Anda di halaman 1dari 69

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL CIPTA KARYA


BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA JUMPRIT HULU SUNGAI PROGO

DESA TEGALREJO, KECAMATAN NGADIREJO, KABUPATEN TEMANGGUNG


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

LOKASI PERENCANAAN : JUDUL GAMBAR SKALA


Desa Tegalrejo, Kecamatan Ngadirejo, Kabupaten Temanggung.

LOKASI PERENCANAAN -

LOKASI PERENCANAAN
NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

am
ak
M
LOKASI

ae
Ar
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


it
pr
m
lJu
bu
Um

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

SITE KONTUR EKSISTING 1:800

SITE KONTUR EKSISTING


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
13

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
7
WILAYAH II JAWA TENGAH
9

8
NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
6 JUMPRIT HULU SUNGAI PROGO
7

am
ak
5

M
LOKASI

ae
Ar
4

6 DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
5
13 MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
11

2
10
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA

12
CV. MONALISA ART

1 Rachmat Ariyanto, SE
DIREKTUR
KETERANGAN
POSISI NAMA PARAF
1 MAIN ENTRANCE (JALAN UTAMA)

2 KIOS TEAM R. Andreas Sulistyo


LEADER Nursetyo Nugroho, ST
3 AREA MAKAN

4 AREA PARKIR MOTOR AHLI SIPIL Wahyu Alfiadi, ST


it
pr
m
lJu
bu
Um

5 GARDU PANDANG
14
6 BANGUNAN CAFE, TOILET DAN RUANG GANTI ASISTEN Dumila Karomah, S.Ars
7 AREA BILAS OUTDOOR

8 KOLAM ANAK-ANAK DRAFTER M. Khoirul Umam


9 KOLAM DEWASA

10 JALUR PENGHUBUNG JUMPRIT TAHAP 1 KE TAHAP 2


JUDUL GAMBAR SKALA
11 TAMAN JUMPRIT TAHAP 1

12 AREA PARKIR MOTOR DAN MOBIL KAWASAN JUMPRIT

13 JEMBATAN PIPA AIR BAKU


SITEPLAN 1:800
14 SITUS UMBUL JUMPRIT

SITEPLAN
NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

am
ak
M
LOKASI

ae
Ar
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


it
pr
m
lJu
bu
Um

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

SITE KONTUR RENCANA 1:800

SITE KONTUR RENCANA


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

SITEPLAN CUT & FILL 1:800

SITEPLAN CUT & FILL


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

KEYPLAN

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


±0.00

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

JARAK 500 1481 440 1646 440 2375


POTONGAN CUT & FILL A-A 1:600

POTONGAN CUT & FILL A-A


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 600

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

KEYPLAN

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

±0.00
ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

JARAK 900 775 1231 1026 1143 140 POTONGAN CUT & FILL B-B 1:600

POTONGAN CUT & FILL B-B NO.GAMBAR JMLH.GAMBAR


Skala 1 : 600
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

KEYPLAN

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


±0.00

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

JARAK 683 1200 311 620 401 604 306 1195 716 POTONGAN CUT & FILL C-C 1:600

POTONGAN CUT & FILL C-C NO.GAMBAR JMLH.GAMBAR


Skala 1 : 600
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

KEYPLAN

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


-5.00

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

JARAK 2406 POTONGAN CUT & FILL D-D 1:600

POTONGAN CUT & FILL D-D NO.GAMBAR JMLH.GAMBAR


Skala 1 : 600
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

KEYPLAN

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


±0.00

ASISTEN Dumila Karomah, S.Ars

-5.00
DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

JARAK 641 343 1162 1194 716 2412 POTONGAN CUT & FILL E-E 1:600

POTONGAN CUT & FILL E-E NO.GAMBAR JMLH.GAMBAR


Skala 1 : 600
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN
A
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI
AREA DECK FOOD COURT
-0.20
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

-0.25

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
-0.20
PERENCANA
CV. MONALISA ART

200 200 200 300 300 200 200 200 300

Rachmat Ariyanto, SE
SELASAR KIOS
200 -0.05 200 DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
500 500
-0.10 -0.10
150 LEADER Nursetyo Nugroho, ST
KIOS
±0.00
300 300
B AHLI SIPIL Wahyu Alfiadi, ST
-0.15 -0.15
150
ASISTEN Dumila Karomah, S.Ars

200 200 200 300 300 200 200 200 150 150
DRAFTER M. Khoirul Umam
2100

JUDUL GAMBAR SKALA

SITEPLAN BANGUNAN KIOS


Skala 1 : 100
- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

TAMPAK SAMPING KIOS


Skala 1 : 100 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

TAMPAK DEPAN KIOS


Skala 1 : 100
- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
310

NAMA PEKERJAAN
30°
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
30
+3.00
JUMPRIT HULU SUNGAI PROGO

LOKASI

300
DESA TEGALREJO
313
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
PASIR URUG t=10cm
RABAT BETON t=5cm PASIR URUG t=10cm

MENGETAHUI
PASIR URUG t=10cm SPESI tb. 3cm PASIR URUG t=10cm RABAT BETON t=5cm
RABAT BETON t=5cm BATU LEMPENG ACAK RABAT BETON t=5cm SPESI tb. 3cm
SLOOF 15/20
CONWOOD DECK 8" CONWOOD DECK 8" GRANIT 60X60cm ±0.00
-0.05
-0.20 -0.20
-0.25
MTA.
39
28 -0.39
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
95
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TANAH URUG TANAH URUG
PAS. BATU 1pc:5pp PAS. BATU 1pc:5pp

PROVINSI JAWA TENGAH


AANSTAMPING AANSTAMPING
PASIR URUG PASIR URUG
200
200 300

500

400 200 400

1000

POTONGAN A-A Tommy Faizal Wahyono, ST


Skala 1 : 100 NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR
310

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST
30

Wahyu Alfiadi, ST
+3.60

AHLI SIPIL

300 ASISTEN Dumila Karomah, S.Ars

PASIR URUG t=10cm


PASIR URUG t=10cm
RABAT BETON t=5cm
PASIR URUG t=10cm
RABAT BETON t=5cm
DRAFTER M. Khoirul Umam
RABAT BETON t=5cm SPESI tb. 3cm SPESI tb. 3cm
SPESI tb. 3cm GRANIT 60X60cm GRANIT 60X60cm SLOOF 15/20
±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00
-0.15 GRANIT UNPOLISHED

50 JUDUL GAMBAR SKALA

95 TANAH URUG
PAS. BATU 1pc:5pp
AANSTAMPING
PASIR URUG

150 150 200 200 200 300 300 200 200 200

2100
- 1:100
POTONGAN B-B
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

S2 20/25

S2 20/25
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
S2 20/25

S2 20/25
200 200 200 300 300 200 200 200 300 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
200 200

S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20

500 500

S1 15/20

S1 15/20

S1 15/20
150
S1 15/20

S1 15/20

S1 15/20

S1 15/20

S1 15/20

S1 15/20

S1 15/20

S1 15/20
300 S1 15/20 S1 15/20 300
Rachmat Ariyanto, SE
DIREKTUR

S1 15/20

S1 15/20

S1 15/20
150

S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20 S1 15/20
POSISI NAMA PARAF
TEAM R. Andreas Sulistyo
200 200 200 300 300 200 200 200 150 150
LEADER Nursetyo Nugroho, ST
2100

AHLI SIPIL Wahyu Alfiadi, ST


DENAH PONDASI
Skala 1 : 100 ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DIMENSI 15 x 20 DIMENSI 20 x 25
POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN

20 20
SLOOF 15 15 SLOOF
25 25
S1 20 20 S2 - 1:100

TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 3 D16 2 D16


TUL. TENGAH - - TUL. TENGAH 2 D16 2 D16
TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 D16 3 D16
NO.GAMBAR JMLH.GAMBAR
SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150

- -
15

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


PASIR URUG t=10cm DIREKTORAT JENDERAL CIPTA KARYA
RABAT BETON t=5cm SLOOF 15/20 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SPESI tb. 3cm SATUAN KERJA BALAI PRASARANA PERMUKIMAN

30
KERAMIK 60X60cm WILAYAH II JAWA TENGAH

SLOOF (S1) 20/30 NAMA PEKERJAAN

9
11 10
PASIR URUG t=10cm
RABAT BETON t=5cm
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA

30
SPESI tb. 3cm
KERAMIK UK. 60x60cm +0.35 MTA. JUMPRIT HULU SUNGAI PROGO
-0.16
4

LOKASI
11 10 5

DESA TEGALREJO

125

70
KECAMATAN NGADIREJO
MTA. KABUPATEN TEMANGGUNG
TANAH URUG
-0.16

5:1
MENGETAHUI
PAS. BATU 1pc:5pp
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
AANSTAMPING

20
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TUL. KOLOM 4Ø12 PROVINSI JAWA TENGAH
PASIR URUG

5
130

BEGEL Ø8-200
200

5 70 5
80

Tommy Faizal Wahyono, ST


DETAIL PONDASI BATU KALI NIP. 198802162010121003
Skala 1 : 20 PERENCANA
Ø10-100 CV. MONALISA ART
10

Ø10-100
20
10

Ø10-100
Ø10-100
50 25 38 Rachmat Ariyanto, SE
100 DIREKTUR

POTONGAN A-AFOOTPLAT POSISI NAMA PARAF


Skala 1 : 20
TEAM R. Andreas Sulistyo
PALEM BAMBU
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


Ø10-100
38

TANAH SUBUR ASISTEN Dumila Karomah, S.Ars


Ø10-100

DRAFTER M. Khoirul Umam


60
100
25

PAS. BATA FIN. TERACOTA


JUDUL GAMBAR SKALA
Ø10-100

PAS. ROLLAG BATA


38

15

Ø10-100
- 1:20

38 25 38
15 30 15
100

DETAIL POT TANAMAN KIOS NO.GAMBAR JMLH.GAMBAR


TAMPAK ATAS FOOTPLAT
Skala 1 : 15
Skala 1 : 20
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
RB 20/25 RB 20/25 RB 20/25 RB 20/25 DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

RB 20/25

RB 20/25

RB 20/25

RB 20/25

RB 20/25
B 15/20

B 15/20

B 15/20
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI
RB 20/25 RB 20/25 RB 20/25 RB 20/25

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
RB 20/25 RB 20/25 RB 20/25 RB 20/25
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
RB 20/25

RB 20/25

RB 20/25

RB 20/25

RB 20/25
B 15/20

B 15/20

B 15/20
200 200 200 300 300 200 200 200 300 Tommy Faizal Wahyono, ST
RB 20/25 RB 20/25 RB 20/25 RB 20/25
NIP. 198802162010121003
RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
K
15/15
PERENCANA
CV. MONALISA ART
RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20
RB 15/20

RB 15/20
200 200

RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20
K K K K K K K K K K K
15/15 15/15 15/15 15/15 15/15 15/15 15/15 15/15 15/15 15/15 15/15
500 500

RB 15/20

RB 15/20

RB 15/20
150
RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20
300 RB 15/20 RB 15/20 300
K K K
15/15 15/15 15/15
Rachmat Ariyanto, SE
DIREKTUR

RB 15/20

RB 15/20

RB 15/20
150

K K K K K K K K K K K
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
RB 15/20
15/15
POSISI NAMA PARAF

200 200 200 300 300 200 200 200 150 150
TEAM R. Andreas Sulistyo
2100
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


DENAH KOLOM DAN RINGBALK
Skala 1 : 100 Dumila Karomah, S.Ars
ASISTEN

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DIMENSI 20 x 20 DIMENSI 15 x 15 DIMENSI 15 x 20 DIMENSI 20 x 25 DIMENSI 15 x 20
POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN

20 20
20 20
KOLOM KOLOM 15 15 RINGBALK 15 15 RINGBALK BALOK 15 15
25 25
K1 20 20
K2 15 15 RB 1 20 20 RB 2 B 20 20
- 1:100

TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 3 D16 2 D16 TUL. ATAS 2 Ø 12 2 Ø 12
TUL. TENGAH - - TUL. TENGAH - - TUL. TENGAH - - TUL. TENGAH 2 D16 2 D16 TUL. TENGAH - -
TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 D16 3 D16 TUL. BAWAH 2 Ø 12 2 Ø 12
SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

AREA DECK FOOD COURT


NAMA PEKERJAAN
-0.20
C PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
-0.25 D PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

-0.20 C

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
200 200 200 300 300 200 200 200 300 CV. MONALISA ART

200 A 200

500 B B 500
150
Rachmat Ariyanto, SE
DIREKTUR
300 300
A A A A A A A A
POSISI NAMA PARAF
150
B B TEAM R. Andreas Sulistyo
A A A A A A A A
LEADER Nursetyo Nugroho, ST
200 200 200 300 300 200 200 200 150 150

2100 AHLI SIPIL Wahyu Alfiadi, ST

A : GRANIT TILE 60x60


DENAH POLA LANTAI ASISTEN Dumila Karomah, S.Ars
INDOGRESS: GIALLO TERAZZO - ROCK, MATT - V2
UNTUK LANTAI TERASAN, KIOS, DAN MEJA SINK Skala 1 : 100

DRAFTER M. Khoirul Umam


B : GRANIT TILE 60x60
INDOGRESS: BEIGE TERAZZO - ROCK, MATT - V2
UNTUK LANTAI AREA WASTAFEL DAN KAMAR MANDI JUDUL GAMBAR SKALA

C : CONWOOD DECK 8"

D : BATU LEMPENG ACAK

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

200 200 200 300 300 200 200 200 300

200 200

FG FG Rachmat Ariyanto, SE
DIREKTUR

500 500
150 POSISI NAMA PARAF
P P TEAM R. Andreas Sulistyo
300 300
LEADER Nursetyo Nugroho, ST

150
BV BV BV BV BV BV BV BV BV BV BV BV BV BV BV BV BV BV AHLI SIPIL Wahyu Alfiadi, ST

200 200 200 300 300 200 200 200 150 150
ASISTEN Dumila Karomah, S.Ars
2100

DRAFTER M. Khoirul Umam


DENAH KUSEN
Skala 1 : 100
JUDUL GAMBAR SKALA

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
POT. A-A BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
6 70 6 WILAYAH II JAWA TENGAH

NAMA PEKERJAAN
6 70 6
82
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
15
LOKASI

5
6
DESA TEGALREJO

15

26
KECAMATAN NGADIREJO

210

47
KUSEN ALUMUNIUM HITAM
KABUPATEN TEMANGGUNG

26

15
FOLDING GATE KACA CLEAR t = 3mm
WARNA COKLAT MENGETAHUI

6
10
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

PINTU ALUMUNIUM HITAM

262
Tommy Faizal Wahyono, ST

181
5 190 5 NIP. 198802162010121003

211

210
PERENCANA
15

15

HANDLE KUNCI PUTAR DARI DALAM


CV. MONALISA ART
5 190 5

POT. A-A

100
DETAIL FG

20
Rachmat Ariyanto, SE
DIREKTUR

POT. C-C POSISI NAMA PARAF


5 72 5
TEAM R. Andreas Sulistyo
DETAIL P LEADER Nursetyo Nugroho, ST

15

15
6 70 6
15 AHLI SIPIL Wahyu Alfiadi, ST
POT. B-B
5
6

ASISTEN Dumila Karomah, S.Ars


15

26
47

KUSEN ALUMUNIUM HITAM


DRAFTER M. Khoirul Umam
26

15

KACA CLEAR t = 3mm


5

JUDUL GAMBAR SKALA


6 70 6
POT. B-B

DETAIL BV
6 70 6
DETAIL KUSEN 1:25
82

POT. A-A DETAIL KUSEN


Skala 1 : 25
NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN
BT BT BT BT BT
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
BT BT BT BT BT
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

BT BT BT BT BT

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
BT BT BT BT BT BT BT BT BT BT BT

BT BT BT BT BT BT BT BT BT BT BT

Rachmat Ariyanto, SE
G2 G2 DIREKTUR
BT BT
G2 G2
POSISI NAMA PARAF
C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2
TEAM R. Andreas Sulistyo
G2 G2
LEADER Nursetyo Nugroho, ST
C1 C1
G1 G1 G1 G1 C2 G1 C2 G1 G1 G1 G2 G2 G2
G2
AHLI SIPIL Wahyu Alfiadi, ST
C1 C1 C1 C1 C1 C1 C1 C1 C1

ASISTEN Dumila Karomah, S.Ars


KETERANGAN :

C1 : CAT EKSTERIOR WEATHERSHIELD


C2 : CAT INTERIOR DENAH WALLPLAN
G1 : GRANIT TILE 60x60
DRAFTER M. Khoirul Umam
Skala 1 : 100
INDOGRESS: GIALLO TERAZZO - ROCK, MATT - V2
UNTUK DINDING MEJA SINK

G2 : GRANIT TILE 30x60


INDOGRESS: BEIGE TERAZZO - ROCK, MATT - V2
JUDUL GAMBAR SKALA
UNTUK DINDING AREA WASTAFEL DAN KAMAR MANDI

BT: BATA TEMPEL TERACOTA 10X20

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA

200 200 200 300 300 200 200 200 300 CV. MONALISA ART

200 200

500 500
150 Rachmat Ariyanto, SE
DIREKTUR
300 300
POSISI NAMA PARAF
150
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

200 200 200 300 300 200 200 200 150 150
AHLI SIPIL Wahyu Alfiadi, ST
2100

KETERANGAN
ASISTEN Dumila Karomah, S.Ars
DOWNLIGHT 4" + LED 8W WHITE (13 BUAH) DENAH ELEKTRIKAL
SAKLAR TUNGGAL 220V/6A (2 BUAH) Skala 1 : 100
DRAFTER M. Khoirul Umam
SAKLAR GANDA 220V/6A (9 BUAH)

STOP KONTAK 220V/6A (7 BUAH)


JUDUL GAMBAR SKALA
LAMPU GANTUNG KAP + LED 15W WARM WHITE (14 BUAH)

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
Reng Baja Ringan RT-35 t=0,4mm Kuda Kuda Baja Ringan Metal Roof Berpasir (Glasur)
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DENAH RENCANA ATAP BANGUNAN KIOS DIREKTUR
Skala 1 : 100
POSISI NAMA PARAF
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
Pergola Conwood Sunshade 1,4x7,5 JUMPRIT HULU SUNGAI PROGO
Jarak 10cm
LOKASI
Besi Siku Pengunci Conwood
DESA TEGALREJO
KECAMATAN NGADIREJO
Besi Hollow 4x6 fin. cat hitam KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Pergola Conwood Sunshade 1,4x7,5


Jarak 10cm
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
Besi Siku Pengunci Conwood
PERENCANA
Besi Hollow 4x6 fin. cat hitam CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR
Plafond ACP

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
Besi Hollow 4x4 LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam


DENAH PLAFOND
Skala 1 : 100 JUDUL GAMBAR SKALA

- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

DETAIL 1 PLAFOND
Skala 1 : 25 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
DENAH PARSIAL PLAFOND
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


POTONGAN A-A PLAFOND
Skala 1 : 25 DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DETAIL ELEKTRIKAL
Skala NTS

DETAIL PLAFOND 1:25

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
200 200 200 300 300 200 200 200 300
PERENCANA
CV. MONALISA ART
200 200

500 500
150

300 300
Rachmat Ariyanto, SE
PIPA 2"
DIREKTUR
150

PIPA 4" INLET OUTLET RESAPAN POSISI NAMA PARAF

200 200 200 300 300 200 200 200 150 150
BIOFIL TEAM R. Andreas Sulistyo
2100
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


DENAH INSTALASI AIR KOTOR
Skala 1 : 100
ASISTEN Dumila Karomah, S.Ars
KETERANGAN
DRAFTER M. Khoirul Umam
CLOSET JONGKOK (2)

FLOOR DRAIN (2) JUDUL GAMBAR SKALA


KRAN (2)

WASTAFEL SUDUT (2)

- 1:100
SINK & KRAN (8)

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003

200 200 200 300 300 200 200 200 300 PERENCANA
CV. MONALISA ART

200 200

SUMBER
AIR
JUMPRIT
500 500
150

Rachmat Ariyanto, SE
PIPA 1"
300 300 DIREKTUR

150 POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
200 200 200 300 300 200 200 200 150 150
LEADER Nursetyo Nugroho, ST
2100

AHLI SIPIL Wahyu Alfiadi, ST

DENAH INSTALASI AIR BERSIH


Skala 1 : 100
ASISTEN Dumila Karomah, S.Ars
KETERANGAN
DRAFTER M. Khoirul Umam
CLOSET JONGKOK (2)

FLOOR DRAIN (2) JUDUL GAMBAR SKALA


KRAN (2)

WASTAFEL SUDUT (2)

- 1:100
SINK & KRAN (8)

NO.GAMBAR JMLH.GAMBAR

- -
RABAT BETON

PIPA VENTILASI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BIOFIL KAPASITAS BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
MANHOLE 8-12 ORANG SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
RABAT BETON PIPA INLET PIPA OUTLET
TANAH URUG NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
MENUJU JUMPRIT HULU SUNGAI PROGO
RESAPAN
LOKASI
PIPA INLET
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
BIOFIL
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
TANAH ASLI PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TANAH URUG PROVINSI JAWA TENGAH

RABAT BETON
RABAT BETON TEBAL 5cm
TEBAL 5cm

PASIR URUG TEBAL 10cm


PASIR URUG Tommy Faizal Wahyono, ST
TANAH ASLI TEBAL 10cm NIP. 198802162010121003
PERENCANA
TAMPAK DEPAN BIOFIL TAMPAK SAMPING BIOFIL
Skala 1 : 25 CV. MONALISA ART
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


RABAT BETON
11

TEAM R. Andreas Sulistyo


MANHOLE
LEADER Nursetyo Nugroho, ST
PIPA INLET
BIOFIL
PIPA OUTLET AHLI SIPIL Wahyu Alfiadi, ST
100

℄ ASISTEN Dumila Karomah, S.Ars


INLET
OUTLET MENUJU RESAPAN

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


4
11

200

DETAIL BIOFIL 1:25


TAMPAK ATAS BIOFIL
Skala 1 : 25

NO.GAMBAR JMLH.GAMBAR

- -
15

15
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
TANAH URUG TANAH URUG BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
PELAT BETON BERTULANG PELAT BETON BERTULANG WILAYAH II JAWA TENGAH
75

75
TEBAL = 10 CM TEBAL = 10 CM

PAS. TRASRAM PAS. TRASRAM NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
IJUK PIPA PVC Ø4 IJUK
LOKASI
BATA KOSONG DESA TEGALREJO
KECAMATAN NGADIREJO
120

120
KABUPATEN TEMANGGUNG
315

315
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

KERIKIL KERIKIL
30

30
22

22
IJUK IJUK

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
30

30
BATU KOSONG BATU KOSONG
PERENCANA
CV. MONALISA ART
23

23
PASIR URUG PASIR URUG

7,5 20 100 20 7,5 7,5 20 100 20 7,5

155 155

POTONGAN R POTONGAN V
Rachmat Ariyanto, SE
Skala 1 : 25 Skala 1 : 25
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

R V
AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DETAIL RESAPAN 1:25

7.5 20 100 20 7.5 7.5 20 100 20 7.5

155 155
NO.GAMBAR JMLH.GAMBAR
DENAH RESAPAN TAMPAK ATAS RESAPAN
Skala 1 : 25 Skala 1 : 25 - -
1 2 1 2

300 300
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
+2.04
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
A A
NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


300
A 300 +4.59 A PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI
B B DESA TEGALREJO
KECAMATAN NGADIREJO
±0.00
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
DENAH GARDU PANDANG ELV. ±0.00 DENAH GARDU PANDANG ELV. +6.12 PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
Skala 1 : 100 Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

TAMPAK DEPAN TAMPAK BELAKANG TAMPAK SAMPING - 1:100


Skala 1 : 100 Skala 1 : 100 Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
250
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
DETAIL B
JUMPRIT HULU SUNGAI PROGO
Skala 1 : 100

350 LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
A
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
255
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
B B

204
C Tommy Faizal Wahyono, ST
NIP. 198802162010121003

C PERENCANA
300 300 CV. MONALISA ART

POTONGAN A-A POTONGAN B-B


Skala 1 : 100 Skala 1 : 100
Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


DETAIL C
Skala 1 : 100
DRAFTER M. Khoirul Umam
0.20

JUDUL GAMBAR SKALA


0.20
0.10

0.20
60 60 60 60 35

0.20
- 1:100
DETAIL A
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
1 2 1 2 1 2 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
300 300 300
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN
A A A PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
HOLLOW 4x4 PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
per-30cm as JUMPRIT HULU SUNGAI PROGO

300 300
A
300 LOKASI
BAJA KANAL C
+4.59 DESA TEGALREJO
100x50x3mm
KECAMATAN NGADIREJO
MODUL 60x60
KABUPATEN TEMANGGUNG
B S 30X40
B B
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
A : CONWOOD DECK 12" D1

DENAH PONDASI DAN SLOOF DENAH POLA LANTAI ELV. +4.59 DENAH RANGKA CONWOOD Tommy Faizal Wahyono, ST
Skala 1 : 100 Skala 1 : 100 Skala 1 : 100 NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

1 2 1 2
Rachmat Ariyanto, SE
300 300
DIREKTUR

+2.04
POSISI NAMA PARAF
TEAM R. Andreas Sulistyo
A A LEADER Nursetyo Nugroho, ST
KETERANGAN
LAMPU TEMPEL DI LANTAI ATAS MENARA

LAMPU TEMPEL + LED 9W WARM WHITE (4 BUAH) AHLI SIPIL Wahyu Alfiadi, ST
LAMPU DI TIAP ANAK TANGGA

SAKLAR GANDA 220V/6A (1 BUAH) 300 300 +4.59

STOP KONTAK CP + COVER PELINDUNG 220V/6A (1 BUAH) ASISTEN Dumila Karomah, S.Ars
LAMPU ANAK TANGGA OUTDOOR (48 BUAH)

B B DRAFTER M. Khoirul Umam

±0.00
JUDUL GAMBAR SKALA

DENAH ELEKTRIKAL ELV. ±0.00 DENAH ELEKTRIKAL ELV. +4.59 - 1:100


Skala 1 : 100 Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
Ø16 - 150
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH

75
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

Ø16 - 150
NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA

200
50
JUMPRIT HULU SUNGAI PROGO

LOKASI

Ø16 - 150 DESA TEGALREJO


KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

75
MENGETAHUI
Ø16 - 150 PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
75 50 75

200

TAMPAK ATAS FOOTPLAT DETAIL SAMBUNGAN IWF DENGAN SLOOF


Skala 1 : 50 Skala 1 : 50 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

SLOOF 30X40

TANAH URUG
DIMENSI 30 x 40
POSISI TUMPUAN LAPANGAN Rachmat Ariyanto, SE
DIREKTUR
30 30
198

POSISI NAMA PARAF


SLOOF
R. Andreas Sulistyo
SL 40 40 TEAM
Nursetyo Nugroho, ST
250

TUL. POKOK BESI Ø16 - 150


LEADER

AHLI SIPIL Wahyu Alfiadi, ST

TUL. SENGKANG BESI Ø10 - 100 TUL. ATAS 3 D16 2 D16


TUL. TENGAH 2 D16 2 D16 ASISTEN Dumila Karomah, S.Ars
TUL. BAWAH 2 D16 3 D16
SENGKANG Ø10-150 Ø10-150 DRAFTER M. Khoirul Umam
20

TUL. POKOK BESI Ø16 - 150 JUDUL GAMBAR SKALA


20

LANTAI KERJA tb. 7cm


5 7

PASIR tb. 5cm


75 50 75 - 1:25
200

POTONGAN A-A
Skala 1 : 50 NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
A KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
130 150 250 300 300 300 300
-0.17 PROVINSI JAWA TENGAH

165

250 250

Tommy Faizal Wahyono, ST


170 500 NIP. 198802162010121003
-0.27 ±0.00 ±0.00 -0.17
PERENCANA
365
B
-0.22 CV. MONALISA ART
250

165 80

80

250 150 250 300 300 300 300

1850
Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


DENAH BANGUNAN CAFE, TOILET, DAN RUANG GANTI (TIMUR)
Skala 1 : 100

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH BANGUNAN CAFE, TOILET,


1:100
DAN RUANG GANTI

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
91 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
15°
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
30

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


300 300 PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

PASIR URUG t=10cm


RABAT BETON t=5cm SLOOF 15/20
LOKASI
SPESI tb. 3cm
±0.00 ANDESIT 20X20cm

DESA TEGALREJO
-0.17 0.17

40
KECAMATAN NGADIREJO
95 TANAH URUG TANAH URUG KABUPATEN TEMANGGUNG
PAS. BATU 1pc:5pp PAS. BATU 1pc:5pp
AANSTAMPING AANSTAMPING
PASIR URUG PASIR URUG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
500 PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
POTONGAN A-A
Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

91
Rachmat Ariyanto, SE
30 DIREKTUR
+3.00

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
300 300 LEADER Nursetyo Nugroho, ST

PASIR URUG t=10cm


AHLI SIPIL Wahyu Alfiadi, ST
RABAT BETON t=5cm
SPESI tb. 3cm PASIR URUG t=10cm
GRANIT 60X60cm RABAT BETON t=5cm SLOOF 15/20
±0.00 ±0.00 ±0.00 ±0.00
SPESI tb. 3cm
-0.17 -0.22 GRANIT UNPOLISHED -0.17
-0.27
40
ASISTEN Dumila Karomah, S.Ars
95 TANAH URUG
PAS. BATU 1pc:5pp
AANSTAMPING
PASIR URUG
DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


300 300 300 300 250 150 250

1850

POTONGAN B-B
- 1:100
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
130 150 250 300 300 300 300
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
S1 15/20 S1 15/20 S1 15/20 S2 15/25 S2 15/25 S2 15/25 S2 15/25 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

/20

S1 15/20

S1 15/20
15
165

S1

S1 15/20
NAMA PEKERJAAN

S2 15/25

S2 15/25
250 250

S1 15/20

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA

S1 15/20

S1 15/20
170 500
JUMPRIT HULU SUNGAI PROGO

S1 15/20
365
S1 15/20 LOKASI

S2 15/25

S2 15/25
250
DESA TEGALREJO

S1 15/20

S1 15/20
165
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
S1 15/20 S1 15/20 S1 15/20 S2 15/25 S2 15/25 S2 15/25 S2 15/25

MENGETAHUI
250 150 250 300 300 300 300
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
DENAH PONDASI
Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
130 150 250 300 300 300 300

CV. MONALISA ART


RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20
K1 K1 K1 K2 K2 K2 K2 K2
15/15 15/15 15/15 20/20 20/20 20/20 20/20 20/20
RB 15/20

RB 15/20

165
RB 15/20

RB 15/20

RB 15/20
250 250
K1
15/15
RB 15/20
K1 K1
15/15 15/15
RB 15/20

RB 15/20

RB 15/20

RB 15/20

RB 15/20
K1 170 500
K2 K2
15/15
20/20 20/20 Rachmat Ariyanto, SE
DIREKTUR
RB 15/20

365
RB 15/20
K1 K1
RB 15/20

RB 15/20
15/15 15/15
250 POSISI NAMA PARAF
RB 15/20

RB 15/20

165
TEAM R. Andreas Sulistyo
K1
15/15
K1
15/15
K1
15/15
K2
20/20
K2
20/20
K2
20/20
K2
20/20
K2
20/20
LEADER Nursetyo Nugroho, ST
RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20 RB 15/20

AHLI SIPIL Wahyu Alfiadi, ST


250 150 250 300 300 300 300

ASISTEN Dumila Karomah, S.Ars

DENAH KOLOM DAN RINGBALK


Skala 1 : 100 DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DIMENSI 20 x 30 DIMENSI 15 x 20 DIMENSI 20 x 20 DIMENSI 15 x 15 DIMENSI 20 x 30
POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN POSISI TUMPUAN LAPANGAN

20 20 20 20
20 20
SLOOF SLOOF 15 15 KOLOM KOLOM 15 15 RINGBALK
S1
30 30
S2 20 20 K1 20 20
K2 15 15 RB
30 30 - 1:100

TUL. ATAS 3 D16 2 D16 TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 2 Ø 12 2 Ø 12 TUL. ATAS 3 D16 2 D16
TUL. TENGAH 2 D16 2 D16 TUL. TENGAH - - TUL. TENGAH - - TUL. TENGAH - - TUL. TENGAH 2 D16 2 D16
TUL. BAWAH 2 D16 3 D16 TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 Ø 12 2 Ø 12 TUL. BAWAH 2 D16 3 D16 NO.GAMBAR JMLH.GAMBAR
SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150 SENGKANG Ø10-150 Ø10-150

- -
15

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

SLOOF (S1) 20/30 NAMA PEKERJAAN


PASIR URUG t=10cm
PASIR URUG t=10cm RABAT BETON t=5cm SLOOF 15/20
RABAT BETON t=5cm SPESI tb. 3cm PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA

30
30
SPESI tb. 3cm KERAMIK 60X60cm +0.35
KERAMIK UK. 60x60cm +0.35 JUMPRIT HULU SUNGAI PROGO
4

9
LOKASI
11 10 5

11 10
DESA TEGALREJO
MTA.
KECAMATAN NGADIREJO
MTA. -0.16 KABUPATEN TEMANGGUNG
-0.16
MENGETAHUI

125
PEJABAT PEMBUAT KOMITMEN

70
BINA PENATAAN BANGUNAN
TANAH URUG PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TUL. KOLOM 4Ø12 PROVINSI JAWA TENGAH

5:1
PAS. BATU 1pc:5pp
130

BEGEL Ø8-200
200

AANSTAMPING

20
PASIR URUG

5
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
5 70 5 PERENCANA
80
Ø10-100 CV. MONALISA ART
10

DETAIL PONDASI BATU KALI


Skala 1 : 20
Ø10-100
20
10

Ø10-100
Ø10-100
50 25 38 Rachmat Ariyanto, SE
100 DIREKTUR

POTONGAN A-AFOOTPLAT POSISI NAMA PARAF


Skala 1 : 20
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

PASIR URUG t=10cm


RABAT BETON t=5cm PASIR URUG t=10cm AHLI SIPIL Wahyu Alfiadi, ST
Ø10-100 SPESI tb. 3cm RABAT BETON t=5cm
KERAMIK UK. 60x60cm +0.30 SPESI tb. 3cm
38

KERAMIK UK. 60x60cm ASISTEN Dumila Karomah, S.Ars


4
4

-0.05

4
15
10 5

10 5

Ø10-100
25

15

10 5
DRAFTER M. Khoirul Umam

25
6
100

15
25

59

6
PAS. BATU KALI
30

PAS. BATU KALI JUDUL GAMBAR SKALA


40
10

30
PASIR URUG t=10cm
Ø10-100 PASIR URUG t=10cm

40
10
38

30
10
Ø10-100
30 30 - 1:20
DETAIL TERASAN
38 25 38
Skala 1 : 20
100

TAMPAK ATAS FOOTPLAT NO.GAMBAR JMLH.GAMBAR


Skala 1 : 20
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
A BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
130 150 250 300 300 300 300
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

B NAMA PEKERJAAN
165

250 250
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
B 170
B B 500
LOKASI
365
DESA TEGALREJO
250 KECAMATAN NGADIREJO
B B 165 KABUPATEN TEMANGGUNG
80

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
A 80
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
250 150 250 300 300 300 300 PROVINSI JAWA TENGAH
1850

A : ANDESIT 30X30
DENAH POLA LANTAI
B : GRANIT TILE UNPOLISH 60x60 Skala 1 : 100
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

130 150 250 300 300 300 300


Rachmat Ariyanto, SE
DIREKTUR
RO RO
165 POSISI NAMA PARAF
250 P 250 J
TEAM R. Andreas Sulistyo
BV LEADER Nursetyo Nugroho, ST

BV
170 500
AHLI SIPIL Wahyu Alfiadi, ST
P
365

BV 250
ASISTEN Dumila Karomah, S.Ars
165 80

BV P P DRAFTER M. Khoirul Umam

BV BV BV BV BV 80 JUDUL GAMBAR SKALA

250 150 250 300 300 300 300

1850

- 1:100
DENAH KUSEN
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
KUSEN UPVC POT. A-A BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
6 70 6 WILAYAH II JAWA TENGAH

5
NAMA PEKERJAAN
6 70 6
82
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
15

97
KACA BENING
tb.5mm
KACA BENING KACA BENING LOKASI
tb.5mm tb.5mm

5
6
142
DESA TEGALREJO

15

26
KECAMATAN NGADIREJO

47
KUSEN ALUMUNIUM HITAM
KABUPATEN TEMANGGUNG

26

15
KACA CLEAR t = 3mm
MENGETAHUI

6
10
PEJABAT PEMBUAT KOMITMEN

30
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II

5
PROVINSI JAWA TENGAH
15

PINTU ALUMUNIUM HITAM


DETAIL J2 POT. B-B

262
Tommy Faizal Wahyono, ST

181
NIP. 198802162010121003
15

211

210
PERENCANA
5 69 5 69 5 69 5
HANDLE KUNCI PUTAR DARI DALAM

226
CV. MONALISA ART
POT. A-A

100
DETAIL J

20
Rachmat Ariyanto, SE
20 20 DIREKTUR

POT. C-C POSISI NAMA PARAF


5 72 5
TEAM R. Andreas Sulistyo
ROSTER DAUN DETAIL P LEADER Nursetyo Nugroho, ST

15

15
TERACOTA 15
20X20
6 70 6
AHLI SIPIL Wahyu Alfiadi, ST
5
6

POT. B-B
15

26
47

ASISTEN Dumila Karomah, S.Ars


KUSEN ALUMUNIUM HITAM
160

26

15

KACA CLEAR t = 3mm


DRAFTER M. Khoirul Umam
6
5

6 70 6
POT. B-B
JUDUL GAMBAR SKALA

DETAIL BV
6 70 6
82

DETAIL KUSEN 1:25


POT. A-A
DETAIL RO
DETAIL KUSEN
Skala 1 : 25
NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
C1 C1 C1 C1 C1 C1 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
C2 DK

DK
NAMA PEKERJAAN
C1 C2
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
C2 DK JUMPRIT HULU SUNGAI PROGO
DK C2

DK
LOKASI
C1
DK
DESA TEGALREJO
C2 DK KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
DK
DK
MENGETAHUI

C1 C1 C1 C1 C1 C1
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
KETERANGAN :

C1 : CAT EKSTERIOR WEATHERSHIELD


C2 : CAT INTERIOR DENAH WALLPLAN
DK : KERAMIK 30x60
Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


KETERANGAN
DOWNLIGHT 4" + LED 8W WHITE (11 BUAH) DENAH ELEKTRIKAL
SAKLAR TUNGGAL 220V/6A (2 BUAH) Skala 1 : 100

SAKLAR GANDA 220V/6A (5 BUAH)

STOP KONTAK 220V/6A (5 BUAH)


DENAHWALLPLAN DAN ELEKTRIKAL 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
Plafond ACP
JUMPRIT HULU SUNGAI PROGO

LOKASI
Besi Hollow 4x4
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

DENAH PLAFOND
Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Reng Baja Ringan RT-35 t=0,4mm Kuda Kuda Baja Ringan Atap Alderon

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH RENCANA ATAP


DENAH PLAFOND
Skala 1 : 100 1:100
DAN RENCANA ATAP

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

DETAIL 1 PLAFOND
Skala 1 : 25 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
DENAH PARSIAL PLAFOND
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


POTONGAN A-A PLAFOND
Skala 1 : 25 DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DETAIL ELEKTRIKAL
Skala NTS

DETAIL PLAFOND 1:25

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI
PIPA 2"

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
PIPA 2"
MENGETAHUI

PIPA 4" PEJABAT PEMBUAT KOMITMEN


BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
KETERANGAN INLET OUTLET RESAPAN

BIOFIL DENAH INSTALASI AIR KOTOR


CLOSET DUDUK (2)
Skala 1 : 100

CLOSET JONGKOK (1)


Tommy Faizal Wahyono, ST
FLOOR DRAIN (3) NIP. 198802162010121003

KRAN (3) PERENCANA

SINK (1)
CV. MONALISA ART

WASTAFEL (4)

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


PIPA 1"

DRAFTER M. Khoirul Umam

PIPA 1"
JUDUL GAMBAR SKALA

PIPA 1"

DENAH INSTALASI AIR KOTOR DAN


1:100
SUMBER
BERSIH
AIR DENAH INSTALASI AIR BERSIH
JUMPRIT
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
RABAT BETON

PIPA VENTILASI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BIOFIL KAPASITAS BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
MANHOLE 8-12 ORANG SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
RABAT BETON PIPA INLET PIPA OUTLET
TANAH URUG NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
MENUJU JUMPRIT HULU SUNGAI PROGO
RESAPAN
LOKASI
PIPA INLET
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
BIOFIL
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
TANAH ASLI PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TANAH URUG PROVINSI JAWA TENGAH

RABAT BETON
RABAT BETON TEBAL 5cm
TEBAL 5cm

PASIR URUG TEBAL 10cm


PASIR URUG Tommy Faizal Wahyono, ST
TANAH ASLI TEBAL 10cm NIP. 198802162010121003
PERENCANA
TAMPAK DEPAN BIOFIL TAMPAK SAMPING BIOFIL
Skala 1 : 25 CV. MONALISA ART
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


RABAT BETON
11

TEAM R. Andreas Sulistyo


MANHOLE
LEADER Nursetyo Nugroho, ST
PIPA INLET
BIOFIL
PIPA OUTLET AHLI SIPIL Wahyu Alfiadi, ST
100

℄ ASISTEN Dumila Karomah, S.Ars


INLET
OUTLET MENUJU RESAPAN

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


4
11

200

DETAIL BIOFIL 1:25


TAMPAK ATAS BIOFIL
Skala 1 : 25

NO.GAMBAR JMLH.GAMBAR

- -
15

15
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
TANAH URUG TANAH URUG BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
PELAT BETON BERTULANG PELAT BETON BERTULANG WILAYAH II JAWA TENGAH
75

75
TEBAL = 10 CM TEBAL = 10 CM

PAS. TRASRAM PAS. TRASRAM NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
IJUK PIPA PVC Ø4 IJUK
LOKASI
BATA KOSONG DESA TEGALREJO
KECAMATAN NGADIREJO
120

120
KABUPATEN TEMANGGUNG
315

315
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

KERIKIL KERIKIL
30

30
22

22
IJUK IJUK

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
30

30
BATU KOSONG BATU KOSONG
PERENCANA
CV. MONALISA ART
23

23
PASIR URUG PASIR URUG

7,5 20 100 20 7,5 7,5 20 100 20 7,5

155 155

POTONGAN R POTONGAN V
Rachmat Ariyanto, SE
Skala 1 : 25 Skala 1 : 25
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

R V
AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DETAIL RESAPAN 1:25

7.5 20 100 20 7.5 7.5 20 100 20 7.5

155 155
NO.GAMBAR JMLH.GAMBAR
DENAH RESAPAN TAMPAK ATAS RESAPAN
Skala 1 : 25 Skala 1 : 25 - -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
500
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
80

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


80
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
300 300

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
300 300
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

300 300

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
1850
CV. MONALISA ART

300 300

250 250 Rachmat Ariyanto, SE


DIREKTUR
250 250
POSISI NAMA PARAF
165 170 165 TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

150 150 AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


130
250

250 DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH BANGUNAN CAFE, TOILET, DAN RUANG GANTI (UTARA)


365 Skala 1 : 100 DENAH BANGUNAN CAFE, TOILET,
1:100
DAN RUANG GANTI

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
91 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
15°
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
30

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


300 300 PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

PASIR URUG t=10cm


RABAT BETON t=5cm SLOOF 15/20
LOKASI
SPESI tb. 3cm
+0.55 GRANIT TILE 60X60

DESA TEGALREJO
+0.60 +0.60

40
KECAMATAN NGADIREJO
95 TANAH URUG TANAH URUG KABUPATEN TEMANGGUNG
PAS. BATU 1pc:5pp PAS. BATU 1pc:5pp
AANSTAMPING AANSTAMPING
PASIR URUG PASIR URUG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
500 PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
POTONGAN A-A
Skala 1 : 100

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

91
Rachmat Ariyanto, SE
30 DIREKTUR
+3.00

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
300 300 LEADER Nursetyo Nugroho, ST

PASIR URUG t=10cm


AHLI SIPIL Wahyu Alfiadi, ST
RABAT BETON t=5cm
SPESI tb. 3cm PASIR URUG t=10cm
GRANIT TILE 60X60 RABAT BETON t=5cm SLOOF 15/20
±0.00 ±0.00 ±0.00 ±0.00
SPESI tb. 3cm
-0.17 -0.22 GRANIT UNPOLISHED -0.17
-0.27
40
ASISTEN Dumila Karomah, S.Ars
95 TANAH URUG
PAS. BATU 1pc:5pp
AANSTAMPING
PASIR URUG
DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


300 300 300 300 250 150 250

1850

POTONGAN B-B
- 1:100
Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
DIMENSI 20 x 30 BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
POSISI TUMPUAN LAPANGAN SATUAN KERJA BALAI PRASARANA PERMUKIMAN
500 500
WILAYAH II JAWA TENGAH
20 20
SLOOF
30
NAMA PEKERJAAN
S2 15/25 S2 15/25
30
RB 15/20 RB 15/20

S1

20/20

20/20

20/20
K2

K2

K2
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
TUL. ATAS 3 D16 2 D16 PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
S2 15/25

S2 15/25
300 300 300 300 TUL. TENGAH 2 D16 2 D16

RB 15/20

RB 15/20
TUL. BAWAH 2 D16 3 D16
SENGKANG Ø10-150 Ø10-150 LOKASI

DESA TEGALREJO

20/20

20/20
K2

K2
15 x 20 KECAMATAN NGADIREJO
RB 15/20
DIMENSI
POSISI TUMPUAN LAPANGAN KABUPATEN TEMANGGUNG

SLOOF 15 15 MENGETAHUI
S2
S2 15/25

S2 15/25
300 300 300 300 20 20

RB 15/20

RB 15/20
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
TUL. ATAS 2 Ø 12 2 Ø 12
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

20/20

20/20
K2

K2
TUL. TENGAH - -
RB 15/20
TUL. BAWAH 2 Ø 12 2 Ø 12
SENGKANG Ø10-150 Ø10-150

20 x 20
S2 15/25

S2 15/25

DIMENSI
300 300 300 300

RB 15/20

RB 15/20
POSISI TUMPUAN LAPANGAN
Tommy Faizal Wahyono, ST
20 20 NIP. 198802162010121003
KOLOM

20/20

20/20
K1 20 20
PERENCANA

K2

K2
RB 15/20

CV. MONALISA ART


TUL. ATAS 2 Ø 12 2 Ø 12
TUL. TENGAH - -
S2 15/25

S2 15/25

300 300 300 300 TUL. BAWAH 2 Ø 12 2 Ø 12

RB 15/20
RB 15/20
SENGKANG Ø10-150 Ø10-150

250 250 250 250

20/20

20/20

20/20
DIMENSI 15 x 15

K2

K2

K2
S2 15/25 S2 15/25 RB 15/20 RB 15/20
POSISI TUMPUAN LAPANGAN

Rachmat Ariyanto, SE
KOLOM 15 15 DIREKTUR
K2
S1 15/20

S1 15/20

15 15
RB 15/20

RB 15/20
250 250 250 250
POSISI NAMA PARAF
165 170 165 165 170 165
TUL. ATAS 2 Ø 12 2 Ø 12 TEAM R. Andreas Sulistyo
15/15

15/15

15/15

15/15
K1

K1

K1

K1
S1 15/20 S1 15/20 S1 15/20 RB 15/20 RB 15/20 RB 15/20
TUL. TENGAH - - LEADER Nursetyo Nugroho, ST
TUL. BAWAH 2 Ø 12 2 Ø 12
S1 15/20

S1 15/20

S1 15/20

S1 15/20

SENGKANG Ø10-150 Ø10-150


RB 15/20

RB 15/20

RB 15/20

RB 15/20
150 150 150 150
AHLI SIPIL Wahyu Alfiadi, ST
15/15

15/15

15/15

15/15
K1

K1

K1

K1
S1 15/20 S1 15/20 S1 15/20 RB 15/20 RB 15/20 RB 15/20
DIMENSI 20 x 30
POSISI TUMPUAN LAPANGAN ASISTEN Dumila Karomah, S.Ars
S1 15/20

250 130 250 130


20 20
15/15

15/15
K1

K1

RINGBALK
RB 15/20
S1 15/20

250 250
DRAFTER M. Khoirul Umam
S1 15/20 RB 15/20
30 30
RB
S1
15
/20

JUDUL GAMBAR SKALA


15/15

15/15
K1

K1

TUL. ATAS 3 D16 2 D16


S1 15/20 RB 15/20

TUL. TENGAH 2 D16 2 D16


TUL. BAWAH 2 D16 3 D16
365 365
SENGKANG Ø10-150 Ø10-150

DENAH PONDASI DENAH KOLOM DAN RINGBALK - 1:100


Skala 1 : 100 Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
15

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

SLOOF (S1) 20/30 NAMA PEKERJAAN


PASIR URUG t=10cm
PASIR URUG t=10cm RABAT BETON t=5cm SLOOF 15/20
RABAT BETON t=5cm SPESI tb. 3cm PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA

30
30
SPESI tb. 3cm KERAMIK 60X60cm +0.35
KERAMIK UK. 60x60cm +0.35 JUMPRIT HULU SUNGAI PROGO
4

9
LOKASI
11 10 5

11 10
DESA TEGALREJO
MTA.
KECAMATAN NGADIREJO
MTA. -0.16 KABUPATEN TEMANGGUNG
-0.16
MENGETAHUI

125
PEJABAT PEMBUAT KOMITMEN

70
BINA PENATAAN BANGUNAN
TANAH URUG PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TUL. KOLOM 4Ø12 PROVINSI JAWA TENGAH

5:1
PAS. BATU 1pc:5pp
130

BEGEL Ø8-200
200

AANSTAMPING

20
PASIR URUG

5
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
5 70 5 PERENCANA
80
Ø10-100 CV. MONALISA ART
10

DETAIL PONDASI BATU KALI


Skala 1 : 20
Ø10-100
20
10

Ø10-100
Ø10-100
50 25 38 Rachmat Ariyanto, SE
100 DIREKTUR

POTONGAN A-AFOOTPLAT POSISI NAMA PARAF


Skala 1 : 20
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

PASIR URUG t=10cm


RABAT BETON t=5cm PASIR URUG t=10cm AHLI SIPIL Wahyu Alfiadi, ST
Ø10-100 SPESI tb. 3cm RABAT BETON t=5cm
KERAMIK UK. 60x60cm +0.30 SPESI tb. 3cm
38

KERAMIK UK. 60x60cm ASISTEN Dumila Karomah, S.Ars


4
4

-0.05

4
15
10 5

10 5

Ø10-100
25

15

10 5
DRAFTER M. Khoirul Umam

25
6
100

15
25

59

6
PAS. BATU KALI
30

PAS. BATU KALI JUDUL GAMBAR SKALA


40
10

30
PASIR URUG t=10cm
Ø10-100 PASIR URUG t=10cm

40
10
38

30
10
Ø10-100
30 30 - 1:20
DETAIL TERASAN
38 25 38
Skala 1 : 20
100

TAMPAK ATAS FOOTPLAT NO.GAMBAR JMLH.GAMBAR


Skala 1 : 20
- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

B
Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

A
P

Rachmat Ariyanto, SE
DIREKTUR
BV

POSISI NAMA PARAF


RO

B
BV

TEAM R. Andreas Sulistyo


LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


BV

B
ASISTEN Dumila Karomah, S.Ars
P

RO
BV

DRAFTER M. Khoirul Umam


A : ANDESIT 30X30
B
BV

B : GRANIT TILE UNPOLISH 60x60 JUDUL GAMBAR SKALA


BV

BV

BV

BV

- 1:100

DENAH KUSEN DENAH POLA LANTAI


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 100 Skala 1 : 100

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
KUSEN UPVC POT. A-A BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
6 70 6 WILAYAH II JAWA TENGAH

5
NAMA PEKERJAAN
6 70 6
82
PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
15

97
KACA BENING
tb.5mm
KACA BENING KACA BENING LOKASI
tb.5mm tb.5mm

5
6
142
DESA TEGALREJO

15

26
KECAMATAN NGADIREJO

47
KUSEN ALUMUNIUM HITAM
KABUPATEN TEMANGGUNG

26

15
KACA CLEAR t = 3mm
MENGETAHUI

6
10
PEJABAT PEMBUAT KOMITMEN

30
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II

5
PROVINSI JAWA TENGAH
15

PINTU ALUMUNIUM HITAM


DETAIL J2 POT. B-B

262
Tommy Faizal Wahyono, ST

181
NIP. 198802162010121003
15

211

210
PERENCANA
5 69 5 69 5 69 5
HANDLE KUNCI PUTAR DARI DALAM

226
CV. MONALISA ART
POT. A-A

100
DETAIL J

20
Rachmat Ariyanto, SE
20 20 DIREKTUR

POT. C-C POSISI NAMA PARAF


5 72 5
TEAM R. Andreas Sulistyo
ROSTER DAUN DETAIL P LEADER Nursetyo Nugroho, ST

15

15
TERACOTA 15
20X20
6 70 6
AHLI SIPIL Wahyu Alfiadi, ST
5
6

POT. B-B
15

26
47

ASISTEN Dumila Karomah, S.Ars


KUSEN ALUMUNIUM HITAM
160

26

15

KACA CLEAR t = 3mm


DRAFTER M. Khoirul Umam
6
5

6 70 6
POT. B-B
JUDUL GAMBAR SKALA

DETAIL BV
6 70 6
82

DETAIL KUSEN 1:25


POT. A-A
DETAIL RO
DETAIL KUSEN
Skala 1 : 25
NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN

C1

C1
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

C1

C1
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN

C1
C1
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST

C1

C1
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

DK
DK
Rachmat Ariyanto, SE
DIREKTUR

C2
POSISI NAMA PARAF

C1

C1
R. Andreas Sulistyo

DK

DK

DK
TEAM
KETERANGAN LEADER Nursetyo Nugroho, ST

DK

DK

DK
DOWNLIGHT 4" + LED 8W WHITE (11 BUAH)

C1

C1
SAKLAR TUNGGAL 220V/6A (2 BUAH) AHLI SIPIL Wahyu Alfiadi, ST
KETERANGAN :

C2

C2

C2
C2
SAKLAR GANDA 220V/6A (5 BUAH) C1 : CAT EKSTERIOR WEATHERSHIELD
C2 : CAT INTERIOR
STOP KONTAK 220V/6A (5 BUAH) DK : KERAMIK 30x60
ASISTEN Dumila Karomah, S.Ars
DK

C1
DRAFTER M. Khoirul Umam
C1
JUDUL GAMBAR SKALA

DENAHWALLPLAN DAN ELEKTRIKAL 1:100


DENAH ELEKTRIKAL DENAH WALLPLAN
Skala 1 : 100 Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
Besi Hollow 4x4

Reng Baja Ringan RT-35 t=0,4mm


LOKASI

DESA TEGALREJO
Plafond ACP KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
Kuda Kuda Baja Ringan

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


Atap Alderon

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH PLAFOND
1:100
DAN RENCANA ATAP

DENAH RENCANA ATAP DENAH PLAFOND


Skala 1 : 100 Skala 1 : 100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

DETAIL 1 PLAFOND
Skala 1 : 25 Tommy Faizal Wahyono, ST
NIP. 198802162010121003
PERENCANA
CV. MONALISA ART
DENAH PARSIAL PLAFOND
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


POTONGAN A-A PLAFOND
Skala 1 : 25 DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


DETAIL ELEKTRIKAL
Skala NTS

DETAIL PLAFOND 1:25

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA

RESAPAN
CV. MONALISA ART

OUTLET
BIOFIL
Rachmat Ariyanto, SE
KETERANGAN DIREKTUR
PIPA 1"

PIPA 2"
CLOSET DUDUK (2) POSISI NAMA PARAF
INLET

PIPA 4" TEAM R. Andreas Sulistyo


CLOSET JONGKOK (1) LEADER Nursetyo Nugroho, ST
PIPA 1"

FLOOR DRAIN (3)


AHLI SIPIL Wahyu Alfiadi, ST
KRAN (3)

SINK (1)
ASISTEN Dumila Karomah, S.Ars
PIPA 1"

PIPA 2"

WASTAFEL (4)

DRAFTER M. Khoirul Umam


JUMPRIT
SUMBER
AIR

JUDUL GAMBAR SKALA

DENAH INSTALASI AIR KOTOR DAN


1:100
BERSIH

DENAH INSTALASI AIR BERSIH DENAH INSTALASI AIR KOTOR


Skala 1 : 100
Skala 1 : 100 NO.GAMBAR JMLH.GAMBAR

- -
RABAT BETON

PIPA VENTILASI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BIOFIL KAPASITAS BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
MANHOLE 8-12 ORANG SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
RABAT BETON PIPA INLET PIPA OUTLET
TANAH URUG NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
MENUJU JUMPRIT HULU SUNGAI PROGO
RESAPAN
LOKASI
PIPA INLET
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
BIOFIL
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
TANAH ASLI PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
TANAH URUG PROVINSI JAWA TENGAH

RABAT BETON
RABAT BETON TEBAL 5cm
TEBAL 5cm

PASIR URUG TEBAL 10cm


PASIR URUG Tommy Faizal Wahyono, ST
TANAH ASLI TEBAL 10cm NIP. 198802162010121003
PERENCANA
TAMPAK DEPAN BIOFIL TAMPAK SAMPING BIOFIL
Skala 1 : 25 CV. MONALISA ART
Skala 1 : 25

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


RABAT BETON
11

TEAM R. Andreas Sulistyo


MANHOLE
LEADER Nursetyo Nugroho, ST
PIPA INLET
BIOFIL
PIPA OUTLET AHLI SIPIL Wahyu Alfiadi, ST
100

℄ ASISTEN Dumila Karomah, S.Ars


INLET
OUTLET MENUJU RESAPAN

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


4
11

200

DETAIL BIOFIL 1:25


TAMPAK ATAS BIOFIL
Skala 1 : 25

NO.GAMBAR JMLH.GAMBAR

- -
15

15
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
TANAH URUG TANAH URUG BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
PELAT BETON BERTULANG PELAT BETON BERTULANG WILAYAH II JAWA TENGAH
75

75
TEBAL = 10 CM TEBAL = 10 CM

PAS. TRASRAM PAS. TRASRAM NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
IJUK PIPA PVC Ø4 IJUK
LOKASI
BATA KOSONG DESA TEGALREJO
KECAMATAN NGADIREJO
120

120
KABUPATEN TEMANGGUNG
315

315
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

KERIKIL KERIKIL
30

30
22

22
IJUK IJUK

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
30

30
BATU KOSONG BATU KOSONG
PERENCANA
CV. MONALISA ART
23

23
PASIR URUG PASIR URUG

7,5 20 100 20 7,5 7,5 20 100 20 7,5

155 155

POTONGAN R POTONGAN V
Rachmat Ariyanto, SE
Skala 1 : 25 Skala 1 : 25
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

R V
AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DETAIL RESAPAN 1:25

7.5 20 100 20 7.5 7.5 20 100 20 7.5

155 155
NO.GAMBAR JMLH.GAMBAR
DENAH RESAPAN TAMPAK ATAS RESAPAN
Skala 1 : 25 Skala 1 : 25 - -
B KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
1685 WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
-1.45

-0.50 -0.45 PEJABAT PEMBUAT KOMITMEN


800 BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
135 135 PROVINSI JAWA TENGAH
-0.35

-0.20

-0.05
±0.00 ±0.00
40 40
-0.10 -0.10
±0.00
Tommy Faizal Wahyono, ST
±0.00 ±0.00 NIP. 198802162010121003
40 40 PERENCANA
CV. MONALISA ART

953,3
A

100 40 800 45 800 40 100

-0.60 -0.60

C
40 Rachmat Ariyanto, SE
508,2
40
DIREKTUR

POSISI NAMA PARAF


327,1

103,4 -0.60 -0.30 TEAM R. Andreas Sulistyo


-0.45 -0.15
1870,6 1870,6 LEADER Nursetyo Nugroho, ST
±0.00

AHLI SIPIL Wahyu Alfiadi, ST

175,2

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH KOLAM AIR


Skala 1 : 100
- 1:100

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
40 100 WILAYAH II JAWA TENGAH

60 NAMA PEKERJAAN
-0.60

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
222,5 400 400 400 222,5
LOKASI
1645 DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
POTONGAN A-A
Skala 1 : 75 MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
±0.00 40
PERENCANA
60 40 100
-0.60 CV. MONALISA ART
145
100
-1.45

414,2 40 400 400


Rachmat Ariyanto, SE
DIREKTUR
POTONGAN B-B
Skala 1 : 75 POSISI NAMA PARAF
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars


DIMENSI 20 x 20
POSISI TUMPUAN LAPANGAN
DRAFTER M. Khoirul Umam
40 100 20 20
30 PENULANGAN
30 BETON 20 20 JUDUL GAMBAR SKALA
30
-0.15
±0.00
-0.05 KOLAM
-0.30
15
60 -0.45
15
-0.60 15
15
TUL. ATAS 2 Ø 12 2 Ø 12
TUL. TENGAH - - - 1:75
TUL. BAWAH 2 Ø 12 2 Ø 12
POTONGAN C-C
SENGKANG Ø10-150 Ø10-150
Skala 1 : 75

NO.GAMBAR JMLH.GAMBAR

- -
BAK
KONTROL
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
BAK SUNGAI
KONTROL
NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

am
ak
M
LOKASI

ae
Ar
SUMUR
RESAPAN
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

SUMUR MENGETAHUI
RESAPAN
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


SUMUR
NIP. 198802162010121003
RESAPAN
PERENCANA
CV. MONALISA ART

PIPA PVC
4"

PIPA PVC Rachmat Ariyanto, SE


4" DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


it
pr
m
lJu
bu
Um

SUMBER
MATA AIR ASISTEN Dumila Karomah, S.Ars
JUMPRIT

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH DRAINASE JALAN UTAMA 1:800

DENAH JARINGAN AIR BERSIH


NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
Beton fc 20 +Wiremesh 1 layer Ø10 tb.10cm

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
menuju sungai Pipa 4" SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

A NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


100 80 PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO
100
35 LOKASI
35
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

80 MENGETAHUI
DENAH BAK KONTROL
PEJABAT PEMBUAT KOMITMEN
Skala 1 : 20
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
Pipa 4" CV. MONALISA ART

menuju sungai
30
50

Rachmat Ariyanto, SE
DIREKTUR

Beton fc 19,3 Mpa +Wiremesh 1 layer Ø10 tb.10cm POSISI NAMA PARAF
TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

Rabat Beton fc 10 tb 5cm AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA


Pasir tb 5cm

10 80 10
POTONGAN A-A DETAIL BAK KONTROL 1:20

Skala 1 : 20

NO.GAMBAR JMLH.GAMBAR

- -
TALUD 1m TALUD 2m KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
TALUD 2m DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
TALUD 2m SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH
TALUD 3m
NAMA PEKERJAAN

TALUD 1m PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


TALUD 2m PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

am
ak
M
TALUD 1m LOKASI

ae
TALUD 2m

Ar
DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG
TALUD 1m
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

TALUD 2m
TALUD 1m

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
TALUD 3m
(BBWS) CV. MONALISA ART

TALUD
TAHAP 1
TALUD 4m
(BBWS)

TALUD 5m Rachmat Ariyanto, SE


(BBWS) DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


it
pr
m
lJu
bu
Um

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DENAH TALUD 1:800

DENAH TALUD
NO.GAMBAR JMLH.GAMBAR
Skala 1 : 800

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
30 KABUPATEN TEMANGGUNG
+2.00
Plesteran & Acian
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
30
Tanah urug PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
+1.00
Plesteran & Acian PROVINSI JAWA TENGAH
Ijuk

Tanah urug
Ijuk
Finishing Siar
100

200
Tommy Faizal Wahyono, ST
125

Pipa PVC 3inch


NIP. 198802162010121003
Pas. Batu Belah

245
Pas. Batu Belah
PERENCANA
13 60 13
Finishing Siar
±0.00 CV. MONALISA ART
25

Pipa PVC 3inch


Urugan Pasir tb.5cm -0.50
-0.55
22 22
85
±0.00

Rachmat Ariyanto, SE

45
DIREKTUR
POTONGAN TALUD 1m -0.45
Urugan Pasir tb.5cm POSISI NAMA PARAF
Skala 1 : 25 -0.50
125 TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

POTONGAN TALUD 2m ASISTEN Dumila Karomah, S.Ars


Skala 1 : 25

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

POTONGAN TALUD 1 DAN 2M 1:25

NO.GAMBAR JMLH.GAMBAR

- -
RB 15X15 S 15X20 K 15X15
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
50 50 50 50 50 50 15 15 15
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
100 100 100 SATUAN KERJA BALAI PRASARANA PERMUKIMAN

15

15
20
WILAYAH II JAWA TENGAH

100
TOP 2Ø10 TOP 2Ø10 TOP 2Ø10
MID
BOTTOM
-
2Ø10
MID
BOTTOM
-
2Ø10
MID
BOTTOM
-
2Ø10
NAMA PEKERJAAN

60
BEGEL Ø 8-150 BEGEL Ø 8-150 BEGEL Ø 8-200

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)

30
PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI
TAMPAK ATAS TALUD
DESA TEGALREJO
Skala 1 : 30
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

30 30
Plesteran & Acian +3.00 Plesteran & Acian +3.00

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
100

100
PERENCANA
Tanah urug CV. MONALISA ART
50 50

Ring Balk 15x15 +2.00 +2.00


60 60

Kolom per-3m Tanah urug


Ijuk

Rachmat Ariyanto, SE
DIREKTUR
367

367
200

200
POSISI NAMA PARAF
Pas. Batu Belah Pas. Batu Belah TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST
Finishing Siar Finishing Siar

Pipa PVC 3inch AHLI SIPIL Wahyu Alfiadi, ST

34 34 34 34 ASISTEN Dumila Karomah, S.Ars


±0.00 ±0.00
Sloof 15/20
DRAFTER M. Khoirul Umam
-0.30 -0.30
67

67
JUDUL GAMBAR SKALA

Urugan Pasir tb.5cm -1.00 Urugan Pasir tb.5cm -1.00


-1.05 -1.05
167 167

POTONGAN TALUD 3M 1:30

POTONGAN TALUD 3m POTONGAN TALUD 3m


Skala 1 : 30 Skala 1 : 30
NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

200

DETAIL TYPIKAL RAILING KAWASAN Tommy Faizal Wahyono, ST


NIP. 198802162010121003
375

Skala 1 : 20
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

DETAIL LAMPU KAWASAN TONG SAMPAH PILAH ISI 3 FIBERGLASS 600x600


DETAIL BAK KONTROL 1:20
Skala 1 : 20 Skala 1 : 20

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

JUDUL GAMBAR SKALA

SITEPLAN ZONA INTI JUMPRIT - 1:300


Skala 1 : 300

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH
A

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

KETERANGAN JUDUL GAMBAR SKALA


AREA PEKERJAAN BATU ANDESIT 30x30 tb. 2cm

SITEPLAN DELINEASI PEKERJAAN LANTAI ZONA INTI JUMPRIT - 1:300


Skala 1 : 300

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

DESA TEGALREJO
KECAMATAN NGADIREJO
KABUPATEN TEMANGGUNG

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

Tommy Faizal Wahyono, ST


NIP. 198802162010121003
PERENCANA
CV. MONALISA ART

Rachmat Ariyanto, SE
DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

KETERANGAN JUDUL GAMBAR SKALA


AREA PEKERJAAN RAILING

SITEPLAN DELINEASI PEKERJAAN RAILING ZONA INTI JUMPRIT - 1:300


Skala 1 : 300

NO.GAMBAR JMLH.GAMBAR

- -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL CIPTA KARYA
BALAI PRASARANA PERMUKIMAN WILAYAH JAWA TENGAH
SATUAN KERJA BALAI PRASARANA PERMUKIMAN
WILAYAH II JAWA TENGAH

NAMA PEKERJAAN

PENYUSUNAN DETAIL ENGINEERING DESIGN (DED)


PENATAAN KAWASAN RITUAL AIR SUCI UMAT BUDHA
JUMPRIT HULU SUNGAI PROGO

LOKASI

PERKERASAN EKSISTING DESA TEGALREJO


KECAMATAN NGADIREJO
SPESI tb. 3cm
KABUPATEN TEMANGGUNG
ANDESIT 30X30 tb. 2cm
MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
BINA PENATAAN BANGUNAN
PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II
PROVINSI JAWA TENGAH

200
POTONGAN A-A
Skala 1 : 20
DETAIL TYPIKAL RAILING KAWASAN Tommy Faizal Wahyono, ST
NIP. 198802162010121003
Skala 1 : 20
PERENCANA
CV. MONALISA ART

PERKERASAN EKSISTING
SPESI tb. 3cm Rachmat Ariyanto, SE
ANDESIT 30X30 tb. 2cm DIREKTUR

POSISI NAMA PARAF


TEAM R. Andreas Sulistyo
LEADER Nursetyo Nugroho, ST

AHLI SIPIL Wahyu Alfiadi, ST


PERKERASAN EKSISTING

ASISTEN Dumila Karomah, S.Ars

DRAFTER M. Khoirul Umam

POTONGAN B-B JUDUL GAMBAR SKALA

Skala 1 : 20

DETAIL PEKERJAAN ZONA INTI 1:20

NO.GAMBAR JMLH.GAMBAR

- -

Anda mungkin juga menyukai