARGA BAHAN 260,842.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang batu L.02 OH 1.150 110,000.00 126,500.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 385,740.00
B BAHAN
Bata merah buah 123.000 800.00 98,400.00
Semen portland Kg 114.000 1,420.00 161,880.00
Pasir pasang M3 0.184 193,750.00 35,650.00
Pasir beton M3 0.120 212,500.00 25,500.00
Kerikil M3 0.033 200,000.00 6,600.00
Baja tulangan Kg 4.850 18,150.00 88,027.50
JUMLAH HARGA BAHAN 416,057.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis ½” M 1.200 25,900.00 31,080.00
Perlengkapan Ls 0.350 25,900.00 9,065.00
JUMLAH HARGA BAHAN 40,145.00
C PERALATAN
III - 158
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 3/4” M 1.200 33,400.00 40,080.00
Perlengkapan % 0.350 14,028.00 14,028.00
JUMLAH HARGA BAHAN 54,108.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 1” M 1.200 50,000.00 60,000.00
Perlengkapan % 0.350 60,000.00 60,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
III - 159
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 80,000.00 8,640.00
Tukang batu L.02 OH 0.180 110,000.00 19,800.00
Kepala tukang L.03 OH 0.018 120,000.00 2,160.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 31,200.00
B BAHAN
Pipa galvanis 11/2” M 1.200 75,900.00 91,080.00
Perlengkapan % 0.350 91,080.00 91,080.00
JUMLAH HARGA BAHAN 182,160.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 3” M 1.200 173,333.33 208,000.00
Perlengkapan % 0.350 72,800.00 72,800.00
JUMLAH HARGA BAHAN 280,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 4” M 1.200 245,000.00 294,000.00
Perlengkapan % 0.350 102,900.00 102,900.00
JUMLAH HARGA BAHAN 396,900.00
III - 160
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1/2” M 1.200 4,500.00 5,400.00
Perlengkapan % 0.350 1,890.00 1,890.00
JUMLAH HARGA BAHAN 7,290.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,960.00
B BAHAN
Pipa PVC 3/4” M 1.200 6,300.00 7,560.00
Perlengkapan % 0.350 2,646.00 2,646.00
JUMLAH HARGA BAHAN 10,206.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
III - 161
B BAHAN
Pipa PVC 1” M 1.200 8,900.00 10,680.00
Perlengkapan % 0.350 3,738.00 3,738.00
JUMLAH HARGA BAHAN 14,418.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 11/2” M 1.200 15,000.00 18,000.00
Perlengkapan % 0.350 6,300.00 6,300.00
JUMLAH HARGA BAHAN 24,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 2” M 1.200 19,350.00 23,220.00
Perlengkapan % 0.350 8,127.00 8,127.00
JUMLAH HARGA BAHAN 31,347.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
III - 162
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 21/2” M 1.200 28,100.00 33,720.00
Perlengkapan % 0.350 11,802.00 11,802.00
JUMLAH HARGA BAHAN 45,522.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 3” M 1.200 65,000.00 78,000.00
Perlengkapan % 0.350 27,300.00 27,300.00
JUMLAH HARGA BAHAN 105,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 4” M 1.200 63,600.00 76,320.00
Perlengkapan % 0.350 26,712.00 26,712.00
JUMLAH HARGA BAHAN 103,032.00
C PERALATAN
III - 163
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.040 110,000.00 4,400.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,420.00 49,700.00
Pasir pasang M3 0.014 193,750.00 2,712.50
Pasir urug M3 0.014 193,700.00 2,711.80
JUMLAH HARGA BAHAN 332,244.30
C PERALATAN
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang batu L.02 OH 0.030 110,000.00 3,300.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,420.00 965.60
Pasir pasang M3 0.013 193,750.00 2,518.75
Pasir urug M3 0.011 193,700.00 2,130.70
JUMLAH HARGA BAHAN 186,735.05
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 7.000 120,000.00 840,000.00
JUMLAH TENAGA KERJA 859,740.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,300.00 48,730.00
Bata merah M3 0.027 800.00 21.60
Semen portlan Kg 3.920 1,420.00 5,566.40
Pasir pasang M3 0.056 193,750.00 10,850.00
Pasir urug M3 0.024 193,700.00 4,648.80
JUMLAH HARGA BAHAN 69,816.80
III - 164
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 110,000.00 20,900.00
Kepala tukang L.03 OH 0.019 120,000.00 2,280.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 55,860.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 800.00 440.00
Semen portlan Kg 10.300 1,420.00 14,626.00
Pasir pasang M3 0.061 193,750.00 11,818.75
Pasir urug M3 0.069 193,700.00 13,365.30
JUMLAH HARGA BAHAN 112,850.05
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang pipa L.02 OH 0.041 110,000.00 4,510.00
Mandor L.04 OH 0.008 120,000.00 960.00
11,950.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm m 1.000 30,600.00 30,600.00
JUMLAH HARGA BAHAN 30,600.00
C PERALATAN
Sewa Tripot/Tackel hari 0.006 3,500,000.00 21,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 21,000.00
D Jumlah (A+B+C) 63,550.00
E Overhead & Profit 15.00% 9,532.50
F Harga Satuan Pekerjaan (D+E) 73,082.50
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada tambahan
peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.
III - 165
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 13,770.00
B BAHAN
Pipa PVC Ø 90 mm m 1.000 64,000.00 64,000.00
JUMLAH HARGA BAHAN 64,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.008 3,500,000.00 28,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 28,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.105 80,000.00 8,400.00
Tukang pipa L.02 OH 0.053 110,000.00 5,830.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 15,550.00
B BAHAN
Pipa PVC Ø 110 mm m 1.000 93,000.00 93,000.00
JUMLAH HARGA BAHAN 93,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.010 3,500,000.00 35,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 35,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.256 80,000.00 20,480.00
Tukang pipa L.02 OH 0.128 110,000.00 14,080.00
III - 166
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 37,680.00
B BAHAN
Pipa PVC Ø 250 mm m 1.000 483,750.00 483,750.00
JUMLAH HARGA BAHAN 483,750.00
C PERALATAN
Sewa Tripot/Tackel hari 0.034 3,500,000.00 119,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 119,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.045 80,000.00 3,600.00
Tukang pipa L.02 OH 0.023 110,000.00 2,530.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 6,730.00
B BAHAN
Pipa HDPE Ø 125 mm m 1.000 101,800.00 101,800.00
JUMLAH HARGA BAHAN 101,800.00
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.102 80,000.00 8,160.00
Tukang pipa L.02 OH 0.051 110,000.00 5,610.00
III - 167
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 14,970.00
B BAHAN
Pipa HDPE Ø 200 mm m 1.000 259,600.00 259,600.00
JUMLAH HARGA BAHAN 259,600.00
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.133 80,000.00 10,640.00
Tukang pipa L.02 OH 0.067 110,000.00 7,370.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 19,570.00
B BAHAN
Pipa HDPE Ø 250 mm m 1.000 404,300.00 404,300.00
JUMLAH HARGA BAHAN 404,300.00
C PERALATAN
Sewa Tripot/Tackel hari 0.042 3,500,000.00 147,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 147,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.345 80,000.00 27,600.00
Tukang pipa L.02 OH 0.172 110,000.00 18,920.00
Mandor L.04 OH 0.034 120,000.00 4,080.00
JUMLAH TENAGA KERJA 50,600.00
B BAHAN
Pipa GIP Ø 63 mm m 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang pipa L.02 OH 0.200 110,000.00 22,000.00
III - 168
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Pipa GIP Ø 100 mm m 1.000 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.448 80,000.00 35,840.00
Tukang pipa L.02 OH 0.224 110,000.00 24,640.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 65,880.00
B BAHAN
Pipa GIP Ø 125 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.506 80,000.00 40,480.00
Tukang pipa L.02 OH 0.253 110,000.00 27,830.00
Mandor L.04 OH 0.051 120,000.00 6,120.00
JUMLAH TENAGA KERJA 74,430.00
B BAHAN
Pipa GIP Ø 150 mm m 1.000 355,000.00 355,000.00
JUMLAH HARGA BAHAN 355,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.796 80,000.00 63,680.00
Tukang pipa L.02 OH 0.398 110,000.00 43,780.00
III - 169
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 117,060.00
B BAHAN
Pipa GIP Ø 200 mm m 1.000 680,000.00 680,000.00
JUMLAH HARGA BAHAN 680,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.949 80,000.00 75,920.00
Tukang pipa L.02 OH 0.475 110,000.00 52,250.00
Mandor L.04 OH 0.095 120,000.00 11,400.00
JUMLAH TENAGA KERJA 139,570.00
B BAHAN
Pipa GIP Ø 250 mm m 1.000 875,000.00 875,000.00
JUMLAH HARGA BAHAN 875,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.489 80,000.00 39,120.00
Tukang pipa L.02 OH 0.098 110,000.00 10,780.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 54,700.00
B BAHAN
Pipa DCI Ø 100 mm m 1.000 618,000.00 618,000.00
JUMLAH HARGA BAHAN 618,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.547 80,000.00 43,760.00
Tukang pipa L.02 OH 0.109 110,000.00 11,990.00
III - 170
Mandor L.04 OH 0.055 120,000.00 6,600.00
JUMLAH TENAGA KERJA 62,350.00
B BAHAN
Pipa DCI Ø 125 mm m 1.000 936,000.00 936,000.00
JUMLAH HARGA BAHAN 936,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.613 80,000.00 49,040.00
Tukang pipa L.02 OH 0.123 110,000.00 13,530.00
Mandor L.04 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 69,890.00
B BAHAN
Pipa DCI Ø 150 mm m 1.000 1,368,000.00 1,368,000.00
JUMLAH HARGA BAHAN 1,368,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.855 80,000.00 68,400.00
Tukang pipa L.02 OH 0.171 110,000.00 18,810.00
Mandor L.04 OH 0.085 120,000.00 10,200.00
JUMLAH TENAGA KERJA 97,410.00
B BAHAN
Pipa DCI Ø 200 mm M 1.000 2,100,000.00 2,100,000.00
JUMLAH HARGA BAHAN 2,100,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.951 80,000.00 76,080.00
Tukang pipa L.02 OH 0.190 110,000.00 20,900.00
III - 171
Mandor L.04 OH 0.095 120,000.00 11,400.00
JUMLAH TENAGA KERJA 108,380.00
B BAHAN
Pipa DCI Ø 250 mm M 1.000 2,800,000.00 2,800,000.00
JUMLAH HARGA BAHAN 2,800,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.050 3,500,000.00 175,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 175,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.499 80,000.00 39,920.00
Tukang pipa L.02 OH 0.100 110,000.00 11,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 56,920.00
B BAHAN
Pipa baja Ø 63 mm m 1.000 167,500.00 167,500.00
JUMLAH HARGA BAHAN 167,500.00
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 238,420.00
E Overhead & Profit 15.00% 35,763.00
F Harga Satuan Pekerjaan (D+E) 274,183.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.579 80,000.00 46,320.00
Tukang pipa L.02 OH 0.116 110,000.00 12,760.00
Mandor L.04 OH 0.058 120,000.00 6,960.00
JUMLAH TENAGA KERJA 66,040.00
B BAHAN
Pipa baja Ø 100 mm m 1.000 229,500.00 229,500.00
JUMLAH HARGA BAHAN 229,500.00
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 309,540.00
E Overhead & Profit 15.00% 46,431.00
F Harga Satuan Pekerjaan (D+E) 355,971.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.648 80,000.00 51,840.00
Tukang pipa L.02 OH 0.130 110,000.00 14,300.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 73,940.00
III - 172
B BAHAN
Pipa baja Ø 125 mm m 1.000 280,500.00 280,500.00
JUMLAH HARGA BAHAN 280,500.00
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 368,440.00
E Overhead & Profit 15.00% 55,266.00
F Harga Satuan Pekerjaan (D+E) 423,706.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.708 80,000.00 56,640.00
Tukang pipa L.02 OH 0.142 110,000.00 15,620.00
Mandor L.04 OH 0.071 120,000.00 8,520.00
JUMLAH TENAGA KERJA 80,780.00
B BAHAN
Pipa baja Ø 150 mm m 1.000 345,250.00 345,250.00
JUMLAH HARGA BAHAN 345,250.00
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 440,030.00
E Overhead & Profit 15.00% 66,004.50
F Harga Satuan Pekerjaan (D+E) 506,034.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.113 80,000.00 89,040.00
Tukang pipa L.02 OH 0.223 110,000.00 24,530.00
Mandor L.04 OH 0.111 120,000.00 13,320.00
JUMLAH TENAGA KERJA 126,890.00
B BAHAN
Pipa baja Ø 200 mm m 1.000 586,500.00 586,500.00
JUMLAH HARGA BAHAN 586,500.00
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 727,390.00
E Overhead & Profit 15.00% 109,108.50
F Harga Satuan Pekerjaan (D+E) 836,498.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.325 80,000.00 106,000.00
Tukang pipa L.02 OH 0.265 110,000.00 29,150.00
Mandor L.04 OH 0.133 120,000.00 15,960.00
JUMLAH TENAGA KERJA 151,110.00
B BAHAN
Pipa baja Ø 250 mm m 1.000 747,500.00 747,500.00
JUMLAH HARGA BAHAN 747,500.00
III - 173
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 912,610.00
E Overhead & Profit 15.00% 136,891.50
F Harga Satuan Pekerjaan (D+E) 1,049,501.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang pipa L.02 OH 0.002 110,000.00 220.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 680.00
B BAHAN
Pipa PVC Ø 63 mm buah 1.000 30,600.00 30,600.00
JUMLAH HARGA BAHAN 30,600.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003 50,000.00 150.00
(gergaji) /saw
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.022 80,000.00 1,760.00
Tukang pipa L.02 OH 0.011 110,000.00 1,210.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA 3,210.00
B BAHAN KERJA
III - 174
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003 50,000.00 150.00
(gergaji) /saw
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang pipa L.02 OH 0.040 110,000.00 4,400.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 11,840.00
B BAHAN
Pipa PVC Ø 200 mm buah 1.000 308,700.00 308,700.00
JUMLAH HARGA BAHAN 308,700.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.017 50,000.00 850.00
(gergaji) /saw
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.002 80,000.00 160.00
Tukang pipa L.02 OH 0.001 110,000.00 110.00
Mandor L.04 OH 0.000 120,000.00 24.00
Operator L.08 OH 0.034 140,000.00 4,760.00
JUMLAH TENAGA KERJA 5,054.00
III - 175
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000 25,900.00 25,900.00
JUMLAH HARGA BAHAN 25,900.00
C PERALATAN
Peralatan potong hari 0.004 50,000.00 200.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 200.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.009 80,000.00 720.00
Tukang pipa L.02 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.001 120,000.00 120.00
Operator L.08 OH 0.096 140,000.00 13,440.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000 101,800.00 101,800.00
JUMLAH HARGA BAHAN 101,800.00
C PERALATAN
Peralatan potong hari 0.006 50,000.00 300.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 300.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.044 80,000.00 3,520.00
Tukang pipa L.02 OH 0.022 110,000.00 2,420.00
Mandor L.04 OH 0.004 120,000.00 480.00
Operator L.08 OH 0.171 140,000.00 23,940.00
JUMLAH TENAGA KERJA 30,360.00
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000 259,600.00 259,600.00
JUMLAH HARGA BAHAN 259,600.00
C PERALATAN
Peralatan potong hari 0.017 50,000.00 850.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 850.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang pipa L.02 OH 0.033 110,000.00 3,630.00
III - 176
Mandor L.04 OH 0.007 120,000.00 840.00
Operator L.08 OH 0.221 140,000.00 30,940.00
JUMLAH TENAGA KERJA 40,770.00
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000 404,300.00 404,300.00
JUMLAH HARGA BAHAN 404,300.00
C PERALATAN
Peralatan potong hari 0.023 50,000.00 1,150.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 1,150.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang pipa L.02 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.002 120,000.00 240.00
2,860.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm buah 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.058 80,000.00 4,640.00
Tukang pipa L.02 OH 0.029 110,000.00 3,190.00
Mandor L.04 OH 0.006 120,000.00 720.00
8,550.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 100 mm buah 1.000 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN
Peralatan potong hari - 50,000.00 -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT -
III - 177
A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.131 80,000.00 10,480.00
Tukang pipa L.02 OH 0.066 110,000.00 7,260.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
19,300.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm buah 1.000 355,000.00 355,000.00
JUMLAH HARGA BAHAN 355,000.00
C PERALATAN
Peralatan potong hari - 50,000.00 -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 374,300.00
E Overhead & Profit 15.00% 56,145.00
F Harga Satuan Pekerjaan (D+E) 430,445.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.340 80,000.00 27,200.00
Tukang pipa L.02 OH 0.170 110,000.00 18,700.00
Mandor L.04 OH 0.034 120,000.00 4,080.00
49,980.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm buah 1.000 680,000.00 680,000.00
JUMLAH HARGA BAHAN 680,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.475 80,000.00 38,000.00
Tukang pipa L.02 OH 0.237 110,000.00 26,070.00
Mandor L.04 OH 0.047 120,000.00 5,640.00
69,710.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm buah 1.000 875,000.00 875,000.00
JUMLAH HARGA BAHAN 875,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw
III - 178
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429 80,000.00 114,320.00
Tukang pipa L.02 OH 0.715 110,000.00 78,650.00
Mandor L.04 OH 0.143 120,000.00 17,160.00
210,130.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 150 mm buah 1.000 3,250,000.00 3,250,000.00
JUMLAH HARGA BAHAN 3,250,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.100 3,500,000.00 350,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 350,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714 80,000.00 137,120.00
Tukang pipa L.02 OH 0.857 110,000.00 94,270.00
Mandor L.04 OH 0.171 120,000.00 20,520.00
251,910.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 200 mm buah 1.000 5,400,000.00 5,400,000.00
JUMLAH HARGA BAHAN 5,400,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.300 3,500,000.00 1,050,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,050,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714 80,000.00 137,120.00
Tukang pipa L.02 OH 0.857 110,000.00 94,270.00
Mandor L.04 OH 0.171 120,000.00 20,520.00
251,910.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 250 mm buah 1.000 9,250,000.00 9,250,000.00
JUMLAH HARGA BAHAN 9,250,000.00
III - 179
C PERALATAN
Sewa Tripot/Tackel hari 0.400 3,500,000.00 1,400,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,400,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
B BAHAN
Air test (air bersih) m3 0.002 5,000.00 10.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 487.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
B BAHAN
Air test (air bersih) m3 0.004 5,000.00 20.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 497.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
III - 180
B BAHAN
Air test (air bersih) m3 0.008 5,000.00 40.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 517.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
B BAHAN
Air test (air bersih) m3 0.018 5,000.00 90.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 567.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
B BAHAN
Air test (air bersih) m3 0.031 5,000.00 155.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 632.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 80,000.00 640.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 736.00
III - 181
B BAHAN
Air test (air bersih) m3 0.049 5,000.00 245.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 722.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 2,331,000.00 2,331,000.00
JUMLAH TENAGA KERJA 2,331,000.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,000.00 15,000.00
Kabel m 15.000 8,000.00 120,000.00
T Dus buah 1.000 2,000.00 2,000.00
L Bow buah 2.000 2,000.00 4,000.00
Klem biasa buah 24.000 90,000.00 2,160,000.00
MCB buah 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 2,331,000.00
C PERALATAN
III - 182
TAMBAHAN / LAIN-LAIN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 80,000.00 16,000.00
Tukang kayu oh 0.600 110,000.00 66,000.00
Kepala tukang oh 0.060 120,000.00 7,200.00
Mandor oh 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 91,600.00
B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 3,500,000.00 70,000.00
Paku Biasa 2-5 kg 0.250 20,000.00 5,000.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 65,000.00 97,500.00
Triplek 6 mm lbr 0.350 127,000.00 44,450.00
Cetak papan nama dg bhn flexi cetak digital m' 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 241,950.00
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.125 110,000.00 13,750.00
Kepala tukang oh 0.013 120,000.00 1,560.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
ubin granit bh 0.020 56,200.00 1,124.00
portland cement kg 0.250 1,420.00 355.00
pasir pasang m3 1.500 193,750.00 290,625.00
semen warna kg 0.350 6,000.00 2,100.00
JUMLAH HARGA BAHAN 294,204.00
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.120 110,000.00 13,200.00
Kepala tukang oh 0.012 120,000.00 1,440.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,200.00
III - 183
B BAHAN
keramik 40 x 40 bh 6.630 11,000.00 72,930.00
portland cement kg 9.800 1,420.00 13,916.00
pasir pasang m3 0.045 193,750.00 8,718.75
semen warna kg 1.300 6,000.00 7,800.00
JUMLAH HARGA BAHAN 103,364.75
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 80,000.00 30,000.00
Tukang batu oh 0.180 110,000.00 19,800.00
Kepala tukang oh 0.018 120,000.00 2,160.00
Mandor oh 0.020 120,000.00 2,340.00
JUMLAH TENAGA KERJA 54,300.00
B BAHAN
granito 60 x 60 bh 3.000 57,900.00 173,700.00
portland cement kg 14.700 1,420.00 20,874.00
pasir pasang m3 0.068 193,750.00 13,078.13
semen warna kg 1.950 6,000.00 11,700.00
JUMLAH HARGA BAHAN 219,352.13
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 80,000.00 4,800.00
Tukang batu oh 0.060 110,000.00 6,600.00
Kepala tukang oh 0.006 120,000.00 720.00
Mandor oh 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
List gypsum profil m' 1.050 18,000.00 18,900.00
Tepung gypsum kg 0.150 18,500.00 2,775.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 80,000.00 8,000.00
III - 184
Tukang batu oh 0.200 110,000.00 22,000.00
Kepala tukang oh 0.020 120,000.00 2,400.00
Mandor oh 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
woodplank bh 0.250 60,000.00 15,000.00
Paku biasa 2" - 5" kg 0.050 20,000.00 1,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Mandor L.15 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 86,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 80,000.00 320,000.00
III - 185
Tukang kayu L.02 OH 6.00 110,000.00 660,000.00
Kepala tukang L.03 OH 0.60 120,000.00 72,000.00
Mandor L.04 OH 0.20 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,076,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 80,000.00 80,000.00
Mandor L.04 OH 0.10 120,000.00 12,000.00
JUMLAH TENAGA KERJA 92,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
III - 186
SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 537,320.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,420.00 329,440.00
Pasir beton m3 0.52 212,500.00 110,500.00
Spleet 2/3 cm m3 0.78 300,000.00 234,000.00
JUMLAH HARGA BAHAN 673,940.00
B TENAGA
Pekerja Oh 1.65 80,000.00 132,000.00
Tukang batu Oh 0.25 110,000.00 27,500.00
Kepala tukang Oh 0.025 120,000.00 3,000.00
Mandor Oh 0.08 120,000.00 9,600.00
JUMLAH TENAGA KERJA 172,100.00
C PERALATAN
JUMLAH HARGA ALAT -
- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 68,000.00 23,800.00
Holo 4/4 meni btg 1.00 12,100.00 12,100.00
Holo 2/4 meni btg 0.34 11,000.00 3,740.00
Kawat Bwg 12 kg 0.10 10,000.00 1,000.00
Paku screw 2.5 cm bh 20.00 50.00 1,000.00
Adhesive kg 0.02 6,000.00 120.00
Kain kasa m' 2.00 400.00 800.00
Cat penutup 2 kali kg 0.03 25,000.00 750.00
Paku beton bh 4.00 175.00 700.00
JUMLAH HARGA BAHAN 44,010.00
B TENAGA
Pekerja oh 0.17 80,000.00 13,600.00
Tukang oh 0.28 110,000.00 30,800.00
Kep Tukang oh 0.03 120,000.00 3,600.00
Mandor oh 0.07 120,000.00 8,400.00
JUMLAH TENAGA KERJA 56,400.00
III - 187
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 6,500.00 71,500.00
Instalasi lapu dan stop kontak ttk 1.00 32,500.00 32,500.00
JUMLAH HARGA BAHAN 104,000.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 80,000.00 38,400.00
Tukang Listrik Oh 0.048 110,000.00 5,280.00
Kepala tukang Listrik Oh 0.048 120,000.00 5,760.00
JUMLAH TENAGA KERJA 49,440.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 13,000.00 13,000.00
JUMLAH HARGA BAHAN 13,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 36,000.00 36,000.00
JUMLAH HARGA BAHAN 36,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik 0 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
III - 188
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
TENAGA
Pembantu tukang Listrik Oh 0.24 80,000.00 19,200.00
Tukang Listrik Oh 0.024 110,000.00 2,640.00
Kepala tukang Listrik Oh 0.024 120,000.00 2,880.00
JUMLAH TENAGA KERJA 24,720.00
III - 189
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 13,000.00 13,000.00
JUMLAH HARGA BAHAN 13,000.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 300,000.00 360,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 193,750.00 100,750.00
JUMLAH HARGA BAHAN 692,210.00
III - 190
C PERALATAN
Sumber, 2019
III - 191
Analisa EI-311a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 192
Analisa EI-321.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0101 531,934.33 5,359.85
2. Dump Truck (E08) Jam 0.6103 248,017.17 151,375.67
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 344,765.59 1,442.29
5. Water tank truck (E23) Jam 0.0070 244,587.98 1,718.99
6 Alat Bantu Ls 1.0000 0.00 0.00
IV - 193
Analisa EI-322.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 354,791.63 3,017.36
2. Dump Truck (E08) Jam 0.6073 248,017.17 150,632.20
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 444,495.58 7,158.39
4. Water Tanker (E23) Jam 0.0070 244,587.98 1,718.99
5. Alat Bantu Ls 1.0000 0.00 0.00
IV - 194
Analisa EI-331.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 344,765.59 162.26
3 Alat Bantu Ls 1.0000 0.00 0.00
IV - 195
Analisa EI-611a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 196
Analisa EI-612a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 197
Analisa EI-621
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 198
Analisa EI-631.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 354,791.63 3,395.85
2. AMP E01 Jam 0.0201 4,944,742.77 99,292.02
3. Genset E12 Jam 0.0201 424,137.65 8,516.82
4. Dump Truck (3,5 ton) E08 Jam 0.0122 248,017.17 3,026.58
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 444,495.58 14,102.71
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 199
Analisa EI-632.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 354,791.63 3,395.85
2. AMP E01 Jam 0.0201 4,944,742.77 99,292.02
3. Genset E12 Jam 0.0201 424,137.65 8,516.82
4. Dump Truck E08 Jam 0.0163 248,017.17 4,035.45
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 444,495.58 10,577.03
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 200
Analisa EI-661
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 201
Analisa EI-662
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 202
Analisa EI-814
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 203
Analisa EI-817
A. TENAGA
B. BAHAN
C. PERALATAN
Sumber, 2019
IV - 204
H. SUKMA NUGRAHA, SH.,MM.
NIP. 19610301 198603 1 012
IV - 205
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
Sumber, 2017
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1544 80,000.00 12,352.00
Tukang bor L.02 OH 0.0386 110,000.00 4,246.00
Mandor L.04 OH 0.0155 120,000.00 1,854.00
JUMLAH TENAGA KERJA 18,452.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
V - 208
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
V - 209
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0720 80,000.00 5,760.00
Tukang bor L.02 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0071 120,000.00 852.00
JUMLAH TENAGA KERJA 8,592.00
B BAHAN
Pipa PVC 6'' m 1.0500 199,650.00 209,632.50
Centralizer Ls 0.1000 209,632.50 20,963.25
JUMLAH HARGA BAHAN 230,595.75
C PERALATAN
Driling rig + perlengkapan jam 0.1250 700,000.00 87,500.00
JUMLAH HARGA ALAT 87,500.00
D Jumlah (A+B+C) 326,687.75
E Overhead & Profit 15.00% 49,003.16
F Harga Satuan Pekerjaan (D+E) 375,690.91
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang bor L.02 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0082 120,000.00 984.00
JUMLAH TENAGA KERJA 9,584.00
B BAHAN
Pipa PVC 8'' m 1.0500 312,000.00 327,600.00
Centralizer Ls 0.1000 327,600.00 32,760.00
JUMLAH HARGA BAHAN 360,360.00
C PERALATAN
Driling rig + perlengkapan m 0.1429 700,000.00 100,030.00
JUMLAH HARGA ALAT 100,030.00
D Jumlah (A+B+C) 469,974.00
E Overhead & Profit 15.00% 70,496.10
F Harga Satuan Pekerjaan (D+E) 540,470.10
V - 210
AT.12 1 m3 Pengadaan dan pemasangan gravel pack
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang bor L.02 OH 0.2600 110,000.00 28,600.00
Mandor L.04 OH 0.1040 120,000.00 12,480.00
JUMLAH TENAGA KERJA 124,280.00
B BAHAN
Gravel pack pelabuhan m3 1.0000 1,200,000.00 1,200,000.00
ratu/sukabumi
JUMLAH HARGA BAHAN 1,200,000.00
C PERALATAN
Driling rig + perlengkapan m 1.8180 700,000.00 1,272,600.00
JUMLAH HARGA ALAT 1,272,600.00
D Jumlah (A+B+C) 2,596,880.00
E Overhead & Profit 15.00% 389,532.00
F Harga Satuan Pekerjaan (D+E) 2,986,412.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 87,500.00 87,500.00
JUMLAH HARGA ALAT 87,500.00
D Jumlah (A+B+C) 155,830.00
E Overhead & Profit 15.00% 23,374.50
F Harga Satuan Pekerjaan (D+E) 179,204.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 87,500.00 87,500.00
V - 211
JUMLAH HARGA ALAT 87,500.00
D Jumlah (A+B+C) 155,830.00
E Overhead & Profit 15.00% 23,374.50
F Harga Satuan Pekerjaan (D+E) 179,204.50
V - 212
1 m³ Galian tanah biasa
1 m³ Urugan pasir
V - 213
1 m³ Beton tumbuk 1:3:5
1 m² Pasang bekisting
1 m³ Trush block
1 m² Plesteran 1:3
V - 214
m³ pasir pasang 0.520 193,750.00 100,750.00
V - 215
tukang batu 0.600 110,000.00 66,000.00
kepala tukang 0.060 120,000.00 7,200.00
mandor 1.500 120,000.00 180,000.00
pekerja 0.075 80,000.00 6,000.00
JUMLAH 921,410.00
V - 216
pekerja 0.600 80,000.00 48,000.00
JUMLAH 389,450.00
V - 217
1 m² Pasangan bata merah 1 : 4 tebal 1/2 bata
1 m² Pengecatan
10 cm Pengelasan
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
V - 218
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
V - 219
m³ Urugan tanah kembali 0.260 25,200.00 6,552.00
V - 220
m³ Buang tanah sisa galian 0.020 27,600.00 552.00
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 77,725.20
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan
V - 221
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
V - 222
m³ Urugan pasir 0.100 257,640.00 25,764.00
V - 223
m³ Urugan tanah kembali 0.325 25,200.00 8,190.00
m³ Buang tanah sisa galian 0.025 27,600.00 690.00
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 77,576.00
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
V - 224
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa
V - 225
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 86,534.80
V - 226
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa
V - 227
m³ Urugan tanah kembali 0.105 25,200.00 2,646.00
V - 228
m³ Buang tanah sisa galian 0.015 27,600.00 414.00
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 33,008.40
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
V - 229
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
V - 230
m³ Buang tanah sisa galian 0.015 27,600.00 414.00
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 69,998.40
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
V - 231
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
V - 232
m³ Buang tanah sisa galian 0.020 27,600.00 552.00
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 97,524.40
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa
V - 233
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa
V - 234
m³ Buang tanah sisa galian 0.020 27,600.00 552.00
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 105,445.20
V - 235
400 m' Pengetesan pipa PVC dia. 350 mm
V - 236
ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 13.000 31,500.00 409,500.00
V - 237
hr biaya mesin test, BBM, dan servis 4.000 52,500.00 210,000.00
mekanik 2.000 110,000.00 220,000.00
tukang pipa 4.000 110,000.00 440,000.00
kepala tukang 0.400 120,000.00 48,000.00
pekerja 4.000 80,000.00 320,000.00
mandor 0.200 120,000.00 24,000.00
JUMLAH 1,934,000.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,934,000.00 4,835.00
V - 238
400 m' Pengetesan pipa PVC dia. 63 mm
V - 239
1 unit perbaikan gate valve dia. 250mm
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
V - 240
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan
V - 241
JUMLAH 173,308.51
V - 242
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu
V - 243
unit Pemasangan box street dia. 63 mm 1 50,186.91 50,186.91
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 264,583.71
V - 244
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa
V - 245
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 329,514.11
V - 246
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa
V - 247
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 158,188.51
V - 248
1 unit pemasangan gate valve dia. 200 mm
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
V - 249
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu
V - 250
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu
V - 251
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu
1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa
V - 252
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa
V - 253
1 unit Pemasangan Box Street dia. 8"
V - 254
JUMLAH 49,686.91
V - 255
1 unit Pemasangan Box Street dia. 1"
V - 256
1 unit Pemasangan wash out dia. 110 mm
V - 257
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 270,251.71
V - 258
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 unit Crossing Jalan Sistim Boring
m' pekerjaan boring tanah pipa dia. 2" 1 165,700.00
m' pekerjaan boring tanah pipa dia. 3" 1 185,100.00
m' pekerjaan boring tanah pipa dia. 4" 1 283,800.00
m' pekerjaan boring tanah pipa dia. 6" 1 335,200.00
m' pekerjaan boring tanah pipa dia. 8" 1 418,600.00
m' pekerjaan boring tanah pipa dia. 10" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 12" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 14" 1 672,500.00
m' pekerjaan boring tanah pipa dia. 16" 1 700,000.00
V - 259
18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal
V - 260
18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal
V - 261
1 unit Tiang Penyangga
Sumber, 2019
V - 262
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2019
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
A. BAHAN :
I. BATU
1 Abu Batu m3 300,000.00
2 Atras ( tanah urug ) m3 125,000.00
3 Batu apung kg 4,300.00
4 Batu belah 10/15 cm m3 300,000.00
5 Batu belah 15/20 cm (Krakal) m3 225,000.00
6 Batu pecah mesin 0.5-1 cm m3 250,000.00
7 Batu pecah mesin 1-2 cm m3 300,000.00
8 Batu pecah mesin 2-3 cm m3 300,000.00
9 Batu pecah mesin 3-5 cm m3 300,000.00
10 Batu tempel Palimanan 10 X 20 bh 2,800.00
11 Batu tempel kapur tekstur tidak rata m2 260,000.00
12 Chipping m3 270,000.00
13 Filler m3 190,000.00
14 Kapur bakar (padam) m3 220,000.00
15 Kapur Sirih kg 2,000.00
16 Kerikil Ø 1-3 cm m3 200,000.00
17 Gravel Pack (pelabuhan ratu/sukabumi) m3 1,200,000.00
II. PASIR
1 Pasir beton m3 212,500.00
2 Pasir aspal m3 212,500.00
3 Pasir pasang m3 193,750.00
4 Pasir urug m3 193,700.00
5 Sirtu m3 175,000.00
6 Sirtu tersaring m3 262,500.00
7 Tanah urug pilhan m3 150,000.00
8 Tanah urug biasa m3 150,000.00
9 Tanah merah m3 150,000.00
VI - 263
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
17 Besi biasa dia. 2" btg 250,000.00
18 Besi biasa dia. 3" btg 310,000.00
19 Dop besi Ø 3 " bh 145,000.00
20 Kawat beton / Kawat tali kg 35,000.00
VI - 264
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
21 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 460,800.00
22 Kawat bronjong dia. 4 mm kg 35,000.00
23 Kawat galvanis dia. 4 mm kg 20,000.00
24 Kawat galvanis dia. 6 mm kg 24,000.00
25 Kawat duri m' 14,700.00
26 Pipa besi galvanis 2" btg/6m' 370,000.00
27 Pipa besi galvanis 3" btg/6m' 1,040,000.00
28 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 34,000.00
29 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 65,000.00
30 Pipa PVC / paralon 2 inch btg 83,000.00
31 Pipa PVC / paralon 3 inch btg 90,000.00
32 Pipa Reducer PVC Ø 3"-4" SNI bh 6,000.00
33 Pipa Knee/bend PVC Ø 1/2" SNI bh 2,100.00
34 Pipa Knee/bend PVC Ø 3/4" SNI bh 2,550.00
35 Pipa Knee/bend PVC Ø 1" SNI bh 3,800.00
36 Pipa Knee/bend PVC Ø 1 1/2" SNI bh 8,200.00
37 Pipa Knee/bend PVC Ø 2" SNI bh 21,400.00
38 Pipa Knee/bend PVC Ø 3" SNI bh 6,000.00
39 Pipa Knee/bend PVC Ø 4" SNI bh 128,100.00
40 Pipa Knee/bend PVC Ø 6" SNI bh 523,700.00
41 Plat baja tebal 5 mm - 20 mm kg 13,000.00
42 Ram kawat harmonika m2 45,000.00
43 Socket besi O 3 " bh 45,000.00
44 Toren Penguin 250 lt bh 525,000.00
45 Toren 500 lt bh 860,000.00
46 Toren 1000 lt bh 1,500,000.00
47 Toren 2000 lt bh 3,500,000.00
48 Sling Ø 32 mm m 305,000.00
49 Sling Ø 16 mm m 225,000.00
50 Klem sling Ø 32 mm set 450,000.00
51 Warfel / jarum keras Ø 32 mm bh 200,000.00
52 Causen sling Ø 32 mm bh 195,000.00
53 Klem kokat sling Ø 32 mm bh 250,000.00
54 Segel sling Ø 32 mm bh 250,000.00
55 Warfel sling Ø 16 mm bh 165,000.00
56 Segel sling Ø 16 mm bh 140,000.00
57 Klem kokat sling Ø 16 mm bh 90,000.00
58 Causen sling Ø 16 mm bh 145,000.00
59 Jarum keras Ø 16 mm bh 165,000.00
VI - 265
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
23 Cat genteng Matex kg 48,000.00
24 Cat genteng maxilite kg 50,000.00
VI - 266
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
25 Cat penutup kayu Bee brand kg 49,000.00
26 Cat penutup kayu Vim kg 25,000.00
27 Cat penutup kayu Ftalit kg 46,000.00
28 Cat penutup kayu Avian kg 48,000.00
29 Cat penutup tembok Vinilex kg 25,000.00
30 Cat penutup tembok Metrolit kg 23,000.00
31 Cat penutup tembok catylac kg 18,600.00
32 Cat penutup tembok Q Luc kg 10,000.00
33 Cat penutup tembok Property kg 9,500.00
34 Cat penutup besi kg 55,000.00
35 Cat Sinkromat kg 90,000.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
37 Closet duduk ( siram ) porselen merk INA bh 545,000.00
38 Closet jongkok porselen merk INA/KIA bh 140,000.00
39 Closet jongkok porselen merk Avena bh 100,000.00
40 Dempul kayu kg 18,500.00
41 Dinding keramik uk. 10 x 20 cm bh 1,000.00
42 Dinding keramik uk. 20 x 20 cm bh 2,000.00
43 Dinding keramik uk. 20 x 25 cm bh 2,200.00
44 Dinding keramik uk. 30 x 30 cm bh 4,500.00
45 Door closer bh 165,300.00
46 Daun Jendela alumunium 4 '' m' 136,850.00
47 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna silver unit 715,000.00
48 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna Black/Brown unit 770,000.00
49 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna White unit 825,000.00
50 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna silver unit 1,210,000.00
51 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna Black/Brown unit 1,320,000.00
52 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna White unit 1,430,000.00
53 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna silver unit 990,000.00
54 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna Black/Brown unit 1,100,000.00
55 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna White unit 1,210,000.00
56 Elastomer 30x30x5 bh 300,000.00
57 Elastomer 50x40x5 bh 3,000,000.00
58 Engsel jendela set 12,000.00
59 Engsel pintu set 60,000.00
60 Engsel meubeler bh 3,800.00
61 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00
62 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00
63 Flincote ltr 22,000.00
64 Loster Jati bh 25,000.00
65 Glass beat kg 25,000.00
66 Glass Block bh 17,500.00
67 Gas elpiji kg 19,000.00
68 Grendel pintu / jendela bh 5,500.00
69 Gypsum board lbr 52,500.00
70 GRC tebal 4 mm lbr 68,000.00
71 Fiber Gelombang 180 x80 lbr 40,000.00
72 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
73 Kaca polos tebal 3 mm m2 63,250.00
74 Kaca polos tebal 5 mm m2 75,000.00
75 Kaca polos tebal 5 mm ryben m2 80,000.00
76 Kait angin bh 7,500.00
77 Kran air Onda bh 12,000.00
78 Kunci gembok bh 25,000.00
79 Kunci pintu ukuran besar bh 125,000.00
80 Kunci pintu ukuran sedang bh 85,000.00
81 Kunci dan daun pintu dari fiber bh 350,000.00
82 Kusen Alumunium 3" warna natural/silver m' 66,000.00
83 Kusen Alumunium 3" warna coklat dop m' 71,500.00
84 Kusen Alumunium 3" warna coklat kilap m' 82,500.00
85 Kusen Alumunium 4" warna natural m' 82,500.00
86 Kusen Alumunium 4" warna coklat dop m' 88,000.00
87 Kusen Alumunium 4" warna coklat kilap m' 99,000.00
VI - 267
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
88 Kusen Alumunium 3" YKK m' 100,000.00
89 Kusen Alumunium 4" YKK m' 1,300,000.00
VI - 268
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
90 Langko - langko kuda - kuda bh 18,000.00
91 Lantai granit 60 x 60 cm ex. Granito corak bh 58,200.00
92 Lantai granit 60 x 60 cm ex. Granito polos bh 57,600.00
93 Lantai granit 40 x 40 cm ex. Essenza bh 57,500.00
94 Lantai granit 40 x 40 cm ex. Granito bh 56,200.00
95 Lantai granit 60 x 60 cm ex. Granito bh 57,900.00
96 Lantai keramik uk. 10 x 20 cm bh 5,000.00
97 Lantai keramik uk. 20 x 20 cm bh 6,500.00
98 Lantai keramik uk. 30 x 30 cm bh 4,200.00
99 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 11,000.00
100 Lantai terakota 20 x 5 cm bh 10,000.00
101 Lem kayu ltr 30,000.00
102 Lemkra/zat addictive kg 15,000.00
103 Lemkra Just Do It kg 4,500.00
104 Lemkra FS Nat kg 15,850.00
105 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
106 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
107 List keliling gypsum lebar 7 cm m' 14,000.00
108 List keliling gypsum lebar 10 cm m' 16,000.00
109 List keliling gypsum lebar 12 cm m' 18,000.00
110 List drop m' 8,900.00
111 Melamin / folywood lbr 88,500.00
112 Mozaik uk. 20 x 20 cm bh 1,900.00
113 Multiplex tebal 12 mm lbr 200,000.00
114 Multiplex tebal 15 mm lbr 275,000.00
115 Paku biasa 1/2" - 1" kg 20,000.00
116 Paku biasa 2" - 5" kg 20,000.00
117 Paku pancing 60 x 230 bh 850.00
118 Paku sekrup 3" - 5 " bh 400.00
119 Paku ulir bh 150.00
120 Plamir kayu / kualitas 1 kg 20,000.00
121 Plamir tembok kg 70,000.00
122 Plester Mutiara kg 8,000.00
123 Pintu kamer mandi fiber polos Daimaru bh 175,000.00
124 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00
125 Pintu kamer mandi Almunium Kettler bh 700,000.00
126 Polycarbonate m2 115,000.00
127 Plywood lbr 92,250.00
128 Portland Cement ( PC ) tiga roda zak 71,000.00
129 Portland Cement ( PC ) holcim zak 68,000.00
130 Portland Cement ( PC ) gresik zak 68,000.00
131 Rubber joint 25x10x5 bh 250,000.00
132 Joint Sealent kg 42,000.00
133 Expansion Cap m2 7,600.00
134 Polytene 125 mikron kg 27,500.00
135 Curing Compound Ltr 12,500.00
136 Roster / batu kerawang bh 4,000.00
137 Semen portland kg 1,420.00
138 Semen warna kg 6,000.00
139 Seng BJLS 30 L. 90 cm m' 38,000.00
140 Seng gelombang 3' - 6 " BJLS 30 lbr 80,000.00
141 Sirlak kg 19,500.00
142 Spirtus ltr 9,000.00
143 Skim Coat kg 4,400.00
144 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00
145 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00
146 Ter kayu kg 14,500.00
147 Thermoplastic Glass beat kg 25,000.00
148 Tiner / minyak cat ltr 11,500.00
149 Triplek 3 mm lbr 56,000.00
150 Triplek 4 mm lbr 84,000.00
151 Triplek 6 mm lbr 127,000.00
152 Triplek 9 mm lbr 142,000.00
VI - 269
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
153 Triplek 12 mm lbr 164,000.00
154 Tempat cuci piring Beleza bh 400,000.00
VI - 270
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
155 Tempat cuci piring Benoti bh 175,000.00
156 Tempat cuci piring Royal bh 160,000.00
157 TG 302 kg 43,600.00
158 Washtafel bh 686,000.00
159 Woodplank corak 4 m lbr 60,000.00
160 Woodplank polos 2 m lbr 32,500.00
161 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
162 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
163 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
164 Ubin warna 20 x 20 cm bh 2,300.00
165 Ubin warna 30 x 30 cm bh 2,900.00
166 Washtafel bh 686,000.00
167 Woodplank corak 4 m lbr 60,000.00
168 Woodplank polos 2 m lbr 32,500.00
169 Zincalume m2 75,000.00
170 Rangka plafon memakai Hollow dengan penutup GRC m2 88,200.00
tebal 4 mm + pengecatan
171 Tyfo Epoxy S Kg 650,000.00
172 Tyfo SHE51A m2 800,000.00
173 Karung plastik bh 2,500.00
VI - 271
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
187 Karet sel 8 x 3 cm bh 695,000.00
188 As Pemutar bh 5,000,000.00
VI - 272
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
189 Laher/Bearing bh 445,000.00
190 Engkel Kemudi Sedang bh 750,000.00
191 Daun Pintu B.50, H.50 bh 1,270,000.00
192 Pintu Klep B=0,5 m unit 3,000,000.00
193 Pintu Klep B=1,0 m unit 5,000,000.00
194 Pintu Klep B=1,5 m unit 7,500,000.00
V. ASPAL
1 Aspal kemasan kg 12,200.00
2 Aspal curah kg 12,000.00
3 Aspal Emulsi ltr 11,400.00
VI. MINYAK
1 Premium liter 6,550.00
2 Premium (non subsidi) liter 6,550.00
3 Solar liter 5,150.00
4 Solar (non subsidi) liter 6,150.00
5 Minyak tanah liter 10,250.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
VII.CETAKAN
1 Bata merah bh 800.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 150 cm bh/0,5 m' 520,000.00
21 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00
22 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 140,000.00
23 Gorong-gorong buis beton dia. 60 cm bh/m' 130,000.00
24 Gorong-gorong buis beton dia. 50 cm bh/m' 125,000.00
25 Gorong-gorong buis beton dia. 40 cm bh/m' 120,000.00
26 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00
27 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00
28 Kansten Cetak bh 82,500.00
29 Gravel dia. 60 cm bh 75,000.00
30 Gravel dia. 40 cm bh 45,000.00
31 Gravel dia. 20 cm bh 35,000.00
32 Nok steel gelombang 1050 x 5 mm m' 29,000.00
33 Nok steel gelombang 920 x 5 mm m' 22,500.00
34 Nok / bubung genteng beton bh 6,000.00
35 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
36 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
37 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
38 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
39 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
40 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
VI - 273
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
41 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
42 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
VI - 274
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
43 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
44 Paving Block K.125 Segi Enam Netural tebal 6 cm m2 43,000.00
45 Paving Block K.125 Segi Enam warna tebal 6 cm m2 47,000.00
46 Box Culvert Ukuran 400 x 400 x1200 Buah 1,334,000.00
47 Box Culvert Ukuran 500 x 500 x1200 Buah 1,675,700.00
48 Box Culvert Ukuran 600 x 600 x1200 Buah 2,109,000.00
49 Box Culvert Ukuran 800 x 800 x1200 Buah 3,433,200.00
50 Box Culvert Ukuran 1000 x 1000 x1200 Buah 4,699,000.00
51 Box Culvert Ukuran 1200 x1200 x1200 Buah 6,545,400.00
52 Box Culvert Ukuran 1500 x 1500 x1200 Buah 11,167,800.00
53 Box Culvert Ukuran 2000 x 2000 x1200 Buah 16,856,300.00
54 U- Ditch Ukuran 300 x 300 x 1200 Buah 336,300.00
55 U- Ditch Ukuran 300 x 400 x 1200 Buah 379,300.00
56 U- Ditch Ukuran 300 x 500BUT x 1200 Buah 446,400.00
57 U- Ditch Ukuran 400 x 400 x 1200 Buah 450,400.00
58 U- Ditch Ukuran 400 x 500 x 1200 Buah 553,200.00
59 U- Ditch Ukuran 400 x 600 x 1200 Buah 623,700.00
60 U- Ditch Ukuran 500 x 500 x 1200 Buah 701,900.00
61 U- Ditch Ukuran 500 x 600 x 1200 Buah 793,300.00
62 U- Ditch Ukuran 500 x 700 x 1200 Buah 859,400.00
63 U- Ditch Ukuran 600 x 600 x 1200 Buah 836,400.00
64 U- Ditch Ukuran 600 x 700 x 1200 Buah 957,500.00
65 U- Ditch Ukuran 600 x 800 x 1200 Buah 999,100.00
66 U- Ditch Ukuran 800 x 800 x 1200 Buah 1,195,400.00
67 U- Ditch Ukuran 800 x 900 x 1200 Buah 1,311,000.00
68 U- Ditch Ukuran 800 x 1000 x 1200 Buah 1,467,900.00
69 U- Ditch Ukuran 1000 x 1000 x 1200 Buah 2,113,400.00
70 U- Ditch Ukuran 1000 x 1100 x 1200 Buah 2,312,300.00
71 U- Ditch Ukuran 1000 x 1200 x 1200 Buah 2,499,000.00
72 U- Ditch Ukuran 1200 x 1200 x 1200 Buah 3,122,400.00
73 U- Ditch Ukuran 1200 x 1400 x 1200 Buah 3,594,700.00
74 U- Ditch Ukuran 1400 x 1400 x 1200 Buah 3,941,500.00
75 U- Ditch Ukuran 1400 x 1600 x 1200 Buah 4,120,200.00
76 U- Ditch Ukuran 1500 x 1500 x 1200 Buah 4,480,000.00
77 U- Ditch Ukuran 1600 x 1600 x 1200 Buah 5,906,300.00
78 U- Ditch Ukuran 2000 x 2000 x 1200 Buah 10,878,400.00
79 Cover U - Ditch 300, Heavy Duty Ukuran 300 x 300 x 600 Buah 120,000.00
80 Cover U - Ditch 400, Heavy Duty Ukuran 400 x 400 x 600 Buah 150,000.00
81 Cover U - Ditch 500, Heavy Duty Ukuran 500 x 500 x 600 Buah 192,000.00
82 Cover U - Ditch 600, Heavy Duty Ukuran 600 x 600 x 600 Buah 258,000.00
83 Cover U - Ditch 800, Heavy Duty Ukuran 800 x 800 x 600 Buah 354,000.00
84 Cover U - Ditch 1000, Heavy Duty Ukuran 1000 x 1000 x 1200 Buah 1,646,200.00
85 Cover U - Ditch 1200, Heavy Duty Ukuran 1200 x 1200 x 1200 Buah 2,091,300.00
86 Cover U - Ditch 300, Light Duty Ukuran 300 x 300 x 600 Buah 91,500.00
87 Cover U - Ditch 400, Light Duty Ukuran 400 x 400 x 600 Buah 153,000.00
88 Cover U - Ditch 500, Light Duty Ukuran 500 x 500 x 600 Buah 236,700.00
89 Cover U - Ditch 600, Light Duty Ukuran 600 x 600 x 600 Buah 277,600.00
90 Cover U - Ditch 800, Light Duty Ukuran 800 x 800 x 600 Buah 369,000.00
91 Cover U - Ditch 1000, Light Duty Ukuran 1000 x 1000 x 1200 Buah 1,059,000.00
92 Cover U - Ditch 1200, Light Duty Ukuran 1200 x 1200 x 1200 Buah 1,350,200.00
93 Jersey Barrfer Ukuran 800 x 500 x 1000 Buah 1,213,500.00
94 Tiang pancang beton Pratekan m3 4,600,000.00
95 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 16,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 12,000,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 65,000.00
6 Kayu dolken O 12 - 15 /4 m btg 75,000.00
7 Kayu dolken O 5 /3 m btg 13,100.00
8 Kayu hutan/kayu perancah acuan (kayu kelas III) m3 3,500,000.00
VI - 275
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
VI - 276
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau (kayu kelas I) m3 9,500,000.00
17 Kayu Borneo (kayu kelas II) m3 5,000,000.00
18 Kayu bakar m3 150,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 17,000.00 0.0024
20 Reng 2 x 3 cm btg 35,000.00
21 Tali Ijuk kg 18,000.00 288,000.00
IX. LAIN-LAIN
1 Air L 50.00 (10 m3 air PDAM = R
2 Air bersih m3 5,000.00
3 Kayu kelas III (0,03 * 0,02 * 2 * 0,8)* harga bahan per m3 kg 33,600.00
4 Jendela naco (0,04 * harga kaca) bh 3,000.00
5 seng pelat (asumsi L.90 P.1 m) lbr 38,000.00
6 kawat jaring lbr 568,468.00
7 panel beton pracetak lbr 103,000.00
8 kolom beton pracetak batang 175,000.00
9 bahan tambahan kimia (efoksi) Liter 135,000.00
10 Strorox – 100 kg 76,500.00
11 Waterstop lebar 150 mm m' 50,000.00
12 Waterstop lebar 200 mm m' 125,000.00
13 Waterstop lebar 230 mm - 320 mm m' 115,000.00
14 Jaring kawat baja dilas (1 lembar = 61,79 kg)untuk wiremesh M8 kg 9,200.00
15 Penjaga jarak bekisting/spacer (dari besi/baut) bh 18,000.00
16 Besi scuare tube m' 19,000.00
17 Besi lis kaca (1 x 1) cm m' 14,300.00
18 Pengelasan cm 4,400.00
19 Besi hollow (50 x 50 x 3) mm kg 7,500.00
20 Dinabolt Ø 12mm bh 2,600.00
21 Phenol film 12 mm lbr 245,000.00
22 Semen grout kg 2,400.00 setara MU 800 = Rp.1
23 Screening kg 150.00 harga /m3 = Rp.200.0
24 Besi siku L 30.30.3 kg 10,500.00
25 Besi pelat baja kg 6,500.00
26 Kawat las kg 27,000.00
27 Pintu gulung besi m2 976,000.00
28 Pintu lipat m2 2,710,000.00
29 Rolling door alluminium m2 400,000.00
30 Profil alluminium (silver) m' 110,000.00
31 Sealant tube 20,000.00
32 Venetions blinds dan vertical blinds (tirai) m2 106,200.00
33 Profil kaca (allumunium) m' 12,400.00
34 Sunscreen alluminium m2 385,000.00
35 Kawat nyamuk m2 250,000.00
36 Baja strip (0,2 x 2) cm kg 18,150.00
37 Jendela nako (rangka + kaca 5 mm) m2 163,200.00
38 Rangka metal hollow 40.40.2 mm m' 19,000.00
39 Baja ringan canai dingin C75 kg 14,000.00
40 HB (Batako Berlobang)-20 m3 437,500.00
41 HB (Batako Berlobang)-15 m3 500,000.00
42 HB (Batako Berlobang)-10 m3 675,000.00
43 Besi angker diameter 8 kg 13,000.00
44 Bata ringan tebal 7,5cm m3 650,000.00
45 Bata ringan tebal 10cm m3 750,000.00
46 Mortar siap pakai kg 3,750.00
47 Semen Mortar (SM) m3 950.00
48 Batu granit kg 5,000.00
49 Batu traso kg 5,000.00
50 ubin keramik mozaik ukuran 30 cm x 30 cm bh 4,000.00
VI - 277
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
51 plint keramik ukuran 10 cm x 20 cm bh 12,000.00
52 plint keramik ukuran 10 cm x 10 cm bh 9,000.00
VI - 278
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
53 plint keramik ukuran 5 cm x 20 cm bh 9,000.00
54 plint internal cove artistik 5 cm x 5 cm x 20 cm bh 15,000.00
55 lantai marmer ukuran 100cm x 100cm bh 800,000.00
56 Karpet m2 100,000.00
57 Lem untuk karpet kg 68,500.00
58 underlayer (pelapis bawah karpet) m2 50,000.00
59 parquet kayu m2 150,000.00
60 dinding keramik artistik 10 cm x 20 cm bh 3,400.00
61 dinding keramik artistik 5 cm x 20 cm bh 1,700.00
62 dinding marmer 100 cm x 100 cm bh 800,000.00
63 bata pelapis 3 cm x 7 cm x 24 cm bh 4,100.00
64 batu paras bh 4,200.00
65 batu tempel hitam bh 1,550.00
66 Vynil bh 11,000.00
67 Lem vynil kg 22,000.00
68 Wallpaper m' 70,000.00
69 Floor harderner kg 9,700.00
70 Asbes semen m2 37,000.00
71 Akustik lbr 51,000.00
72 Profil Allum "T" m' 99,000.00
73 Ramset bh 200.00
74 Rooflight 90 x 180 lbr 62,000.00
75 Bubung stel gelombang lbr 62,000.00
76 Nok paten 92 cm lbr 62,000.00
77 Sirap kayu bh 1,650.00
78 Aluminium gel tebal 0,55 lbr 136,000.00
79 Kunci tanam antik (belluci) bh 222,000.00
80 Kunci tanam KM bh 45,000.00
81 Kunci silinder bh 70,000.00
82 Engsel kupu-kupu bh 25,000.00
83 Engsel angin bh 20,000.00
84 Spring knip bh 22,000.00
85 Door closer set 280,000.00
86 Kunci slot bh 12,000.00
87 Door holder bh 23,000.00
88 Door stop bh 40,000.00
89 Rel pintu sorong set 350,000.00
90 Kunci lemari set 142,000.00
91 Kaca tebal 8 mm m2 150,000.00
92 Kaca buram 12 mm m2 360,500.00
93 Kaca cermin 5 mm m2 135,000.00
94 Kaca cermin 8 mm m2 257,700.00
95 Kaca wireglassed 5 mm m2 210,000.00
96 Kaca patri 5mm m2 2,000,000.00
97 Soda api kg 25,000.00
98 Sabun kg 11,000.00
99 Kuas bh 12,000.00
100 Pengencer kg 24,000.00
101 Teak oil ltr 30,250.00
102 Politur ltr 37,950.00
103 Politur jadi ltr 43,100.00
104 Residu atau ter ltr 27,500.00
105 Vernis ltr 34,650.00
106 Kalkarium kg 18,500.00
107 Alang-alang ikat 10,000.00
108 Cat antara kg 35,000.00
109 Wood filler kg 26,000.00
110 Woodstain kg 47,000.00
111 Sanding kg 48,000.00
112 Melamic kg 43,500.00
113 Urinoir unit 649,000.00
114 Baja tulangan kg 18,150.00
115 Kayu bekisting m2 35,000.00
VI - 279
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
116 Waterdrain bh 385,000.00
117 Floor drain unit 82,500.00
VI - 280
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
118 Pipa galvanis ½” m' 25,900.00
119 Pipa galvanis 3/4” m' 33,400.00
120 Pipa galvanis 1” m' 50,000.00
121 Pipa galvanis 1 1/2” m' 75,900.00
122 Pipa galvanis 4” m' 245,000.00
123 Sealtape bh 4,000.00
124 genteng palentong kecil bh 900.00
125 genteng kodok glazuur bh 1,400.00
126 genteng palentong besar/super bh 1,500.00
127 genteng bubung palentong besar bh 6,000.00
128 Nok genteng beton bh 4,000.00
129 Nok genteng metal bh 44,400.00
130 Pipa PVC 1/2” S.10 m' 4,500.00
131 Pipa PVC 3/4” S.10 m' 6,300.00
132 Pipa PVC 1” S.10 m' 8,900.00
133 Pipa PVC 1 1/2” S.12,5 m' 15,000.00
134 Pipa PVC 2” S.12,5 m' 19,350.00
135 Pipa PVC 3” S.12,5 m' 28,100.00
136 Pipa PVC 4” S.12,5 m' 63,600.00
137 Pipa PVC 6” S.12,5 m' 199,650.00
138 Pipa PVC 8” S.12,5 m' 312,000.00
139 Pipa PVC Ø 63 mm m' 30,600.00
140 Pipa PVC Ø 90 mm m' 64,000.00
141 Pipa PVC Ø 110 mm m' 93,000.00
142 Pipa PVC Ø 200 mm m' 308,700.00
143 Pipa PVC Ø 250 mm m' 483,750.00
144 Pipa HDPE Ø 63 mm m' 25,900.00
145 Pipa HDPE Ø 125 mm m' 101,800.00
146 Pipa HDPE Ø 200 mm m' 259,600.00
147 Pipa HDPE Ø 250 mm m' 404,300.00
148 Pipa GIP Ø 63 mm m' 85,000.00
149 Pipa GIP Ø 100 mm m' 245,000.00
150 Pipa GIP Ø 150 mm m' 355,000.00
151 Pipa GIP Ø 200 mm m' 680,000.00
152 Pipa GIP Ø 250 mm m' 875,000.00
153 Pipa tanah Ǿ 20 cm bh 173,200.00
154 pipa tanah diameter 15 cm bh 113,200.00
155 pipa beton diameter 15 – 20 cm bh 44,300.00
156 pipa beton diameter 30 – 100 cm bh 66,000.00
157 Valve Ø 150 mm bh 3,250,000.00
158 Valve Ø 200 mm bh 5,400,000.00
159 Valve Ø 250 mm bh 9,250,000.00
160 Pipa listrik 5/8” btg 5,000.00
161 Kabel 1,5 x 2 m 8,000.00
162 Kabel 1,5 x 3 m 12,000.00
163 Kabel 2,5 x 2 m 13,000.00
164 Kabel 2,5 x 3 m 15,000.00
165 T Dus bh 2,000.00
166 L Bow bh 2,000.00
167 Las Dop bh 3,000.00
168 Mongkok bh 1,000.00
169 Saklar tunggal bh 13,000.00
170 Saklar ganda bh 16,000.00
171 Fitting tempel bh 4,500.00
172 Fitting gantung bh 3,500.00
173 M C B bh 30,000.00
174 digital print m' 25,000.00
175 Lampu pijar 25 s/d 100 watt (phlips) bh 12,000.00
176 Lampu Sl philip 18 watt bh 36,000.00
177 Lampu Sl philip 25 watt bh 47,000.00
178 Downlight + SL 25 watt philip bh 77,000.00
179 Lampu taman + tiang + lampu 1 buah bh 250,000.00
180 Stop kontak broco standard bh 13,000.00
VI - 281
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
181 kawat arde m 11,000.00
182 over spaneng m 9,000.00
VI - 282
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
183 arde btg 11,000.00
184 box sikring bh 40,000.00
185 box MCB bh 5,000.00
186 Holo 4/4 meni btg 12,100.00
187 Holo 2/4 meni btg 11,000.00
188 Kawat Bwg 12 kg 10,000.00
189 Paku screw 2.5 cm bh 50.00
190 Adhesive kg 6,000.00
191 Kain kasa m' 400.00
192 Cat penutup 2 kali kg 25,000.00
193 Paku beton bh 175.00
194 Kabel Listrik NYA 3 x 2,5 mm m' 6,500.00
195 Bata berongga expose bh 2,600.00
196 Atap Selulosa uk. 195 x 96 cm bh 150,000.00
197 Paku/screw atap selulosa bh 1,200.00
198 Nok/bubung untuk atap selulosa untuk uk. 106 x 40 cm bh 82,500.00
199 Atap Selulosa uk. 106 x 40 cm bh 50,500.00
200 Nok/Bubung untuk Atap Selulosa 195 x 96 cm bh 88,000.00
201 Tabung Gas kg 19,000.00
202 Atap Bitumen Bergelombang Monolayer 3 mm LBR 164,500.00
X. ACCESSORIES PIPA
VI - 283
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
26 Blind Flange 250 mm 1,800,000.00
27 Blind Flange 200 mm 1,500,000.00
VI - 284
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
28 Blind Flange 150 mm 1,200,000.00
29 Blind Flange 100 mm 580,000.00
30 Loose flange dia 350 mm 784,000.00
31 Loose flange dia 300 mm 450,000.00
32 Loose flange dia 250 mm 300,000.00
33 Loose flange dia 200 mm 247,000.00
34 Loose flange dia 160 mm 180,000.00
35 Loose flange dia 110 mm 106,500.00
36 Loose flange dia 90 mm 96,000.00
37 Loose flange dia 63 mm 67,500.00
38 Gate valve dia. 350 mm 26,640,000.00
39 Gate valve dia. 300 mm 12,700,000.00
40 Gate valve dia. 250 mm 9,500,000.00
41 Gate valve dia. 200 mm 5,700,000.00
42 Gate valve dia. 160 mm 3,900,000.00
43 Gate valve dia. 110 mm 2,500,000.00
44 Gate valve dia. 90 mm 1,800,000.00
45 Gate valve dia. 63 mm 950,000.00
46 Air Valve dia. 25 mm single ball PN 10 780,000.00
47 Air Valve dia. 63 mm Double PN 10 1,950,000.00
48 Air Valve dia. 75 mm Double 2,500,000.00
49 Air Valve dia. 100 mm Double 3,500,000.00
50 Dresser joint for HDPE dia. 300 mm 1,950,000.00
51 Dresser joint for HDPE dia. 250 mm 1,560,000.00
52 Dresser joint for HDPE dia. 200 mm 975,000.00
53 Dresser joint for HDPE dia. 150 mm 780,000.00
54 Dresser joint for HDPE dia. 100 mm 552,500.00
55 Tee all flange dia 300 x 300 mm 4,368,000.00
56 Tee all flange dia 300 x 250 mm 4,032,000.00
57 Tee all flange dia 300 x 200 mm 3,696,000.00
58 Tee all flange dia 300 x 150 mm 3,528,000.00
59 Tee all flange dia 300 x 100 mm 3,444,000.00
60 Tee all flange dia 300 x 75 mm 3,276,000.00
61 Tee all flange dia 300 x 50 mm 3,192,000.00
62 Tee all flange dia 250 x 250 mm 3,780,000.00
63 Tee all flange dia 250 x 200 mm 3,696,000.00
64 Tee all flange dia 250 x 150 mm 3,528,000.00
65 Tee all flange dia 250 x 100 mm 3,276,000.00
66 Tee all flange dia 250 x 75 mm 3,108,000.00
67 Tee all flange dia 250 x 50 mm 3,024,000.00
68 Tee all flange dia 200 x 200 mm 3,108,000.00
69 Tee all flange dia 200 x 150 mm 2,772,000.00
70 Tee all flange dia 200 x 100 mm 2,688,000.00
71 Tee all flange dia 200 x 75 mm 2,520,000.00
72 Tee all flange dia 200 x 50 mm 2,184,000.00
73 Tee all flange dia 150 x 150 mm 1,638,000.00
74 Tee all flange dia 150 x 100 mm 1,470,000.00
75 Tee all flange dia 150 x 75 mm 1,428,000.00
76 Tee all flange dia 150 x 50 mm 1,386,000.00
77 Tee all flange dia 100 x 100 mm 781,000.00
78 Tee all flange dia 100 x 75 mm 756,000.00
79 Tee all flange dia 100 x 50 mm 714,000.00
80 Tee all flange dia 75 x 75 mm 688,800.00
81 Tee all flange dia 75 x 50 mm 655,000.00
82 Tee all flange dia 50 x 50 mm 646,000.00
83 Bend All Flange OD 350 x 90 4,102,500.00
84 Bend All Flange OD 300 x 90 3,091,000.00
85 Bend All Flange OD 250 x 90 2,125,200.00
86 Bend All Flange OD 200 x 90 1,789,200.00
87 Bend All Flange OD 150 x 90 1,209,600.00
88 Bend All Flange OD 100 x 90 747,000.00
89 Bend All Flange OD 75 x 90 462,000.00
90 Bend All Flange OD 50 x 90 319,200.00
VI - 285
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
91 Reducer All Flange dia 350 x 300 mm 1,645,000.00
VI - 286
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
92 Reducer All Flange dia 350 x 250 mm 1,428,000.00
93 Reducer All Flange dia 350 x 200 mm 1,316,000.00
94 Reducer All Flange dia 350 x 150 mm 1,239,000.00
95 Reducer All Flange dia 300 x 250 mm 1,141,000.00
96 Reducer All Flange dia 300 x 200 mm 1,064,000.00
97 Reducer All Flange dia 300 x 150 mm 1,001,000.00
98 Reducer All Flange dia 300 x 100 mm 896,000.00
99 Reducer All Flange dia 250 x 200 mm 966,000.00
100 Reducer All Flange dia 250 x 150 mm 868,000.00
101 Reducer All Flange dia 250 x 100 mm 567,000.00
102 Reducer All Flange dia 250 x 75 mm 637,000.00
103 Reducer All Flange dia 200 x 150 mm 749,000.00
104 Reducer All Flange dia 200 x 100 mm 679,000.00
105 Reducer All Flange dia 200 x 75 mm 595,000.00
106 Reducer All Flange dia 150 x 100 mm 511,000.00
107 Reducer All Flange dia 150 x 75 mm 441,000.00
108 Reducer All Flange dia 150 x 50 mm 343,000.00
109 Reducer All Flange dia 100 x 75 mm 224,000.00
110 Reducer All Flange dia 100 x 50 mm 168,000.00
111 Reducer All Flange dia 75 x 50 mm 133,000.00
112 Water Meter Induk dia 300 mm 44,850,000.00
113 Water Meter Induk dia 250 mm 32,300,000.00
114 Water Meter Induk dia 200 mm 19,800,000.00
115 Water Meter Induk dia 150 mm 15,300,000.00
116 Water Meter Induk dia 100 mm 8,950,000.00
117 Water Meter Induk dia 75 mm 7,350,000.00
118 Water Meter Induk dia 50 mm 6,050,000.00
119 Reducer equal HDPE dia 100 x 75 mm 475,000.00
120 Reducer equal HDPE dia 75 x 50 mm 325,000.00
121 Pressure Reducing Valve 250 mm 98,475,000.00
122 Pressure Reducing Valve 200 mm 78,325,000.00
123 Tee equal coupling dia 100 x 100 mm 515,000.00
124 Tee equal coupling dia 100 x 75 mm 512,000.00
125 Tee equal coupling dia 100 x 50 mm 509,000.00
126 Tee equal coupling dia 75 x 75 mm 450,000.00
127 Tee equal coupling dia 75 x 50 mm 431,400.00
128 Tee equal coupling dia 50 x 50 mm 367,000.00
129 Bend HDPE dia 250 x 90 1,800,400.00
130 Bend HDPE dia 200 x 90 1,131,000.00
131 Bend HDPE dia 150 x 90 927,700.00
132 Bend HDPE dia 100 x 90 456,400.00
133 Bend HDPE dia 75 x 90 371,400.00
134 Bend HDPE dia 50 x 90 222,200.00
B. UPAH
1 Mandor /hari 120,000.00 17,142.86
2 Kepala tukang /hari 120,000.00 17,142.86
3 Tukang kayu / besi /hari 110,000.00 15,714.29
4 Tukang batu /hari 110,000.00 15,714.29
5 Tukang bor /hari 110,000.00 15,714.29
6 Tukang Las /hari 120,000.00 17,142.86
7 Pembantu tukang/Pekerja /hari 80,000.00 11,428.57
8 Operator terlatih /hari 140,000.00 20,000.00
9 Operator kurang terlatih /hari 85,000.00 12,142.86
10 Pembantu operator /hari 80,000.00 11,428.57
11 Supir truk /hari 90,000.00 12,857.14
12 Pembantu supir /hari 80,000.00 11,428.57
13 Mekanik /hari 90,000.00 12,857.14
14 Pembantu mekanik /hari 80,000.00 11,428.57
15 Buruh lapangan terlatih /hari 100,000.00 14,285.71
16 Buruh lapangan kurang terlatih /hari 80,000.00 11,428.57
17 Buruh lapangan tak terlatih / pekerja /hari 80,000.00 11,428.57
VI - 287
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 288
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
C. ALAT
1 Sewa crane (10 Ton) unit/hari 3,900,000.00
2 Sewa pipe support buah/hari 297,000.00
3 Sewa scaffolding unit/hari 297,000.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 3,500,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,596,000.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 50,000.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 50,000.00
8 Mobile crane £ 3 ton unit/hari 1,450,000.00
9 Sewa Genset 1500 watt unit/hari 1,234,800.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 330,000.00
11 Sewa crane (3 Ton) Jam 115,000.00
12 Compressor Jam 68,310.00
13 Driling rig + perlengkapan (daerah berbatu/keras) m 700,000.00 87,500.00
14 Driling rig + perlengkapan (daerah Lunak/Lempung) m 525,000.00
15 Mesin Las Jam 200,000.00
16 Mesin Blower Jam 300,000.00
ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 531,934.33
2 DUMP TRUCK 3.5 TON E08 Jam 248,017.17
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 354,791.63
4 MOTOR GRADER >100 HP E13 Jam 442,939.10
5 VIBRATORY ROLLER 5-8 T. E19 Jam 344,765.59
6 WATER TANKER 3000-4500 L. E23 Jam 244,587.98
7 TANDEM ROLLER 6-8 T. E17 Jam 444,495.58
8 ASPHALT DISTRIBUTOR E41 Jam 332,028.13
9 COMPRESSOR 4000-6500 L\M E05 Jam 177,151.16
10 TIRE ROLLER 8-10 T. E18 Jam 443,944.31
11 ASPHALT MIXING PLANT E01 Jam 4,944,742.77
12 GENERATOR SET E12 Jam 424,137.65
13 ASPHALT FINISHER E02 Jam 971,280.62
14 DUMP TRUCK 5 TON E09 Jam 334,702.39
15 THREE WHEEL ROLLER 6-8 T E16 Jam 223,446.66
16 ASPHALT SPRAYER E03 Jam 68,836.11
Sumber, 2019
VI - 289
HARGA PERKIRAAN SENDIRI (HPS)
PEMBIKINAN SKAT PARTISI RUANG
TAHUN : 2019
KABUPATEN : C I R E B O N
HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PARTISI
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x
1 A.4.2.1.20. 7.00 m2
120 cm, untuk partisi 212,819.00 1,489,733.00
2 Pemasangan kaca tebal 5 mm warna hitam A.4.6.2.17. 1.65 m2 119,825.40 197,711.91
3 Pasang Multiplek t: 12 mm 7.12 m2 80,000.00 569,600.00
4 Pemasangan Lapis HPL Urat kayu Coklat dop 7.12 m2 105,000.00 747,600.00
Pemasangan rangka kusen Alumunium 4' serta
5 13.40 m'
aksesoriesnya 150,073.28 2,010,981.89
5,015,626.80
II PEKERJAAN SKAT RUANGAN
Pemasangan rangka kusen Alumunium 4' serta
1 26.58
m'
150,073.28 3,988,947.65
aksesoriesnya
2 Daun Pintu strip Lebar beserta kaca dan asesoriesnya 1.60 m2 2,255,925.10 3,609,480.16
3 Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18. 8.38 m2 218,670.20 1,832,237.61
4 Pemasangan Sandblast 8.46 m2 101,000.00 854,439.80
10,285,105.22
REKAPITULASI
I PEKERJAAN PARTISI Rp 5,015,626.80
II PEKERJAAN SKAT RUANGAN Rp 10,285,105.22
JUMLAH 15,300,732.01
DIBULATKAN Rp 15,300,000.00
HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek SNI.100.03 bh -
-
II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-
IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-
V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K
9 A.4.1.1.1 m3
100), setara dengan beton rabat -
Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-
10 A.4.1.1.2 m3
125) -
Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K
11 A.4.1.1.3 m3
150) -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump
12 A.4.1.1.4 m3
(3-6) cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20)
13 A.4.1.1.5. m3
mm (sama dengan K 175) -
Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K
14 A.4.1.1.6 m3
220) -
Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K
15 A.4.1.1.7. m3
225) -
Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K
16 A.4.1.1.8. m3
250) -
VII - 291
Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K
17 A.4.1.1.9. m3
325) -
VII - 292
Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K
18 A.4.1.1.10. m3
350) -
Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K
19 A.4.1.1.11. m3
375) -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20)
20 A.4.1.1.12. m3
mm (sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-
VII - 293
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I
7 A.4.6.1.21. m'
atau kelas II -
VII - 294
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I
8 A.4.6.1.22. m'
atau kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm
9 A.4.6.1.23. m2
kayu kelas II atau III -
Pemasangan 1 m2 dinding lambrisering dari papan kayu
10 A.4.6.1.26. m2
kelas I -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I
15 A.4.6.1.21. m'
atau kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I
16 A.4.6.1.22. m'
atau kelas II -
Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x
17 A.4.5.2.8. m2
5 mm -
18 Pemasangan 1 m’ bubung stel gelombang 0,92 m A.4.5.2.22. m' -
19 Pemasangan 1 m’ nok paten 0,92 m A.4.5.2.22. m' -
-
IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
VII - 295
17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh
-
-
VII - 296
XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis
1 A.4.7.1.4. m2
cat dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat
2 A.4.7.1.10. m2
dasar, 2 lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -
Pengecatan 1 m2 permukaan baja galvanis secara manual 4
4 A.4.7.1.18. m2
lapis -
5 Plituran 10 m2 dengan plitur melamic A.4.7.1.22. m2 -
6 Pemasangan 1 m2 wallpaper A.4.7.1.15. m2 -
7 1 m2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1. m2 -
-
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -
PPN 10 % Rp -
JUMLAH TOTAL Rp -
DIBULATKAN Rp -
TERBILANG : ( ………………………………………….. )
Sumber, 2019
VII - 297
Paraf
Tim Teknis Penyusun
Disiapkan
Analisa
Diperiksa Kasie Perencanaan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.042 82,500.00 85,965.00
Paku/Screw 8.330 1,200.00 9,996.00
JUMLAH HARGA BAHAN 95,961.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Atap Selulosa 3.230 50,500.00 163,115.00
Paku/Screw 16.150 1,200.00 19,380.00
JUMLAH HARGA BAHAN 182,495.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.300 88,000.00 114,400.00
Paku/Screw 10.000 1,200.00 12,000.00
JUMLAH HARGA BAHAN 126,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 164,500.00 106,925.00
Paku atau Sekrup 9.100 1,200.00 10,920.00
JUMLAH HARGA BAHAN 117,845.00
C PERALATAN